Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 1 of 26
Edisi:
3
Tarikh:
8 Disember 2018
KAWALAN PROSES
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Tenaga Nasional Berhad
Wisma TNB,
19 Jalan Timur
46200 Petaling Jaya
Selangor Darul Ehsan, Malaysia
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN INDUSTRI
YANG MEMATUHI KEPERLUAN STANDARD KUALITI KUASA
NOMBOR DOKUMEN: ENGR-750-70
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Edisi
1
2
Keterangan
Isu untuk perlaksanan SPK MS 9001:2000
Realignment for function based on VUP
Pindaan nama prosedur daripada ’Prosedur
Perancangan
Bekalan
Elektrik
untuk
Pelanggan
Kuasa
Besar/Industri
yang
Mengambil
Paras
Voltan
Sederhana
Mematuhi Keperluan Standard Kualiti Kuasa’
ke ’Prosedur Pematuhan Syarat Lesen TNB
Bagi Perancangan Bekalan Elektrik Untuk
Pelanggan Industri yang Mematuhi Keperluan
Standard Kualiti Kuasa’.
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 2 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Tarikh
Effective date
Pemula
PBK(PA)
Semak
MR
Kelulusan
NP(P)
1.9.2016
HOU(AM)
HOU(AM)
SGM(DN)
8.12.2018
HOU(AM)
HOU(AM)
SGM(DN)
Prosedur untuk muat turun format surat rasmi
bagi pematuhan kepada piawaian kualiti
kuasa.
3
Prosedur untuk muat turun format surat rasmi
bagi tiada pematuhan kepada piawaian kualiti
kuasa.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 3 of 26
Edisi:
3
Tarikh:
8 Disember 2018
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN INDUSTRI
YANG MEMATUHI KEPERLUAN STANDARD KUALITI KUASA
KANDUNGAN
1.
Objektif
2.
Definisi / Ringkasan
3.
Skop & Latarbelakang
4.
Rujukan
5.
Tanggungjawab
6.
Prosedur
7.
Input / Sumber
8.
Output / Penerima
9.
Rekod Kualiti
10.
Penanda Utama Prestasi (KPI)
11.
Lampiran
12.
Work Instruction Berkaitan
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
1.0
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 4 of 26
Edisi:
3
Tarikh:
8 Disember 2018
OBJEKTIF
Dokumen ini bertujuan menerangkan prosedur keperluan kualiti kuasa untuk
perancangan bekalan elektrik baru/ naik taraf untuk pelanggan kuasa besar (LPC)
industri pada paras voltan sederhana (VS) yang mematuhi keperluan Syarat Lesen
TNB No 30.
Nota:
Syarat Lesen TNB No 30: - Distribution supply security and power quality standards
Selain dari pematuhan kepada Syarat Lesen TNB No.30, prosedur ini juga
disediakan untuk memastikan semua perancangan bekalan bekalan elektrik baru/
naik taraf untuk pelanggan kuasa besar (LPC) industri akan mematuhi semua
keperluan:-
2.0
Akta Bekalan Elektrik Pindaan 2015 (Klausa 40 iv)
Peraturan Elektrik 1994 (Klausa 114C)
ST Distribution Code (Klausa 5.4.5 hingga 5.4.8)
TNB’s Electricity Supply Application Handbook (Klausa 1.3.1.5, 1.3.2.1 to 1.3.2.7)
SKOP
Dokumen ini bertujuan menerangkan prosedur keperluan kualiti kuasa untuk
perancangan bekalan elektrik baru/ naik taraf untuk pelanggan kuasa besar (LPC)
industri pada paras voltan sederhana (VS) yang mematuhi keperluan Syarat Lesen
TNB No 30.
Prosedur ini juga boleh diapplikasikan untuk permohonan penambahan beban
tambahan oleh pelanggan industri sediada.
Perlaksanaan prosedur ini dikhaskan untuk semua industri yang sensitif kepada
kualiti voltan atau kualiti kuasa seperti industri elektronik/ semiconductor, industri
logam, industri plastik, industri simen, industri kabel, industri kayu/ papan, industri
makanan, industri aerospace, tren elektrik (traction), dan lain-lain.
Perlaksanaan prosedur ini juga dikhaskan untuk semua industri yang boleh
menghasilkan emisi kualiti kuasa seperti industri logam, tren elektrik (traction), industri
simen dan lain-lain.
Objektif utama prosedur ini adalah untuk memastikan semua peralatan fasiliti &
produksi di dalam premis pelanggan kuasa besar (LPC) mempunyai tahap immuniti
(immunity) dan emisi (emission) yang mematuhi/ melebihi piawaian yang ditetapkan
oleh TNB bagi semua kejadian kualiti voltan (kuasa) yang wujud di sistem elektrik
TNB.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
2.1
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 5 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Kesan kualiti kuasa kepada pelanggan
Kejadian kualiti kuasa yang berlaku di sistem penghantaran/ pembahagian TNB
khasnya kejadian ’voltage sag’ boleh menghentikan proses/ mesin didalam premis
LPC. Kejadian ini akan memberi kerugian RM kepada LPC dan juga boleh
merosakkan peralatan-peralatan elektronik di dalam premis LPC.
