(c) NDJ 2023 REVIEWER ANSWER QUESTION is strong, rigid, and economical. It resists a wide range of Polyvinyl chloride (PVC) acids and bases but may be damaged by some solvents and chlorinated hydrocarbons. 140◦F (60◦C) maximum service temperature of PVC Acrylonitrile-butadiene- it is limited to 160◦F (71.1◦C) water temperatures at lower pressures, which is considered adequate for DWV use. styrene (ABS) Chlorinated polyvinyl This meets national standards for piping 180◦F (82.2◦C) water at pressures of up to 100 psi (689 chloride (CPVC) kPa) CPVC can withstand how much water temparature for limited periods 200◦F (93.3◦C) Polyethylene (PE) Polybutylene (PB) Compressiontype joints Polypropylene 180◦F (82.2◦C) Kem-Temp polyvinylidene fluoride (PVDF) 280◦F (138◦C) 2 inches (50.8 mm) This is a flexible pipe for pressure systems. Like PVC, it cannot be used for hot-water systems. This is flexible and can be used for either hot-water or cold-water pressure systems. Since no method has been found to chemically bond , solvent-weld joints cannot be used what are used to bond PB pipes? This is a very lightweight material suitable for lower-pressure applications.It is used widely for industrial and laboratory drainage acids, bases, and many solvents. maximum service temperature of Polypropylene Pipes This is a strong, tough, and abrasive-resistant fluorocarbon material. It has excellent chemical resistance to most acids, bases, and organic solvents and is ideally suited for handling wet or dry chloride, bromine, and other halogens. maximum service temperature of PVDF PVC Type 1–100 feet (30.5 meters) operating at 140◦ F(60◦C) will expand approximately 31/4 inches (82.55 mm) Polypropylene and PVDF at the same temperature will expand approximately natural bristle or nylon Cement is applied with brush is considered a safe period for the piping system to be allowed to stand vented to the atmosphere before pressure testing. Shorter periods may be satisfactory for high air temperatures, small sizes of pipe, quick-drying cement, and tight dry-fit joints. 48 hours PVC solvent cements are available in two general viscosity categories: light and standard. The light cements are intended for use with pipes and fittings up through _______and for pipes and 2 inches (50.8 mm) fittings where interface fits occur between the parts to be joined. N.P.S. National Sanitation Meaning of NSF; Foundation min. lengthof metal pipe is recommended on both hot- and cold-water lines above the tank before converting to CPVC. 12 inches (304.8 mm) are used to connect the CPVC to the metal pipe risers. Transition unions tubing may be used for the relief line to a point 6 inches (152.4 mm) above the floor. The relief line must be the same size as the outlet of the relief valve. CPVC 3 feet (914.4 mm) in runs longer than 3 feet (914.4 CPVC tubing should be supported at least every mm). Plastic pipe lighter than this should not be threaded. Schedule 80 resists corrosion, freezing, rust, acidic soils, and scale buildup. It will not burst when frozen and withstands temperatures of 180◦F (82.2◦C) at 100 psi (689 kPa). It is also unaffected by freezing; should be stored out of direct sunlight because it is susceptible to ultraviolet attack Polybutylene pipe Water pressure in the water supply system is normally about 50 psi 9. Romans 8:28 1 (c) NDJ 2023 Cast Iron Soil Pipe Institute 48 (nor more than 60) inch-lbs (67.79 N-m) of torque. 3/32 inch (2.38 mm). ARC tube Plumbing tube 1/8 inch (0.32 cm) Drawn tube Annealed Tube Capillary Joints 2 inches greater the side of the heater near the bottom the top of the water heater 210◦F (98.9◦C) 130°f (54°c) diaphragm expansion tank closed-loop system heater-mounted differential controller 32◦F to 212◦F Absolute pressure 140˚F to 160˚F (60˚Cto71˚C CISPI stands for The stainless steel bands for hubless cast iron pipes must be tightened alternately and firmly to not less than spacer inside neoprene gasket where fittings of pipe ends meet. is a copper pipe used for air-conditioning and refrigeration. is a copper pipe which includes types K, L, M, and DWV. Types K, L, M, and DWV come in standard sizes with the outside diameter always_________ larger than the standard size. is a hard copper tube; can be joined by soldering or welding. is always a soft copper tube. joints rely on a seal of molten and then cooled solder. location of the drain pan from the water heater. ___ greater than the length and width of the water heater. The water heater inlet is located on_________ the water heater outlet is located on_________ The temperature setting of the relief valve should not exceed_______. Water temp. above______may cause scalding is provided on top of the heater to handle the expansion of heat-transfer fluid in a closed-loop circulating line. is used for transfer of the heated solution and return. has a modulating output to collect the maximum amount of available heat from collector panels, even on cloudy days. The pump is adjustable for flow with a restrictor that makes this solar system flexible for various installations. Water in a heating system, when heated from (0 ◦C to 100◦C) will expand approximately 1/23 of its original volume. gage pressure plus atmospheric pressure. The maximum acceptable temperature for domestic hot water is from Temperatures above _____ are not recommended, because they cause increased corrosion, increased deposit of lime, waste of fuel, more rapid heat loss by radiation, scalding, and other accidents. 160◦F (71◦C) If hot-water pipes are insulated, the heat loss from pipes is reduced by up to__________ 80 percent anode rod/protector rod is used to prevent corrosion in some water heaters. 1 inch (25mm) Storage tanks up to 82 gal. (310.4) liters are tapped for_________ connections Tanks over that size are tapped for a minimum_____________ 1-1/4" (32mm) when water solidifies it becomes lighter The amount of heat required to change ice to liquid water 144 BTU/ 335J/kg Are sold and ordered by their OD measurement Flare fittings contain 85% copper, 5% zinc, 5% tin, 5% lead Brass fittings space entirely devoid of matter Vacuum a space where and air pressure exists is less than the atmospheric pressure. Partial Vacuum should be installed on a copper tank to prevent collapse in the event of a vacuum occurrence. Vacuum Relief Valve 6 inch/15cm, 6 inch/15 a vacuum breaker should be atleast______above the flood level rim or _______above the top of the unit. cm have a machined seat and a composition disk and usually off tight. Have more flow resistance than gate valves. Globe valves 9. Romans 8:28 2 (c) NDJ 2023 Gate Valves Electrolysis 12 inches(305mm) check valve one fourth 16 feet (4.88 m ) 8 feet (2.44 m ) 4 feet (1.22m) 75 feet(23m) 150 sq. feet(14 sqm): 1 inch2 Hygrometer Friction clamp asphaltum washerless valve 90F -100F lift stations wet-well installation dry-well installations Impeller Submersible axial flow pumps 12 inches (305mm) 80 psi (552 kpa) 1935 City Ordinance 2411 June 18, 1955 1966-1969 November 28, 1967 (6) sets Two (2) sets 1 set may leak slightly when closed (particularly if frequently operated) because of the wear between the brass gates and the faces against which they operate. when copper and steel contact each other, especially when dampness is present, this chemical reaction occurs. a relief line from a relief valve is generally piped to the outside,_________ or less above ground level, elbow and nipple turned down. Never install this valve to a water heater because it would confine pressure in the tank and result in an accident if the relief valve did not operate. when using a ladder, place the ladder base____ of the ladder length away from which the ladder is leaning. maximum height for horses supporting scaffold platforms. vertical braces should be located at every_____ Horizontal stringers in good soil conditions should be placed every_______ The maximum spacing for rainwater leaders(downspouts) the recommended standard for roof leader area to roof area ratio the instrument for measuring the relative humidity. for use with brass pipe in a regular pipe vise is made by cutting a pipe coupling in half lengthwise and then lining it with sheet metal. protects the lead from corrosion during the curing period of concrete caused by a chemical reaction that occurs between concrete, lead, and the water seeping through and contacting both. the secret behind the no-drip features of faucets The typical temperature fo a comfortable bath. Pumping stations are built when sewage must be raised from a low point to a point of higher elevation, or where the topography prevents downhill gravity flow. Special nonclogging pumps are available to handle raw sewage. They are installed in structures called has only one chamber or tank to receive and hold the sewage until it is pumped out. have two separate chambers, one to receive the wastewater and one to enclose and protect the pumps and controls. The protective dry chamber allows easy access for inspection and maintenance. This is the most important single part of the sewage pump. are for direct installation in the discharge pipes. These save space and installation costs. They are intended for large flows and moderate heads for storm water, land drainage, and flood protection. pipes more than____diameter are classified by their OD. a pressure regulator must be installed NATIONAL PLUMBING CODE OF THE PHILIPPINES RA 1378 NAMPAP was registered Plumbing code for the city of Manila R.A. 1378, otherwise known as the "PLUMBING LAW OF THE PHILIPPINES" was signed by President Ramon Magsaysay the Board of Examiners for Master Plumbers and the NAMPAP prepared a Cuniculum for Plumbing Engineering that was approved by the Department of Education and was first introduced at the Feati University. the First Amendment to the National Plumbing Code was approved, which effected the inclusion of "Asbestos·Cement Pipe" as an approved plumbing material . All plumbing plans, drawings. diagrams, design analyses/computations as required, technical sp~cifications, bills of materials and other required documents for all types ofoccupancy shall be prepared, signed and sealed by a Registered and Licensed Master Plumber. without limitations pursuant to Republic Act 1378, as amended and shall be submitted in______________of the aforementioned requirements with each application for a permit. shall be returned to the applicant and owner. shall be kept at the jobsite at all times while work is in progress. 