PROCESS MOTOR EB SAMPLE MOTOR KANGPING VN: 742127012 DEPARTMENT: NPI Date: Feb.16th.2021 Prepare: Felix GENERAL CONTENT OVERALL INFORMATION 1 2 5 5/25/2023 PRODUCT DRAWING 3 PRODUCT OVERVIEW 4 PROCESS OVERVIEW IMPROVEMENT POINT NPI @ Techtronic Industries Vietnam 2 1. OVERALL INFORMATION SUPPLIER’S INFORMATION SUPPLIER NAME: KANGPING VN ADRESS: 28 Dan Chu Street, VSIP 2 Industrial Park, Hoa Phu Ward, TDM, Binh Duong COUNTRY: Vietnam SUPPLIER PERSONEL PARTICIPATING Ms. Fiona Mr. Henry Felix-NPI Michael-NPI BEN-SQE Email: fiona@chinahighspeed.net Email: mc-sale@vnkangping.com VISITORS PERSONEL Email: Synam.ho@ttigroup.com.vn Email: Huutan.Nguyen03@ttigroup.com.vn Email: Ben.Zhong@ttigroup.com.vn MOTOR INFORMATION EB Sample Motor 292349001 (Lot Mar.09th 2022) © Techtronic Industries Co. Ltd. All rights reserved. 3 2. PRODUCT DRAWING 292349001 Motor Drawing 5/25/2023 NPI @ Techtronic Industries Vietnam 4 3. PRODUCT OVERVIEW Stator 5/25/2023 Rotor NPI @ Techtronic Industries Vietnam Motor 5 4. PROCESS OVERVIEW Insert commutator Rotor integration testing Welding A02 A01 A03 A04 A05 Fixative wire Winding Insert magnet Rotor balancing Add glue to rotor slot A06 A07 A08 A09 Turning commutator Add varnish Ball bearing press A10 A11 Insert washer A12 Visual check Ball bearing press R01 R02 R04 R03 Add glue magnet Insert rotor to stator magnetic flux loading M02 M01 M03 Dimension check M04 Caulking motor M05 Test with load Running motor Flux ring press Insert base cover M06 Insulation test M07 M08 No load test NOTE: A: Rotor process R: Stator Process M: Motor assembly Process 5/25/2023 NPI @ Techtronic Industries Vietnam M09 Motor engraving M10 Low voltage test M11 M12 Visual check 6 A01- Insert commutator A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer Process Product A04 Fixative wire A05 Rotor integration testing A06 Add varnish A07 Add glue to rotor slot Check result A11 Ball bearing press A12 Visual check Station’s requirement: The commutator angle 18.5° ~19.5° Actual: 19.394/19.191 -> OK Pull out force of commutator 40Kgf Min Actual: 215/270-> OK Run_out of shaft Twist torque of commutator 1N.m Min Actual: 3.09/2.28-> OK The commutator inserting dimension 64.9~65.1 Actual: 65.03/65.02 -> OK © Techtronic Industries Co. Ltd. All rights reserved. Pull out force Twist torque 7 A02- Winding A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire A05 Rotor integration testing A06 Add varnish A07 Winding rotor Winding setup Rotor winding sample Ball bearing press A12 Visual check Station’s requirement: The winding spec Ø0.4*31T Actual: Ø0.4*31T -> OK Tensile winding force 7~13 N Actual: 8.0/8.0-> OK Resistance of rotor 0.1473~0.173Ω Actual: 0.1645/0.1576-> OK Tensile force Resistance rotor Add glue to rotor slot © Techtronic Industries Co. Ltd. All rights reserved. 8 A02- Winding A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire Ball bearing press Spray test A05 Rotor integration testing A06 Add varnish Result test Check deformed winding A12 Visual check Station’s requirement: The test spec at 24VDC, 60S, 10mA Max Actual: OK The deformed of wire 5% Max Actual: 1.2/1.3-> OK A07 Add glue to rotor slot © Techtronic Industries Co. Ltd. All rights reserved. 9 A03- Welding A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire A05 Rotor integration testing Ball bearing press Welding rotor Rotor welding sample Welding setup A12 Visual check A06 Add varnish A07 Add glue to rotor slot Station’s requirement: Resistance of rotor 0.1473~0.173Ω Actual: 0.1587/0.1608-> OK The dimension stick welding 0.35~0.4mm Actual: 0.38-> OK Resistance check © Techtronic Industries Co. Ltd. All rights reserved. Resistance result 10 A04- Fixative wire A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire A05 Rotor integration testing A06 Add varnish A07 Add glue to rotor slot Ball bearing press A12 Fixative wire of rotor Rotor wire after fixative Visual check Station’s requirement: The coil heigh 1.0mm Min compare with washer surface Actual:1.11/1.17> OK Check visual of rotor Actual: OK © Techtronic Industries Co. Ltd. All rights reserved. 