CENTRALIZED PLANT HISTORIAN AND PLANT INFORMATION SYSTEM(yokogawa PIMS) NOT IN THE SCOPE OF VENDOR, ALREADY EXIST PRINTER AT ENGINEERING STATION ROOM PRINTER FOR CONTROL ROOM FIREWALL LAYER 3 Switch DUAL REDUNDANT INFORMATION/TERMINAL BUS OS-1 OS-2 OS-3 OS-4 ENGINEERING PC OS-5 DUAL REDUNDANT RING PLANT/CONTOL BUS DATA HIGHWAY NOTE: 1. SEPARATE FCS/ CONTOLLER NEED TO CONSIDERED AREA WISE AS FOLLOW: • SULPHURIC ACID PLANT-1(SAP-1) • TAP (TURBO ALTERNATOR PRIMARY) • TAS (TURBO ALTERNATOR SECONDARY) • COMMON SECTION CONTROLLER (REDUNDANT) I/O MARSHALLING CABINET TERMINALS/FTA/REALYS AI AO RTD TC DI DO DI/DO INTERFACES E E Transmitter 4-20mA MCC Air supply Thermocouple Control valve Solenoid Valve RTD Proximity Switch/ mechanical Switch M M TO VIBRATION MOINTOING SYSTEMS, TUBRINE GOVERNIG SYSTEMS, ELECTICAL NUMERICAL RELAY, PROTECTION RELAY, GENERATOR CONTROLLER, PACKAGE PLC ETC.