9. Romans 8:28 3 (c) NDJ 2023 120 days A plumbing permit issued under the provisions of this Code shall expire and become null and void if the plumbing work authorized therein is not commenced within one year from the date of such permit or ifthe plumbing work so authorized is suspended or abandoned at any time after having been commenced for a period of_______ in case of renewal of a plumbing permit, a fee equivalent to______of the original fee shall be paid. any public space, public park or thoroughfare less than three (3) meters but not less than two (2) meters in width dedicated or deeded for public use. alley a physical separation. which may be a low inlet into the indirect waste receptor from the fixture, appliance or device indirectly connected . AIRBREAK the part of a vent line, which connects directly with an individual trap underneath or behind the fixture and extends to the branch or main vent pipe at any point higher than the fixture or fixture traps it serves. This is sometimes called an individual vent. See Revent pipe. BACKVENT PIPE BENDING PIN (or IRON) a tool for straightening or bending lead pipe. A flange that is not drilled for bolt holes. BLANK FLANGE A flange that closes the end of a pipe. BLIND FLANGE A controlled outlet of a pipeline to discharge liquid or deritus. BLOW-OFF a valved outlet of a boiler that permits discharge of accumulated sediment. BOILER BLOW-OFF a length of soil or waste stack corresponding in general to a story height but in no case less than 2.43 meters within which the horizontal branches from one floor or story of a building are connected to the stack. BRANCH INTERVAL any joint obtained by joining metal parts within alloys which melt at temperatures higher than 449 degrees centigrade, but lower than the melting temperature of the parts to be joined. BRAZED JOINT that part of the lowest horizontal piping of a drainage system which receives the discharge from soil, waste and other drainage pipes inside the walls of the building and conveys it to the building sewer beginning 0.6 meter outside the building wall. BUILDING DRAIN a structure which any part of its structural framework will ignite and burn at a temperature of 7_________. 756 centigrade or less a room or space having a volume less trhan 1.4 cu.m with 250 kg. calorie of the aggreagte input rating of all fuel burning appliacnes installed in that space. CONFINED SPACE 28.3 liters/min. Fixture unit. 1cu.ft/min a valve in which the flow of water is cut off by means of a circular disc fitted against machinesmoothed faces, at right angles to the direction of flow. The disc is raised or lowered by means of a threaded stem connected to the handle of the valve. The opening in the valve is usually as large as the full bore of the pipe. GATE VALVE one-half the amount GLOBE VALVE INTERCEPTOR (CLARIFIER) PB - Polybutylene PE - Polyethylene PVC REGULATING EQUIPMENT a valve in which the low of liquid is cut off by means of a circular disc fits over and against the horizontal valve seat. The movement of the plane of disc is parallel to the normal direction of flow of water through the orifice resulting to a tortous passage which offers a high pressure loss. is a device designed and installed to separate and retain deleterious, hazardous or undesirable matters from normal wastes and permits normal sewage or liquid wastes to discharge into the disposal terminal by gravity. Tube made of plastic material and colored black. The cross-sectional shape is normally oval and is denoted by its outside diameter or O.D. Normally used as water service connection from main to meter. tube made of plastic material and colored black. The cross-sectional shape is circular and is denoted by its outside diameter or O.D. Polyvinyl Chloride. Potable water pipings are color-coded blue. Drainpipes are manufactured with toxic components are color-coded gray, orange or brown. include all valves and controls used in plumbing systems which are accessible. 9. Romans 8:28 4 (c) NDJ 2023 SOLDERED JOINT UNCONFINED SPACE UNIT VENT 20mm/m (2%) 10mm/m (1%) 22 1/2 or 1/16 bend, 45 bend, 60 or 1/6 bend a pipe joint obtained by joining metal parts with metallic mixtures or alloys which melt at a temperature below 427 degrees centigrade and above 149 degrees centigrade. a room space having a volume equal to atleast 1.4 cu.m of the aggregate input rating of the fuelburning appliance installed at that space. an arrangement of venting so installed that one vent pipe will serve (2) traps. Horizontal drainage pipes shall run in practical alignments and at a uniform slope between manholes not less than_______ toward the point of disposal. Existing adverse in arrangement so building or structure; any such piping 102mm or larger in diameter may have a slope of ______ provided it is first approved by the administrative authority. Changes in direction of drainage piping shall be made by the use of approved pipe fittings and shall be of the angles presented by a ________,__________,__________ or other approved fittings for longer sweeps. 45° or 60° wye branches, combination wye and 1/8 bend branches, sanitary tee or other approved fittings of longer Horizontal drainage lines connecting to a vertical stack shall enter through _____________________________. sweeps. Vertical installation of double sanitary tees for the changes in direction of drainage flow may be used when the barrel of the fitting is atleast __pipe sizes larger than the largest size inlet. 2 pipe sizes 45° wye branches, combination wye and 1/8 bend branches or other approved fittings Horizontal drainage lines connecting to other horizontal drainage lines shall enter through. of longer sweeps. 45-degree branches, or other approved fittings Vertical drainage lines connecting to horizontal drainage lines shall enter through. of longer sweep 60 degree branches or may be used only when installed in a true vertical position. offsets Prohibited fittings and practices: 1 DOUBLE HUB FITTING FOR LEAD-CAULKED JOINT IN A VERTICAL POSITION, 2 SINGLE OR DOUBLE TEE BRANCH 3 SINGLE OR DOUBLE TAPPED TEE BRANCH 4 SIDE INLET QUARTER BEND 5 RUNNING THREAD 6 BAND OR SADDLE DRILLED AND TAPPED No drainage or vent piping shall be ______ for making connections thereto THREADED No cast iron pipings shall be___________ The enlargement of a ______ closet bend or stub to _______ diameter shall not be considered and obstruction. 76mm, 102mm Void between pipes and sleeves through concrete floors in the ground shall be appropriately sealed with________. Bitumen The bottom of all pipe trenches deeper than the footing of any adjacent building or structure and parallel to it must be at least_________therefrom, unless permission is granted by the administrative authority. 45 degrees No building sewer or other drainage pipings or part thereof, constructed of materials other than that approved for use under or within _______ of any building or structure, nor less than ___ meter below the finish ground surface. 0.6 meter, 0.3 meter every other storey or Cast iron soil pipe-bell & spigot and hubless pipe shall be supported at closer 9. Romans 8:28 5 (c) NDJ 2023 every other storey Iron pipe size (IPS) shall be supported at not less than height each storey or, 3 meters Copper tubing shall be supported at _______ or at maximum intrervals of_______. on center Lead pipe shall be suppoerted at intervals not exceeding______ at centers with a rigid vertical backup. 1.20 meters Plastic pipe shall be supported at______ 1 meter interval Cast iron soil pipe horizontal support where joints occus, suspended cast iron pipe shall be supported at not more than _____meters intervals; except that pipe exceeding ____ meters length may be supported at not more than ____meter intervals. 1.5m, 1.5m, 3m Supports shall be adequate to maintain alignment and to prevent sagging and shall be placed within ___ meters of the hub or joint. (Cast iron soil pipe horizontal support) 0.45 Hubless or compression gasket joints must be supported atleast at every other joint except that when the developed length betweeen supports exceed ____meters, they shall be provided at each joint. (Cast iron soil pipe horizontal support) 1.2 Screwed pipe- IPS as provided in the other sections of this code shall be supported at approximately ___meters intervals for piping 19mm diameter and smaller; ___meters intervals for pipings 25 mm and larger in diameter. 