Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Design responsibility Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility 3 - Developed Design Design team Level of detail (LOD) Level of information 1 1 1 1 1 1 1 1 Design responsibility 4- Technical Design Design team Level of detail (LOD) Level of information 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design responsibility 5 - Construction Design team Level of detail (LOD) Level of information 3 3 Design responsibility 6 - Handover and Close Out Design team Level of detail (LOD) Level of information 4 4 4 4 4 4 4 4 4 4 4 4 Design responsibility 7 - In Use Design team Level of detail (LOD) Level of information 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Design responsibility Design team Level of detail (LOD) Level of information 6 6 SCA/2018 1A Services Provided by the Project Lead Stage 0 Strategic Definition 1.01 Obtain the Client’s Requirements, Budget and Project Timetable including the Client’s Business Case and the Strategic Brief. 1.02 Inform the Client of the duties of a client under the CDM Regulations and that guidance is available from the Health & Safety Executive. 1.03 Advise on the need for and the scope of Consultants’ services and the conditions of their appointment. 1.04 Arrange for and assist in the selection of Consultants. 1.05 Prepare Services Timetable for the completion of the Services. Stage 1 Briefing and Appraisal 1.06 Assist the Client in preparation of the Client’s Requirements including any Project objectives, Quality objectives, Project outcomes and Sustainability objectives 1.07 Advise Client on methods of procuring construction. Project Manager (HC) Project Manager (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Project Manager (HC) Design Lead (HC) 1.08 Advise the Client on the need for specialist contractors, sub-contractors and suppliers to design and execute parts of the Works. 1.09 Review with the Client alternative design and construction approaches and cost implications. Stage 2 Concept Design 1.10 Provide information to others for cost planning. Design Lead (HC) Design Lead (HC) 1.11 Submit outline proposals and approximation of construction costs for the Client’s preliminary approval. 1.12 Obtain Client acceptance of the Brief. Project Manager (HC) Project Manager (HC) Project Manager (HC) Design Lead (HC) 1.13 Obtain Client acceptance of the Concept Design. 1.14 Obtain confirmation or revision to the Client’s Requirements including Project objectives, Quality objectives, Sustainability objectives and Budget. 1.15 Define the Other Project Team Members’ roles and responsibilities. 1.16 Identify, agree and implement appropriate (Digital) Information Handling Systems, including identifying roles and responsibilities of all parties. (BIM) Stage 3 Design Development 1.17 Review and update the Project objectives, Quality objectives, Project outcomes and Sustainability objectives. Stage 4 Technical Design 1.18 Generate a maintenance and access strategy. Project Manager (HC) BIM Coordinator (HC) Design Lead (HC) Design Lead (HC) 1.19 Advise on and recommend form of building contract and explain the Client’s obligations thereunder. 1.20 Obtain the Client’s approval of the type of construction, quality of materials and standard of workmanship. Quantity Surveyor (HC) Design Lead (HC) 1B Services Provided by the Contract Administrator Stage 4 Technical Design 1.21 Advise on and obtain the Client’s approval to a list of tenderers for the building contract. 1.22 Invite tenders. Project Manager (HC) Contract Administrator (HC) Contract Administrator (HC) 1.23 Appraise and report on tenders with other Consultants. Stage 5 Construction 1.24 Advise the Client on the appointment of the Contractor and on the responsibilities of the parties under the building contract. 1.25 Prepare the building contract and arrange for it to be signed. 1.26 Administer the terms of the building contract. Project Manager (HC) Quantity Surveyor (HC) Contract Administrator (HC) Contract Administrator (HC) Quantity Surveyor (HC) Contract Administrator (HC) Commissioning Manager (HC) Contract Administrator (HC) 1.27 Conduct meetings with the contractor to review progress. 1.28 Present to the Client financial reports prepared by others. 1.29 Generate a hand-over strategy. 1.30 Arrange for [contractor] testing and commissioning of Mechanical, Electrical and Plumbing systems. 1.31 Arrange for drawings of Mechanical, Electrical and Plumbing installations to be provided. 1C Services Provided by the Principal Designer Stage 0 1.32 Prepare and provide to other duty holders relevant information required under the Regulations Stages 0-4 1.33 Plan, manage, monitor and co-ordinate health and safety considerations in the preparation of the design 1.34 Direct Designers in identifying and eliminating or controlling foreseeable risks 1.35 Use reasonable endeavours to ensure Designers carry out their duties (reg 9) Stages 4-6 1.36 Liaise with the Principal Contractor to support their planning, management, monitoring and co-ordination of the construction 2 Services Provided by the Architect Stage 1 Briefing and Appraisal 2.1 Obtain information about the Site from the Client. CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) 1 1 1 1 1 1 CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) 2 2 2 2 2 2 CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) 3 3 3 3 3 3 CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) CDM Advisor (HC) Design Lead (HC) 2.2 Visit the Site and carry out an initial appraisal. Design Lead (HC) 2.3 Carry out such studies as may be necessary to determine the feasibility of the Client’s Requirements. 2.4 Assist the Project Lead to review with the Client alternative design and construction approaches and cost implications. Design Lead (HC) 2.5 Advise the Client on the need to obtain planning permission, approvals under building acts and/or regulations and other statutory requirements. 2.6 Ascertain any Town and Country Planning implications. Design Lead (HC) 1 1 1 1 1 1 1 1 1 1 1 1 Design Lead (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 CDM Advisor (HC) CDM Advisor (HC) Design responsibility Level of detail (LOD) Level of information Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task 2.7 Ascertain any other Environmental restrictions. Stage 2 Concept Design 2.8 Analyse the Client’s Requirements; prepare concept design and specification proposals. 2.9 Assist the Project Lead to provide information to others for cost planning. 2.10 Assist the Project Lead to submit outline proposals and approximation of construction cost for the Client’s preliminary approval. 2.11 Assist the Project Lead to obtain Client acceptance of the Brief. 2.12 Assist the Project Lead to obtain Client acceptance of the Concept Design. 2.13 Co-operate with the Principal Designer (where not the architect). 2.14 Make application for planning permission in principle. Design responsibility Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Design Lead (HC) Design team Level of detail (LOD) Level of information 1 1 Design responsibility Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 2.16 Prepare appropriate Health and Safety Risk Assessments. Design Lead (HC) Design team Level of detail (LOD) Level of information 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design responsibility Design Lead (HC) Design Lead (HC) Design Lead (HC) 2.21 Consult with fire authorities. Design Lead (HC) 2.22 Consult with environmental health authorities. Design Lead (HC) 2.23 Consult with statutory undertakers. Design Lead (HC) 2.24 Prepare an application for full planning permission. Design Lead (HC) 2.25 Prepare appropriate Health and Safety Risk Assessments. CDM Advisor (HC) Design Lead (HC) Stage 4 Technical Design 2.28 Develop a technical design from approved scheme design in co-ordination with other design team members and proposed specialist sub-contractors. 2.29 Assist the Project Lead to generate a maintenance and access strategy. 