MS PROJECT ASSIGNMENT Refer to the attached Bills of Quantities case study comprising the construction of a residential house. Execute the following tasks: • • Price the Bills of Quantities using your best estimates of prevailing market rates. Prepare a work programme for the following elements, each to be completed within a maximum period of 8 weeks. Your proposed work programme should cover the following parameters: 1. 2. 3. 4. 5. 6. 7. Project Summary and other Summary Tasks WBS (with Outline Numbers) Resources (cost resources; work resources and materials resources) Milestones Critical Path(s) Project costs, including the overall cost of the selected element. Project status date (in dashed red line) is 10/04/2023. Assume the project/element start date is 1st March 2023, and the work must be completed within a maximum period of 8 weeks/ 56 calendar days. 8. Assume the first 4 activities of the project are 100% complete, the next 3 activities are 75% complete and all other activities are 0% complete. Set the start date to 01/03/2023 and the status date to 10/04/2023. Based on the information provided, determine if the project is behind schedule, on schedule or ahead of schedule. 9. Set the project calendar to work throughout the weekends (7 days a week). 10. Submit both pdf and MS Project files. TASK ALLOCATION 1. Substructure 2. Superstructure: R.C. Frame; Stairs & Ramps; Walling & Partitioning 3. Roofing & Rainwater Disposal; Windows & Doors; Internal & External Finishes 4. External Works NB: proposed work programme should be done on each task above. END OF ASSIGNMENT