3.0, 3.6 Copper tubing shall be supported at approximately ___meters intervals for piping 38mm diameter and smaller and __meters intervals for pipings 51mm and larger in diameter. LEAD PIPE Inground piping PLASTIC TUBE 0.6 meter One pipe size larger 0.3 meter acid resistant Gauge 16 US B&S or 1.6mm thick Bonderized Galvanized 0.3 Gauge no. 20 B&S or 0.8mm in thickness 38mm OD 32 mm OD BRASS OR COPPER Dishwasher 0.375 Shall be supported by stiff wooden backing for its entire length with hangers properly spaced. Shall be laid on a firm bed for its entire length, except where concrete cradle support is provided which is adequate and approved by the administrative authority. Shall be supported by stiff metal or wood backing with hangers in its entire length for small-size tubings up to 38 mm diameter and without backings but with spaced metal hangers at approved spacing for larger size tubings. Tunnels shall have a clear height of ___meter above the pipe and shall be limited in length to 1/2 of the depth of the trench with a maximum length of 2.4 meters. When pipe is driven, it shall be atleast one pipe size largerr than the pipe to be laid. All excavations shall be completely back filled as soon as possible after inspection. Adequate precaution shall be taken to ensure proper compactness of backfill around pipes without damage to such pipes. Trenches shall be back-filled in thin layers of _____ above the top of the pipe with clean earth which shall not contain stones, boulders, cinders or other materials which can damaghe or break the pipes or cause corrosive action. All porcelain enamel surfaces on plumbing fixtures shall be_______. Restaurant kitchen and other special-use sinks may be made of approved type bonderized and galvanized sheet steel of not less than________. to be put in phospate solution to avoid corrosion. coated in protective layer of zinc. Fixtures having concealed slip joint connections shall have an access panel of not less than___ in its least dimension. Continuous waste and fixture taipiece shall be constructed from the materials specified on this code for drainage piping provided however, that such connections where exposed or accessible may be of seamless drawn brass not less than ________________ . Each such tailpiece, continuous waste or waste and overflow shall not be less than____ for sinks dishwashers, laundry tubs, bathtubs, urinals and similar fixtures. for lavatories, drinking fountains and similar fixtures. shall not be used for urinal tailpiece or trap. No ________ drain shall be connected to a sink tailpiece, continuous waste or trap on the discharge side of a food waster disposal unit. No water closet or bidet shall be set closer than ____meter from its center to any side wall or obstruction; 9. Romans 8:28 6 (c) NDJ 2023 0.75 0.3 0.6 more than one urinal integrally cast waterstop 25.4 mm 51 mm, 228mm 2% or 20mm/m; 4% or 40mm/m 559mm 1.2 Nor closer than ____meter center to center from any similar fixture. No urinal shall be set closer than ___meter from its center to any sidewall or partition; Nor closer than _____meter center to center. No manually controlled flushometer valve shall be used to flush_______ and each such urinal flushometer valve shall be approved, self-closing type discharding a predetermined quantity of water. Floor drains, floor receptors and shower drains shall be of an approved type, the body provided with _________ outside flange around the body at mid depth and with an inside caulk outlet to provide a watertight joint in the floor. Each shower receptor shall be an approved type and be constructed to have a finished dam, curb or threshold which is at least _______ lower than the outside floor at the sides and back of such receptor. ln no case shall any dam or threshold be less than ____ nor more than___ in depth when measured from the top of the dam or threshold to the of the drain The finished floor receptor shall slope uniformly from the sides towards the drain not less than ______or more than _____. Thresholds shall be of sufficient width to accommodate a minimum______wide door. The minimum distance for wheelchair users between the door or entry to the drain opening shall be_____meters. All shower compartments regardless of shape shall have a min. interior area of____ square meter; And shall be able of encompassing a ______mm diameter circle. The minimum area and dimensions shall be maintained from a point above the shower drain outlet to a height of______ with no protrusions other than the fixture valve or valves, shower head and safety grab bars·or rails. 1.78 meters When shower receptors are built above ground the sub-floor and rough side of walls to a height of no less than_______ above the top of the finished dam or threshold shall be first lined with sheet lead or copper or with other durable and watertight materials. 76mm All lining materials shall be pitched at a slope of ________ to weep holes in the subdrain of a smooth and solidly formed sub-base. 2 percent or 20 mm/m All lining materials shall extend upward on the rough jambs of the shower opening to a point no less than _____ above the top of the finished dam or threshold and shall extend outward over the top of the rough threshold and be turned over and fastened on the outside face of both the rough threshold and the jambs. 76mm (3) layers of standard No metallic shower sub-pans or linings may be built-up on the jobsite of not less than_________asphalt-impregnated roofing telt. grade 6.8 kg All folds, laps and reinforcing webbing shall extend to at least ________ in all directions from the comer and all webbing shall be of approved type and mesh, producing a tensile strength of not less than 0.9 kg/mm in either direction. 101 mm Linings shall be properly-recessed and fastened to approved backing so as not to occupy the space required for the wall covering and shall not be nailed or perforated at any point which may be less than _____ above the finished dam or threshold. 25.4 mm Gutters in public or gang shower rooms shall have rounded comers for easy cleaning and shall be sloped not less than _____ toward the drains two (2) percent drains in gutters shall be spaced not more than____apart. 4.9 meters in the absence of local regulations, showers occupancies other than dwelling units served by pressure balance or individual water heaters shall be provided with individual shower control valves of thermostatic mixing type the__________type master thermostatic Multiple or gang showers may be controlled by a _____in lieu of individually controlled pressure balance or thermostatic mixing valves. mixing valve limit stops shall be provided on such valves and shall be adjusted to deliver hot water with a maximum temperature of_____. 48.88 degrees celsius 0.6 762 9. Romans 8:28 7 (c) NDJ 2023 9. 6kg/m2. Gauge No. 24 B&S (0.5mm thick) Burned Soldered or Brazed above the crown weir 3 15 minutes 34.5 Kpa;254mm 50 percent 344.5KPa AVB (Atmospheric Vacuum Breaker) DC(Double Check Valve Backflow Prevention Assembly) PVB(Pressure Vacuum Breaker Backflow Prevention Assembly) RP(Reduced Pressure Principle Backflow Prevention Assembly) 25mm 38mm 38mm 57mm 51mm 76mm 2x the dia. Of the effective opening. 3x the dia. Of the effective opening. effective opening 0 to 63.5cm Lead and copper sub-pans or linings shall be installed from all conducting substances other than their connecting drain by 6.8 kg asphalt felt or its equivalent and no lead pan or liner shall be constructed of material weighing less than ____. Thickness of copper pans or liners shall atleast be _______. Joints in lead pans or liners shall be_____ Joints in copper pans or liners shall be________ the circulation pump shall be located ______of the trap. If the system is tested in sections, each opening shalt be tightly plugged except the highest opening of the section under test, and each section shall be filled with water, but no section shall be tested with less than a___meter head of water. The water shall be kept in the pipe system or in the portion under test for atleast ____minutes. the air test shall be made by attaching an air compressor testing apparatus to any suitable opening, and after closing all other inlets and outlets to the system, air is forced into the pipe system until there is a uniform gauge pressure of______ or sufficient to balance a column of mercury _____ in height. The pressure shall be held without introduction of additional air for atleast 15 minutes. Water Piping -upon completion of a section or of the entire hot and cold water supply systems, it shall be tested and proved tight under a water pressure not less than the working pressure under which it is to be used plus ___%. A _____air pressure may be substituted for the water test. consists of a body, a checking member, and an atmospheric opening. Consists of two independently acting internally or externally loaded check valves, four properly located test cocks with connectors and two isolation gate valves. Consists of a loaded air inlet valve, and internally loaded check valve, two properly located test cocks and two isolation gate valves. Consists of two independently acting internally loaded check valves, a differential pressure relief valve, four proprely located test cocks, and two isolation