Uploaded by anteneh hailie

COST ENGINEERING PROJECT

advertisement
COST ENGINEERING PROJECT
Detail Cost Estimation
1
2
3
4
5
6
7
8
Group Members
Id. No.
Lemessa Bezu
Leulseged Shewangzaw
Meseret Birhanu
Nardos Berihun
Natnael Aychew
Natnael Leul
Samson Sisay
Yadeta Gardew
ETR/6001/09
ETR/3612/09
ETR/0585/09
ETR/4178/09
ETR/3142/09
ETR/1160/09
ETR/9370/09
ETR/4910/09
SUBMITTED TO
Mr. Tamru M.
SUBMISSION DATE
16-Jun-19
Download