Uploaded by Ahmed Mohamed Abdelhamid Elmarsfi

Ahmed Mohamed Abdelhamid

advertisement
Ahmed Mohamed Abd El Hamid
Date of Birth
Nationality
Address
Military status
Mobile
Email
Languages Known
:
:
:
:
:
:
:
1th Nov, 1986
Egyptian
8 st Bostan Redan – El Zaher – Cairo.
done “Reserve officer “.
01064393172
Elmarsfi@gmail.com
Arabic, English is good.
OBJECTIVE
I am seeking a challenging career in a leading Company as an Engineer, Which matches my
field of interest in Communication Engineering, where my abilities and skills can be developed
and knowledge can be applied.
EDUCATIONAL DETAILS
Course
B.E
(Electronics and
Communication)

College/University
Year
Aggregate
Garyounis , Libya
2008
82.3%
Holds a certificate of equation of the Supreme Council of Universities.
SKILLS:


CCNA (Cisco certified networking associate).
Mobile package “FROM GSM TO LTE “Theoretical and practical and “Drive Test “in
TELECOME EGYPT.

Microsoft ® certified technology specialist: Windows server® 2008 network infrastructure,
configuration.
EXPERINCE:
1 - Operation, repair and maintenance of equipment and electrical devices “Egyptian Armed
Forces” (1/12/2010 to 31/3/2012).
2 - Site Engineer in " Teleco-max Consult Group " from (12/ 2012 to 5/ 2014).
Projects:
- Site survey Alcatel Lucent for Mobinil (Orange) Single RAN Project.
- Site monitors Huawei for Vodafone.
- Safety engineer from (1/2014 to 5/ 2014).
3 - Site Engineer in "LCC Company" from (6/ 2014 to 4/ 2015).
- Safety engineer in LCC Company from (6/ 2014 to 9/ 2014).
- Site engineer in LCC Company from (10/2014 to 4/ 2015)
Project:
- 2G (New - expansion - swap from RBS2000 to RBS 6000, troubleshoot alarms)
- 3G (New - expansion - swap from RBS3000 to RBS 6000, troubleshoot alarms)
4- Site engineer in Sysel Saudi Arabia from (4/2015 to 30/9/2015).
Project:
- NEC microwave swap project in south area
5 - Site engineer in GSM Company from (7/2018 till 2/2020)
Project:
- 2G (New - expansion - swap from RBS2000 to RBS 6000 , troubleshoot alarms )
- 3G ( New - expansion - swap from RBS3000 to RBS 6000 , troubleshoot alarms )
- 4G ( New - expansion - Mimo action - troubleshoot alarms )
6- Project Coordinator from 2/2020 till 30/11/2022
-
Etisalat Ericsson Expansion Radio Project from 2/2020 to 15/12/2020
Vodafone Ericsson ( L2600 , Massive Mimo , Power Action , Mimo Actions ) from
15/12/2020 to 30/11/2022
Download