gate valves. MINIMUM AIR GAPS FOR WATER DISTRIBUTION Lavatories and other fixtures with effective openings not greater than 13mm in diameter ( not affected by sidewalls) Affected by walls Sinks, laundry trays, gooseneck bath faucets, and other fixtures with effective openings not greater than 19mm in diameter (not affected by sidewalls) Affected by sidewalls Over rim bath fillers and other fixtures with effective openings not greater than 25mm in diameter. (not affected by side walls) Affected by sidewalls Effective openings not greater than 25mm in diameter (not affected by sidewalls) Affected by sidewalls shall he the minimum cross-sectional area at the seat of the control valve or the supply pipe or tubing which feeds the device or outlet If two or more lines supply one outlet, the _________ shall be the sum of the cross-sectional areas of the individual supply lines or the area of the single outlet whichever is smaller. Airgap less than 25mm shall only be approved as a permanent part of a listed assembly that has been tested under actual backflow conditions with vacuums of from _________mercury 9. Romans 8:28 8 (c) NDJ 2023 305 mm 1.52 meters 2; 25 mm 152 mm 43.3 degrees Celsius 152mm 25 mm 25mm 25mm two separate walls 152mm 152mm 152 mm DANGER UNSAFE WATER 51 GALVANIZED eight(8) 51mm Access and clearance shall be provided for the required testing, maintenance and repair. Access and clearance shall require minimum of______ space between the lowest porlion of the assembly and the grade, floor or platform. Installations elevated more than _______ above the floor or grade shall be provided with a permanent platform capable of supporting a tester or maintenance person. Where potable water is discharged to the drainage system, it shall be by means of an approved airgap of ____pipe diameters from the supply outlet and the top surface of the drainage inlet, but in no case shall the gap be less than ______. Connection may be made to the inlet side of a trap provided that an approved atmospheric vacuum breaker is installed no less than____above the flood level rim of such trapped fixture, so that at no time will any such device be subjected to any back·pressure. Backflow prevention for hot water over _____ shall be a listed type assembly designed to operate at a temperature of _____or higher without rendering any assembly inoperative. The vacuum breaker shall be installed at the discharge side of the flushometer valve with the critical level at least _____or the distance according to its listing above the overflow rim of a water closet howl or the highest part of a urinal. Water Closet and Urinal Tanks shall be equipped with a listed ballcock .The ballcock shall be installed with the critical level at least ____ above the full opening of the overtlow pipe. In cases where the ballcock has no hush tube, the bottom of the water supply inlet shall be installed ____ above the full opening of the overllow pipe. Water closets having the flush valve seat less than___ above the flood level rim of the closet bowl shall have the ballcock installed in a separate and isolated compartment of the tank, or provided with a sheathed baJlcock, or other equivalent protection. Potable water shall be separated from the fluids or gasses by a minimum of _____________, with a positive, vented leak detection path. Inlets to Tanks, Vats, Sumps, Swimming Pools and other receptors when protected by a listed atmospheric vacuum breaker shall have sucb atmospheric vacuum breaker installed in the discharge side of the last valve with the critical level of not less than _____ or in accordance with its listing above the flood level rim of such equipment, and ail downstream piping. Potable Water Outlets with Hose Attachments other than water heater drains and clothes washer connections shall be protected by a listed non-removable hose-bibb type vacuum breaker installed at least ______mm above the highest point of usage and located on the discharge side of the last valve. Water Inlets to Water Supplied Aspirators shall be equipped with a listed atmospheric vacuum breaker mounted at least ____ above the aspirator unit or equipped with a listed backflow preventer installed in accordance with its listed requirements and this Chapter. The discharge shall drain through an airgap. When using the tailpiece of a fixture to receive the discharge of an aspirator, the air gap shall be located above the flood level rim of the fixture. Each outlet on the non-potable water line, which may be used for drinking or domestic purposes shall be posted: Cast iron fittings up to and including ___mm in size, when used in connection with potable water piping shall be galvanized. All small-sized malleable iron water fittings shall be_____ Water pipes and fittings with a lead content that exceed_____percent shall be prohibited and not be used in potable piping systems. Valves up to and including _____ in size shall be brass or other approved materials. Sizes over ____ may have cast iron or brass bodies. Each gate valve shall be a fullway type with working parts of non-corrosive materials 9. Romans 8:28 9 (c) NDJ 2023 fullway gate valve fullway gate valve control gate valves A single control gate valve return vent pipe float valve, float switch or electrode-type water level 103 kPa/14.935Psi 551psi/78.895Psi 80 percent listed nonstorage instantaneous heaters 1033 kPa/149.785Psi 0.6m nor less than 152 mm water pressure relief valve CT&PRV workmanlike manner 0.3m 0.3m 0.3m 0.3m 0.3m 6.895 KPA 4 feet (1219mm) 3 feet (914mm) 1/4" (6.4mm) A ________controlling all outlets shall be installed on the discharge side of each water meter and on each unmetered water supply; shall be installed on the cold water supply pipe to each water heater; shall eb installed for each apartment or dwelling occupied by more than one family; shall be installed on the discharge piping from water supply tanks or near the tank. A valve used to control two (2) or more openings shall be a ________ shall be installed before each water-supplied appliance, slip joint, supply pipings for non-metallic fixture and appliance. shall he installed in a water supply line ahead of any automatic metering valve which supplies a battery of fixtures. The covers of gravity tanks shall be vented with a _________ having an area not less than the area of the down-feed riser pipe, and the vent shall be screened with a fine corrosion-resistant screen with openings not less than 14 nor more than 18 mess per 25 mm. Potable water inlets to gravity tanks shall be controlled by a _______________control to prevent the tank from overflowing. inadequate water pressure excessive water pressure All pipe size determinations shall be based on____percent of the reduced pressure. Any water distributing system provided with a pressure regulating device or check valve at its source or any water system containing storage water heating equipment shall be provided with an approved, listed, adequately sized pressure relief valve with approved drain, except for _______________________ having an inside diameter of not more than 76mm. Each pressure relief valve shall br an approved automatic type with drain, and each such relief valve shall be set at a pressure of not more than __________. Relief valves located inside a building shall be provided with drain. Adequately-sized and not smaller than the relief valve outlet or galvanized steel, hard drawn copper piping and fittings, CPVC or PB with fittings which will nut reduce the internal bore or the pipe or tubing (straight lengths as opposed to coils) and shall extend from the valve to the outside of the building with the the end of the pipe not more than above the ground and pointing downward. Any water-heating device connected to a separate elevated or pressure-type storage tank and having valves between said heater and tank shall be provided with an approved ____________ . Controlled temperature and pressure relief valve All pipings, equipment, appurtenances and devices shall be installed in a _____________________ in conformity with the provisions and intents of this Code. all water service yard piping shall be at least ____ below the finish ground level. the bottom of the water pipe is at least ____ above the sewer or drain line. the water pipe shall be placed on a solid shelf excavated at one side of the common trench with a minimum clear horizontal distance between the sides of at least _____ from the side of the sewer or drain and the water line. water pipes crossing sewer or drainage piping constructed of clay or materials, not approved for use within a building shall be laid a minimum of _____above the sewer or drain pipe. unions shall be installed in the water supply piping within _____ away from regulating equipment, water heater, conditioning tank, and similar equipment which require removal for servicing or replacement. 1 PSI support all piping intervals of not more than ______ at end of branches and at change of direction or elevation. support trap arms in excess of _____ in length as close as possible to the trap. closet rings shall be tightly fastened with corrosive resistant fasteners up to the floor with top surface _____ above the finish floor. 9. Romans 8:28 10 (c) NDJ 2023 For excreta drainage system, no galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least ____mm above ground. 