Electrical services 1234567- Electrical conduits all should be properly installed without lose Electrical junction boxes closed properly Ceiling rose fixed and not lose All wires connected properly No rolls wire (all rolls should not be tied for easy reach after ceiling closing) All systems to be checked (fire alarm , emergency light , sound system,,,etc) Home smart system specialist should check the ceiling before final approval Drainage and water system services 12345- All pipe should be joined properly No damages in the pipe insulation All labels and serviced indication should be fixed properly CDP for the AC machine should be connected with proper insulation Valves and connections should be near the access door for maintenance HVAC services 123456- Checking the duct connection with all the accessories (VCD, Plenum boxes ,,,etc) No damages in the duct insulation All labels and serviced indication should be fixed properly Flexible duct length should be not more 1 meter and without bend All the vcd’s should be opened FCU box connection and thermostat box should be connected and near access doors General comments 1- All the services wall penetration should be properly sealed 2- Return air opening should be properly civil finishing 3- All access door location should be correct and serve the MEP services mantainace areas