PROJECT / CONTRACT REF.: CONTRACT TITLE: - DOCUMENT TITLE INSPECTION AND TEST PLAN - ELECTRICAL CONTRACTOR: ELECTRICAL WORKS AND INFRASTURCTURE LTD., TRINIDAD 1 BURGESS DRIVE, OFF KARAMATH STREET, TUNAPUNA TEL: 1-868-748-2841 WEB: WWW.EWILTT.COM DATE DATE A APPROVED FORCONSTRUCTION 2 ISSUEDFORAPPROVAL JB B RK 1 RE- ISSUED FORCOMMENTS JB BAA RK 0 ISSUEDFORCOMMENTS JB BAA RK PREPARED BY CHECKED BY APPROVED BY REV. DOCUMENT NUMBER REVISION DESCRIPTION QB SHT. OF 29 APPROVED BY: REV. C CONTRACT NUMBER H QP PROJECT NUMBER CONTRACT TITLE QP EXTERNAL TRANSMITTAL REFERENCE DATE DOCUMENT NUMBER DOCUMENT REVISION DOCUMENT TITLE No. INSPECTION AND TEST PLAN ‐ ELECTRICAL QP COMMENTS CONTRACTOR RESPO NSE 1 Page 1 of 1 PROJECT / CONTRACT REF.: CONTRACT TITLE: - DOCUMENT TITLE : INSPECTION AND TEST PLAN - ELECTRICAL EPIC CONTRACTOR: DOPET ELECTRICAL WORKS AND INFRASTURCTURE LTD., TRINIDAD 1 BURGESS DRIVE, OFF KARAMATH STREET, TUNAPUNA TEL: 1-868-748-2841 WEB: WWW.EWILTT.COM DATE A APPROVED FOR CONSTRUCTION 2 ISSUED FOR APPROVAL 1 RE- ISSUED FOR COMMENTS 0 ISSUED FOR COMMENTS REV. DOCUMENT NUMBER REVISION DESCRIPTION PREPARED BY SHT. CHECKED BY 0 APPROVED BY OF 29 APPROVED BY QP REV. A Electrical Works and Infrastructure Ltd 1 Burgess Drive, Off Karamath Street, Tunapuna Tel: 7482941 INSPECTION & TEST PLAN ELECTRICAL Project Job No, Ref. No. Revision Date Page Contract No. Project No. Item No. 1 Process Description Quality Control Activity QC Procedure/ Spec. Reference Value Acceptance Criteria Code/Standard Verifying Documents Responsibility EWIL Inspection Points Remarks Material Receiving 1.1 1.2 1.3 1.4 2 Pre-Installation DOC NO : REV. A PAGE 2 OF 29 Electrical Works and Infrastructure Ltd 1 Burgess Drive, Off Karamath Street, Tunapuna Tel: 7482941 INSPECTION & TEST PLAN ELECTRICAL Project Job No, Ref. No. Revision Date Page Contract No. Project No. Item No. Process Description Quality Control Activity QC Procedure/ Spec. Reference Value Acceptance Criteria Code/Standard Verifying Documents Responsibility EWIL Inspection Points Remarks 2.1 3 Installation 3.1 3.2 3.3 DOC NO : REV. A PAGE 3 OF 29 Electrical Works and Infrastructure Ltd 1 Burgess Drive, Off Karamath Street, Tunapuna Tel: 7482941 INSPECTION & TEST PLAN ELECTRICAL Project Job No, Ref. No. Revision Date Page Contract No. Project No. Item No. Process Description Quality Control Activity QC Procedure/ Spec. Reference Value Acceptance Criteria Code/Standard Verifying Documents Responsibility EWIL Inspection Points Remarks 3.4 3.5 3.6 3.7 DOC NO : REV. A PAGE 4 OF 29 INSPECTION & TEST PLAN Project ELECTRICAL Contract No. Project No. Item No. Process Description Quality Control Activity QC Procedure/ Spec. Reference Value Acceptance Criteria Code/Standard Verifying Documents Responsibility Job No, Ref. No. Revision Date Page Inspection Points DOPET QP Remarks 3.8 3.9 3.10 3.11 DOC NO : REV. A PAGE 5 OF 29 Doha Petroleum Construction Co. Ltd Post Box 1744, Doha - Qatar. Tel: 4600350 - Fax: 4601066 INSPECTION & TEST PLAN Project ELECTRICAL Contract No. Project No. Item No. Process Description Quality Control Activity QC Procedure/ Spec. Reference Value Acceptance Criteria Code/Standard Verifying Documents Responsibility Job No, Ref. No. Revision Date Page Inspection Points DOPET QP Remarks 3.12 4 Testing and Commissioning 4.1 4.2 DOC NO : REV. A PAGE 6 OF 29 Doha Petroleum Construction Co. Ltd Post Box 1744, Doha - Qatar. Tel: 4600350 - Fax: 4601066 INSPECTION & TEST PLAN Project ELECTRICAL Contract No. Project No. Item No. Process Description Quality Control Activity QC Procedure/ Spec. Reference Value Acceptance Criteria Code/Standard Verifying Documents Responsibility Job No, Ref. No. Revision Date Page Inspection Points DOPET QP Remarks 4.3 4.4 4.5 4.6 DOC NO : REV. A PAGE 7 OF 29 Doha Petroleum Construction Co. Ltd Post Box 1744, Doha - Qatar. Tel: 4600350 - Fax: 4601066 Project Contract No. Project No. Item No. INSPECTION & TEST PLAN EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED GC12105200 3513 Process Description Quality Control Activity QC Procedure/ Spec. Reference ELECTRICAL Value Acceptance Criteria Code/Standard Verifying Documents Responsibility Job No, Ref. No. Revision Date Page J 24555 