2.30 Provide information to other consultants for their revision of cost estimate. 2.31 Consult with building control authorities on developed design proposals. 2.32 Consult with fire authorities on developed design proposals. 2.33 Prepare applications for approvals under building acts and/or regulations and other statutory requirements. 2.34 Apply for approvals under the building acts and/or regulations and other statutory requirements. 2.35 Assist the Project Lead to obtain the Client’s approval of the type of construction, quality of materials and standard of workmanship. 2.36 Pass relevant information to the Principal Designer (where not the Architect) for incorporation in the initial Health and Safety Plan. 2.37 Prepare production drawings for construction. Design team Level of detail (LOD) Level of information 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design responsibility Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design team Level of detail (LOD) Level of information 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design responsibility 7 - In Use Design team Level of detail (LOD) Level of information 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Design responsibility Design team Level of detail (LOD) Level of information 6 6 6 6 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 2.39 Provide information for the preparation of schedules of rates and/or quantities and/or schedules of works for tendering purposes. 2.40 Co-ordinate production information. Design Lead (HC) 2.41 Provide information to other consultants for their revision of cost estimate. 2.42 Assist the Contract Administrator to appraise and report on tenders with other consultants. Stage 5 Construction 2.43 Provide production information as required by the building contract. 2.44 Assist the Contract Administrator to administer the terms of the building contract. 2.45 Assist the Contract Administrator to conduct meetings with the contractor to review progress. 2.46 Assist the Contract Administrator to present to the Client financial reports prepared by others. 2.47 Generally inspect materials delivered to the site. Design Lead (HC) 2.52 Assist the Contract Administrator to generate a hand-over strategy. Stage 6 Handover and Close Out 2.53 Assist the Contract Administrator to arrange for testing and commissioning of Mechanical, Electrical and Plumbing systems. 2.54 Pass relevant information to the Principal Designer (where not the Architect) for incorporation in the Health and Safety File. 6 - Handover and Close Out Design Lead (HC) 2.38 Prepare detailed specifications for construction. 2.48 As appropriate instruct sample taking and carrying out tests of materials, components, techniques and workmanship and examine the conduct and results of such tests whether on or off Site. 2.49 As appropriate instruct the opening up of completed work to determine that it is generally in accordance with the Contract Documents. 2.50 At intervals appropriate to the stage of construction visit the site to observe and comment on the contractor’s site supervision and examples of his work relevant to the provisions of the building contract. 2.51 Review contractor’s and sub-contractors proposals. 5 - Construction Design Lead (HC) 2.20 Consult with building control authorities. 2.26 Prepare a scheme design showing spatial arrangements, materials and appearance, together with a cost estimate, and obtain the Client’s approval. 2.27 Submit an application for full planning permission. 4- Technical Design Design Lead (HC) 2.15 Assist the Project Lead to identify, agree and implement appropriate (Digital) Information Handling Systems, including identifying roles and responsibilities of all parties. Stage 3 Design Development 2.17 Develop a scheme design from the approved Concept Design proposals incorporating information from other members of the design team. Prepare accompanying specifications. 2.18 Provide information to other consultants for their preparation of cost estimate. 2.19 Consult with planning authorities. 3 - Developed Design Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Quantity Surveyor (HC) Clerk of Works (HC) Contract Administrator (HC) Contract Administrator (HC) Contract Administrator (HC) Design Lead (HC) Design Lead (HC) Commissioning Manager (HC) Design Lead (HC) Design responsibility Level of detail (LOD) Level of information Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Design responsibility Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Level of detail (LOD) 3 - Developed Design Design team Level of information Design responsibility Level of detail (LOD) 4- Technical Design Design team Level of information Design responsibility Level of detail (LOD) 5 - Construction Design team Level of information Design responsibility Level of detail (LOD) 6 - Handover and Close Out Design team Level of information Design responsibility Level of detail (LOD) 7 - In Use Design team Level of information 2.55 Provide Final Construction Issue architectural drawings and specifications for the building appropriate for the Health and Safety File and general maintenance. 2.56 Give general advice on maintenance. Design responsibility Design Lead (HC) Design Lead (HC) Design team Level of detail (LOD) Level of information 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 Design responsibility Level of detail (LOD) Level of information 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 Acoustician 7 7 Project Sponsor (HC) 7 7 7 7 7 7 7 7 7 7 7 7 7 7 3 Other services for which additional fees are included in the fee agreement [if required from the design lead] Cost Advice 3.1 Prepare an approximation of construction cost of the approved Concept Design. 3.2 Prepare cost estimate of approved Design Development. Quantity Surveyor (HC) 2 2 Quantity Surveyor (HC) 3 3 3 3 3 3 3 3 3.3 Revise cost estimate of the approved Technical Design. 3.4 Prepare schedules of rates and/or quantities and/or schedules of works for tendering purposes. 3.5 Prepare pre-tender cost estimate based on tender documentation. 3.6 Negotiate a price with contractor. 3.7 Prepare financial reports for the Client. Quantity Surveyor (HC) Quantity Surveyor (HC) Quantity Surveyor (HC) 1 1 Quantity Surveyor (HC) 2 2 Quantity Surveyor (HC) Quantity Surveyor (HC) Quantity Surveyor (HC) Quantity Surveyor (HC) Quantity Surveyor (HC) 4 4 4 4 4 4 4 4 3.8 Prepare valuations of work carried out and completed. Statutory/Other Parties 3.9 Conduct exceptional negotiations with planning authorities. Design Lead (HC) 3.10 Arrange for specialist advice in connection with planning and other statutory requirements. 3.11 Make revisions to scheme design to meet requirements of planning and other statutory authorities. 3.12 Negotiate if necessary over building acts and/or regulations and other statutory requirements and revise documentation. 3.13 Submit plans for proposed building works for approval of landlords, funders, freeholders, tenants or others as requested by the Client. Design Skills 3.14 Provide interior design services. Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 3.16 Design furniture and fittings. Design Lead (HC) 3.17 Provide landscape design services. Landscape Architect (HC) Design Lead (HC) 3.18 Provide model-making and/or photographic services. 3.19 Provide specialist services in connection with energy conservation and carbon emissions. Energy & Sustainability Consultant (HC) Property Support (HC) Property Support (HC) 3.20 Arrange/co-ordinate electronic document management systems. 3.21 Agree/prescribe systems/software for data transfer. Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Ecologist 3.27 Provide services in connection with environmental studies. 3.28 Provide specialist advice on Acoustics. 3.29 Provide/arrange specialist advice on Airtightness/Permeability. 3.30 Provide Fire Engineering consultancy services. Buildings/Sites 3.31 Advise on the suitability and selection of sites. Acoustician Design Lead (HC) Fire Safety Officer (HC) Design Lead (HC) Design Lead (HC) 3.32 Make measured surveys, take levels and prepare plans of Topographical sites. Surveyor 3.33 Arrange for investigations of soil conditions of sites. 