3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment 5 de 15 Pesquisar no documento Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 1/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No Base Risk Ranking (Without Controls) People Involved Assessed by Title L S Run over by vehicles/plants Hit by reversing equipment Overhead obstrucons Vehicle break down Property damage Collision with other vehicles Personal injury Fatality Accident due to poor lighng and visibility (operaon at night Operaves Sta/visitors 3 4 Signature Residual Risk Ranking (With Controls) CONTROL MEASURES Risk Risk Score Rang 1 20/03/2021 Safety Ocer Plant and Trac movement Delivering, unloading and storing of Fireghng Pipes and ngsusing pickup and unloading by manual handling Rev. Date 00 Installaon of Fire Fighng System IDENTIFIED HAZARDS/RISKS ACTIVITY Rev. No. 12 Medi um 1. Delivery/ collecon drivers shall be subject to McLaren inducon/Training with regards to trac management. 2. Ensure exclusion zone is set up around the preparaon work area and all plant movement and checked by supervisor 3. Always use the pedestrian access provided 4. Trac light batons shall be provided for banks man at night 5. All plant to have a fully trained banks man present all mes. 6. No plant to reverse without banks man. 7. Ensure access route are sucient and safe to use. 8. Do not take rest in or under vehicles 9. Proper barricade and safety signboard provided on open excavaon 10.All vehicles must be ed with reverse alarm / Flashing light. 11.The work place and all access to be well illuminated. 12.Enforce Speed limit 13.Ensure all vehicles entering the site is properly maintained and reported if found any defect 14.Ensure materials are secured/ed in pallet trolley to avoid fall from trolley. Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx L S 1 4 Risk Risk Score Rang 4 Low Person Responsible Site Eng. Supervisor, Foreman, SPECIFIC RISK ASSESSMENT RECORD 2/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Anúncio Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 3/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No 2 3 Manual Handling Mat erial storing 1. Musculoskeletal disorders 2. Hand injuries 3. cut & bruises Rev. Date 00 20/03/2021 Assessed by Title Slips, Trips and fall Poor house keeping Base Risk Ranking (Without Controls) People Involved L Operaves involved in work Operaves Sta/storekeeper S Signature Safety Ocer Installaon of Fire Fighng System IDENTIFIED HAZARDS/RISKS ACTIVITY Rev. No. Residual Risk Ranking (With Controls) CONTROL MEASURES Risk Risk Score Rang 3 4 12 3 4 12 Med ium Med ium L 1. Eliminate the need for manual handling by using mechanical aid. 2. Reduce the weight of a load to limit force exeron 3. If unsure of the load weight, check with supervisor. 4. Ensure proper manual handling procedure 5. Ensure adherence with sucient and appropriate PPE. 6. Limit load carrying to 20kg per person 7. Supervisor must make sure while manual handling load individual task and environment to be considered to reduce the risk of manual handling. 1. Ensure accesses are kept clear at all mes. S 1 4 4 1 4 4 2. Housekeeping to be carried out regularly throughout the day when required 3. Supervisor to ensure operaves are stacking material neatly and stacks are stable and in a safe condion 4. Provide adequate lighng especially during night hours 5. Appropriate space is allowed around storage areas for employees to move around safely without the risk being trapped between stacked materials. 6. Maintain good housekeeping. Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx Risk Risk Score Rang Low Low Person Responsible Supervisor, Foreman, Site Eng. Supervisor, Foreman, Site Eng. SPECIFIC RISK ASSESSMENT RECORD 4/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 5/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No 4 Cung & grinding operaon People Involved L S Risk Risk Score Rang Contact with grinding or cung wheel Minor/Major injuries, cuts Ejecon of abrasive material from grinding wheel. Eye injury. Equipment failure All concerned pares 3 4 12 Med Threading and grooving Operaons Title Clothing entanglement with moving parts Involving 3 4 Signature Residual Risk Ranking (With Controls) CONTROL MEASURES Fire 5 Assessed by Base Risk Ranking (Without Controls) 20/03/2021 Safety Ocer Rev. Date 00 Installaon of Fire Fighng System IDENTIFIED HAZARDS/RISKS ACTIVITY Rev. No. 12 Operaves Grinding wheels shall be guarded. Ensure that the tools are provided with g uards to avoid accidental contact. RPM of the grinding wheel shall be greater than the driver. Hot work permit shall be taken from concerned authority before performing the job Damaged or expired wheel shall be discarded. Barricade immediate work area. Safety glass along with clear face shield shall be worn. Training on power tools handling is benecial. Trained Fire watchers, re blankets, re exnguishers available to prevent the risk of re. All combusble materials kept away from the area of work. Fire exnguisher in place and easily accessible Posioning of machines will be planned to allow clear access and avoid causing obstrucons. Risk Risk Score Rang L S 1 4 4 LOW 1 4 3 LOW Person Responsible Operator Task supervisor Foreman Operator Task supervisor Foreman Machines will be maintained to the manufacturer’s instrucons. Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx SPECIFIC RISK ASSESSMENT RECORD 6/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Anúncio Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 7/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No ACTIVITY Rev. No. Rev. Date 00 20/03/2021 Assessed by Title IDENTIFIED HAZARDS/RISKS Base Risk Ranking (Without Controls) People Involved L S Signature Safety Ocer Installaon of Fire Fighng System Residual Risk Ranking (With Controls) CONTROL MEASURES Risk Risk Score Rang L S Risk Risk Score Rang Person Responsible COSHH assessments must be made available for any lubricang or cung uids used on machines. Guards are to be ed to the rotang parts, and end guards around the rotang pipe ends, unless the machine is posioned so that no person can approach a rotang pipe end. Machines are to be posioned clear of access routes and warning noces are to be displayed. Operators are not to wear loose clothing o r gloves or use rags or other materials which could become entangled with moving parts. Machines will be operated by foot switches, and supply leads are to be routed so as to avoid damage to leads and trip hazards. Only trained operators are to erect, maintain and use these machines. The work area is to be monitored to ensure clear access is available at the machine, that all guards are in place and the oor is clean. Machines are not to be le running while unaended. Operators will be trained to set up and use these machines in accordance with manufacturer’s instrucons. Operators will also be made aware Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx SPECIFIC RISK ASSESSMENT RECORD 8/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 9/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No 6 Installaon of Fireghng Pipes and sprinkler using mobile scaolding Rev. Date 00 20/03/2021 Assessed by Title Work at height Fall form height Falling objects Over loading Protruding objects Access & egress Base Risk Ranking (Without Controls) People Involved L Operaves/Sta/ Visitors Others 3 S 4 Signature Safety Ocer Installaon of Fire Fighng System IDENTIFIED HAZARDS/RISKS ACTIVITY Rev. No. Residual Risk Ranking (With Controls) CONTROL MEASURES Risk Risk Score Rang 12 Med ium of any hazards and controls required by relevant COSHH assessments. 1. STARRT card brieng must before start the acvity 2. Ensure the PTW in place. 3. Ensure proper working plaorm with complete fall protecon 4. Ensure Full body harness and 100% Tie o 5. Ensure the scaold plaorm is properly erected with "Safe to use" tag. 6. Ensure castor wheels are locked 7. Hand tools must be secured/tethered 8. Work materials strictly not allowed to be stored on plaorm except for working tools 9. Ensure avoid over reaching and climb on handrail. 10. Ensureunauthorised person not allowed to modify the scaolding and if needed to any changes then must be modied by trained and cered scaolder. 11. Ensure safe access to the working plaorm 12. Scaold access must be free from obstrucon L S 1 4 Risk Risk Score Rang 4 Low Person Responsible Supervisors Foreman, Site Eng. 13. Ensure sucient illuminaon in work area 14. Ensure while ngs the GI clamp and brackets operaves must safely use drill machine to avoid nger injury. 15. Ensure that working near fragile surface special care of body and eye protecon with necessary PPE. 16. Must clean the debris aer compleon the Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx SPECIFIC RISK ASSESSMENT RECORD 10/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Anúncio Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 11/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No ACTIVITY Rev. No. Rev. Date 00 20/03/2021 Assessed by Title IDENTIFIED HAZARDS/RISKS Base Risk Ranking (Without Controls) People Involved L S Signature Safety Ocer Installaon of Fire Fighng System Residual Risk Ranking (With Controls) CONTROL MEASURES Risk Risk Score Rang L S Risk Risk Score Rang Person Responsible job and maintain good housekeeping. 1. 1 Sharp edge item 7 Installaon of sprinkler 2 Sprinkler glass may damage Installer Foreman Supervisor 3 4 12 Med 2. 3. 8 Use of Ladder (Ladder is not allowed to use daily basis but in certain cases where there is very narrow place and even podium ladder not possible to x in that cases Ladder can use if permission Falling from height Working on Uneven ground Operaves/ Sta/ 3 4 12 Med ium A qualied and experienced plumber is needed to opmally install this network of pipes to t the sprinklers with high volumes of water when the need arises. Ensure sprinkler installaon according to NEPA 13 AND 14 Use necessary ppe while using sharp glass Materials. 1) Only light work, o short duraon and work in which the operave can maintain secure hand and foot hold can be undertaken form a ladder 2) Never try to overreach with any ladders 3) Check the ladder is of suitable quality for industrial use and is in good condion 4) Maintain a minimum of 3 points of contact with stepladders at all mes (feet/thighs/hands) If possible avoid the use of stepladders at a working height of 2 meters and more. 5) Check the ladder legs (and stays) are fully deployed or locked (depending on type) to maintain maximum base dimensions and the step Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 1 4 4 Low 1 4 4 Low Site Engr Supervisor Foreman Supervisor Site Eng. Foreman, SPECIFIC RISK ASSESSMENT RECORD 12/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 13/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No Base Risk Ranking (Without Controls) People Involved Assessed by Title L S Spillage/ soil contaminaon Burns Contact with skin Acute/Chronic adverse heath eect. Operaves using solvent 3 4 Signature Residual Risk Ranking (With Controls) CONTROL MEASURES Risk Risk Score Rang Falling objects 20/03/2021 Safety Ocer granted from McLaren Safety) 9 Rev. Date 00 Installaon of Fire Fighng System IDENTIFIED HAZARDS/RISKS ACTIVITY Rev. No. 12 Med ium ladder is orientated to provide maximum stability. 