3513-M3GE-2-25-0019 A 13-08-2013 8 of 29 Inspection Points DOPET QP Remarks 4.7 5 Hold Point (H) Hold Points are operational points of Inspection that require witnessing or releasing and where any subsequent work is not to proceed without approval/clearance. Other fabrication activities may proceed that are not related to the Hold Point approval. Witness Point (W) A Witness Point is a significant operational point requiring sighting and scrutinizing of the activity, however, the activity and any subsequent activity proceeds as planned. Notifications to witness these activities are required. Review (R) To check specific data/documentation to determine conformity of an item activity. Surveillance Point (S) To inspect activities at random. Note: Sections changed in last revision are identified by ” bold Italic” DOC NO : REV. A PAGE 8 OF 29 TITLE: DOC. NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TEST VOLTAGE MANUFACTURER DRAWING NO. TEST SHEET DESCRIPTION TEST DATA Cable Drum Cable Number Manufacturer Cable Insulation Resistance (MΩ) Cable Size Cable Type Length R-Y Y-B R-B R-N Y-N B-N RArmour YBNArmour Armour Armour Continuity proved for all cores : TEST EQUIPMENT DETAILS Test equipment used Cert.No / ID No. Make / Model Serial No. Calibration Date Expiry Date Remarks:- Construction DA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 9 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: CABLE TRAY/LADDER INSTALLATION CHECKLIST DOC NO.: EI-E/002 CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. DRAWING NO. AREA FROM LOCATION TO LOCATION ITEM CHECKLIST DESCRIPTION 1 Materials are in accordance with project specification 2 Cable ladder and tray installation as per standard installation and layout drawings without clashes with pipe runs or other equipment 3 Check cable tray/ladder is undamaged 4 Cable tray and protectors are properly supported and right materials are used 5 Check cable seggregation in accordance with drawings 6 Check repair where cuts, spacing and fabrication have been made good 7 Check if thermal expansions are provided for straight cable tray run 8 Check if cable tray cover provided for vertical runs 9 Check if expansion guide and hod down clips are placed as per standard installation drawing 10 Check for deflection of tray after cable installation 11 Check tray size,radius and elevation as per layout drawings 12 To ensure no sharp edges 13 Check electrical continuity 14 Check clearance from heat sources 15 Check earthing & bonding against drawings 16 Check insulation pads are adapted to stainless steel or aluminium cable tray/ladder 17 Cover (if required) is fitted properly 18 Check the capacity of cable tray/ladder against bunching, size of cables etc. 19 Check cover installation,if any against drawings 20 Produce marked-up documents in accordance with installation 21 Produce list of defects for punchlist issue GC12105200 RESULT REMARKS Remarks:- QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 10 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: DOC NO. EI-E/003A CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. LENGTH DESCRIPTION CABLE TAG NO. LOCATION GC12105200 DRAWING NO. ITEM CHECKLIST DESCRIPTION RESULT REMARKS 1 2 3 4 5 6 7 8 9 10 Remarks:- Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 11 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. LENGTH DESCRIPTION CABLE TAG NO. LOCATION DRAWING NO. ITEM CHECKLIST DESCRIPTION RESULT REMARKS 1 2 3 4 5 6 7 8 9 10 11 12 Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 12 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: LIGHTING CIRCUIT AND CONVENIENCE SOCKET OUTLET CIRCUIT INSTALLATION CHECKLIS EI-E/004A DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER CIRCUIT REF. DISTRIBUTION BOARD LOCATION RATING GC12105200 DRAWING NO. ITEM CHECKLIST DESCRIPTION 1 Check circuit is de-energized and safe 2 Check luminiaries / sockets rating and tagging against drawings 3 Check luminiaries / sockets are correctly mounted and accesible 4 Check installation of fittings is as per project specification & drawings 5 Check light fittings and sockets are suitable for area 6 Check for mechanical damage and security 7 Check cable terminated correctly 8 Check