Line 3 Production Process Sorting & loading Crate Distiller Sorting bottle for foreign materials, foreign glass, dirt's Preliminary washing for dirt Uncaser Bottle Washer Crate and bottle separated Bottle to bottle washer Crate to Crate washer 4 Controlling parameters Temp, chemical (caustic), Physical & Time. Blender Crown Check mat Inspection Over fill/ Under fill/ not crowned Filler Product filled Date Code The CDE manager will approve the spare part requisition. Treated water + Final Syrup + Co2 Water is deaerated Air & Liquid dissolved by saturation pressure Packing, Palletizing and ready for e CDE planner will generate a work order requesting the required spare parts as per the assessment. Physical check Wash ability EBI Check Wrong size bottle Neck finish Residual Side wall Capture the Production On IPR Every hour PET Production Process Sorting & loading Crate Distiller Sorting bottle for foreign materials, foreign glass, dirt's Preliminary washing for dirt Uncaser Bottle Washer Crate and bottle separated Bottle to bottle washer Crate to Crate washer 4 Controlling parameters Temp, chemical (caustic), Physical & Time. Blender Crown Check mat Inspection Over fill/ Under fill/ not crowned Filler Product filled Date Code The CDE manager will approve the spare part requisition. Treated water + Final Syrup + Co2 Water is deaerated Air & Liquid dissolved by saturation pressure Packing, Palletizing and ready for e CDE planner will generate a work order requesting the required spare parts as per the assessment. Physical check Wash ability EBI Check Wrong size bottle Neck finish Residual Side wall Capture the Production On IPR Every hour UTILITY Water Sugar Bore hole (raw water) High quality sugar Softener Sand filter Simple syrup prepared with only sugar & water and To boiler Carbon filter will be pasteurized till 80◦c ready for final syrup TO cooler RO preparation To washer UV (Ready for production input) Final syrup preparation Chiller ( Central cooling system) Concentration will be prepared (agitator) Batch preparation method Steam for bottle washer Syrup tank For automation (compressed gas) CIP Compressor Compressed gas Boiler Oil free (Counter pressure) Steam generate Oil injected (Production line &utility automation ) Softener Sand filter To boiler Carbon filter Generator TO cooler RO 2 x 2000 Kva To washer UV (Ready for production input) 2 x 1500 Kva Engineering SHEQ Legal req. & KORE Req. Critical KPI Major activities incorporated LTIR (any incident) 0.17 Safety EUR 0.44 target Quality WUR 2.69 target Maintenance Near miss Crash rate SHEQ Manager EOSH Coordinator Safety KPI Monitors EOSH performance Business sys. Coordinator Manages internal & external audits Documentation (achiever +) Training External communication Microbiologists GMP technology Water & beverage sample check QAT QC QAQC