Emisi kualiti kuasa (harmonik, flicker, voltage step change & unbalance) boleh
memberi gangguan kepada pepasangan pelanggan lain yang mengambil bekalan dari
punca yang sama (PMU/ PPU) dengan pelanggan yang menghasilkan emisi ini.
2.2
Pematuhan kepada prosedur PSI ENGR 750-70
Prosedur ini bermula dari perancangan bekalan elektrik baru/ naik taraf dari LPC/
jurutera perunding yang dimajukan ke pejabat TNB. SP11/SP33 akan membuat
perancangan rekabentuk sistem bekalan elektrik dengan menurut keperluan
kehendak maksima (MD) dari LPC/ jurutera perunding. Prosedur perancangan
bekalan sediada perlu dipatuhi dalam membuat perancangan bekalan baru ini.
SP11/SP33 akan berkongsi maklumat statistik (rekod) kualiti kuasa dan keperluan
kualiti kuasa merujuk kepada standard kualiti kuasa yang telah dinyatakan dalam buku
panduan permohonan bekalan ’TNB Electricity Supply Application Handbook’ (ESAH)
& Kod Pembahagian ST (ST Distribution Code).
LPC/ jurutera perunding perlu melaksanakan kajian kualiti kuasa dan membuat
deklarasi pematuhan kualiti kuasa di borang Appendix 8 (Rujukan ESAH: Power
Quality Declaration Form: Declaration of Electromagnetic Compatibility (EMC)
Compliance).
Kajian kualiti kuasa yang perlu dibuat adalah:Jenis kejadian kualiti kuasa
Harmonik
Flicker
Unbalance
Voltage Step Change
Nilai terkini semasa operasi
Pengesahan THDV
Pengesahan PST & PLT
Pengesahan % Voltage Unbalance
Pengesahan ∆V %
Deklarasi kualiti kuasa yang perlu dbuat
Jenis kejadian kualiti kuasa
Voltage sag
Transient
Deklarasi untuk peralatan yang sensitif
Pematuhan kepada IEC 61000-4-11/34
Pematuhan kepada IEC 61000-4-5
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 6 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Senarai piawaian kualiti kuasa telah ditetapkan di dalam buku panduan permohonan
bekalan ’Electricity Supply Application Handbook (ESAH)’.
Syarat untuk mematuhi keperluan kualiti kuasa ini juga dinyatakan dalam borang
kontrak khas bekalan elektrik / permohonan bukan domestic (A-Form) iaitu para 39 di
‘Conditions of Supply for Business and Non Domestic Consumers’ (Lampiran 1) &
Kontrak Khas Bekalan Elektrik (Lampiran 2).
2.3
Pengecualian kepada prosedur PSI ENGR 750-70
Sebarang pengecualian dari membuat kajian kualiti kuasa perlu dirujuk kepada Pakar
Teknikal (Kualiti Kuasa & Kecekapan Tenaga) di AMSDS.
Tiada pengecualian untuk membuat deklarasi kualiti kuasa untuk kejadian voltage
sag.
Sebarang pengecualian untuk membuat deklarasi kualiti kuasa untuk transient perlu
dirujuk kepada Pakar Teknikal (Kualiti Kuasa & Kecekapan Tenaga) di AMSDS.
Bagi deklarasi & keputusan kajian yang tidak mematuhi piawaian kualiti kuasa TNB,
rujukan perlu dibuat kepada Pakar Teknikal (Kualiti Kuasa & Kecekapan Tenaga) di
AMSDS untuk tindakan susulan.
3.0
RUJUKAN / POLISI
-
Akta Bekalan Elektrik Pindaan 2015 (Klausa 40 iv)
Peraturan Elektrik 1994 (Klausa 114C)
ST Distribution Code (Klausa 5.4.5 hingga 5.4.8)
TNB’s Electricity Supply Application Handbook (Klausa 1.3.1.5, 1.3.2.1 to 1.3.2.7)
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Buku panduan ESAH
Gambarajah 1:
4.0
ENGR-750-70
Mukasurat:
Page 7 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Appendix 8: PQ declaration form
Buku panduan ESAH & borang deklarasi kualiti kuasa
TANGGUNGJAWAB





5.0
Nombor Dokumen:
SP11
SP33
ME
HEMP
AMSDS
DEFINISI/RINGKASAN



AMSDS
HEMP
Flicker
Asset Management Strategy Design Standard
Head of engineer maintenance planner di zon.
Kegoyangan sensasi visual disebabkan oleh rangsangan cahaya
yang mengalami perubahan kecerahan yang kerap. (Impression
of unsteadiness of visual sensation induced by a light stimulus
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN














Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 8 of 26
Edisi:
3
Tarikh:
8 Disember 2018
whose luminance or spectral distribution fluctuates with time).
Flicker dipantau menggunakan indek PST dan PLT.
Harmonic
Voltan dan Arus yang mempunyai frekuensi pelbagai dari
frekuensi 50 Hz. Voltan dan arus harmonik ini wujud dan boleh
memberi kesan negatif kepada sistem pembekalan elektrik.
Harmonic dipantau menggunakan indek THD (Total harmonic
distortion).