spare cable entries are plugged correctly 9 Check cable glands are in accordance with specification 10 Check earthing & bonding of all equipments is as per project specification 11 Check that light fitting is the correct type / standard for voltage 12 Check that supports for light fittings are as per specification & drawings 13 Confirm installed numbers of light fittings and sockets in circuit agrees with drawings 14 Produce marked-up documents in accordance with installation 15 Produce list of defects for punchlist issue RESULT REMARKS Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 13 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: LIGHTING CIRCUIT AND CONVENIENCE SOCKET OUTLET CIRCUIT TEST SHEET EI-E/004B DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER CIRCUIT REF. DISTRIBUTION BOARD VOLTAGE RATING DRAWING NO. LOCATION GC12105200 TEST DESCRIPTION Insulation Resistance Test (IR) Test Voltage: Circuit Number Circuit Number Insulation Resistance (MΩ) Insulation Resistance (MΩ) Test Equipment Details Test equip. Used Cert.No / ID No. Make / Model Serial No. Cal. Date Exp. Date Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 14 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: LIGHT FITTING ILLUMINATION TEST SHEET EI-E/004C DOC NO. GC12105200 CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. FITTING TYPE MANUFACTURER CIRCUIT REF. DISTRIBUTION BOARD LOCATION RATING DRAWING NO. TEST SHEET DESCRIPTION TEST DATA Illumination Level Area of Measurement Actual measured (Lux) As per Project Spec. (Lux) Remarks RESULT TEST EQUIPMENT DETAILS Test equipment used Cert.No / ID No. Make / Model Serial No. Calibration Date Expiry Date Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 15 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: JUNCTION BOX INSTALLATION CHECKLIST EI-E/005 DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TAG DESCRIPTION TAG NO. MANUFACTURER MODEL NO. SERIAL NO. DRAWING NO. GC12105200 LOCATION ITEM CHECKLIST DESCRIPTION 1 Junction box is in good condition and compliant with data sheet and data plate 2 Junction box installation as per standard installation and layout drawings & easily accesible 3 Terminal box is adequately supported and protected against vibration 4 Check flameproof joints are clean and greased with approved lubricants 5 Check for missing bolts and gaskets 6 Check all bolts are fitted and correctly tightened 7 Check all unused entries are suitably plugged 8 Check for proper glanding of all cables 9 Check termination as per termination diagrams. 10 Check for mechanical tension of cable in Junction box 11 Check that core ferruling and core crimped termination’s are correct and terminal box layout satisfactory 12 Tag & name plate is correct and properly attached 13 Terminal box and installed equipment is grounded in accordance with specification and drawings 14 Check terminal blocks seggregation barriers are fitted where necessary 15 Terminal box and cable glands are in accordance with hazardous area classification 16 Environmental protection/classification is suitable for service 17 Produce marked-up documents in accordance with installation 18 Produce list of defects for punchlist issue RESULT REMARKS Remarks- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 16 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: CONDUIT & FITTINGS INSTALLATION CHECKLIST EI-E/006 DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. MANUFACTURER TYPE LOCATION DRAWING NO. ITEM CHECKLIST DESCRIPTION 1 Conduit material/accessories as per project specification 2 Surface mounted conduits shall be laid in straight lines with neat bends & sets permits ease drawing in cables 3 No conduit shall have more than two right angle bends without a draw-in box 4 Conduit shall be installed in accordance with manufacturer's installation instructions 5 All conduits shall be installed with fish wires to permit ease of wiring 6 Conduits arranged such that running couples are minimum 7 8 Check if underground conduit is not less than 2 inch diameter 10 Check if underground conduit rising from ground has concrete encasement 11 Proper sockets/bushes shall be provided for conduit entry to enclosures. 