Uploaded by Geonesies Balbido

16 -DFIR -DAILY FIELD INSPECTION REPORT

advertisement
Segment 3
DAILY FIELD
INSPECTION /
PROGRESS REPORT
WEATHER: FAIR (F) LIGHT RAIN (L)
24
01
02
03
04
05
06
07
08
09
RAINY (R) STORMY (S)
10
11
NAME OF PROJECT: NLEX Widening
12
13
14
15
SEGMENT:
16
DATE:
17
18
19
20
21
22
___ 2 ___ 3
AREA:
__ Roadway/Drainage ___ Structural ___ L&G ___QA/QC ___ FOE/Non-FOE ___ESH
ITEM NO
LOCATION /
STATION
REMARKS /
STATUS
ACTIVITY
EQUIPMENT USED: (Note: Use Equipment body number)
Operational
Inactive
MANPOWER: (Note: Indicate specific trade)
Present
Absent
PROBLEMS ENCOUNTERED
ACTION TAKEN
PREPARED BY:
NOTED BY:
CONCURRED BY:
FIELD INSPECTOR
SECTION HEAD
PROJECT MANAGER
Attachments: Progress photos per activity
23
Download