ME
Maintenance Executor
Kualiti Kuasa
Kejadian kualiti kuasa elektrik ditakrifkan sebagai perubahan
bentuk voltan yang sempurna (sinewave) kepada bentuk voltan
terganggu (deformed/distorted) dalam tempoh masa yang singkat
(short duration).
LPC
Pelanggan Kuasa Besar Industri
PQMSWeb
Laman sesawang PQMSWeb (http://10.163.160.32/pqmsweb)
RM
Ringgit Malaysia
RMS
Adalah ukuran statistik bagi magnitud kuantiti yang berbeza-beza.
Ia amat berguna apabila variat positif dan negatif, contohnya,
sinusoid voltan. Contoh nilai RMS adalah voltan 230 Volt, 11 kV
dan 33 kV.
SP11
Supply planner 11 kV di sub zon.
SP33
Supply planner 33 kV di zon
Transient
Kejadian perubahan voltan yang terlalu singkat (< 10 ms).
Unbalance
Kejadian voltan tidak seimbang.
VS
Voltan sederhana (11 hingga 33 kV)
Voltage sag
Penurunan voltan rms di antara 10 % hingga 90 % dalam tempuh
10 ms hingga 1 minit (A decrease to between 0.1 and 0.9 pu in
rms voltage or current at the power frequency for durations of 0.5
cycle to 1 min). Statistik voltage sag di lapurkan dengan
menggunakan indek SARFI (System Average RMS Frequency
Index).
Voltage step change
Satu perubahan nilai RMS atau puncak voltan di antara dua
peringkat berturut-turut dikekalkan untuk jangka masa yang pasti
tetapi tidak diperincikan. (A variation of the RMS or peak value of
a voltage between two consecutive levels sustained for definite
but unspecified durations)
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 9 of 26
Edisi:
3
Tarikh:
8 Disember 2018
6.0
PROSEDUR
6.1
Peta proses bagi prosedur perancangan bekalan elektrik untuk pelanggan industri
(LPC) pada paras voltan sederhana untuk mematuhi keperluan standard kualiti kuasa
di Semenanjung Malaysia adalah seperti di Lampiran 3.
Prosedur ini dikhaskan untuk permohonan bekalan elektrik baru (new supply
application) bagi kategori industri pada paras voltan sederhana (VS).
Prosedur ini juga boleh diapplikasikan untuk penambahan beban tambahan oleh
pelanggan industri sediada.
Perlaksanaan prosedur ini dikhaskan untuk industri berikut:
Jenis industri
pada paras
voltan sederhana
Semiconductor
Industri logam
Industri simin
Industri data
center
Tren elektrik
Industri
aerospace
Lain-lain
Deklarasi
voltage
sag
Ya
Ya
Ya
Ya
Deklarasi
Kajian
transient harmonik
Ya
Tidak
Tidak
Ya
Ya
Ya
Ya
Ya
Kajian
voltage step
change
Tidak
Ya
Ya
Tidak
Kajian
flicker
Kajian
unbalance
Tidak
Ya
Ya
Tidak
Tidak
Tidak
Tidak
Tidak
Ya
Ya
Ya
Tidak
Ya
Ya
Ya
Tidak
Ya
Tidak
Ya
Tidak
Ya
Tidak
Ya
Tidak
Tidak
Tidak
Sebarang pengecualian dari membuat kajian kualiti kuasa perlu dirujuk kepada Pakar
Teknikal (Kualiti Kuasa & Kecekapan Tenaga) di AMSDS.
Tiada pengecualian untuk membuat deklarasi kualiti kuasa untuk kejadian voltage
sag.
Sebarang pengecualian untuk membuat deklarasi kualiti kuasa untuk transient perlu
dirujuk kepada Pakar Teknikal (Kualiti Kuasa & Kecekapan Tenaga) di AMSDS.
Bagi deklarasi yang tidak mematuhi piawaian kualiti kuasa TNB, rujukan perlu dibuat
kepada Pakar Teknikal (Kualiti Kuasa & Kecekapan Tenaga) di AMSDS untuk
tindakan susulan.
Bagi deklarasi & keputusan kajian yang tidak mematuhi piawaian kualiti kuasa TNB,
rujukan perlu dibuat kepada Pakar Teknikal (Kualiti Kuasa & Kecekapan Tenaga) di
AMSDS untuk tindakan susulan.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 10 of 26
Edisi:
3
Tarikh:
8 Disember 2018
6.1.1 LPC/ jurutera perunding memajukan permohonan bekalan elektrik ke pejabat TNB.
6.1.2 SP11/SP33 akan menentukan punca bekalan elektrik iaitu PMU/ PPU.
Sila rujuk kepada PSI ENGR-750-51 (Prosedur perancangan projek bekalan dan
sistem 22 kV dan ke bawah) dan PSI ENGR-750-56 (Prosedur perancangan projek
bekalan dan sistem 33 kV).
6.1.3 SP11/SP33 akan mendaftarkan pelanggan dan memuat turun statistik kualiti kuasa
dari laman sesawang PQMSWeb (http://10.163.160.32/pqmsweb).
Sekiranya PMU/PPU berkenaan mempunyai sistem PQMS, SP11/SP33 akan rujuk
Arahan Kerja ENGR-750-70-WI-01: Tatacara muat turun statistik kualiti kuasa bagi
lokasi yang mempunyai sistem pemantauan kualiti kuasa (PQMS). Contoh rekod
pendaftaran di laman PQMSWeb adalah seperti di Lampiran 4. (ENGR-750-70-QR01).