6) Stepladders/ladders has to be used on leveled ground/rm base 7) Ensure that during using ladder from the top 2 step is blocked to avoid climb on that. 8) The ladder securely xed to prevent slipping outwards or sideways or securely footed at all mes. 9) Person must hold the ladder while another operave working on it 8) Materials should not b e placed above the thread of ladders/step ladders 9) Do not carry any materials in one hand while climbing or geng down from ladder 10) Ensure the area under the ladder is barricaded especially if it is being used in a public area. 11) Ensure the ladder is electrical insulated podium type if working in live services 1. Ensure that all chemical substances have a COSHH assessment 2. Refer SDS prior to any handling of hazardous substances and ensure SDS is easily accessible at site while working with chemicals. 3. Ensure chemicals are properly stacked. 4. Ensure all chemical containers are properly labeled. 5. Spill kits to be available at site. 6. Ensure operaves use the correct PPE Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx L S 1 4 Risk Risk Score Rang 4 Low Person Responsible Supervisors Foreman, Site Eng. SPECIFIC RISK ASSESSMENT RECORD 14/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Anúncio Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 15/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Document Reference GEMC-FP-A-MST-0019 NPCL PROJECT CHENNAI Risk Assessment Record Acvity: No 10 Use of power tools such as Grinder/Cuer & Drill machine, 20/03/2021 Assessed by Title Base Risk Ranking (Without Controls) People Involved L S Residual Risk Ranking (With Controls) CONTROL MEASURES Risk Risk Score Rang L S 1 4 Risk Risk Score Rang Person Responsible 7. Competent person to oversee the storage, use and disposal of hazardous materials. 8. Ensure that correct welfare/rst aid facilies are available in the area i.e. washing facility/eye wash. 9. Proper and adequate PPE to be used always 10.Ensure all chemical containers are properly labeled. 11.Adjust work schedules so that workers are not overexposed to a hazardous chemical. 12.Wear respiratory protecon 13.Ensure proper and adequate PPE to be used always. 14.Ensure smoking only in designated area 15.Ensure appropriate Fireghng equipment’s are in place and easily accessible Fire Damaged Sockets &cable insulaon. Electrocuon Electric shock Short circuit & Burns Trip/Fall Noise Hearing loss Vibraon Signature Safety Ocer Use of Primer/paint (Hazardous Substance) Rev. Date 00 Installaon of Fire Fighng System IDENTIFIED HAZARDS/RISKS ACTIVITY Rev. No. Operaves and sta 3 4 12 Med ium 1. All portable electrical equipment must be PAT tested and color coded. Make sure the test dates are visible on the equipment. 2. Ensure all disk shall be appropriate and expiry date is over. 3. Ensure all power tools are in good condion and appropriately maintained 4. PTW to be obtained, prior to commencing the task 5. Damaged industrial sockets and power cables 4 Low Supervisor Foreman Site Eng. must be removed. Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx SPECIFIC RISK ASSESSMENT RECORD 16/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 17/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 18/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Anúncio Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 19/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 20/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 21/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 22/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Anúncio Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 23/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 24/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 25/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 26/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Anúncio Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 27/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 28/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 29/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Títulos relacionados https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 30/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment de 15 Recompense a sua curiosidade Tudo o que você quer ler. A qualquer hora. Em qualquer lugar. Em qualquer dispositivo. Leia gratuitamente por 30 dias Sem compromisso. Cancele quando quiser. Compartilhar este documento Sobre Suporte Jurídico Sobre o Scribd Ajuda / Perguntas frequentes Termos Instagram Imprensa Acessibilidade Privacidade Twitter Nosso blog Ajuda para comprar Direitos Autorais Facebook Faça parte de nossa equipe! AdChoices Preferências de cookies Pinterest Fale conosco Editoras Não vender ou compartilhar minhas informações pessoais Convidar amigos Social Presentes Scribd para empresas Faça o download gratuito de nossos aplicativos Títulos relacionados Livros • Audiolivros • Revistas • Podcasts • Partituras • Documentos https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx • Snapshots 31/32 3/7/23, 8:06 AM NPCL Project Chennai Risk Assessment Record: Activity: Installation of Fire Fighting System | PDF | Firefighting | Risk Assessment Idioma: Português Copyright © 2023 Scribd Inc. de 15 https://pt.scribd.com/document/500258729/439839370-Risk-Assessment-for-Installation-of-Fire-Fighting-System-1-docx 32/32