Report prepared for public access on 4/10/2023 3:37:22 PM LISTING INFORMATION OF E.Z. Barrier, Inc. - EZB 16-24-9, EZB 14-14-3, and EZB EXH Fire Rated Enclosures SPEC ID: 26578 E.Z. Barrier 20777 Kensington Blvd. Lakeville, MN 55044 United States This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Page 1 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM LISTING INFORMATION The E.Z. Barrier™ line of fire rated enclosures consist of the EZB 16-24-9, EZB 14-14-3, and EZB EXH. The EZB 16-24-9, when installed can maintain the integrity of a fire rated ceiling and is used to cover ceiling mounted lights. The EZB 14-14-3 is used for in-wall mounted speakers which can also diminish the transfer sound from one room to another. The EZB EXH is used to maintain the integrity of a fire rated ceiling when installing an exhaust fan or fan. RATINGS Standard ASTM E 119 UL 263 CAN/ULC-S101 ASTM E 119 UL 263 CAN/ULC-S101 ASTM E 119 UL 263 CAN/ULC-S101 ASTM E 119 UL 263 CAN/ULC-S101 Rating Design Number 1 Hour EZB/FME 60-01 1 Hour EZB/FME 60-02 1 Hour EZB/FME 60-04 1 Hour EZB/FME 60-03 Attribute Criteria Value ASTM E119 (2005a) Criteria ASTM E119 (2008a) Criteria ASTM E119 (2010) Criteria UL 263 (2011) Criteria CAN / ULC S101 (2014) Criteria ASTM E119 (2016a) Criteria ASTM E119 (2018a) CSI Code 05 50 00 Metal Fabrications Fire Resistance 1 Hour Fire Rating Intertek Services Certification Listed or Inspected LISTED Listing Section ADDITIONAL COMPONENTS FOR WALL ASSEMBLIES Listing Section FIXTURES FOR RECESSED INSTALLATION IN FIRE RATED CONSTRUCTION Spec ID 26578 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Page 2 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM DRAWING INDEX EZB/FME 60-01 EZB/FME 60-02 EZB/FME 60-03 EZB/FME 60-04 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Page 3 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-01 Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures E.Z. Barrier, Inc. Design No. EZB/FME 60-01 Non-Loadbearing Wall E.Z. Barrier™ EZB 14-14-3 Fire Rated Enclosure ASTM E119, UL 263, CAN/ULC-S101 Rating – 1 Hour 1. WALL ASSEMBLY: Construct wall assembly using the following elements: A. WOOD STUDS – Install No. 2 Grade Douglas Fir 2 in. x 4 in. wood studs spaced max. 16 in. on center (oc) between a double wood stud top plate and single wood stud Date Revised: January 29, 2018 Page 1 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy bottom plate with horizontal 2 in. x 4 in. wood stud cross-bracing at the midpoint of the wall height. Fasten wood studs to top and bottom plates with No. 16d framing nails spaced max. 16 in. oc. Project No. G103337866 SFT-BC-OP-19i Page 4 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-01 (2 OF 2) Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures B. GYPSUM BOARD – Attach one layer of 5/8 in. thick, Type X gypsum board on each face. Locate butt joints over studs and offset butt joints on opposite sides max. 24 in. Attach to wood studs (Item 1A) with No. 6 x 1-5/8 in. long coarsethread screws, spaced min. 8 in. oc around the perimeter and min. 12 in. oc on the intermediate studs. C. JOINT TAPE AND COMPOUND – (Not Shown) Use vinyl or casein, dry or premixed, joint compound applied to face layers of gypsum wallboard in two coats to all exposed screw heads and gypsum board (Item 1B) butt joints. Embed a min. 2 in. wide paper, plastic, or fiberglass tape in first layer of compound over butt joints between gypsum board (Item 1B). Verify a min. wall depth of 4-3/4 in. created from face layer of gypsum board (Item 1B) to face layer of gypsum board (Item 1B). 