Sila ke prosedur 6.1.6.
Sekiranya PMU/PPU berkenaan tidak mempunyai sistem PQMS, SP11/SP33 akan
meminta HEMP/ME untuk membuat tindakan berikut:
HEMP/ME perlu membuat anggaran statistik ‘voltage sag’ atau SARFI menurut
prosedur di dalam arahan Kerja ENGR-750-70-WI-02: Tatacara menyediakan
statistik kualiti kuasa bagi lokasi yang tidak mempunyai sistem pemantauan kualiti
kuasa (PQMS).

Bagi data harmonik, flicker dan unbalance, HEMP/ME akan memasang alat
perakam kualiti kuasa di PMU/ PPU. Sila ke prosedur 6.1.4.
6.1.4 HEMP/ME akan memasang alat perakam kualiti kuasa di PMU/ PPU untuk tempuh 7
hari.
Sila rujuk kepada prosedur kerja ENGR-750-70-WI-02: Tatacara menyediakan statistik
kualiti kuasa bagi lokasi yang tidak mempunyai sistem pemantauan kualiti kuasa
(PQMS).
6.1.5 HEMP/ME akan memasukkan data harmonik, flicker dan unbalance ke sistem
PQMSWeb dan memberi makluman kerja telah di siapkan kepada SP11/SP33.
Sila rujuk kepada prosedur kerja ENGR-750-70-WI-02: Tatacara menyediakan statistik
kualiti kuasa bagi lokasi yang tidak mempunyai sistem pemantauan kualiti kuasa
(PQMS).
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 11 of 26
Edisi:
3
Tarikh:
8 Disember 2018
6.1.6 SP11/SP33 akan muat turun lapuran statistik kualiti kuasa (Lampiran 5: ENGR 75070-QR-02). & borang Appendix 8 (Lampiran 6: Declaration of Equipment Conformity
on Power Quality Requirement).
Sila rujuk kepada prosedur kerja ENGR-750-70-WI-03: Tatacara muat turun statistik
kualiti kuasa dan menilai laporan kajian & deklarasi kualiti kuasa oleh LPC/ jurutera
perunding.
Lapuran statistik kualiti kuasa ini perlu ditandatangani oleh SP11/SP33.
Borang Appendix 8 boleh juga di dapati dari buku ‘TNB’s Electricity Supply
Application Handbook’ dan boleh dimuat turn (download) dari laman PQMSWeb.
Semua lapuran statistik kualiti kuasa dan borang Appendix 8 ini dimajukan ke LPC/
jurutera perunding berkenaan.
SP11/SP33 akan melaksanakan prosedur 6.1.15.
6.1.7 LPC/ jurutera perunding akan menilai statistik kualiti kuasa dan membuat penilaian
kualiti kuasa terhadap cadangan sistem pendawaian dan peralatan elektrik yang akan
dipasang di premis LPC.
6.1.8 Seterusnya, LPC/ jurutera perunding membuat kajian kualiti kuasa & deklarasi kualiti
kuasa bagi semua sistem pepasangan yang akan di buat dalam premis pelanggan
(pendawaian, peralatan fasiliti, produksi dll).
Semua keputusan kajian dan deklarasi perlu di dilapurkan menggunakan borang
Appendix 8 (Power Quality Declaration Form: Declaration of Equipment Conformity on
Power Quality Requirement).
Nota:
Projek memberi bekalan elektrik tidak boleh dimulakan sekiranya LPC/ jurutera
perunding gagal melaksanakan kajian kualiti kuasa dan membuat deklarasi
kualiti kuasa.
6.1.9 LPC / jurutera perunding kemudiannya memajukan laporan kajian kualiti kuasa,
dokumen deklarasi (certificate) kualiti kuasa & borang Appendix 8 yang lengkap
kepada SP11/SP33.
6.1.10 SP11/SP33 menerima laporan kajian kualiti kuasa, dokumen deklarasi (certificate)
kualiti kuasa & borang Appendix 8.
Untuk rekod, dokumen Appendix 8 yang diterima dari LPC/Jurutera perunding perlu di
muatnaik (upload) ke laman sesawang PQMWeb.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 12 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Dokumen lain perlu disimpan dalam fail projek.
SP11/SP33 memeriksa semua dokumen ini dan menilai maklumat tahap immuniti dan
emisi kualiti kuasa untuk kejadian ’voltage sag’, ’transient, ’harmonic’, ’voltage
change’, ’flicker’ dan ’unbalance’ yang dilaporkan dalam dokumen ini.
Sila rujuk kepada prosedur kerja ENGR-750-70-WI-03: Tatacara muat turun statistik
kualiti kuasa dan menilai laporan kajian & deklarasi kualiti kuasa oleh LPC/ jurutera
perunding.
Tahap emisi yang dibenarkan adalah:Kejadian
kualiti kuasa
Standard teknikal
Harmonic
Engineering
Recommendation
(E/R) G 5/4
Voltage step
change
Engineering
Recommendation P28
Tahap emisi yang dibenarkan
Voltan
0.400
6.6 kV, 11 kV and 20 kV
22 kV to 400 kV
THDV (%)
5.0
4.0
3.0
Indices
Acceptable permissible values at point of
common coupling (PCC)
∆V %
1% - Frequent starting/ switching and/ or
disconnection of load.
