HSE/SWI-27 HOT TAPPING Purpose/Scope of Procedure Ensuring and that all hot tapping work and hot tapping tools maintenance are carried out in accordance with a safe and approved manner. Outlines the processes involved in all Hot Tapping Operations, and hot tapping tools maintenance activities in compliance with the relevant standards. 2 Hot Tapping Technique of attaching a branch fitting to a pipe in service, and creating an opening in this pipe by trepanning/boring a portion of pipe within the attached branch fitting. 3 Pressure Test Certification 4 Prior to commencing a hot tapping operation, the hot tapping machine, the retriever, and the service valve shall be pressure tested to 1.5 times the Maximum Allowable Working Pressure (MAWP) of the lowest rated component. The pressure test shall be maintained for at least 15 minutes. The Certification Documents (Inspection Certificates) shall be properly filled, signed by the ‘Inspection Engineer’ and filed by the Permit to Work (PTW) Performing Authority. General Requirements: All hot tapping operations shall be undertaken in accordance with the approved procedures and the requirements of the Control of Work (CoW) system . Hot tapping shall not be emergency work—if precautions cannot be established in advance, accommodated, and properly implemented, then the unit or equipment shall be taken out of service or shut down. Key Safety Measures: Hot Taps shall not be carried out on piping that can be shut down for sufficient time. The hot tap operations on in-service equipment shall be justified as the Operations Manager could demonstrate that: Continuity of service is essential; Shutdown of the system is impractical; Documented procedures and special equipment are utilized which will provide effective protection for employees. Key Safety Measures Hot taps shall NOT be permitted on lines containing; Acetylene, Amines, Ammonia, Caustic, Chlorides that decompose on heating, Chlorine, Oxygen. Materials that may decompose, polymerize, explode, or detonate upon severe heating(e.g Chlorides, Peroxides etc.) Combustible vapor/air/oxygen mixtures within flammable/explosive ranges. Hot taps shall not be made on lines that are clad or lined. Hot taps shall not be permitted on lines where stress relieving is required. Key Safety Measures Hot taps made on breathing air or potable water lines, upstream of machinery that is not adequately protected by filters, and upstream of instrumentation, shall be reviewed to ensure downstream services will not be affected by metal shavings which may enter the lines. Full-Port Gate or Ball Valves shall shall be tested and certified leak-free, prior to be used in the hot tapping operations. Key Safety Measures The hot tap shall be located: At least 18 inches from all flanges or threaded connections. At least 3 inches from any weld seams. The location of the hot tap shall provide; Clearance and Support for the machine Bending moments applied to the piping by the machine Support requirements for the pipe being hot tapped due to additional weight of the fittings and branch line Availability of air or electric power for the hot tap machine Easy and safe egress for personnel making the hot tap, and easy access for emergency services. Key Safety Measures Thickness measurements shall be taken in the location of the hot tap and extending out to either side for a minimum of 12 inches or the diameter of the pipe, whichever is greater. Inspection and engineering assessment shall be carried out to ensure that the pipeline thickness is suitable for the hot tapping operations (A minimum base metal thickness for hot tapping is ¼ inch). Key Safety Measures Suggested product velocities range during welding are: For liquids: from (0.4 m/sec) to (1.22 m/sec). For gases: from (0.4 m/sec) with no maximum limits. Dye penetrant examination of the surface of a stainless-steel pipe is required to ensure that no stress cracking of the surface. If stress cracking exists, ultrasonic survey shall be carried out by the Inspection Engineer, for determination of the suitability of the pipe for hot tapping operations. Key Safety Measures All welds on pressure containing parts shall be made using ASME Code certified welders. Proof of competence for the Contractor’s welders (training certificates) shall be provided. Maximum allowable operating Pressure and Temperature of the flowing product inside the pipeline on which hot tapping activities take place shall be established and monitored during the whole operation. All welds on pressure containing parts shall be made using ASME Code certified welders. Proof of competence for the Contractor’s welders (training certificates) shall be provided. Key Safety Measures To ensure adequate strength in the welded fittings, only standard fittings that meet the strength requirements of the pipe specification shall be used. Inspection of the welds and the weldment shall consist of the following: 100% of the root (first) weld pass and 100% of the final pass of all welds shall be examined by dye penetration testing procedures. If dye penetrant examination is not possible, alternate testing methods will be determined and approved by the Inspection Engineer. Key Safety Measures: All weldments, complete with flange and valve, shall be pressure tested to assure integrity. Branch connections which utilize a Reinforcement Pad Branch Fitting (re-pad) or split tee reinforcement shall be hydrotested before installation of the re-pad or split tee. A hydro test at 150% of design pressure is preferred. If a Hydrotest is not possible due to operating temperatures, a pneumatic test at 110% of design pressure shall be performed. Key Safety Measures: Contractor shall perform measurements and calculations to verify that the cutter or the pilot drill shall not penetrate beyond the center of the pipe. The Performing Authority shall review these calculations. The temperature of the pipeline shall be monitored, by using heat guns, to ensure that the temperature is kept within the safe limits. In case of insufficient or interrupted flow, such as flare line, it may be necessary to continually purge the line with inert gas or hydrocarbon gas to ensure that the line doesn’t contain a flammable mix during welding operation. Key Safety Measures Never pump in or out of a tank while hot work is in progress. Turn off all heating coils during hot tapping. No attempts shall be made to hot tap atmospheric pressure petroleum storage tanks above the liquid level (in the vapor space or on the roof). Key Safety Measures Maintain at least 1 meter of liquid head above the hot work area when welding or hot tapping is being done on a tank. No hot tapping over floating tank roofs, double-walled vessels, lined pipeline, or pipeline with casing. Strainers near Pumps and Control Valves may be clogged by the cutting debris inside the pipeline. Consideration shall be given in such cases, and shall be covered by RA. Key Safety Measures Coupon Retrievers shall be verified by the Performing Authority. Specific Contingency Plans shall be prepared and approved by the Operations Manager, The plan shall include the following points as minimum requirements: Operational Emergency (OE) and the recovery conditions. Contingency plans shall include readiness for emergency shutdown of the facility, distribution of operators at the main isolation points, and fire & safety equipment, and the firefighters. Firefighting equipment in place. Site layouts, including the main isolation points of pipeline or equipment. Key Safety Measures No other activity shall be carried out, which could affect the safety or integrity of equipment/facility, In case that hot tapping operation has to be carried out at a high elevation, the scaffold shall be provided as per the "OSHA Recommended Practice for Scaffolding. In case that hot-tapping operation has to be carried out in underground pit, Confined Spaces procedure shall be followed.. Key Safety Measures Ensure the gas test are carried out by calibrated and certified gas testing device. Ensuring that any area in which the fire detection/protection has been inhibited/overridden, shall not left unattended. Use of iron hammer shall not be used. Wooden, rubber, or copper hammer under adequate supervision may be allowed to be used with caution. Key Safety Measures 21 Hot tapping machine shall be independently supported, and its weight shall not be transferred to the equipment/pipeline which is being tapped. Hot tapping shall not be carried out during high windy, stormy, dusty and wet atmospheric conditions. Spilled hydrocarbons and Fluids shall be cleaned and disposed of safely in an environmentally-friendly (Ecofriendly) manner. Stand by fire truck should be present on-site. Key Safety Measures Mobile plant, equipment, and vehicles shall be stationed upwind, and shall not be within the fifteen (15) meters radius from the working spot, and their engines are switched off. The Safety Data Sheet (SDS) of the welding electrodes shall be reviewed for Permissible Exposure Levels (PELs) of their fumes. Ensure that the operating pressure and temperature of equipment or piping being hot tapped shall not exceed the rated pressure and temperature of the cutting machine, at any time. Hot Tapping Machine, Retrieval Tool & Access Valve The following conditions should be applied: 23 Safeguards shall be fitted in place, the safe use and testing procedures of hot tapping machine, retrieval tool, and the service valve, shall be maintained as per the manufacturers’ instructions manuals, and the applicable standards. The operating conditions of the hot tapping machine, retrieval tool, and the access valve shall be maintained as per the manufacturers’ instructions manuals, and the applicable standards. Protective Clothing and Equipment All personnel shall wear appropriate PPE, which shall not be contaminated with oil or grease - may include, but are not limited to, the following: Cotton coverall along with suitable aprons, and sleeves. The welder shall wear the appropriate PPEs. The hot tapping machine operator shall also use other PPE (such as goggles, helmet, face shield, hand gloves etc.) As the Hot tapping Machine is a rotating equipment, therefore all personnel should not wear loose clothing. The Work-site Crew shall be familiar with precautionary measures associated with breathing apparatus for safe escape. Documentations Hot tapping procedures shall be made available at Site for the entire duration of the hot tapping operation. The Manufacturer's instructions manuals shall also be followed while performing the hot tapping operations. Upon completing the hot tapping operation, the hot tapping machine shall not be removed until the required inspection is completely finished.