3.34 Advise on the suitability and selection of buildings. Topographical Surveyor Civil Engineer Design Lead (HC) 3.35 Make measured surveys and prepare drawings of existing Topographical buildings. Surveyor 3.36 Inspect and prepare report and schedule of condition of Building Surveyor existing buildings. 3.37 Inspect and prepare report and schedule of dilapidations. Topographical Surveyor Building Surveyor 3.38 Prepare, submit, and negotiate claims following damage by fire and other causes. 3.39 Investigate and advise on means of escape in existing buildings. 3.40 Investigate and advise on change of use in existing buildings. 3.41 Investigate and report on building failures. Design Lead (HC) Design Lead (HC) Design Lead (HC) Building Surveyor Building Surveyor Design Lead (HC) Design Lead (HC) 3.43 Make structural surveys and reports on the structural elements of buildings. 3.44 Investigate and advise on sound insulation in existing buildings. 3.45 Inspect and prepare a valuation report for mortgage or other purposes. Post Contract Evaluation 3.46 Carry out [facilitate / organise] post occupancy evaluations of building in use Structural Engineer Acoustician Structural Engineer Acoustician Building Surveyor Building Surveyor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 Design Lead (HC) Design Lead (HC) Design Lead (HC) Landscape Architect (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Property Support (HC) Property Support (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) Ecologist Acoustician Design Lead (HC) Fire Engineer Design Lead (HC) Topographical Surveyor Civil Engineer Design Lead (HC) Topographical Surveyor Building Surveyor Design Lead (HC) Design Lead (HC) 3 3 3 3 3 3 3 3 Design Lead (HC) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Design Lead (HC) Design Lead (HC) Landscape Architect (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Property Support (HC) Property Support (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) Ecologist Acoustician Design Lead (HC) Fire Engineer Topographical Surveyor Civil Engineer Design Lead (HC) Topographical Surveyor Building Surveyor Design Lead (HC) Design Lead (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 2 2 2 2 Building Surveyor 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) Design Lead (HC) Design Lead (HC) Landscape Architect (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Property Support (HC) Property Support (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) Ecologist Acoustician Design Lead (HC) Fire Engineer Topographical Surveyor Civil Engineer Design Lead (HC) Topographical Surveyor Building Surveyor Design Lead (HC) Design Lead (HC) Design Lead (HC) 1 2 1 1 1 1 1 1 1 Building Surveyor Design Lead (HC) 3 3 3 3 2 3 3 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 Building Surveyor Design Lead (HC) 4 4 4 4 4 4 3 3 3 3 3 3 3 Structural Engineer Acoustician Building Surveyor 5 5 5 5 5 5 5 5 5 Design Lead (HC) Design Lead (HC) Design Lead (HC) Landscape Architect (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Property Support (HC) Property Support (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) Ecologist Acoustician Design Lead (HC) Fire Engineer Topographical Surveyor Civil Engineer Topographical Surveyor Building Surveyor Project Sponsor (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 Contract Administrator (HC) Structural Engineer Acoustician Building Surveyor Quantity Surveyor (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Building Surveyor Design Lead (HC) 3 Structural Engineer Acoustician Design Lead (HC) 5 5 Design Lead (HC) Building Surveyor Design Lead (HC) 2 Structural Engineer Acoustician Design Lead (HC) 5 Design Lead (HC) Design Lead (HC) Building Surveyor Design Lead (HC) Energy & Sustainability Consultant (HC) Property Support (HC) Property Support (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) Ecologist Acoustician Building Surveyor Project Sponsor (HC) Contract Administrator (HC) Contract Administrator (HC) Structural Engineer Acoustician Building Surveyor Design Lead (HC) 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 Energy & Sustainability Consultant (HC) Property Support (HC) Property Support (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) Ecologist Contract Administrator (HC) Contract Administrator (HC) Structural Engineer Acoustician Building Surveyor Project Manager (HC) SCOPING / INITIATION Project Manager (HC) Project Sponsor (HC) Development of designers programme Draft of master programme 2 Design Lead (HC) Building Surveyor 3.42 Arrange for and inspect exploratory work by contractors and specialists in connection with building failures. Site ownership and boundary locations 2 Design Lead (HC) 1 Funding arrangements 2 2 Design Lead (HC) 3.15 Advise on the selection of furniture and fittings. Consultancy Services 3.22 Provide information in connection with local authority, government and other grants. 3.23 Make applications for local authority, government and other grants. 3.24 Conduct negotiations for local authority, government and other grants. 3.25 Provide services in connection with party wall negotiations. 3.26 Provide specialist advice on energy conservation and carbon emissions in new or existing buildings. 2 Quantity Surveyor (HC) Quantity Surveyor (HC) Project Manager (HC) Project Manager (HC) Project Sponsor (HC) Design Lead (HC) Project Manager (HC) 1 1 1 1 1 1 1 1 Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Development of brief Design responsibility Project Sponsor (HC) Room data sheets Accommodation Schedule Adjacencies Technical brief Sustainability review and energy statement Engineering requirements to be developed Energy & Sustainability Consultant (HC) Principal Engineer (HC) Appointment of engineering consultants Development of sustainabilty objectives Advise specialist M&E input Energy & Sustainability Consultant (HC) Principal Engineer (HC) Commissioning policy Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Principal Engineer (HC) Principal Engineer (HC) Energy & Sustainability Consultant (HC) Principal Engineer (HC) Commissioning Manager (HC) Design team Level of detail (LOD) Level of information 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Draft Outline Specification Stakeholder Consultation Strategy Project Sponsor (HC) Building management strategy Adherence to the project procedures Review lessons learned from previous projects All Project Manager (HC) VISITS / INVESTIGATIONS / SURVEYS / RECORDS / STRATEGIES Identify relevant fire legislation which will affect the design of the building Highlight any significant constraints arising from the site such as fire service access, boundary conditions, water supplies and crowd dispersal, etc. Review project requirements to provide a sprinkler hazard assessment guidance Provide design strategies and advice for the provision of fire fighting facilities and equipment Provide design strategies and advice in liaison with the M&E consultant for the active fire safety systems Prepare a ground investigation desk study of the site [refer to CIRIA guidance and to BS 5930:2015] Prepare a ground investigation reconnaissance briefing note [refer to CIRIA guidance and to BS 5930:2015] Outline the effects of limitations of the site from topography / ground composition / access Obtain records of all utilities Advise on the arrangements to be made for a utility scan, and develop a scope of works Prepare accurate GA drawings for existing water and drainage detailing connections and building entry / exit points Project Sponsor (HC) Project Sponsor (HC) All Project Manager (HC) 1 1 1 1 1 1 1 1 Design team Level of information Design responsibility Level of detail (LOD) Level of information Design responsibility Level of detail (LOD) Level of information Principal Engineer (HC) 2 2 Principal Engineer (HC) 3 3 Principal Engineer (HC) 4 4 Principal Engineer (HC) 5 5 Energy & Sustainability Consultant (HC) 2 2 Energy & Sustainability Consultant (HC) 3 3 Energy & Sustainability Consultant (HC) 4 4 Energy & Sustainability Consultant (HC) 5 5 2 2 Commissioning Manager (HC) 3 3 Commissioning Manager (HC) 4 4 Commissioning Manager (HC) 5 5 2 2 2 2 3 3 4 4 5 5 2 2 3 3 4 4 5 5 2 2 3 3 4 4 5 5 2 2 2 2 3 3 3 3 4 4 5 5 3 3 4 4 5 5 3 3 4 4 5 5 3 3 4 6 3 3 4 4 3 3 4 4 3 3 3 3 4 4 3 3 4 4 3 3 4 4 3 3 4 4 3 3 4 4 3 3 3 3 4 4 4 4 5 5 5 5 3 3 4 4 5 5 3 3 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Commissioning Manager (HC) Design Lead (HC) Project Sponsor (HC) Project Sponsor (HC) All Civil Engineer Civil Engineer Civil Engineer 1 1 1 1 1 1 1 1 Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Project Sponsor (HC) Project Sponsor (HC) All Project Sponsor (HC) Project Sponsor (HC) All Project Sponsor (HC) Project Sponsor (HC) All 7 - In Use Design team Level of detail (LOD) Fire Engineer Civil Engineer Design team Design responsibility Fire Engineer 1 Design team 6 - Handover and Close Out Level of information Fire Engineer 1 5 - Construction Level of detail (LOD) Fire Engineer Civil Engineer 4- Technical Design Design responsibility Fire Engineer Design responsibility Design team Level of detail (LOD) Level of information 6 6 6 6 6 6 6 6 6 6 6 6 6 6 Project Manager (HC) 6 6 CDM Advisor (HC) 6 6 6 6 6 6 6 6 6 6 Commissioning Manager (HC) Project Sponsor (HC) Project Sponsor (HC) All Design responsibility Commissioning Manager (HC) Project Sponsor (HC) Project Sponsor (HC) All Level of detail (LOD) Level of information 7 7 7 7 7 7 7 7 7 7 7 7 Fire Engineer 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Fire Engineer Fire Engineer Fire Engineer Fire Engineer Fire Engineer Fire Engineer Fire Engineer Fire Engineer Fire Engineer Civil Engineer Advise on the need for arrangements to be made for geotechnical investigations of the site Advise arrangements to be made for contamination investigations on the site Define the extent of underground foul and surface water drainage condition survey requirements Advise of the potential for the re-use or demolition of any existing buildings Provide a report on the structure of the buildings to be demolished and an outline method statement for their demolition. Prepare and submit pre development enquiry on water and waste water Arrange for flow and pressure test / water impact assessment / drainage impact assessment Liaise with relevant external statutory authority parties and public utility bodies (SW / SEPA / FRM, etc.) Advise of all potential issues arising from the design development which effect the obtainment of consent, including diversions and capacity Ensure all SW / GI consents are granted and are in place Prepare accurate GA drawings for existing power, gas and comms - detailing connections and building entry / exit points Civil Engineer Liaise with relevant external statutory authority parties and public utility bodies (SSE / BT / SGN) Energy & Sustainability Consultant (HC) Civil Engineer Civil Engineer Structural Engineer Structural Engineer Civil Engineer 1 1 1 1 1 1 1 1 1 6 1 1 Civil Engineer Civil Engineer Civil Engineer Structural Engineer Structural Engineer Civil Engineer Civil Engineer Civil Engineer 1 1 Civil Engineer Civil Engineer Structural Engineer Civil Engineer Civil Engineer 2 Civil Engineer 1 1 Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Building Surveyor Design Lead (HC) Design Lead (HC) Principal Designers duties Principal Designer Principal Designer Confirmation of Principal Designer appointment Design Lead (HC) Design Lead (HC) Development of master programme Project Manager (HC) Project Manager (HC) Design Lead (HC) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Ecologist Arboriculturalist Ecologist Design Lead (HC) Structural Engineer Civil Engineer Civil Engineer Civil Engineer 2 Advise of all potential issues arising from the design development which effect the obtainment of consent, including diversions and capacity Ensure all utility service consents are granted and are in place Prepare condition survey of adjacent properties with potential to be affected by construction works. Ecology & environmental surveys Tree Surveys Archaeological assessment / survey Asbestos surveys 3 - Developed Design 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Building Surveyor Ecologist Arboriculturalist Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Building Surveyor Ecologist Arboriculturalist Design Lead (HC) Ecologist Arboriculturalist Design Lead (HC) Ecologist Arboriculturalist DESIGNING DUTIES Development of designers programme CDM compliance / risk assessments CDM Advisor (HC) Project Sponsor (HC) Project Manager (HC) Design Lead (HC) CDM Advisor (HC) CDM Advisor (HC) Project Sponsor (HC) Project Manager (HC) Design Lead (HC) Project Manager (HC) Project Manager (HC) Pre construction health & safety plan (inc. fire strategy) Instruction of change Issue of CCS forms Design team coordination Project risk register Principal Designer Principal Designer Principal Designer Principal Designer Design Lead (HC) Project Manager (HC) Design Lead (HC) CDM Advisor (HC) CDM Advisor (HC) Project Sponsor (HC) Project Manager (HC) Design Lead (HC) Project Manager (HC) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Project Manager (HC) Design Lead (HC) CDM Advisor (HC) CDM Advisor (HC) Project Sponsor (HC) Project Manager (HC) Design Lead (HC) Project Manager (HC) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Project Manager (HC) Design Lead (HC) CDM Advisor (HC) CDM Advisor (HC) Project Sponsor (HC) Project Manager (HC) Design Lead (HC) Project Manager (HC) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Project Manager (HC) Design Lead (HC) CDM Advisor (HC) Project Sponsor (HC) Project Manager (HC) Design Lead (HC) Project Manager (HC) Principal Designer Project Sponsor (HC) Project Manager (HC) Design Lead (HC) Project Manager (HC) Principal Designer CDM Advisor (HC) Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Design responsibility Energy efficiency evaluation SBEM / SAP calculations Project Sponsor (HC) Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Energy & Sustainability Consultant (HC) M&E Engineer Design team Level of detail (LOD) Level of information 1 1 1 1 Structural options appraisal Design responsibility Energy & Sustainability Consultant (HC) M&E Engineer Structural Engineer Fire Engineer Fire strategy Access / egress strategy to site Design Lead (HC) 1 1 - vehicular circulation Design Lead (HC) Transport Consultant Design Lead (HC) - non vehicular Transport assessment Safer routes to school Flood risk assessment Building maintenance strategy Design Lead (HC) 1 1 Transport Consultant Project Sponsor (HC) Civil Engineer Design Lead (HC) Acoustics Principles of building design (general arrangements) Acoustician Design Lead (HC) Interface / interaction of all design elements Design Lead (HC) Services co-ordination Design Lead (HC) Undertake life cycle costing and review Quantity Surveyor (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) LCTT reports LZCT requirements Advise on section 6 compliance Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Warranties Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Project Sponsor (HC) 3 - Developed Design 1 1 1 1 1 1 1 1 4- Technical Design Design team Level of detail (LOD) Level of information 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design responsibility Energy & Sustainability Consultant (HC) M&E Engineer Structural Engineer Fire Engineer Design Lead (HC) Transport Consultant Design Lead (HC) Transport Consultant Project Sponsor (HC) Civil Engineer Design Lead (HC) Acoustician Design Lead (HC) Design Lead (HC) Design Lead (HC) Quantity Surveyor (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) 5 - Construction Design team Level of detail (LOD) Level of information 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design