152mm no____________type clay pipes or fittings for building drain or sewer shall be used above ground or whenever piping is pressurized by a pump or ejector.They shall be kept atleast ______ below vitrified clay pipes, 0.3m finish ground level. recessed drainage type fittings on screwed pipe joints shall be of the __________________________. water closets shall be computed at this amount of fixture units when determining the septic tank size. 6 F.U. clothes washers in groups of three shall be determined by this amount of fixture units for the common horizontal and vertical waste size piping. 6 F.U. 0.063Lps 1 gpm is equal to 0.47 liters/second the discharge capacity of 1 FU is 0.50-0.95 L/s 2 FU 1 to 1.89 L/s 4 units 1.95-31.5 L/s 6 units 3.15 L/s capacity over this amount shall be determined by the administrative authority. Each horizontal drainage pipe shall be provided with a cleanout at its upper terminal and each run of piping which is more than________in total developed length shall be provided with a cleanout and at every____________length or a fraction thereof. 15 meters 11 1/2 Number of threads per 25.4mm for 38 & 51mm dia. Pipes 8 Number of threads per 25.4mm for 64,76, & 102 or larger dia. Pipes 38mm size of cleanout for 38 and 51mm diameter pipes. 64mm size of cleanout for 64 and 76 diameter pipes. 89mm size of cleanouts for 102 diameter and larger pipes. cleanouts may be omitted on a horizontal drain line less than 1.5meter in length unless such line is serving sinks or urinals. 1.5 meter in length cleanouts may be omitted on a horizontal drainage pipe installed at a slope of ______ or less from the vertical line. 72 degrees or less an approved type of________ , installed inside the building wall near the connection between the building drain and building sewer or installed outside of a building at the lower and of the building two way cleanout fitting drain and extended to grade may be substituted for and upper terminal cleanout. an additional cleanout shall be provided on a horizontal line with an aggregate offset angle of direction exceeding_____________ 135 degrees Each cleanout shall be installed so it opens in the direction of flow to allow cleaning of the soil or waste line or at right angles thereto, except int the case of wye branch and end of line cleanouts, shall be installed _________above the flow line of the pipe vertically Each cleanout extension shall be considered as drainage piping and each ________ cleanout extension shall be extended from a wye type fitting or other approved fitting of equivalent 90 degrees sweep. Each cleanout piping 51 mm or less in size shall be installed so that there is a clearance of not less than _______mm in front of the cleanout. 305mm 0.45 meter vertical, 0.75 Cleanouts in piping larger than 51mm shall have a clearance of not less than_________ meter vertical and ________meter horizontal clearance from the means of access to such cleanout. meter horizontal No underfloor cleanout in any residential occupancy shall be located more than___________ from an access door, trap door, or crawl hole. 6.1 meters shall be provided for pressure drainage systems. cleanouts countersunk cleanout shall be installed where raised heads may cause hazard to passing personnel or vehicles. plugs when a ________________ is used for a required cleanout, the complete coupling and plug shall be accessible for removal or replacement. hubless blind plug drainage piping serving fixtures which have flood level rims located below the elevation of the nearby upstream manhole invert of the public sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type________________. backwater valve 9. Romans 8:28 11 (c) NDJ 2023 50.8mm diameter backwater or swing check valve and gate valve 0.063L/s 51mm 3kgs. 2.4 meters 25mm 1.5-4.6meters 4.6 meters 0.8 meter; 0.45 15 cm; 45 cm 152mm 60 degrees celsius 152mm 19mm 1/2" wearing plates and baffles 102mm No. 12 standard gauge (2.77mm) 102mm the minimum size of any pump discharge or any discharge pipe from a sump having a water closet connected thereto shall be 50.8mm diameter. the vertical discharge line from such ejector, pump, or other mechanical device to a horizontal drainline shall be provided with an accessible ______________close to connection with the horizontal line. The method of connection shall be at the top of the horizontal line using a wye branch fitting. The gate valve shall be located at the discharge side of the backwater or check valve. Building drain or building sewer receiving discharge from any pump or ejector shall be adequately sized to prevent overloading.Two fixture units shall be allowed for each ____________ or each gpm flow. the invert of the lowest inlet to the tank shall have a minimum distance of_______ above the high water or "starting" level of the pumping operation. air tanks shall be proportioned to be of equal cubical capacity to the ejector connected therewith where there shall be maintained an air pressure of not less than ____ for each meter of height the sewage is raised. No water operated ejectors shall be permitted. Fixture outlets shall not be connected to the horizontal excreta drainage piping system within _____ meter of any vertical or horizontal change of direction of a stack containing suds producing fixtures. the airgap for drainage shall not be less than _____ between the plumbing fixture, appliance, or appurtenance outlet and the rim of the floor, sink, or receptor. Indirect waste pipes exceeding ________ but not less than _______ length shall be directly trapped but such traps need not be vented. indirect waste pipes less than ___ in length need no be larger in diameter than the drain outlet or tailpiece of the fixture, appliance, or equipment served, but in no case less than 13mm diameter. No standpipe receptor for clotheswasher shall extend more than ____ nor less than ______ above its trap. No trap for any clotheswasher strandpipe receptor shall be installed below the floor but shall be roughed no less than ____ and not more than ____ above the floor. Clean running water used as cooling medium may discharge in the inlet of the drainage system. Such trap connection shall be by means of a pipe connected to the inlet side of an approved fixture trap, the upper end terminating in a funnel-shaped receptacle set adjacent, not less than______ above the overflow rim of the fixture. No steam pipe shall be directly connected to any part of a plumbing or drainage system nor shall any water having a temperature above _____ be discharged under pressure dircetly into any part of a drainage system. All condensers and sumps shall be properly trapped at the outlet with a deep seal trap extending to within ____ of the bottom of the tank. The top of the deep seal trap shall have a _____ diameter opening located at the highest point of the trap to serve as siphon breaker. Outlets shall be taken off from the side in a manner to allow a water line to be maintained that permanently occupies not less than ______ the capacity of the condenser or sump. shall be installed in the tank to protect the shell sumps, condensers, or intercepting tanks constructed of concrete shall have walls and bottom not less than _____ thickness, and the inside shall be cement plastered not less than 13mm in thickness. condensers constructed of metal shall not be less than and all such metal condensers be protected from external corrosion by an approved bituminous coating. sumps and condensers shall be provided with a suitable means of access for cleaning and shall contain a volume of not less than twice the volume of water removed from the boiler or boilers connected thereto when the normal water level of such boiler or boilers is reduced not less than _______ 9. Romans 8:28 12 (c) NDJ 2023 51mm 64mm 76mm 102mm 127mm 152mm 9.29m2 Wet venting Four fixtures two consecutive inlet levels Size of vents for boiler blowoff and water outlets 19mm diameter Size of vents for boiler blowoff and water outlets 25.4mm diameter 32mm diameter 38mm diameter 51mm diameter 64mm diameter the aforementioned size ratio shall only be used with boilers of ____ heating surface or less. is limited to vertical drainage piping receiving the discharge from the trap arm of one and two fixture units. fixtures that also serve as a vent for not more than ____ the vertical piping between_______________ shall be considered a wet vented section. each wet-vented section shall be a minimum of ____ larger than the required minimum waste pipe size of the upper fixture or shall be 1 pipe size larger than the required minimum pipe size for the sum of the fixture unites served by such wet-vented section, whichever is larger, but in no case 1 pipe size larger less than 51mm in diameter. Traps for ______ shall be roughed-in above the floor and may be vented by extending the vent as island sinks and similar high as possible but not less than the drainboard height and then returning it downward and connecting it to the horizontal sink drain immediately downstream from the vertical fixture drain. equipment The retumed vent shall be connected to the horizontal drain through a wye-branch fitting and shall, in addition, be provided with a foot vent taken oft' the vertical fixture vent by means of a wye-branch immediately below the floor and thence extending the vent line to the nearest partition and then through the roof to the open air or may be connected to other veats at a point not less than _______ above the flood level rim of the fixtures served. 