11 A05- Rotor integration testing A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire Rotor integration testing A06 Add varnish Visual check Result test- OK Sample Station’s requirement: Resistance of rotor 0.1473~0.173Ω Actual: 0.1587/0.1608-> OK Check Hight voltage 600VAC, 1s/1mA Max Actual: OK Check Impulse 600V, 15% Max Actual: OK Add glue to rotor slot © Techtronic Industries Co. Ltd. All rights reserved. Result test- NG Sample Master NG A07 A12 integration testing Master OK A05 Ball bearing press 12 A06- Add varnish A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer Add varnish rotor A04 Fixative wire A05 Rotor integration testing A06 Add varnish A07 Rotor sample-top side Rotor sample- bottom side A11 Ball bearing press A12 Visual check Station’s requirement: The weight of varnish 2.8~3.2g Actual: 3.05/3.02-> OK The weight of glue fixed 1.0~2.2g Actual: 1.40/1.41 OK Cutting rotor and check varnish inside Actual: OK Rotor cutting check varnish inside Add glue to rotor slot © Techtronic Industries Co. Ltd. All rights reserved. 13 A07- Add glue to rotor slot A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire A05 Rotor integration testing A06 Add varnish Add glue in rotor slot Rotor sample- added glue Check length add glue Ball bearing press A12 Visual check Station’s requirement: The weight of glue 0.5~1.1g Actual: 0.627/0.546-> OK The length add glue Actual: 8.26/9.62 OK Temperature dry 135°C ~ 155°C Actual: 145°C OK Rotor dry soaking A07 Add glue to rotor slot © Techtronic Industries Co. Ltd. All rights reserved. 14 A08- Turning commutator A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire A05 Rotor integration testing A06 Add varnish A07 Add glue to rotor slot Ball bearing press A12 Visual check Turning commutator Rotor sample- after turning Station’s requirement: The length of turning 9.2mm Min Actual: 9.52/9.48-> OK Roundness of commutator 4.0ɥm Max Actual: 2.74/2.63 OK Bar to bar 2.0ɥm Max Actual: 0.93/1.21 OK Diameter turning commutator Ø14.8 Min Actual:14.98/15.0 OK Roughness of commutator Ra 0.6~1.0ɥm Actual:0.896/0.887 OK © Techtronic Industries Co. Ltd. All rights reserved. 15 A09- Rotor balancing A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire A05 Rotor integration testing A06 Add varnish A07 Rotor balancing Master NG balancing Ball bearing press A12 Visual check Station’s requirement: Unbalance spec 30mg Max Actual: 19.8/18.0-> OK Deep cutting 1.0mm Max Actual: 0.82/0.81 OK The length cutting 7.4mm Max Actual: 6.12/5.43 OK Add glue to rotor slot © Techtronic Industries Co. Ltd. All rights reserved. 16 A10 A12- Insert washer, press bearing and visual check A01 A08 Insert commutator Turning commutator A02 Winding A09 Rotor balancing A03 A10 Welding Insert washer A04 A11 Fixative wire A05 Rotor integration testing A06 Add varnish A07 Insert washer to rotor Ball bearing press A12 Visual check Press ball bearing rotor Station’s requirement: Insert washer prevent oil to rotor at commutator side. Actual: OK Dimension press ball bearing 70.4~70.6mm Actual: 70.55/70.52 OK Visual rotor check Actual: OK Add glue to rotor slot © Techtronic Industries Co. Ltd. All rights reserved. 17 R01- Insert magnet R01 Insert magnet R02 Add glue magnet R03 Ball bearing press R04 magnetic flux loading Insert magnet Stator ass’y magnet Check deep magnet Check inner diameter of magnet Station’s requirement: The deep of magnet 18.3~18.9mm Actual: 18.62/18.61 -> OK Inner diameter of magnet 31.5mm Min Actual: 31.58 -> OK Gauge check © Techtronic Industries Co. Ltd. All rights reserved. 18 R02- Add glue magnet R01 Insert magnet R02 Add glue magnet R03 Ball bearing press R04 magnetic flux loading Add glue fix magnet and V clip Stator added magnet glue Before add glue after add glue Station’s requirement: The weight of glue 0.1~0.3g Actual: 0.131/0.176 -> OK Temperature for dry glue 135~155°C Actual: 145°C -> OK Time for dry glue 45~60 minutes Actual: 60 minutes -> OK © Techtronic Industries Co. Ltd. All rights reserved. 