responsibility Energy & Sustainability Consultant (HC) M&E Engineer Structural Engineer Fire Engineer Design Lead (HC) Transport Consultant Design Lead (HC) Transport Consultant Project Sponsor (HC) Civil Engineer Design Lead (HC) Acoustician Design Lead (HC) Design Lead (HC) Design Lead (HC) Quantity Surveyor (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) 6 - Handover and Close Out Design team Level of detail (LOD) Level of information 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design responsibility M&E Engineer Fire Engineer Transport Consultant Design Lead (HC) Project Sponsor (HC) Acoustician Design Lead (HC) Design Lead (HC) Design Lead (HC) Quantity Surveyor (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Contractor 7 - In Use Design team Level of detail (LOD) Level of information 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Undertake lessons learned review Design responsibility M&E Engineer Fire Engineer Project Sponsor (HC) Facilities Manager (HC) Acoustician Quantity Surveyor (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Contractor Project Manager (HC) Design team Level of detail (LOD) Level of information Design responsibility Level of detail (LOD) Level of information 6 6 6 6 Facilities Manager (HC) 7 7 6 6 Project Sponsor (HC) 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 Facilities Manager (HC) Acoustician Quantity Surveyor (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Facilities Manager (HC) Project Manager (HC) CONSULTATION, APPLICATION & CONSENTS Planning Design Lead (HC) Design Lead (HC) 1 1 Design Lead (HC) Building Control / regulations Design Lead (HC) Police – secured by design Design Lead (HC) Highways design, regulations Street lighting Civil Engineer Energy & Sustainability Consultant (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Access panel Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Care commission Sport Scotland Adjacent land owners Community council / local interest groups 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Preparation of wayleave drawings Design Lead (HC) Design Lead (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Design Lead (HC) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design Lead (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Design Lead (HC) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Design Lead (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Design Lead (HC) Design Lead (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) TENDER DUTIES Cost planning and control Budget monitoring Pre construction health & safety information Employers requirements Prelims Quantity Surveyor (HC) Project Manager (HC) Quantity Surveyor (HC) Project Manager (HC) Project Sponsor (HC) Design Lead (HC) 1 1 1 1 1 1 1 1 Quantity Surveyor (HC) Project Manager (HC) Project Sponsor (HC) Design Lead (HC) Quantity Surveyor (HC) Project Manager (HC) Project Sponsor (HC) Design Lead (HC) 2 2 2 2 2 2 2 2 Quantity Surveyor (HC) 2 2 Quantity Surveyor (HC) 3 3 CDM Advisor (HC) 2 2 CDM Advisor (HC) 3 3 Quantity Surveyor (HC) Project Manager (HC) Project Sponsor (HC) Design Lead (HC) Quantity Surveyor (HC) Quantity Surveyor (HC) Project Manager (HC) Project Sponsor (HC) Design Lead (HC) Quantity Surveyor (HC) Quantity Surveyor (HC) Project Manager (HC) Project Sponsor (HC) Design Lead (HC) Quantity Surveyor (HC) CONSTRUCTION DUTIES Construction phase health and safety plan Construction phase fire safety plan F10 notification Plan in place CDM Advisor (HC) Project Manager (HC) Site inspections Valuations / financial statement Contract administration Review of contractor design submissions Contract Administrator (HC) Design Lead (HC) 3 3 3 3 Contract Administrator (HC) Design Lead (HC) 4 4 4 4 Clerk of work reports Services commissioning scheduling Coordination of snagging lists Issue of handover checklist Contractor Contract Administrator (HC) 3 3 Contract Administrator (HC) 4 4 4 4 Contractor Contractor CDM Advisor (HC) Project Manager (HC) Design Lead (HC) Quantity Surveyor (HC) Contract Administrator (HC) Design Lead (HC) Clerk of Works (HC) Contractor Design Lead (HC) Contract Administrator (HC) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Practical completion certificate As built drawings Contractor As built specification Contractor O & M manual Contractor Health & safety file in place Viewpoint upload to schedule ENABLING AND DEMOLITION Contractor 5 5 CDM Advisor (HC) Project Manager (HC) Design Lead (HC) Quantity Surveyor (HC) Contract Administrator (HC) Design Lead (HC) Clerk of Works (HC) Contractor Design Lead (HC) Contract Administrator (HC) Contract Administrator (HC) Contractor Contractor Contractor CDM Advisor (HC) Contractor Design Lead (HC) Quantity Surveyor (HC) Contract Administrator (HC) Clerk of Works (HC) Design Lead (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Contractor Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Design responsibility Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Level of detail (LOD) 3 - Developed Design Design team Level of information Design responsibility Level of detail (LOD) 4- Technical Design Design team Level of information Design responsibility Level of detail (LOD) 5 - Construction Design team Level of information R+D survey Design responsibility Asbestos Officer (HC) Asbestos removal Dilapidation survey for refurbishments Building Surveyor Schedule of condition – adjacent buildings Building Surveyor 6 - Handover and Close Out Design team Level of detail (LOD) Level of information 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design responsibility Asbestos Officer (HC) Contractor Building Surveyor Building Surveyor 7 - In Use Design team Level of detail (LOD) Level of information 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Design responsibility Building Surveyor Building Surveyor Design team Level of detail (LOD) Level of information 6 6 6 6 Design responsibility Level of detail (LOD) Level of information 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 DRAINAGE Pop up setting out Design Lead (HC) Drainage above FFL M&E Engineer Below FFL drainage Civil Engineer Site wide – surface and foul Civil Engineer Manholes / gullies etc. Civil Engineer Outfalls from site Civil Engineer Discharge of drainage off site or to network Civil Engineer Pumping station requirements Civil Engineer Storm water attenuation Civil Engineer 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 M&E Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 M&E Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Design Lead (HC) M&E Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer Civil Engineer FOUNDATIONS AND UNDERBUILDING Levels and setting out (building only) Design Lead (HC) Loading including M&E plant DPM up to DPC level Structural Engineer Design Lead (HC) DPC’s Design Lead (HC) Retaining structures Slab jointing Civil Engineer Structural Engineer Civil Engineer Civil Engineer Design Lead (HC) Gas membranes Tanking Interface between dpm and tanking Foundation design Structural Engineer Civil Engineer Lift pit details including tanking Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Civil Engineer Structural Engineer Civil Engineer Civil Engineer Design Lead (HC) Structural Engineer Civil Engineer Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Civil Engineer Structural Engineer Civil Engineer Civil Engineer Design Lead (HC) Structural Engineer Civil Engineer Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Civil Engineer Structural Engineer Civil Engineer Civil Engineer Design Lead (HC) Structural Engineer Civil Engineer GROUND FLOOR Levels and setting out Design Lead (HC) Floor construction and specification Design Lead (HC) Structural floor components Structural Engineer 2 2 2 2 Movement joint setting out Interfaces with other elements / structures & external wall / typical details DPC / DPM weather proofing Insulation – U Values Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) 1 1 