12 Cables shall run in conduit with min space factor of 40% 14 15 RESULT REMARKS Conduits shall be fastened with heavy duty spacing saddles fixed at intervals not exceeding 1.2m Check if underground conduit bending radius not less than cable manufacturer bending radius. 9 13 GC12105200 Damaged coating shall be properly repaired with protective paint as per project specifications. All metallic conduit couplings/joints shall be properly repaired with protective paint as per project specifications. Conduit in plaster/concrete shall be secured by holdfasts or crampits Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 17 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TILTLE: EARTHING SYSTEM INSTALLATION CHECKLIST EI-E/007A DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TAG NO. TAG DESCRIPTION TYPE DRAWING NO. GC12105200 LOCATION ITEM CHECKLIST DESCRIPTION 1 Check all earth bars and ground electrode are installed in accordance with project drawings. 2 Check earth cables installation and tagging against drawings 3 Check all connections are clean, tight and coated with an approved anticorrosive grease 4 Check for earth pit tagging for traceability 5 Verify segregation of the various earthing networks actually conforms to specification 6 Check electrode driven to correct depth 7 Produce marked-up documents in accordance with installation 8 Produce list of defects for punchlist issue RESULT REMARKS Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 18 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: EARTHING SYSTEM TEST SHEET EI-E/007B DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TAG NO. TAG DESCRIPTION TYPE DRAWING NO. GC12105200 LOCATION: TEST DESCRIPTION Earth Resistance Test for Earth Rod / Pit Earth Resistance (Ω) Location / ID Remarks GRID EARTH RESISTANCE ohms Test for grounding cables EQUIPMENT NO. (FROM) EARTH DISPATCHER (TO) LOOP RESISTANCE ASSOCIATED CABLE NO. Test Equipment Details Test equip. Used Cert.No / ID No. Make / Model Serial No. Cal. Date Exp. Date Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 19 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: LOW VOLTAGE CABLE LAYING CHECKLIST EI-E/008A DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER LENGTH DRAWING NO. LOCATION RATING TAG NO. CABLE SCHEDULE NO. ITEM CHECKLIST DESCRIPTION 1 Check cable against cable schedule and data sheet. 2 Check cables are as per specs and cable is accepted after drum test 3 Check cable for any physical damage 4 Check that cables are routed correctly as per approved drawings 5 Check that cables are adequately supported and fixed to tray as per specification 6 Ensure no sharp edges in cable tray 7 Check all cable bends are within manufacturers specified limits 8 9 GC12105200 RESULT REMARKS Check that cables are correctly loomed and segregated as per project specification Check cable and core marking are as per cable schedule and installation specification 10 Check cable glands and earthing are in accordance with specification 11 Check that cable types are as specified in the project cable schedule 12 Produce marked-up documents in accordance with installation 13 Produce list of defects for punchlist issue Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 20 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: LOW VOLTAGE CABLE TEST SHEET EI-E/008B DOC NO. GC12105200 CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER LENGTH DRAWING NO. LOCATION RATING TAG NO. CABLE SCHEDULE NO. FROM EQUIPMENT TO EQUIPMENT TEST SHEET DESCRIPTION TEST DATA Lowest Megger Test Reading (MΩ) L1-L2 L2-L3 L1-L3 L1-N L2-N L3-N L1 - L2 - L3 - N- ARMOUR ARMOUR ARMOUR ARMOUR Continuity Continuity Proved Proved for all for all Armour Conductor Test Voltage (V) TEST EQUIPMENT DETAILS Test equipment used Cert.No / ID No. Make / Model Serial No. Calibration Date Expiry Date Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 21 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: MULTI CORE CABLE TEST SHEET EI-E/008C DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER LENGTH DRAWING NO. LOCATION RATING TAG NO. CABLE SCHEDULE NO. FROM EQUIPMENT TO EQUIPMENT GC12105200 TEST SHEET DESCRIPTION Test Voltage: INSULATION TESTS (MΩ) Cable CORE-CORE CORE-ARMOUR CORE-EARTH