3 % - Infrequent single starting/ switching or
disconnection of Load – once in two
hours or more hours.
6 % - Starting/switching once or twice
a year
.
Flicker
Unbalance
Engineering
Recommendation P28
Engineering
Recommendation P29
Voltage
≤ 132 kV
> 132kV
PST
1.0
0.8
PLT
0.8
0.6
2%
Tajuk Prosedur:
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
Jenis Dokumen: Aras II
KAWALAN PROSES
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 13 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Tahap immunity minima yang dibenarkan adalah:Kejadian
kualiti kuasa
Voltage Sag
(Peralatan
Fasiliti)
Standard teknikal
Tahap minima immuniti yang dibenarkan
IEC 61000-4-11
(Class 3)
&
IEC 61000-4-34
(Class 3)
%
Graph A
100
90
% of nominal voltage
80
70
60
50
40
30
20
Graph B
10
ms
0
20
50 100 150 200 300 400 500 600 700 1000 2000 3000 4000 5000
Duration of Voltage Sag (ms)
IEC 61000-4-11 / 34 (Class 3)
Voltage Sag
(Peralatan
produksi)
Transients
IEC 61000-4-11
(Class 1)
&
IEC 61000-4-34
(Class 1)
Voltage %
Based on equipment
requirement for protection
against voltage sags
Duration (ms)
Based on equipment
requirement for protection
against voltage sags
General requirement
0%
General requirement
1000 ms
IEC 61000-4-5
Declaration of compliance
Test & immunity
classification:
Class 0 to class 5
Critical equipment
Facility / Production
Facility / Production
Facility / Production
Facility / Production
Facility / Production
Compliance Class
1
2
3
4
5
Sekiranya tahap kualiti kuasa bagi LPC menepati tahap emisi / immuniti kualiti kuasa
yang dibenarkan, sila ke prosedur 6.1.11.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 14 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Sekiranya tahap kualiti kuasa bagi LPC tidak menepati tahap emisi / immuniti kualiti
kuasa yang dibenarkan, sila ke prosedur 6.1.12.
6.1.11 SP11/SP33 muat turun (download) surat status penilaian dan pematuhan piawaian
kualiti kuasa untuk diberi kepada LPC/ jurutera perunding.
Format surat boleh dimuat turun dari PQMSWeb.
Semua surat yang telah ditandatangan perlu dimuat naik di laman sesawang
PQMSWeb.
6.1.12 Sekiranya tahap kualiti kuasa bagi LPC tidak menepati tahap emisi / immuniti kualiti
kuasa, SP11/SP33 akan memberi surat kepada LPC/ jurutera perunding untuk
mengambil tindakan untuk mematuhi standard kualiti kuasa.
Format surat boleh dimuat turun dari laman sesawang PQMSWeb.
Semua surat yang telah ditandatangan perlu dimuat naik di laman sesawang
PQMSWeb.
Salinan surat diberi kepada pejabat Suruhanjaya Tenaga (ST) di Putrajaya & Pakar
Teknikal (Kualiti Kuasa & Kecekapan Tenaga).
Di dalam laporan kajian kualiti kuasa mesti mencadangkan mitigasi yang sesuai untuk
memastikan LPC mematuhi piawaian kualiti kuasa TNB.
6.1.13 Proses tamat
7.0
INPUT / SUMBER
Permohonan bekalan baru atau permohonan penambahan beban dari LPC / jurutera
perunding.
8.0
OUTPUT / PENERIMA
Borang Appendix 8.
Lapuran kajian kualiti kuasa
Deklarasi kualiti kuasa
Laporan Rekod Kualiti ENGR-750-70-QR-04: Senarai pelanggan dan status
pematuhan standard kualiti kuasa.
Tajuk Prosedur:
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
Jenis Dokumen: Aras II
KAWALAN PROSES
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
9.0
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 15 of 26
Edisi:
3
Tarikh:
8 Disember 2018
REKOD KUALITI
Rekod
Nombor Borang
Tempat Simpanan
Tempoh
Simpanan
Senarai pendaftaran pelanggan
industri baru untuk muat turun
statistik kualiti kuasa.
ENGR-750-70-QR-01
PQMS Web
5 Tahun
Statistics on Power Quality for
New Supply Application for use by
customers
Rekod pelanggan dan pematuhan
kepada standard kualiti kuasa
ENGR-750-70-QR-02
ENGR-750-70-QR-04
Fail projek bekalan
baru di pejabat zon/
subzon.
Fail projek bekalan
baru di pejabat zon/
subzon.
5 Tahun
5 Tahun
PQMS Web
10.0
PENANDA UTAMA PRESTASI (KPI)
Penanda Utama Prestasi
Rekod pelanggan dan pematuhan kepada
standard kualiti kuasa
Pengukuran
Semua pelanggan LPC industri di daftar dan diberi
makluman mengenai keperluan standard kualiti
kuasa.
Semua pelanggan LPC industri melaksanakan kajian
& deklarasi kualiti kuasa.