2 Design Lead (HC) Cold bridging Design Lead (HC) Acoustic performance Design Lead (HC) Project Sponsor (HC) 1 1 Design Lead (HC) 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) 2 Condensation risk analysis Fire rating and compartmentation 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Acoustician Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician SUPERSTRUCTURE Setting out grid Design Lead (HC) Structural options appraisal Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Frame design Secondary frame elements and infill (including deflection head details) Lintels – performance spec / Schedule Movement / expansion joints Connection details Protective finishes (including fire) to frame Finish slab levels Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) Stairs – design intent Design Lead (HC) Lift shaft Structural Engineer Temporary bracing if required Interfaces with other structural elements 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer EXTERNAL WALLS Cladding material specifications Design Lead (HC) Curtain walling Design Lead (HC) Support for curtain walling system / cladding Windows / glazing and ironmongery details Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) External doors / details & ironmongery Design Lead (HC) External screens / details & ironmongery Design Lead (HC) Structural openings (lintels and wind posts) Structural trimming and restraint for openings Movement joint setting out Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Level of information Design responsibility DPC / DPM / cavity trays Design Lead (HC) Energy & Sustainability Consultant (HC) Level of detail (LOD) 3 - Developed Design Design team Masonry / cladding support systems including wall ties, head restraints and masonry reinforcement Interfaces with other elements / structures / typical details Insulation – U Values Level of detail (LOD) Design team Design responsibility Structural Engineer Design Lead (HC) Task Design responsibility 2 - Concept Design Level of information Design team Level of detail (LOD) Level of information 2 2 2 2 2 2 2 2 Design Lead (HC) 1 1 Condensation risk analysis Design Lead (HC) Air tightness Design Lead (HC) 2 2 Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) 1 1 Design Lead (HC) Project Sponsor (HC) 2 2 Design Lead (HC) Fire stopping, rating and compartmentation Acoustic performance Design responsibility Structural Engineer Design Lead (HC) 1 1 Design Lead (HC) Design Lead (HC) Level of information 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Acoustician Design responsibility Structural Engineer Design Lead (HC) Design Lead (HC) 3 3 3 3 3 3 Design Lead (HC) Design Lead (HC) Design Lead (HC) Level of information 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) Acoustician Design responsibility Structural Engineer Design Lead (HC) Design Lead (HC) 7 - In Use Design team Level of detail (LOD) Level of information 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Design responsibility Level of detail (LOD) Design team Level of information Design responsibility Level of detail (LOD) Level of information Facilities Manager (HC) 7 7 Facilities Manager (HC) 7 7 7 7 7 7 7 7 Facilities Manager (HC) 7 7 Facilities Manager (HC) 7 7 Design Lead (HC) 4 4 4 4 4 4 Design Lead (HC) 3 6 - Handover and Close Out Design team Level of detail (LOD) Design Lead (HC) Design Lead (HC) 2 5 - Construction Design team Level of detail (LOD) Design Lead (HC) Cold bridging Vapour control layers 4- Technical Design Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design Lead (HC) Acoustician ROOF Levels and setting out Design Lead (HC) Roof build up (inc. decks and terraces) Design Lead (HC) Roof structure RWP & gutter including capacities and snow boards Structural Engineer Structural Engineer Design Lead (HC) Fascia and soffits Design Lead (HC) Wind loading Structural Engineer Structural Engineer Design Lead (HC) Design loadings (inc. snow) Structural trimming and restraint for openings Insulation – U Values Energy & Sustainability Consultant (HC) 1 1 Condensation risk analysis Design Lead (HC) 2 2 Cold bridging Acoustic performance Design Lead (HC) Energy & Sustainability Consultant (HC) Project Sponsor (HC) 1 1 1 1 Design Lead (HC) Design Lead (HC) Design Lead (HC) 2 2 Design Lead (HC) Fire stopping, rating and compartmentation Roof access – mansafe systems and / or anchor points design intent / strategy Roof access – mansafe systems and / or anchor points design of system Roof access (hatches, ladders) 1 1 Design Lead (HC) Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) 3 3 3 3 3 3 Design Lead (HC) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Acoustician Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Roof lights Design Lead (HC) Service penetrations Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Project Sponsor (HC) 1 1 Design Lead (HC) 2 2 2 2 2 2 Design Lead (HC) 4 4 4 4 4 4 Design Lead (HC) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Acoustician Design Lead (HC) Design Lead (HC) Design Lead (HC) Cleaning cradles Interfaces with other elements / structures & external wall / typical details Bird prevention Design Lead (HC) Design Lead (HC) Vapour control layers Air tightness Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Acoustician Design Lead (HC) Contractor Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) INTERNAL WALLS Levels and setting out Design Lead (HC) Load bearing walls Structural Engineer Interfaces with other elements / structures & external wall / typical details Non load bearing walls (including deflection head details) Design Lead (HC) Fire stopping, rating and compartmentation Design Lead (HC) Acoustic performance Project Sponsor (HC) 1 1 Design Lead (HC) Co-ordinated wall elevations (setting out) Design Lead (HC) Structural trimming and restraint for openings Structural Engineer Design Lead (HC) Internal doors & ironmongery / screens Lock suiting Project Sponsor (HC) Joinery, architraves and skirtings Project Sponsor (HC) Design Lead (HC) Roller shutters – security / fire shutters Design Lead (HC) 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Design Lead (HC) Project Sponsor (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Design Lead (HC) Project Sponsor (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Design Lead (HC) Project Sponsor (HC) Design Lead (HC) Design Lead (HC) INTERMEDIATE FLOORS Levels and setting out Design Lead (HC) Floor construction and specification Design Lead (HC) Structural floor components Structural Engineer Movement joint setting out Interfaces with other elements / structures & external wall / typical details Cold bridging Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Fire rating and compartmentation Acoustic performance Design Lead (HC) Design Lead (HC) Project Sponsor (HC) 1 1 Design Lead (HC) Raised access floors Design Lead (HC) Structural trimming and restraint for openings Structural Engineer 2 2 2 2 2 2 2 2 Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Project Sponsor (HC) 6 6 Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Design responsibility Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Level of detail (LOD) 3 - Developed Design Design team Level of information Design responsibility 4- Technical Design Design team Level of detail (LOD) Level of information 2 2 2 2 2 2 2 2 Design responsibility 5 - Construction Design team Level of detail (LOD) Level of information 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design responsibility 6 - Handover and Close Out Design team Level of detail (LOD) Level of information 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design responsibility 7 - In Use Design team Level of detail (LOD) Level of information 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Design responsibility Level of detail (LOD) Design team Level of information Design responsibility Level of detail (LOD) Level of information Facilities Manager (HC) 7 7 Facilities Manager (HC) 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 