2. CERTIFIED MANUFACTURER: E.Z. Barrier, Inc. CERTIFIED PRODUCT: Fabrications Formed Metal MODEL: E.Z. Barrier™ EZB 14-14-3 Fire Rated Enclosure RECESSED SPEAKER BOX COVER SYSTEM – Construct an open box using nominal 24 GA galvanized steel and having nominal dimensions of 24 in. long x 14 in. wide x 3-1/4 in. deep, having two nominal 5 in. wide flanges on the short edges. Position the box in wall cavity with flanges over wood studs (Item 1A). Secure the flanges of the box to the wood studs (Item 1A) with 1 in. coarse-thread wood screws, spaced at pre-drilled locations on the flanges (fasten a min. of two screws per flange). Install gypsum board (Item 1B) to the Date Revised: January 29, 2018 wood stud framing (Item 1A) covering the flange. Install max. of one recessed speaker box cover system within a 100 square foot wall surface area. INTUMESCENT MAT MATERIAL – Cover the interior surface area of the recessed speaker box cover system (Item 2) with nominal 3/16 in. thick, one layer 3M I10 intumescent mat material. Attach intumescent mat material using four pre-punched tabs on the inside of the EZB 14-14-3 in accordance with manufacturer’s instructions. If tabs are not available, attach mat using No. 8 x 3/4 in. long K-lath screws inserted through 1 in. diameter galvanized steel washers. Attach a min. of two screws per interior face. All interior surfaces must be covered with 3M I10 intumescent material. 3. ELECTRICAL WIRING: (Not Shown) Insert max. 12 GA electrical power wiring into the prepunched hole of the recessed speaker box cover system (Item 2). Seal penetration with fill, void, or cavity (Item 4) and install in accordance with manufacturer’s instructions. 4. FILL, VOID, OR CAVITY MATERIAL: (Not Shown): Non-combustible sealant. Apply a bead of 3M CPWB25+ Sealant around annular space at the penetration through the recessed speaker box cover system (Item 2). 5. SPEAKER: Nominal 3-3/4 in. depth x 9-3/4 in. diameter. Cut a max. 8-5/8 in. diameter hole into the gypsum board (Item 1B) and install speaker in accordance with manufacturer’s instructions or a standard electrical fixture and housing mounted to the inside of the enclosure with an LED display mounted on the wall covering the enclosure opening. Page 2 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Project No. G103337866 SFT-BC-OP-19i Page 5 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-02 Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures E.Z. Barrier, Inc. Design No. EZB/FME 60-02 Floor/Ceiling Assembly E.Z. Barrier™ EZB 16-24-9 Fire Rated Enclosure ASTM E119, UL 263, CAN/ULC-S101 Rating – 1 Hour 1. FLOOR/CEILING ASSEMBLY: Use a one-hour ASTM E119, UL 263, or CAN/ULC-S101 fireresistance-rated floor/ceiling assembly, as applicable, constructed in accordance with the material and construction specifications of the corresponding listed design and with the min. requirements listed below: A. FLOORING – Use min. 23/32 in. thick interior grade plywood panels, or other Date Revised: January 29, 2018 approved flooring system as specified in the corresponding listed design. B. TRUSSES – Parallel chord trusses spaced a max. of 24 in. on center (oc) fabricated of nominal 2 in. x 4 in. lumber, with lumber oriented vertically or horizontally. Truss members are secured with No. 20 MSG galvanized steel truss plates. Page 1 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Project No. G103337866 SFT-BC-OP-19i Page 6 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-02 (2 OF 2) Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures C. RESILIENT CHANNELS – Formed from nominal 26 GA galvanized steel, spaced 16 in. oc and applied perpendicular to the trusses. Channel is secured to the trusses with 1-1/4 in. long steel wood screws. Channel overlapped at splices a min. of 4 in. Channel is removed in