Segment 3 DAILY FIELD INSPECTION / PROGRESS REPORT WEATHER: FAIR (F) LIGHT RAIN (L) 24 01 02 03 04 05 06 07 08 09 RAINY (R) STORMY (S) 10 11 NAME OF PROJECT: NLEX Widening 12 13 14 15 SEGMENT: 16 DATE: 17 18 19 20 21 22 ___ 2 ___ 3 AREA: __ Roadway/Drainage ___ Structural ___ L&G ___QA/QC ___ FOE/Non-FOE ___ESH ITEM NO LOCATION / STATION REMARKS / STATUS ACTIVITY EQUIPMENT USED: (Note: Use Equipment body number) Operational Inactive MANPOWER: (Note: Indicate specific trade) Present Absent PROBLEMS ENCOUNTERED ACTION TAKEN PREPARED BY: NOTED BY: CONCURRED BY: FIELD INSPECTOR SECTION HEAD PROJECT MANAGER Attachments: Progress photos per activity 23