11.0
LAMPIRAN
Lampiran 1:
Para 39 di ‘Conditions of Supply for Business and Non Domestic
Consumers’ (A-Form)
Lampiran 2:
Contoh borang kontrak Bekalan Khas (Customized Supply
Contract)
Lampiran 3 :
Peta Proses Perancangan Bekalan Elektrik Untuk Pelanggan Industri
Yang Mematuhi Keperluan Standard Kualiti Kuasa
Lampiran 4:
Borang Kualiti ENGR-750-70-QR-01
Contoh rekod pendaftaran LPC di laman PQMSWeb
Lampiran 5:
Borang Kualiti ENGR-750-70-QR-02
Format penyerahan ringkasan data kualiti kuasa kepada pelanggan/
jurutera perunding untuk melaksanakan kajian kualiti kuasa
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Lampiran 6:
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 16 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Borang Kualiti ENGR-750-70-QR-03
Borang Appendix 8 (Power Quality Declaration Form: Declaration of
Equipment Conformity on Power Quality Requirement).
12.0
WORK INSTRUCTION BERKAITAN
ENGR-750-70-WI-01 : Tatacara muat turun statistik kualiti kuasa bagi lokasi yang mempunyai
sistem pemantauan kualiti kuasa (PQMS).
ENGR-750-70-WI-02 : Tatacara menyediakan statistik kualiti kuasa bagi lokasi yang tidak
mempunyai sistem pemantauan kualiti kuasa (PQMS).
ENGR-750-70-WI-03: Tatacara muat turun statistik kualiti kuasa dan menilai laporan kajian &
deklarasi kualiti kuasa oleh LPC/ jurutera perunding.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 17 of 26
Edisi:
3
Tarikh:
8 Disember 2018
LAMPIRAN 1
Clause (Established with the new ESAH)
Para 39 di borang permohonan bekalan (A-Form)
The customer shall ensure all its electrical installations have sufficient immunity against short duration
voltage events (sags & swells) and transient events, and shall not generate other significant power
quality voltage signatures that might have detrimental effects to the electrical supply systems. The
related power quality technical standards are defined in TNB Electricity Supply Application Handbook
(ESAH).
Versi Bahasa Malaysia
Para 35 di borang permohonan bekalan (A-Form)
Pelanggan hendaklah memastikan semua pepasangan elektrik mempunyai imuniti yang mencukupi
terhadap kejadian voltan pendek tempoh (sags & swell) dan kejadian voltan fana, dan tidak boleh
menjana kejadian kualiti kuasa lain yang mungkin mempunyai kesan yang memudaratkan sistem
bekalan elektrik. Standard kualiti kuasa yang berkaitan adalah ditakrifkan dalam buku panduan
permohonan bekalan elektrik (ESAH)
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 18 of 26
Edisi:
3
Tarikh:
8 Disember 2018
LAMPIRAN 2
Annexure E
OPERATING GUIDELINES AND POWER FACTOR FOR ALL VOLTAGE LEVELS
E1.
OPERATING GUIDELINES
E1.1
The consumer shall have an obligation to ensure the following operational requirements are
satisfied in the operation of the consumer’s installation.
(i)
Nominal voltage & steady state voltage regulations
Nominal voltage (kV)
500
275
132
33
22
11
0.400 & 0.230
(ii)
% Variation
+10%,- 5 %
+10%,- 5 %
+10%,- 5 %
±5%
±5%
±5%
+10%, -6%
Short duration voltage disturbances
All voltage sensitive/critical equipment and control system within the consumer’s premises
shall be designed to be able to ride through or be immune to all short duration voltage
disturbances i.e. voltage sags, short duration overvoltage (voltage swells) and very short
duration overvoltage (transients) that exist in TNB’s power system electromagnetic
environment.
The standards to refer to ensure all voltage sensitive/critical equipment and control systems
are immune to voltage sags are IEC 61000-2-8, IEC 61000-4-11 & IEC 61000-4-34.The
selection of the immunity classes (C1, C2, C3) are based on the sensitivity and criticality of
each equipment.
The standards to refer to ensure all voltage sensitive/critical equipment and control systems
are immune to short duration overvoltage & very short duration overvoltage are IEC 61000-214, IEC 61000-4-2, IEC 61000-4-4, IEC 61000-4-5 etc.
(iii)
Basic Insulation Level (BIL)
Electrical power and distribution apparatus must be assigned a given insulation class and
capable of withstanding, without flashover or apparent damage, an impulse test of specified
crest kV. This specified crest voltage is the basic insulation level (BIL) of the equipment.
Overall, the consumer’s electrical power and distribution apparatus shall be compatible with
the BIL requirement.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
System voltage (kV)
500
275
132
33
22
11 & 6.6
(iv)
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 19 of 26
Edisi:
3
Tarikh:
8 Disember 2018
BIL (kV)
1425
1050
450
150
125
75
Voltage step change
A voltage change is a single variation of the RMS voltage ( V RMS ) or peak value ( V P ) of the
voltage signal in time domain. RMS is the root mean square.