locations where the recessed light cover (Item 2) is located. D. GYPSUM BOARD – Use one layer of approved, nominal 5/8 in. thick, Proprietary Type X gypsum board of the type specified in the listed design and installed in accordance with the approved listed design. Secure the gypsum board to the underside of the resilient channel (Item 1C) with 1 in. long wallboard screws spaced max. 12 in. oc and located 1-1/2 in. from side and end joints. Apply vinyl or casein, dry or premixed, joint compound to face layers of gypsum board in two coats to all exposed fastener heads and gypsum board joints. A min. 2 in. wide paper, plastic, or fiberglass tape is embedded in first layer of compound over joints in gypsum board. 2. CERTIFIED MANUFACTURER: E.Z. Barrier, Inc. CERTIFIED PRODUCT: Fabrications Formed Metal MODEL: E.Z. Barrier™ EZB 16-24-9 Fire Rated Enclosure Date Revised: January 29, 2018 RECESSED LIGHT COVER – Constructed of nominal 24 GA galvanized steel and having nominal dimensions 20 in. long x 12 in. wide x 9-1/2 in. deep and having nominal 2-1/2 in. wide flanges. Position the box inverted and recessed into the floor cavity. Secure the flanges of the box to the underside of the truss assembly (Item 1B) with No. 6, 1-1/4 in. long bugle-head screws spaced at pre-drilled locations on the flanges. The boxes may be installed in the floor with the following provisions: • Max. two fixtures within 36 sq.ft. area • Min. oc fixture spacing of 24 in. within same truss cavity • Min. center-to-center fixture spacing of 34 in. for adjacent truss cavities 3. RECESSED LIGHT FIXTURE: Standard canisterstyle recessed light assembly installed in accordance with manufacturer’s instructions. Standard 3C-12AWG “Romex” wire is fixed to the assembly and exits the recessed light cover (Item 2) through a max. of two openings. 4. FILL, VOID, OR CAVITY MATERIAL: (Not Shown) Use only fill, void, or cavity material certified by Intertek, bearing an Intertek label. Apply a bead of fill, void, or cavity material around the power supply wire where it exits the recessed light cover (Item 2). Page 2 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Project No. G103337866 SFT-BC-OP-19i Page 7 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-03 Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures E.Z. Barrier, Inc. Design No. EZB/FME 60-03 E.Z. Barrier™ EZB EXH Fire Rated Enclosure ASTM E119 Rating – 1 Hour 1. FLOOR/CEILING ASSEMBLY: Use a one-hour, ASTM E119, UL 263, or CAN/ULC-S101 fireresistance-rated floor/ceiling assembly, as applicable, constructed in accordance with the material and construction specifications of the corresponding listed design and with the min. requirements listed below: A. FLOORING SYSTEM – Use min. 23/32 in. thick interior grade plywood panels, or other approved flooring system as specified in the corresponding listed design. Date Revised: January 29, 2018 B. WOOD JOISTS – Use nominal 2×10 dimensional lumber spaced max. 24 in. on center (oc). C. CHANNELS – Use min. 25 GA and min. 5/8 in. deep resilient channels or furring channels, spaced max. 16 in. oc and applied perpendicular to the 2×10 wood joists (Item 1B). D. GYPSUM BOARD – Use one layer of approved nominal 5/8 in. thick, Proprietary Type X gypsum board of the type specified in the listed design and installed in accordance with the approved listed design. Page 1 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Project No. G103337866 SFT-BC-OP-19i Page 8 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-03 (2 OF 2) Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures Note: This system has not been evaluated with alternate gypsum configurations, including systems that require greater membrane protection. 