CEILINGS Levels and setting out Design Lead (HC) Ceiling construction and specification Design Lead (HC) Fully coordinated reflected ceiling plans Design Lead (HC) Structural ceiling components Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Movement joint setting out Structural Engineer Design Lead (HC) Interfaces with other elements / structures & external wall Design Lead (HC) Fire rating and compartmentation Acoustic performance and treatment Design Lead (HC) Project Sponsor (HC) 1 1 Design Lead (HC) Access hatches Design Lead (HC) Structural trimming and restraint for openings Structural Engineer 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Acoustician Design Lead (HC) Structural Engineer DECORATION Floor finishes drawing, schedule and specification Design Lead (HC) Wall finishes drawing, schedule and specification Design Lead (HC) Ceiling finishes drawing, schedule and specification Design Lead (HC) Lift finishes Design Lead (HC) Graphics Games markings Manifestation Moodboards Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) FURNITURE, FITTINGS, FIXTURES AND EQUIPMENT Loose furniture Fixed furniture and fixtures (inc. mirrors) Bespoke furniture (reception desks) Client supplied items (hand dryers, fire extinguishers, ICT etc.) Blinds and curtains Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Internal elevations Design Lead (HC) Setting out drawings Design Lead (HC) Signage Wayfinding Project Sponsor (HC) Project Sponsor (HC) 1 1 1 1 Service connection to fixtures and equipment Sanitaryware drawing, schedule and specification Project Sponsor (HC) 1 1 Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Handrails, balustrades and guarding (design) Design Lead (HC) Handrails, balustrades and guarding (loading) Structural Engineer Design Lead (HC) Lifts and lifting equipment Hoists Laboratory equipment Games equipment Sensory equipment Bleacher seating Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) 1 1 1 1 1 1 1 1 1 1 1 1 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Design Lead (HC) Structural Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) 6 6 6 6 6 6 Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) FIRE STRATEGY AND PROTECTION Requirement for structural fire protection Design Lead (HC) Fire barriers and stopping Design Lead (HC) Compartmentation Design Lead (HC) Smoke venting Design Lead (HC) Emergency service access Design Lead (HC) Means of escape Design Lead (HC) Fire Tender access Design Lead (HC) Boundary calculations Design Lead (HC) Emergency lighting & illuminated fire signage Energy & Sustainability Consultant (HC) Design Lead (HC) Emergency signage (non illuminated) Fire alarm and detection system Project Sponsor (HC) Dry / wet risers Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Fire Engineer Fire suppression system Project Sponsor (HC) Fire shutters / fire curtains Design Lead (HC) Fire fighting static tank Fire Engineer Fire extinguishers BUILDING SERVICES Project Sponsor (HC) 1 1 1 1 1 1 Design Lead (HC) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Fire Engineer Design Lead (HC) Fire Engineer Design Lead (HC) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Fire Engineer Design Lead (HC) Fire Engineer Design Lead (HC) 4 4 4 4 4 4 4 4 4 4 4 4 Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Fire Engineer Design Lead (HC) Fire Engineer Design Lead (HC) 5 5 5 5 5 5 5 5 5 5 5 5 Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Fire Engineer Design Lead (HC) 6 6 6 6 Facilities Manager (HC) 6 Facilities Manager (HC) Facilities Manager (HC) 6 Facilities Manager (HC) 6 6 6 6 6 6 Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Telephone line - requirements, route and specification Design responsibility Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Project Sponsor (HC) Design team Level of detail (LOD) Level of information 1 1 Telephone line - new connection application Fibre - requirements, route and specification Project Sponsor (HC) 1 1 Fibre - new connection application Electric - requirememts, grid capacity, route and specification Project Sponsor (HC) 1 1 Electric - new connection application Natural gas - requirements, grid capacity, route and specification Project Sponsor (HC) 1 1 Natural gas - new connection application Calor gas - requirements, tank provision, route and specification Project Sponsor (HC) 1 1 Calor gas - new connection application Water - requirements, tank provision, capacity, route and specification Project Sponsor (HC) 1 1 Water - new connection application including pre development enquiry, water impact assessments and flow and pressure tests Foul drainage - requirememts, pumping provision, grid capacity, route and specification Foul drainage - new connection application including pre development enquiry, drainage impact assessments ICT - requirements and specification including server rooms, cabinets and distribution Project Sponsor (HC) 1 1 1 1 Wireless network points Fuel and energy supply options appraisal Energy & Sustainability Consultant (HC) 1 1 Renewable design, specification and provision Heat source design, specification and provision Disconnections, diversions & terminations of existing services excluding foul drainage Energy & Sustainability Consultant (HC) 1 1 Disconnections, diversions & terminations of existing foul drainage Coordination of services distribution around site Client metering for all services Energy & Sustainability Consultant (HC) 1 1 Builderswork in connection with service penetrations External ductwork External flues Heating / cooling installations & systems Project Sponsor (HC) 1 1 Project Sponsor (HC) 1 1 Lighting – including emergency lighting Project Sponsor (HC) Small power including standby requirements Project Sponsor (HC) Ventilation & extract design systems Project Sponsor (HC) Actuation of blinds and rooflights Project Sponsor (HC) 1 1 1 1 1 1 1 1 1 1 Riser sizes Acoustic specification of services distribution Alarms (including telecoms interface) Energy & Sustainability Consultant (HC) ICT Services (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Design Lead (HC) Service entry details including waterproofing, pits, etc. Service distribution throughout the building Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Civil Engineer Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) 1 1 CCTV Project Sponsor (HC) BMS Project Sponsor (HC) 1 1 Access control (including interface with alarm systems) Project Sponsor (HC) 1 1 Panic alarms Project Sponsor (HC) Public address systems Project Sponsor (HC) Illuminated signage Project Sponsor (HC) Intercom system Project Sponsor (HC) 1 1 1 1 1 3 - Developed Design 1 1 1 1 1 Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Acoustician Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design team Level of detail (LOD) Level of information 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4- Technical Design 2 2 2 2 Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Civil Engineer Energy & Sustainability Consultant (HC) ICT Services (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Acoustician Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design team Level of detail (LOD) Level of information 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 5 - Construction 3 3 3 3 Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Civil Engineer Energy & Sustainability Consultant (HC) ICT Services (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Acoustician Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design team Level of detail (LOD) Level of information 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 6 - Handover and Close Out 4 4 4 4 Design responsibility Contractor Energy & Sustainability Consultant (HC) Contractor Energy & Sustainability Consultant (HC) Contractor Energy & Sustainability Consultant (HC) Contractor Energy & Sustainability Consultant (HC) Contractor Energy & Sustainability Consultant (HC) Contractor Energy & Sustainability Consultant (HC) Contractor Civil Engineer Energy & Sustainability Consultant (HC) ICT Services (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design Lead (HC) Civil Engineer Energy & Sustainability Consultant (HC) Design Lead (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Acoustician Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design team Level of detail (LOD) Level of information 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 7 - In Use 5 5 5 5 Design responsibility Design team Level of detail (LOD) Level of information Energy & Sustainability Consultant (HC) 6 6 Energy & Sustainability Consultant (HC) 6 6 Energy & Sustainability Consultant (HC) 6 6 Energy & Sustainability Consultant (HC) 6 6 Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) 6 6 Design responsibility Level of detail (LOD) Level of information Facilities Manager (HC) 7 7 Facilities Manager (HC) 7 7 7 7 7 7 6 6 Facilities Manager (HC) Civil Engineer Energy & Sustainability Consultant (HC) ICT Services (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Civil Engineer Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Acoustician Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) 6 6 6 6 6 6 6 6 Facilities Manager (HC) 7 7 6 6 Facilities Manager (HC) 7 7 6 6 6 6 6 6 7 7 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 6 Facilities Manager (HC) 7 7 6 6 6 6 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 7 7 6 6 6 6 6 ICT Services (HC) Energy & Sustainability Consultant (HC) 6 6 6 6 Energy & Sustainability Consultant (HC) Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 Facilities Manager (HC) 7 7 6 6 6 6 Responsibility Matrix (Incorporating Information Exchanges) 0 - Strategic Definition 1 - Preparation and Brief Design team Task Telecoms & equipment Design responsibility Level of detail (LOD) 2 - Concept Design Design team Level of information Design responsibility Project Sponsor (HC) Audio visual equipment including fittings Project Sponsor (HC) Induction loops Project Sponsor (HC) Plant room requirement, specification and layout Energy & Sustainability Consultant (HC) Design team Level of detail (LOD) Level of information 1 1 1 1 1 1 1 1 Plant loadings Plantroom access & fire escapes Boiler (room / container) Project Sponsor (HC) Energy & Sustainability Consultant (HC) 3 - Developed Design 1 1 1 1 Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Structural Engineer Design Lead (HC) Design team Level of detail (LOD) Level of information 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Design Lead (HC) Lightning Protection Energy & Sustainability Consultant (HC) 4- Technical Design Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Structural Engineer Design Lead (HC) Design team Level of detail (LOD) Level of information 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Design Lead (HC) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Energy & Sustainability Consultant (HC) 5 - Construction Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Structural Engineer Design Lead (HC) Design team Level of detail (LOD) Level of information 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design Lead (HC) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Energy & Sustainability Consultant (HC) 6 - Handover and Close Out Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Structural Engineer Design Lead (HC) Design team Level of detail (LOD) Level of information 5 5 5 5 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Design responsibility Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Energy & Sustainability Consultant (HC) Design team Level of detail (LOD) Level of information 6 6 Design responsibility ICT Services (HC) Level of detail (LOD) Level of information 7 7 6 Facilities Manager (HC) 7 7 6 6 Facilities Manager (HC) 7 7 6 6 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 6 5 5 5 5 5 5 5 5 5 5 Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) 5 5 Facilities Manager (HC) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Design Lead (HC) Energy & Sustainability Consultant (HC) 7 - In Use EXTERNAL WORKS / LANDSCAPING Boundary conditions and specification (including setting out) Earthworks & excavations Retaining structures Hard landscaping including levels, setting out & specifications (excluding roads and pavements) Soft landscaping including levels, setting out & specifications (excluding roads and pavements) Roads, pavements, road markings including levels, setting out & specifications Surface water drainage including road gullies, permeable paving and SUDS Swales and attenuation ponds Road signage Property signage Wayfinding Car parking capacity and design Swept path analysis Other site circulation, including service access to pitches and maintenance access to buildings Street furniture, play equipment, fixtures and fittings Playgrounds External lighting – car park and building and external circulation (including setting out of lamp standards) External feature lighting Flood lighting Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) 1 1 1 1 1 1 Civil Engineer Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Handrails, balustrades and guarding (design) Handrails, balustrades and guarding (loading) External stairs and ramps Bicycle stores, bin stores Refuse equipment (waste, recycling, compost and grit) External taps Landscape Architect (HC) Civil Engineer Civil Engineer Landscape Architect (HC) Landscape Architect (HC) Civil Engineer Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) 1 1 1 1 1 1 Landscape Architect (HC) Civil Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Civil Engineer Design Lead (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Structural Engineer Landscape Architect (HC) Landscape Architect (HC) Design Lead (HC) Car park barriers / security barriers / bollards Landscape Architect (HC) Civil Engineer Traffic calming and crossing points Fire hydrants Civil Engineer Fire Engineer All weather sports pitch setting out, markings and specification Grass pitches / running tracks Sports equipment and fixtures Sub stations Project Sponsor (HC) Project Sponsor (HC) Project Sponsor (HC) Energy & Sustainability Consultant (HC) 1 1 1 1 1 1 1 1 Landscape Architect (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) 2 2 2 2 2 2 2 2 2 2 Landscape Architect (HC) Civil Engineer Civil Engineer Landscape Architect (HC) Landscape Architect (HC) Civil Engineer Civil Engineer Landscape Architect (HC) Civil Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Civil Engineer Design Lead (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Structural Engineer Landscape Architect (HC) Landscape Architect (HC) Design Lead (HC) Landscape Architect (HC) Civil Engineer Civil Engineer Fire Engineer Landscape Architect (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) 3 3 3 3 3 3 3 3 3 3 Landscape Architect (HC) Civil Engineer Civil Engineer Landscape Architect (HC) Landscape Architect (HC) Civil Engineer Civil Engineer Landscape Architect (HC) Civil Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Civil Engineer Design Lead (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Structural Engineer Landscape Architect (HC) Landscape Architect (HC) Design Lead (HC) Landscape Architect (HC) Civil Engineer Civil Engineer Fire Engineer Landscape Architect (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) 4 4 4 4 4 4 4 4 4 4 Landscape Architect (HC) Civil Engineer Civil Engineer Landscape Architect (HC) Landscape Architect (HC) Civil Engineer Civil Engineer Landscape Architect (HC) Civil Engineer Design Lead (HC) Design Lead (HC) Design Lead (HC) Civil Engineer Design Lead (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) Landscape Architect (HC) Structural Engineer Landscape Architect (HC) Landscape Architect (HC) Civil Engineer Civil Engineer Fire Engineer Landscape Architect (HC) Landscape Architect (HC) Landscape Architect (HC) Energy & Sustainability Consultant (HC) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC) Facilities Manager (HC)