Continuity proved for all cores and armour: TEST EQUIPMENT DETAILS Test equipment used Cert.No / ID No. Make / Model Serial No. Calibration Date Expiry Date Remarks:Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 22 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: LOW VOLTAGE DISTRIBUTION BOARD/CONTROL PANEL INSTALLATION CHECKLIST EI-E/009A DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER MODEL NO. SERIAL NO. RATING IP RATING TAG NO. TAG DESCRIPTION LOCATION DRAWING NO. ITEM CHECKLIST DESCRIPTION 1 Check equipment is de-energized and safe 2 Equipment is in good condition and compliant with data sheet and specification 3 Check preservation status and anti-condensation heaters are ready to be energized 4 Check equipment is correctly aligned, level, rigid and secured with correct bolting 5 Equipment has been installed in accordance with manufacturer's installation instructions 6 Check all panel mounted devices are undamaged and correctly labeled as per drawing 7 Check busbars are correctly aligned 8 Check bus bars and supports are clean and clear of debris 9 Check earthing & bonding of all equipments is as per project specification 10 Check that all isolators / circuit breakers are mechanically operational and undamaged. Prove all mechanical interlocks 11 Check functionality and ensure operation as per scheme 12 Check all internal wiring is correctly loomed and clearly identified 13 Check that all fuses are installed in accordance with the data sheet 14 Check that all gland plates and terminations are suitable for external cables 15 Check that all spare cable entries are correctly plugged 16 Produce marked-up documents in accordance with installation 17 Produce list of defects for punchlist issue GC12105200 RESULT REMARKS Remarks- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 23 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: LOW VOLTAGE DISTRIBUTION BOARD/CONTROL PANEL TEST SHEET EI-E/009B DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER MODEL NO. SERIAL NO. RATING IP RATING TAG NO. TAG DESCRIPTION VOLTAGE CURRENT FREQUENCY SWBD & CUB REF. DATA SHEET DRAWING NO. GC12105200 LOCATION TEST DESCRIPTION Insulation Resistance Test Test Voltage Insulation Resistance (MΩ) Remarks R-Y Y-B R-B R-N Y-N B-N RYB - EARTH Test Equipment Details Test equip. Used Cert.No / ID No. Make / Model Serial No. Cal. Date Exp. Date Remarks- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 24 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: UPS INSTALLATION CHECKLIST EI-E/010 DOC. NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TAG DESCRIPTION TAG NO. MANUFACTURER SERIAL NO. RATING MODEL INPUT VOLTAGE INPUT CURRENT OUTPUT VOLTAGE OUTPUT CURRENT FREQUENCY SWBD. & CUB. REF. IP RATING UNIT/AREA Check List Item GC12105200 Result 1 Equipment is in good condition and compliant with data sheet and data plate 2 Check equipment is correctly aligned, level, and securely bolted down. 3 Equipment has been installed in accordance with manufacturer's installation instructions 4 Check all panel mounted devices are undamaged and correctly labeled as per drawing. 5 Check all busbar bolted connections and verify all busbar joint torque setting are correct. 6 Panel clean and free from dust 7 Check earth bonding of all equipments, doors etc is to project specification 8 Check that all isolators / circuit breakers are mechanically operational and undamaged. 9 Check access for maintenance is satisfactory. Remarks 10 Check that all protection relays are as per data sheets and installed correctly. 11 Check all internal wiring is correctly loomed and clearly identified 12 Check that all fuses are installed in accordance to the data sheet 13 Check that all gland plates and terminations are suitable for incoming cables. 14 Check that all spare cable entries are correctly plugged Remarks- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 25 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: BATTERY INSTALLATION CHECKLIST EI-E/011 DOC. NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TAG DESCRIPTION TAG NO. MANUFACTURER TYPE NUMBER OF BANKS CELLS PER BANK VOLTS PER CELL VOLTS PER BANK OVERALL VOLTAGE OVERALL RATING FULL LOAD CURRENT UNIT/AREA Check List Item GC12105200 Result 1 Check that battery rack is correctly assembled and installed. 