152mm The retum bend used under the drainboard shall be a one ( 1) piece fitting or an assembly of a ________ 45 degree elbows Any branch more than _____m in length shall be separately vented in an approved manner 4.6meter the minimum area of any vent installed in a CW &VS shall be atleast _____ the inside cross sectional area of the drain pipe served. 1/2 (one-half) each waste pipe and each trap in an CW & VS shall be atleast ____ pipe sizes larger than the sizes required and atleast _____pipe sizes larger than any fixture tailpiece or connection. 2 pipe sizes Such tailpiece or connections shall be as short as possible and in no case shall exceed _____ meters long. 0.6 meters/24inches Cleanouts may not be required on any wet-vented branch serving a single trap when the fixture tailpiece or connection is not less than ____ in diameter and provide ready access for cleaning through the trap. 51mm 1 inlet serving not more than 2.8m3 of refrigeration space. 32mm 4 to 12m3; 32mm inlets or the equivalent refrigeration space. 51mm 13 to 36m3; 32mm inlets or the equivalent refrigeration space. 76mm no galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least ____ above ground. 15cm copper, cast iron, galvanized wrought iron, Horizontal and vertical vent lines and vent stacks shall be or PVC pipes cast iron, galvanized malleable iron, steel, lead, copper,brass,ABS, vent fittings shall be PVC and others. no galvalized malleable iron or galvanized steel fittings shall be buried underground but shall be kept atleast______above finish ground level. 152mm the length of the horizontal portion of a vent may exceed _____ of the total length of vertical and horizontal postions, provided the vent is increased to one pipe size larger for its entire length. one-third 9. Romans 8:28 13 (c) NDJ 2023 152mm unless prohibited by structural conditions, each vent shall rise vertically to a point not less than ___ from the flood level rim of the fixtures served before offsetting horizontally to join the vent stack or stack vent; the bottom connvestion shall be installed with approved drainage fittings and installed with proper grade to the horizontal drain. all vent pipes shall extend undiminished in size above the roof or shall be reconnected with the soil or waste stack vent of proper size at a point below the roof, the vent through roof (VSTR) shall be 1 pipe size larger increases ______ above the reconnection point of the stack vent and horizontal vent. the vent pipe opening from a soil or waste pipe except for _____ or similar fixtures shall not be below the weir of the trap. water closet may be served by a common vertical vent pipe when each such fixture wastes separately into an Two fixtures approved double branch fitting having inlet openings at the same level. each vent pipe or stack thru roof (SVTR) shall extend its flashing all around the stack vent and shall 15cm terminate verticaly not less than ____ above the roof 0.3meters nor less than __ from any vertical surface nearby each vent opening shall terrminate not less than ____ meters from, or at least ____meter above 3 meters, 0.9 meters, 0.9 any openable window, door opening, air intake or vent shaft,; nor less than ___meter away from any lot line, alley and street boundary lines. meters vertical vent pipes for outdoor installations shall extend to atleast _____ meters distant from any part of the roof that is used for other purposes and shall extend less than _______ above such roof and shall be securely stayed. 3 meters; 2.1meters Each soil or waste stack which extends _______ or more stories above the building drain shall be served by a parallel vent stack which shall extend undiminished in size from its upper terminal at the roof and connect to the soil or waste stack at ground level and at every fifth floor levels with a "yoke vent" at a point below the horizontal soil or waste branch connection to the stack and at the nearby vent stack above the same floor to provide a relief vent. The size of yoke vent shall be not less in diameter than either the soil stack or the vent stack, whichever is smaller. ten (10) the yoke vent connection with the vent stack shall be placed not less than ____meter above the floor level; 1.00meter and the yoke vent connection with the drainage stack shall be by means of a _______ fitting placed wye branch below the fixture branch serving that floor. 1-1/4" (32mm) nor less The diameter of an individual vent shall not be less than _________ nor less than ______ the diameter of the drain to which it is connected than 1/2" one trap may serve 3 laundry tubs or single compartment sinks or 3 lavatories immediately adjacent to each other and in the same room if the waste outlets are not more than ____ and the 0.75 meter apart trap is centrally located where the 3 compartments are installed. maximum length or a tailpiece. 0.6meter a trap arm may change direction without the use of a cleanout when such change of direction does not exceed______ 90 degrees for trap arms _____ mm diameter and larger, the change of direction not exceeding 22-1/2 degrees no cleanout is required and for change of direction greater than 22-1/2 a cleanout is required at the bend. 76mm TRAP ARM DIAMETER DISTANCE TO VENT (x3) except for water closets or similar fixtures. 0.76 meters 32mm 1.07 meters 38mm 1.52 meters 51mm 1.83 meters 76mm 3.05 meters 102mm+ the developed length between the trap of a water closet or similar fixture measured from the top of closet ring (closet flange) to inner edge of vent shall not exceed _____meters 1.8 meters/1829mm/6ft an exposed and readily accessible tubing trap not less than ______ may be used on fixtures gauge 17 B&S (1.1mm) discharging domestic sewage but shall exclude urine. 9. Romans 8:28 14 (c) NDJ 2023 51mm-102mm 152mm 3.4 L/s-1.3L/s 1.2 meters; 0.75 51mm each fixture shall have a water seal of not less than ___ but not more than _____ deep except where a deeper seal is found necessary by the administrative authority for special conditions. interceptors or clarifiers for sand and similar heavy solids shall be so designed and located as to be readily accessible for cleaning and shall have a water seal of not less than ____ deep. No individual grease trap shall be installed for a facility that has an approved rate of flor of more than _____ nor less than ______ an approved type grease trap may be used as a fixture outlet and the grease trap does not exceed ____ and the vertical tailpipe or drain does not exceed ____ meters each grease trap shall have an approved water seal of not less than _____ in depth or the diameter of its outlet, whichever is greater 9. Romans 8:28 15 (c) NDJ 2023 12.7mm sand interceptors 0.2sqm/610mm 18 .9 L per minute flow or fraction thereof 26 ga. galvanized sheet metal. 102mm not less than two (2) times C.l. drain with integrally cast waterstop ring around the outside of body and placed at middepth of the concrete roof slab for one wall for two adjacent walls two walls opposite each other and of each other and of the same heights two walls opposite of differing heights walls on three (3) sides walls on four (4) sides one-half of the gross area 61 meters 0.6meter 150mm diameter 102mm & 154mm in diameter 203mm diameter and larger 0.3 meter below 3 meters 91 meters laundry equipment that does not have integral strainers shall discharge into and interceptor having a wire basket or similar device that is removable for cleaning that will prevent passage into the drainage system of solids _____mm or larger in mazimum dimension such as string, rags, buttons, or other solid materials. shall be built of brick or concrete, prefabricated coated steel or other watertight material. The interceptor shall have an interior baffle for fuill separation of the interceptor in 2 sections. the sand interceptor shall have a minimum dimension of____ for the net free opening of the inlet section and a min. depth under the invert of the outlet pipe of _____mm For each___________over 75.7 L per minute the area of the sand interceptor inlet section is to be increased by 0 .09 sqm. The outlet section shall at all times have a minimum area of fifty (50) percent of the inlet section. Rainwater downspout or conductor located on the exterior side of a low height building shall be not less than ____________ Roof drains shall be equipped with strainers extending not less than ____ mm above the surface of the roof immediately adjacent to the drain, Dome-Type Strainers shall have a minimum total net inlet area of one and one-half (1-1/2) times the area ofthe outlet pipe to which it is connected. Roof deck strainers for use on sun decks, parking decks and similar occupied areas shall be an approved flat-surface type which is level with the deck. Such drains shall have a total net inlet area _____________________the area of the outlet pipe to which the drain is connected. Roofdrains passing through the roof into the interior of a building shall be made watertight at the roof level by the use of _____________________ and the installation of a clamped suitable flashing material around the drain. 