2. CERTIFIED MANUFACTURER: E.Z. Barrier, Inc. CERTIFIED PRODUCT: Fire Rated Enclosure CERTIFIED MODEL: E.Z. Barrier™ EZB EXH Install the enclosure constructed of nominal 24 GA galvanized steel, and having nominal dimensions 20 in. long × 12 in. wide × 9-1/2 in. deep, and having nominal 2-5/8 in. wide flanges. Ensure a max. installation density of one enclosure within any 104 ft2 area. Position the enclosure inverted and recessed into the floor/ceiling cavity. Secure the flanges of the box to the underside of the floor/ceiling assembly (Item 1) by fastening them to the channels (Item 1C) with six 7/16 in. long pan framing screws. Use three screws on each side equally spaced along the length of the flanges. 3. INTUMESCENT MAT: Use manufacturerinstalled 3M Company, 3M Interam™ I-10 Series Mat. Use one layer of intumescent mat, lining the interior surface area of the fire rated enclosure (Item 2) and secured to the fire rated enclosure using either Method A or Method B listed below: i. METHOD A – Mechanically fastened using pre-punched tabs. ii. METHOD B – Adhered using 30 - 60 mils (0.08 cm – 0.16 cm) thick of one of the silicone sealant materials listed below: • 3M Fire Barrier Water Tight Sealant 1000 NS • 3M Fire Barrier Water Tight Sealant 1003 SL; or, • 3M Fire Barrier 2000+ Silicone Sealant Date Revised: January 29, 2018 4. RECESSED EXHAUST FAN: Install the bathroom exhaust fan/combination light fixture in accordance with the manufacturer’s instructions. 5. EXHAUST DUCT: Install nominal 3 in. to 6 in. diameter metal exhaust pipe. 6. SLEEVE EXTENSION: (Not Shown) Install 3 in. to 6 in. nominal diameter PVC pipe through the fire rated enclosure (Item 2), fitted concentrically inside or outside the exhaust duct (Item 5), and concentrically over the exhaust connection at the exhaust fan (Item 4). 7. FIRESTOP DEVICE: (Not Shown) Install an approved firestop device, mounted to the fire rated enclosure (Item 2) in accordance with the manufacturer’s installation instructions. Install the firestop device from inside or from outside of the fire rated enclosure (Item 2), as required. Mechanically fasten the firestop device to the fire rated enclosure using appropriately sized sheet metal screws. Slide the PVC Sleeve Extension (Item 6) as needed to install the firestop device and then reposition it accordingly. Use one of the 3M Company firestop devices listed below of the appropriate size for the PVC Sleeve Extension (Item 6): • 3M Fire Barrier Ultra PPD 3.0 • 3M PPD 600 • 3M Fire Barrier RC-1 Restricting Collar with 3M Fire Barrier Wrap Ultra GS per UL System No. C-AJ-2214 specifications 8. FILL, VOID, OR CAVITY MATERIAL: (Not Shown) Apply a bead of 3M™ Fire Barrier™ CP 25WB+ Caulk around the annular space at the penetration through the floor/ceiling assembly (Item 1). Page 2 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Project No. G103337866 SFT-BC-OP-19i Page 9 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-04 Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures E.Z. Barrier, Inc. Design No. EZB/FME 60-04 Non-Loadbearing Wall E.Z. Barrier™ EZB 14-14-3 Fire Rated Enclosure ASTM E119, UL 263, CAN/ULC-S101 Rating – 1 Hour 1. WALL ASSEMBLY: Construct wall assembly using the following elements: A. WOOD STUDS – Install No. 2 Grade Douglas Fir nominal 2 in. x 4 in., or nominal 2 in. x 6 in. wood studs, spaced max. 16 in. on center (oc) between a double wood stud top plate and single wood stud bottom plate with horizontal nominal 2 in. x 4 in., or nominal 2 in. x 6 in., wood stud cross-bracing at the Date Revised: January 29, 2018 midpoint of the wall height. Fasten wood studs to top and bottom plates (two nails per stud) with