Show three streams of water flow in sump.
Cut out section below diversion and stormwater.
Levels:
Bottom of shared: 66.510
Bottom of stormwater cut-out: 64.910
Diversion chamber bottom: 70.710
Diversion to Spill pipe: 71.210
Look at (the one with info on flange and weirs) and change existing holes at diversion
chamber and valve pit.
Check that the height of the tank is correct (in reference to weir on the bottom level for
W11 shared to spill).
Put in pipes and pumps.
Need to do intermediate landings?
75.380
Bottom of pipe to groundwater: 68.500
Middle of diversion to groundwater pipe: 71.285