2 Check that batteries are correctly installed in accordance with manufacturers instructions with sufficient clearance and accessibility 3 Battery system clean and secure. Terminal and interconnectors covered with protective base. 4 Check cell type and battery make up in accordance with data. 5 Check all battery posts, links, nuts are clean, fitted, tightened and greased. 6 Where applicable, check all electrolyte levels are correct. 7 Check that battery room is clean and adequately ventilated. 8 Earthing completed as per drawing Remarks Remarks- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 26 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: MULTI CORE CABLE PRE-INSTALLATION TEST SHEET EI-E/012 DOC. NO. GC12105200 CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TEST VOLTAGE MANUFACTURER DRAWING NO. TEST SHEET DESCRIPTION TEST DATA Cable Insulation Resistance (MΩ) Cable Drum Number Cable Manufacturer Cable Size Cable Type Length Core to Core Core to Armour Core to Earth Continuity proved for all cores and armour: TEST EQUIPMENT DETAILS Test equipment used Cert.No / ID No. Make / Model Serial No. Calibration Date Expiry Date Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 27 OF 29 EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED TITLE: CABLE TERMINATION CHECKLIST EI-E/013 DOC NO. CONTRACT NO. PROJECT NO. SYSTEM/SUB-SYSTEM NO. TYPE MANUFACTURER LENGTH DRAWING NO. LOCATION RATING TAG NO. CABLE SCHEDULE NO. ITEM CHECKLIST DESCRIPTION 1 Check cable against cable schedule, size/type correct and accepted. 2 Check cable gland/termination accessories are as per specifications and accepted 3 Check cable for any physical damage 4 Check that cables are routed correctly as per approved drawing 5 Check any support is required for cable 6 Check cable bending radius are within manufacturers specified limits 7 Check that cables are correctly loomed and segregated as per project specification 8 Check cable identification tag provided for control cables 9 Check cable and core markings are as per cable schedule and project specification 10 Cable color coding checked and accepted 11 Check cross reference ferruling provided for control cables 12 Cable termination accepted 13 Cable lugs/connector used are correct and crimping accepted 14 Check cable glands and earthing are in accordance with specification 15 Cable connection done properly and bolt tightness checked by using calibrated torque wrench, torque value is as per specification/standards GC12105200 RESULT REMARKS Remarks:- Dopet Construction Dopet QA/QC QP Name Position Signature Date DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 28 OF 29 PLF NO: Page 1 of 1 PUNCH LIST FORM (PLF) PLF NO: CONTRACT TITLE : EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED SYSTEM NO. LOCATION: CONTRACT NO. GC12105200 PROJECT NO. 3513 CONTRACTOR DOPET DISCIPLINE: MECH. (M) DESCRIPTION: CIVIL (C) PART I PUNCH LIST TYPE INST. (I) HVAC (H) OTHER (X) PART II PUNCH LIST ITEMS ITEM No. ELEC. (E) CLEARED AND ACCEPTED ITEMS MPL.NO RAISED BY DESCRIPTION REF.IND/NAME INITIAL CAT. DATE CLEARED BY REF.IND/NAME INITIAL ACCEPTED BY DATE CATEGORY 'A' ITEMS: Item shall be repaired, completed or corrected before the equipment/system can progress to the next stage CATEGORY 'B' ITEMS: Item shall be repaired, completed or corrected at later date and which allow the equipment/system to be operated without jeopardizing plant, personnel or the environment PUNCH LIST TYPE: (1) CONSTRUCTION PUNCH LIST (2) COMMISSIONING PUNCH LIST REF.IND/NAME INITIAL DATE (3) PLANT OPERATIONAL HANDOVER PUNCH LIST Note: Punch List Numbering Nomeclature: Contract No. (GCyyxxxxxx)/Type(1-2-3)/Sequential No; Example (GC07102800/1-001) All Construction / Commissioning / Plant Operational Handover (Strike out the one not applicable) Category "A" Punch List Items cleared and accepted in above list Signature Date: Commissioning Team Leader : Punch List Item if not Categorised, i.e. left blank, would be considered as an ‘Exception Item’ to be resolved as per procedure IP-ENG-027 DOC NO : 3513-M3GE-2-25-0019 REV. A IP-ENG-037PAGE - Punch29List OFForm.xls 29