19 R03- Ball bearing press R01 Insert magnet R02 Add glue magnet R03 Ball bearing press R04 magnetic flux loading Press ball bearing to stator Add glue to stator at bearing area Stator pressed bearing Station’s requirement: Dimension press bearing 49.5~49.7mm Actual: 49.57/49.60 -> OK The weight of bearing glue 0.06~0.13g Actual: 0.09/0.115 -> OK Pull out force of bearing 70Kg Min Actual: 187/190-> OK © Techtronic Industries Co. Ltd. All rights reserved. 20 R04- magnetic flux loading R01 Insert magnet R02 Add glue magnet R03 Ball bearing press R04 magnetic flux loading Magnetic flux loading Stator pressed bearing Master NG flux Station’s requirement: The voltage for magnetic flux loading 2000V Actual: 2000V -> OK The flux of stator 7.3~7.6 mWb Actual: 7.45/7.50 -> OK Visual magnet no break Actual: OK © Techtronic Industries Co. Ltd. All rights reserved. 21 M01 M03 - Insert rotor to stator M01 M08 Insert rotor to stator No load test M02 Dimension check M09 Test with load M03 M10 Insert base cover Low voltage test M04 M11 Caulking motor M05 Flux ring press M06 Insulation test Motor engraving Assembly rotor to stator Insert brush holder to cover Motor assembly M12 Visual check Station’s requirement: The rotor and base assembly correct position and no deformed The carbon brush no broken and no stuck Actual: OK M07 Running motor © Techtronic Industries Co. Ltd. All rights reserved. 22 M04, M05- Caulking motor and press flux ring M01 M08 Insert rotor to stator No load test M02 Dimension check M09 Test with load M03 M10 Insert base cover Low voltage test M04 M11 Caulking motor M05 Flux ring press M06 Insulation test M07 Running motor Motor engraving Press flux ring to motor Motor insert flux ring M12 Visual check Station’s requirement: Press force caulking motor 70Kg Min Actual: 130/150 -> OK Caulking 8 positions of motor Actual: 8 positions -> OK Dimension press flux ring 4.6 ~5.4mm Actual: 4.91/4.82-> OK © Techtronic Industries Co. Ltd. All rights reserved. 23 M06, M07 - Insulation test, Running motor M01 M08 Insert rotor to stator No load test M02 Dimension check M09 Test with load M03 M10 Insert base cover Low voltage test M04 M11 Caulking motor M05 Flux ring press M06 Insulation test M07 Running motor Motor engraving Motor insulation test M12 Visual check Station’s requirement: Insulation test 600VAC, 1s,1mA Actual: OK Insulation resistance 500V, 10M ohm Min Actual: OK Running motor at 20.5VDC, 60s Actual: OK © Techtronic Industries Co. Ltd. All rights reserved. 24 M08 - No load test M01 M08 Insert rotor to stator No load test M02 Dimension check M09 Test with load M03 M10 Insert base cover Low voltage test M04 M11 Caulking motor M05 Flux ring press M06 Insulation test M07 Motor engraving M12 Visual check No load test motor Master NG no load Station’s requirement: No load spec at 20.5VDC, 1.7A Max Actual: 0.98/0.97 -> OK The speed of motor 10800 ~13200rpm Actual: 12163/12410 -> OK The rotation of motor CCW Actual: CCW -> OK Running motor © Techtronic Industries Co. Ltd. All rights reserved. 25 M09-M10 - Test with load, low voltage M01 M08 Insert rotor to stator No load test M02 Dimension check M09 Test with load M03 M10 Insert base cover Low voltage test M04 M11 Caulking motor M05 Flux ring press M06 Insulation test M07 Running motor Motor engraving M12 Visual check Motor Test Station’s requirement: Current with load spec at 20.5VDC, 7.5A Max Actual: 5.31/5.55 -> OK The speed of motor 9720~11880rpm Actual: 10163/10414 -> OK Fan load 80*25mm Actual: OK Low voltage test at 1VDC motor rotate Actual: OK © Techtronic Industries Co. Ltd. All rights reserved. 26 M09 - Motor engraving M01 M08 Insert rotor to stator No load test M02 Dimension check M09 Test with load M03 M10 Insert base cover Low voltage test M04 M11 Caulking motor M05 Flux ring press Motor engraving M12 Visual check Motor engraving Station’s requirement: Part no for engraving 742127012 01 RS7310PM4031 20.5VDC KPVNXXXXXX M06 Insulation test M07 Running motor Motor sample engraving Actual: OK Check visual of motor Actual: OK © Techtronic Industries Co. Ltd. All rights reserved. 27 5. IMPROVEMENT POINT FOR BUIL EB SAMPLE © Techtronic Industries Co. Ltd. All rights reserved. 28 5. IMPROVEMENT POINT FOR BUIL EB SAMPLE © Techtronic Industries Co. Ltd. All rights reserved. 29 5/25/2023 NPI @ Techtronic Industries Vietnam 30