The RMS voltage, VRMS is calculated by taking the square root of the mean average of the
square of the voltage signal in time domain in an appropriately chosen interval and is given by,
VRMS
1T

   v(t ) 2 dt 
T 0

where,
T : period of a voltage signal
v(t ) : continuous function of a voltage signal in time domain
The allowable % RMS ( V RMS ) or peak value ( V P ) voltage change values are defined as
follows:Type Of
Disturbance
Voltage Step
Change
(v)
Indices
∆V %
Acceptable permissible values at
Reference
point of common coupling (PCC)
Document
1% - Frequent starting/ switching
and/or disconnection of motor/ load.
3 % - Infrequent single starting/
Engineering
switching or disconnection of
Recommendation
motor/load – once in two hours or
(E/R) P28
more hours.
6 % - Starting/ switching once or
twice a year.
Flickers constraints
Flicker is the name given to changing light intensity caused by fluctuations in the voltage. It is
a common power quality problem causing both irritation and possible medical consequences
to users exposed to its effects.
Tajuk Prosedur:
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
Jenis Dokumen: Aras II
KAWALAN PROSES
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
The maximum flicker level
Recommendation (E/R) P28.
System voltage (kV)
500, 275 and 132kV
Less than 132kV
Mnemonic
PST
PLT
(vi)
shall
be
within
Absolute short term
flicker severity (PST)
0.8
1.0
the
limits
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 20 of 26
Edisi:
3
Tarikh:
8 Disember 2018
specified
in
Engineering
Absolute long term
flicker severity (PLT)
0.6
0.8
Definition
Short Term Flicker Perceptibility
Long Term Flicker Perceptibility
Harmonics constraints
Harmonic distortion is the departure of a waveform from sinusoidal shape that is caused by
the addition of one or more harmonics to the fundamental waveform due to the existence of
non-linear electric loads etc. Harmonic frequencies in the power system are a frequent cause
of power quality problems. Harmonics in power systems result in increased heating in the
equipment and conductors, misfiring in variable speed drives, capacitor damage, torque
pulsations in motors etc.
The harmonic distortion level at the Point of Common Coupling (PCC) shall be within the limits
specified in the Engineering Recommendation (E/R) G5/4 based on the respective voltage
levels as shown below.
Harmonics Planning Limits -Total Harmonic Distortion (THD)
Voltage (kV)
0.400
6.6 kV, 11 kV and 20 kV
22 kV to 400 kV
(vii)
THD (%)
5.0
4.0
3.0
Voltage unbalance
The magnitude of the negative phase sequence component (NPS) at the Point of Common
Coupling (PCC) must be within 2% of the positive phase sequence component. The limits imposed
at PCC are made reference to Engineering Recommendation (E/R) P29.
(viii)
Short Circuit Levels
The consumer’s installation shall be planned such that the maximum subtransient three phase
symmetrical short circuit fault levels are not greater than 90 % of the design short circuit break
and make capacity of switchgear connected to TNB’s power system and within 90 % of the
short time current rating of equipment connected to the TNB’s power system.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nominal Voltage (kV)
500
275
132
33
11
0.4
E1.2
E1.3
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 21 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Fault Current (kA)
50
40
31.5
25
20
31.5
Compensating/ mitigation equipment
(i)
Whenever the operation of the consumer’s facilities, plants and/or equipment leads to
the violation of the limits in Clauses E1.1 (iv), (v), (vi) & (vii), a compensating /
mitigation equipment shall be installed and provided by the consumer at its own cost
and expense to reduce the power quality disturbances to be below the stipulated limits.
The consumer shall ensure that no resonance phenomenon is induced due to the
interaction between the consumer’s Installation (after the installation of the
compensating/ mitigation equipment) and TNB’s power system.
(ii)
The consumer shall warrant that no violation of the limits stipulated under Clauses
E1.1 (iv), (v), (vi) & (vii), shall occur in all situations during the consumer’s operations
including but not limited to during any emergency feeding conditions, changes of the
consumer’s operational parameter, faulty equipments, maintenance of the consumer’s
equipments or due to the consumer’s equipments having been switched-off.
Disconnection of Electricity Supply
(i)
If the limits stipulated in Clauses E1.1 (iv), (v), (vi) & (vii), above are violated under
any situation, including emergency feeding conditions, the consumer shall rectify the
said violation within stipulated time as requested by TNB. In the event the consumer
fails to rectify the said violation, TNB has the right to disconnect the electricity supply
without prior notice to the Said Premises.
(ii)
In the event that TNB has exercised its rights under clause E1.3 of the Agreement,
TNB shall not be liable to the consumer for such disconnection, cessation, interruption,
reduction or defect in the supply of electricity or for any loss, damage, cost or
expenses resulting there from which includes but not limited to for any loss of profits,
business, goodwill, opportunity or special, exemplary, indirect, incidental,
consequential or punitive damages of any kind for any reason, whether such liability is
asserted on the basis of contract, tort (including negligence and strict liability) or
otherwise, even if TNB has been advised of the possibility of such damages.
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 22 of 26
Edisi:
3
Tarikh:
8 Disember 2018
E2.
POWER FACTOR
E2.1
The consumer shall obtain the highest power factor possible in the operation of the
consumer’s Installation.
E2.2
The consumer shall be subject to supplementary charge(s) as provided in Annexure D for
failure to maintain certain level(s) of power factor.
