OSWARD BEATUS No. Date Work Performed Location 1 January Coordinates fixing of DIT main leakages (damaged flexible campus pipes, IPS pipes and stop cork) at block A, V and dispensary 2 January Distributing materials to DIT main workers (plumbing campus materials) 3 January Assigning, painting works at canteen as well as DIT main painting to fabricated six campus (6) students beds 4 January Site visit to Lindi region for Lindi the aim of conducting a Regional pre-feasibility study of establishing a new DIT campus at Lindi region 5 February Coordinating renovation of DIT main PMU side office campus Materials Remarks N/A Completed N/A Completed N/A Completed N/A Completed N/A On going February Preparation of prefeasibility study report of establishing a new DIT campus at Lindi region February Preparation of Schedule of Materials for renovation of Sokoine University’s Offices February Review and provide comments on Teaching tower snag list items which were not attended by TBW February Assigning, repairing of toilet block at canteen DIT main campus N/A Completed DIT main campus N/A Completed DIT main campus N/A Completed DIT main campus N/A Completed 9 March DIT main campus N/A Completed 6 March DIT main campus N/A Completed 5 6 7 8 Preparation of preliminary cost estimate of Construction of Girls Hostel at DIT Review comments and finalising a pre-feasibility study report of establishing a new DIT campus at Lindi region 1 7 March Facilitating and Supervision of installation of Fire Extinguisher DIT main campus N/A Completed 8 March DIT main campus N/A On progress 9 April DIT main campus N/A On progress 9 April Organizing of labourers/staff and materials to execute renovation of Lab tech building Assigning the inspection and estimation of required AC materials at DITSO office, Mining office and Warden office Block 5 Printing and Submission of a pre-feasibility study report of establishing a new DIT campus at Lindi region to DPAF DIT main campus N/A Completed 2