No. 16d framing nails spaced max. 16 in. oc. B. GYPSUM BOARD – Attach one layer of 5/8 in. thick, Type X gypsum board on each face. Locate butt joints over studs and offset butt joints on opposite sides max. 16 in. Attach to wood studs (Item 1A) with No. 6 x 1-5/8 in. long coarse- Page 1 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Project No. G103337866 SFT-BC-OP-19i Page 10 of 11 Report prepared for public access on 4/10/2023 3:37:22 PM EZB/FME 60-04 (2 OF 2) Division 05 – Metals 05 58 00 Formed Metal Fabrications 05 58 16 Formed Metal Enclosures thread screws, spaced min. 8 in. oc around the perimeter and min. 12 in. oc on the intermediate studs. C. JOINT TAPE AND COMPOUND – (Not Shown) Use vinyl or casein, dry or premixed, joint compound applied to exposed sides of gypsum board (Item 1B) in two coats to all exposed screw heads and gypsum board (Item 1B) butt joints. Embed a min. 2 in. wide paper, plastic, or fiberglass tape in first layer of compound over butt joints between gypsum board (Item 1B). Verify a min. wall depth of 4-3/4 in. created from exposed face of gypsum board (Item 1B) to exposed face of gypsum board (Item 1B). 2. CERTIFIED MANUFACTURER: E.Z. Barrier, Inc. CERTIFIED PRODUCT: Fabrications Formed Metal MODEL: E.Z. Barrier™ EZB 14-14-3 Fire Rated Enclosure FIRE RATED ENCLOSURE – Use E.Z. Barrier™ EZB 14-14-3 Fire Rated Enclosure, which is an open box constructed using nominal 24 GA galvanized steel and having nominal dimensions of 24 in. long x 14 in. wide x 3-1/4 in. deep, having two nominal 5 in. wide flanges on the edges. Position the enclosure in wall cavity with flanges over wood studs (Item 1A). Secure the flanges of the enclosure to the wood studs (Item 1A) with 1 in. coarse-thread wood screws, spaced at pre-drilled locations on the flanges (fasten a min. of two screws per flange). Install gypsum board (Item 1B) to the wood stud framing (Item 1A) covering the flange. Install max. of one fire rated enclosure system within a 100 sq.ft. wall surface area. Min. spacing from adjacent wall must be 8 in. Date Revised: January 29, 2018 INTUMESCENT MAT MATERIAL – Cover the interior surface area of the fire rated enclosure (Item 2) with one layer of nominal 3/16 in. thick, 3M I10 intumescent mat material. Attach intumescent mat material using four pre-punched tabs on the inside of the fire rated enclosure in accordance with manufacturer’s instructions. If the fire rated enclosure is not equipped with pre-punched tabs, attach mat using No. 8 x 3/4 in. long K-lath screws inserted through 1 in. diameter (1/4 in. hole) galvanized steel washers. Attach a min. of two screws per interior face spaced nominally 8 in. oc. All interior surfaces must be covered with 3M I10 intumescent material. 3. ELECTRICAL WIRING: (Not Shown) Insert max. four 12 GA, 3 conductor, Romex wires through the pre-punched hole of the fire rated enclosure (Item 2). Seal penetration with fill, void, or cavity material (Item 4) and install in accordance with the manufacturer’s installation instructions. 4. FILL, VOID, OR CAVITY MATERIAL: (Not Shown) Non-combustible sealant. Apply a bead of 3M CPWB25+ Sealant around annular space at the electrical wiring (Item 3) penetration through the fire rated enclosure (Item 2). 5. LIGHT: Install Vision Quest Lighting (model number PR222-UDRS) in the fire rated enclosure (Item 2) per the manufacturer's installation instructions or a standard electrical fixture and housing mounted to the inside of the enclosure with an LED display mounted on the wall covering the enclosure opening. Page 2 of 2 Version: 02 August 2017 E.Z. Barrier | 26578 | Rev: Dec 29 2020 7:40AM | Uncontrolled Copy Project No. G103337866 SFT-BC-OP-19i Page 11 of 11