50 percent of area of the wall to the roof area add 35 percent of the total wall areas to the roof area. add no additional area to the roof area. add 50 percent of wall area above top of lower wall to the roof area. add 50 percent of area of the inner wall below the top of the lowest wall, plus allowance for area of wall above the top of the lowest wall. no allowance for wall areas below top of lowest wall-add for areas above top of lowest wall. the area of the side of a tall building exposed to rain is taken___________of the gross ara. the public sewer may be considered as not being available when such public sewer is or any exterior drainage facility connected thereto is located more than _____ from any proposed building or exterior drainage facility on any lot or premises thereat. the building sewer, beginning from___meter from outside face off wall of building or structure…. no building sewer shall be smaller than _____diameter nor less in size than the building drain. may have a slope of not less than s=1% (10.5mm) per meter may have a slope of not less than s=0.5% (5.3mm per meter) the building sewer or drainage piping shall be installed ______ below the surface of the ground. when a building sewer or branch thereof does not exceed ____ in length and is a short straight line extension from a building drain which is provided with a cleanout, no cleanout will be required at its point of connection to the building drain. the maximum distance between manholes shall not exceed______ 9. Romans 8:28 16 (c) NDJ 2023 0.3meters 0.3 meters above 0.3meters 0.3m clear 3 meters 1.5 meters 30 days 0.6meters clear 15.2meters 15.2meters 0.3meters 0.3meters 25.4mm 3.2mm schedule 80/4.55mm male threads screwed pipe joint 19mm 0.002are prohibited cement mortar joints asbestos cement sewer pipe joints approved adapter coupling leak sealing additives the inlet and outlet pipe connections of manholes shall be made by the use of flexible compressions joints no closer than _______meter from outside of the manhole. the bottom of the water pipe, at all points, shall be atleast______the top of the sewer or drain line. the water pipe shall be placed on a solid shelf excavated at one side of the common trench with a minimum clear horizontal distance of atleast_________ meter from the sewer or drain line. water pipes crossing sewer or drainage piping constructed of clay or materials which are not approved for use within a building shall be laid a minimum of ____ clear above the sewer or drain pipe. water pipe joints shall be installed not less than _____meters away from sewer line in both directions. every abandoned building (house) sewer, or part htereof, shall be plugged or capped in an approved manner within ______ meters of the property line. where disposal facilities are abandoned consequent to connecting any premises with the public sewer, the permittee making the connection shall fill all abandoned facilities as required Minimum horizontal distance required from building sewer-building or structures "…" Property line adjoining private property water supply wells (the distance may be reduced to not less than 7.6meters when drainage piping is constructed of materials approved for use within a building) streams on site domestic water service line public water main depth of molten pig lead packed on CISP bell and spigot the lead shall be caulked thoroughly at the inside and outside edges of the joint. After caulking the finished joint shall not extend more than______ below the rim of the hub. threaded plastic pipe shall be _______minimum wall thickness. pipe joint materials shall only be applied to ________and such materials shall be approved type,insoluble in water and nontoxic. tape is acceptable for use on male threads, only if_______ wiped lead joints shall have an exposed surface on each side of the joint not less than_______and at least as thick as the material being joined. solder and fluxes with a lead content which exceeds this amount are prohibited in piping systems used to convey potable water. are prohibited on new building sewers shall be a sleeve coupling of thesame composition as the pipe or of other approved materials, and sealed with neoprene rubber rings or joined by an approved type compression coupling. joints between asbestos cement pipe and other approved pipes shall be made by means of an________________. the addition of _________ to joint packing is prohibited. 9. Romans 8:28 17 (c) NDJ 2023 Flexible compression factory fabricated joints mechanical joints neoprene rubber elastomeric gasketed and rubber-ring joints neoprene gaskets when pipe is joined by this means, such joints shall conform to approved standards and shall not be considered as slip joints. joints for centrifugally cast iron water pipe shall be used in soils subject to oil intrussion. shall comply with the applicable IAPMO installation standard. are recommended for oil handling piping works. a mechanical connection which depends on an internal retention device to prevent pipe or tubing Pressure lock-type separation. Connection is made by inserting the pipe or tubing inside the fitting to a prescribed depth. connection shielded coupling joints shall not be considered as slip joints. hubless cast iron pipes shall comply with IAPMO standards and shall not be considered as slip joints. International Association of Plumbing & Mechanical Officials IAPMO joints in vitrified clay pipe or between such pipe and metal pipe shall be joined with neoprene gasket for hub and spigot joints. Neoprene Gaskets caulked or threaded joints between wrought iron, steel, brass, or copper pipe with cast iron pipe shall either be_________________ joints or shall be made with approved adapter fittings. joints lead to cast iron, joints between these shall be made by means of wiped joints to a caulking ferrule, soldering nipple or bushing. wrought iron, or steel joints shall be made by the appropriate use of approved brass fittings properly soldered or brazed together, or by means of approved brass compression type fittings. copper water tube job-fabricated female use of ____________of PVC for water piping are prohibited. Factory made screw and of PVC screws adaptor fittings are acceptable for use if thickness conforms to schedule 80. joints in thin-walled copper tubing to thick-walled threaded pipe shall be made by the use of_________. Brass adaptor fittings fixture drains and traps slip joints of approved materials may be used in ________________. vent and stacks trap seal or between fixture and its trap Slip Joints Closet bends or stubs fixture carrier fitting graphite-impregnated asbestos, felt counterflashing brass or cast iron body Copper tube L expansion joints shall be accessible, except for _____________ and it used in soil and waste stacks to provide for necessary expansion and contraction joints of the pipes for high-rise buildings. approved unions may be used in drainage work when accessibly located in the _____________ or between a _________________________. three piece assemblies involving the use of a friction ring and a compression washer. must be cut off square so as to present a smooth surface even with the top of the closet ring before rough in inspection is called. wall-mounted water closets shall be securely bolted to an approved fixture carrier fitting. Gasket material for fixture carrier fitting shall be _______,_______, or other similar materials. shall not restrict the required internal cross-sectional area of the vent. cleanouts shall not be used as reducer or adapter. shall not be used for piping carrying chemical or industrial wastes. Copper tube for piping shall have a weight of not less than type _____ Copper tubing may be used to water piping when piping is above ground, inisde or atop a building or underground outside of structures with outside protective coating. M all drawn copper tubing shall be marked by means of a continuous and indelibly colored stripe at least _______mm in width. 6.4mm Green color type K Blue Type L Red Type M Yellow DWV Weight and thickness of sheet lead shall not be less than: LEAD 19.56kg per sqm/1.6mm For safe pans not less than ____________ and ________thick 14.63 kg/sqm and 1.2mm For flashings and vent terminals not less than _____________________ and ___________thick. Lead bends and lead traps shall not be less then _____in wall thickness 3.22mm 9. Romans 8:28 18 (c) NDJ 2023 178mm in diameter 6.4mm 4 bolts Plugs gas and watertight Fullway type 102mm and larger 102mm and smaller up to and including 51mm in size ABBREVIATION AHAM ANSI ASME ASSE ASTM AWWA Each such closet ring or flange shall be approximately ____mm in diameter and, when installed, shall together with the soil pipe, presend a 38mm wide flange and groove face to receive the fixture gasket or ball wax. Caulked on closet rings or closet flanges shall not be less than ___mm thick and not less than 51mm in overall depth. There will be ___bolts per water closet. shall have raises square heads or approved countersunk regular slots, when cleanout is installed along travel ways. Cleanouts shall be ________and ________ without the use to any gasket, packing, or washer. Gate valves, when used in drainage work, shall be of the _________type with working parts of corrosion resistant metal. shall have cast iron bodies for gate valves shall have cast brass or bronze bodies valves in this size shall be all brass or bronze metal ACRONYMS MEANING ASSOCIATION OF HOME APPLIANCE MANUFACTURERS AMERICAN NATIONAL STANDARD INSTITUTE AMERICAN SOCIETY OF MECHANICAL ENGINEERS AMERICAN SOCIETY OF SANITARY ENGINEERING AMERICAN SOCIETY FOR TESTING AND MATERIALS AMERICAN WATER WORKS ASSOCIATION 9. Romans 8:28 19 (c) NDJ 2023 CISPI FS PDI PNS UL WQA ISO EN 103.42 kpa 55.16 kPa CAST IRON SOIL PIPE INSTITUTE FEDERAL SPECIFICATIONS PLUMBING AND DRAINAGE INSTITUTE PHILIPPINE NATIONAL STANDARD CERTIFICATION MARK UNDERWRITER'S LABORATORIES, INCORPORATED WATER QUALITY ASSOCIATION INTERNATIONAL STANDARD ORGANIZATION EUROPEAN COMMITTEE FOR STANDARDIZATION CENTRAL SECRETARIAT If the highest group of the fixtures contains flushometer valves, the pressure for the group should not be less than for flush tank supplies, the available pressure may not be less than Determine the elevation in meters of the highest fixture group of fixtures above the water street(main). Multiply this difference in elevation by 9.79. The result is in the loss in static pressure in kPa. How to solve loss in static pressure in Kpa pressure available for friction loss in the supply pipes if no water subtract the sum of loss in static pressure and the pressure to be maintained at the highest fixture from the average minimum daily service pressure. meter is used if a water meter is used the friction loss in the meter for the estimated maximum demand should also be subtracted from the service pressure to determine the pressure loss available for friction loss in the supply pipes. 