E2.3
If the consumer's power factor is found to be constantly below 0.90 lagging (for 132 kV and
above) or below 0.85 lagging (for 132 kV below) for a period of three (3) months and after
written notice to improve its power factor has been issued, TNB may consider taking action to
disconnect the electricity supply. Reconnection of the electricity supply shall only be restored
after TNB is satisfied that the power factor has improved to the acceptable value.
Tajuk Prosedur:
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
Jenis Dokumen: Aras II
KAWALAN PROSES
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
LPC / Jurutera
Perunding
Mula
SP11 / SP33
6.1.2
Menentukan
rekabentuk sistem
& punca bekalan
elektrik
6.1.7
Menilai statistik
kualiti kuasa
6.1.3
Daftar pelanggan
di laman
PQMSWeb &
muat turun data
6.1.8
Membuat kajian
kualiti kuasa &
deklarasi kualiti
kuasa.
6.1.6
Menyediakan lapuran
statistik kualiti kuasa &
muat turun borang
Appendix 8
ENGR-750-70
Mukasurat:
Page 23 of 26
Edisi:
3
Tarikh:
8 Disember 2018
PETA PROSES BAGI PROSEDUR PEMATUHAN SYARAT LESEN TNB
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN INDUSTRI YANG
MEMATUHI KEPERLUAN STANDARD KUALITI KUASA
6.1.1
Majukan
permohonan
Nombor Dokumen:
LAMPIRAN 3
6.1.9
Memajukan laporan,
deklarasi & borang
Appendix 8
6.1.10
Menerima laporan,
deklarasi & borang
Appendix 8
6.1.12
Upload semua
dokumen ke
PQMSWeb & muat
turun surat tiada
pematuhan untuk
LPC
Tidak
Ya
Ada data sag,
harmonic, flicker &
unbalance?
Patuhi standard
kualiti kuasa?
Ya
6.1.13
Tamat
HEMP / ME
Tiada
6.1.4
Memasang alat
perakam selama
7 hari
6.1.5
Muat naik data
ke PQMSWeb
6.1.11
Upload semua dokumen ke PQMSWeb &
muat turun surat pematuhan untuk LPC
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
LAMPIRAN 4
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 1 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Contoh borang rekod kualiti ENGR-750-70-QR-01
Tajuk Prosedur:
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
Jenis Dokumen: Aras II
KAWALAN PROSES
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
LAMPIRAN 5
Page 1 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Contoh borang rekod kualiti ENGR-750-70-QR-02
Site’s details
Source (PMU/PPU)
Voltage level (kV):
Fault Level:
Type
3-phase
1-phase
2.0
3.0
kA
Voltage sags statistics (SARFI)
Parameters
SARFI
90
80
70
60
50
40
Harmonics statistics
Parameter
Harmonic Harmonic Harmonic Harmonic Harmonic
3
5
7
11
13
THDV
% Values
4.0
Voltage Change, Flickers & Unbalance statistics
Power Quality parameters
Voltage Change (%)
Flickers
Existing values at source
Non Applicable (Equipment starting & Arc furnace)
Index
PST
PLT
Unbalance (%)
Prepared by Engineer Supply Planner
Signature: ………………………………
Name: ……………..……………………
Date: ………………………..…………
Value
ENGR-750-70
Mukasurat:
Power Quality Statistics for New Supply Applications
1.0
Nombor Dokumen:
Tajuk Prosedur:
Jenis Dokumen: Aras II
KAWALAN PROSES
PROSEDUR PEMATUHAN SYARAT LESEN TNB NO 30
BAGI PERANCANGAN BEKALAN ELEKTRIK UNTUK PELANGGAN
INDUSTRI YANG MEMATUHI KEPERLUAN STANDARD
KUALITI KUASA
NAIB PRESIDEN
BAHAGIAN PEMBAHAGIAN
LAMPIRAN 6
Nombor Dokumen:
ENGR-750-70
Mukasurat:
Page 2 of 26
Edisi:
3
Tarikh:
8 Disember 2018
Contoh borang rekod kualiti ENGR-750-70-QR-03
APPENDIX 8
Power Quality Declaration Form
Declaration of Electromagnetic Compatibility (EMC) Compliance
1.0 Name of customer
2.0 Area / State:
3.0 Type of industry:
4.0 Declared Maximum Demand (MW):
Types Of PQ
Disturbances
Reference
Standards
Declaration / Results of PQ study/ Compliance
Voltage Step
Change
Engineering
Recommendation
ERP28
Voltage Flicker
Engineering
Recommendation
ERP28
Location
Point of common coupling
Harmonic
Distortion
Engineering
Recommendation
ER G5/4
Location
Point of common coupling
THDV (%)
Voltage Unbalance
Engineering
Recommendation
ERP29
Location
Point of common coupling
%
Type of equipment
Category
∆V %
PST
PLT
Declaration of compliance
Voltage sags
IEC 61000-4-11 &
IEC 61000-4-34
Critical equipment
Compliance Class
Test & immunity
classification:
Class 1 to class 3
Declaration of compliance
Transients
IEC 61000-4-5
Critical equipment
Test & immunity
classification:
Class 0 to class 5
Prepared by
Signature:
Approved by
Signature:
Name:
Date:
Name:
Date:
Compliance Class
Compliance
(Yes/No)