9. Romans 8:28 20 (c) NDJ 2023 APPENDIX A TBC BASIC PRINCIPLES OF PLUMBING PRINCIPLE NO.1 PRINCIPLE NO.2 PRINCIPLE NO.3 PRINCIPLE NO.4 PRINCIPLE NO.5 PRINCIPLE NO.6 PRINCIPLE NO.7 PRINCIPLE NO.8 PRINCIPLE NO.9 PRINCIPLE NO.10 PRINCIPLE NO.11 PRINCIPLE NO.12 PRINCIPLE NO.13 PRINCIPLE NO.14 PRINCIPLE NO.15 PRINCIPLE NO.16 PRINCIPLE NO.17 PRINCIPLE NO.18 PRINCIPLE NO.19 PRINCIPLE NO.20 PRINCIPLE NO.21 PRINCIPLE NO.22 CODE OF ETHICS NO.1 NO.2 NO.3 NO.4 NO.5 NO.6 NO.7 14sqm 304.8mm - 914.4 mm 50% 15 meter 1.5meter 3.00 meters 2/3, 2m3 0.9 meters, 1.5 meters KEYWORDS PURE AND WHOLESOME WATER SUFFICIENT VOLUME AND AT PRESSURE ADEQUATE MINIMUM QTY OF WATER DEVICES FOR HEATING AND STORING WATER SHALL BE CONNECTED TO THE SEWER SYSTEM ONE WATER CLOSET AND ONE KITCHEN TYPE SINK SMOOTH NON ABSORBENT MATERIAL WITH ADEQUATE CLEANOUTS NAMPAP APPROVED EQUIPPED WITH WATER SEALED TRAP ADEQUATE CIRCULATION OF AIR EXTEND TO THE OUTER AIR SUBJECTED TO TESTS NO SUBSTANCE THAT WILL CLOG THE PIPES PROPER PROTECTION TO PREVENT CONTAMINATION NO WATER CLOSET, VENTILATION AND LIGHTING SUITABLE PROVISION SHALL BE MADE FOR DISPOSING BUILDING SEWAGE PREVENT OVERFLOW MAINTAINED IN SERVICEABLE CONDITION PROPERLY SPACED DUE REGARD TO STRENGTH OF STRUCTURAL MEMBERS UNLESS FIRST RENDERED INNOCUOS KEYWORDS ACT IN AN UNPROFESSIONAL MANNER SUPPLANT ANOTHER REGISTERED MASTER PLUMBER UNDERBID ANOTHER MASTER PLUMBER TAKE ADVANTAGE OF A SALARIED GOVERNMENT POSITION ALLOW THE USE OF HIS/HER LICENSE FOR A FEE INJURE FALSELY ADVERTISE IN SELF-LAUDATORY LANGUAGE Where disposal fields are installed, a minimum of _____trench bottom shall be provided for each system exclusive of any hard pan, rock, clay, or other impervious formations. Side wall area in excess to the required _______and not to exceed ______ below the leach line may be added to the trench bottom and when computing absorption areas. where leaching beds are permitted in lieu of trenches, the area of each such bed shall be atleast_____percent greater than the tubular requirements for trenches. No excavation for a leach line or leach bed shall extend within ______ of the ground water table nor to a depth where sewage may contaminate the underground water stratum that is usable for domestic purposes. In areas where the records or data indicate that the ground water are grossly degraded, the ______ separation requirement may be reduced by the administrative authority. No excavation shall extend within _____ of the water table nor to a depth where sewage may contaminate underground water stratum that is usable for domestic purposes. The inlet compartment of any septic tank shall not be less than ______ of the total capacity of the tank, nor less than ______m3 liquid capacity The septic tank shall be atleast _____ in width and _____ in length 9. Romans 8:28 21 (c) NDJ 2023 0.6meters-1.8meters 1m3, 1/3 1.50meters 2(two) 508mm 3.7 meters connecting sewer pipe 104.6 mm 106.6mm 101.6mm, 304.8 50.8mm 228.6mm 50.8mm 101.6mm 104.6mm in size wooden baffles 14.4Kpa 101.6mm No. 12 U.S. gauge (109) (2.8mm) 25.4mm 19.1mm to 63.5mm 1.5meters Distribution box 25.4 mm dosing tank Dosing tanks The septic tank's liquid depth shall be ______ nor more than_____ The secondary compartment fo any septic tank shall have a minimum capacity of ____m3 and maximum capacity of _____ of the total capacity of such tank. In septic tanks having over 6m3 capacity, the secondary compartment may not be less than _____meters in length. Access to the septic tank must atleast have ___ manholes. The manhole's minimum dimensions should be Whenever a first compartment exceeds _____ in length, an additional manhole shall be provided over the baffle wall. The inlet and outlet pipe openings shall not be less in size than the ______________. The vertical leg of a round inlet and outlet fittings shall not be less in size than the connecting sewer pipe nor less than ________mm horizontal dimension when measured at the inlet and outlet pipe inverts. A baffle type fitting shall have the equivalent cross-sectional area of the connecting sewer pipe and not less than ______mm horizontal dimension when measured at the inlet and outlet pipe inverts. the inlet and outlet pipe or baffle shall extend ______ mm above and atleast _______mm below the water surface. the invert of the inlet pipe shall be at a level not less than ____mm above the invert of the outlet pipe. The side walls shall extend atleast _____ above the liquid depth. The cover of the septic tank shall atleast be _____ above the back vent openings. Partitions of baffles between compartments shall be of solid durable material and shall extend atleast ______ above the liquid level. An inverted fitting equivalent in size to the tank inlet, but in no case less than _____mm in size shall be installed in the inlet compartment side of the baffle with the bottom of the fitting placed midway in the depth of the liquid. these type of baffles are prohibited All septic tank covers shall be capable of supporting an eart load of not less than this when the maximum coverage does not exceed 9 meters. All concrete septic tanks shall be protected from corrosion by coating with an approved bituminous coating or by other acceptable means. The coating shall extend to atleast ______ below the water line and shall cover all of the internal area above that point. the minimum wall thickness of any steel septic tank shall be____________and each such tank shall be protected from corrosion, both externally and internally, by an approved bituminous coating or by other acceptable means. Before placing filter material or drain lines in a prepared excavation, all smeared or compacted surfaces shall be removed from trenches by raking to a depth of _______ and the loose material removed. Clean stone, gravel, or slag, or similar filter material acceptable to the administrative authority, varying in size from _____to ______ shall be placed in the trench to the depth and grade required by this. When seepage pits are used in combination with disposal fields, the filter material in the trenches shall terminate atleast ____ from the pit excavation and the line extending from such points to the seepage pits shall be approved pipe with watertight joints. Where two or more drain lines are installed, an approved ______ of sufficient size to receive lateral lines shall be installed at the head of each disposal field. The inverts of all outlets shall be level and the invert of the inlet shall atleast be _____mm above the outlets. When the quantity of sewage exceeds the amount that can be disposed in 154.4 linear meter of each line, a _________ shall be used. shall be equipped with an automatic siphon or pump which discharges the tank once every (3) or (4) hours. The tank shall have a capacity equal to (60) to (75) percent of the interior capacity of the pipe to be dosed at one time. 9. Romans 8:28 22 (c) NDJ 2023 304.8mm 30.5mm 457.2 to 914.4mm 1.8mm 304.8mm 457.2mm level, 25mm/m 304.8mm 50.8mm 1.20 meters plus 6 meters 1.8 meters 304.8mm 2.2m 1.8m 101.6mm 304.8mm 152.4mm 17225 kPa/2498.19Psi 50.8mm 152.4mm 127mm 228.6mm 457.2mm (1/4)bend fitting Cesspool Where the total length of pipe exceeds ___________linear meter, the dosing tank shall be provided with 2 siphons or pumps dosing alternateky and each serving 1/2 of the leach field. 1 Disposal fields shall have a minimum of ___ drain lines per field. The maximum length of each line The bottom with of trench for disposal fields should be ______to ______ The spacing of lines of disposal fields, center to center. The minimum depth of earth cover of lines is The recommended depth of earth cover lines is The minimum grade of lines should be ______ while the maximum is _______ Minimum filter material under drain lines Minimum filter material over drain lines The minimum spacing between trenches or leaching beds shall be _____ plus _____ for each additional 3meters of depth in excesss of 0.3 meters below the bottom of the drain line for disposal field construction. Distribution drain lines in leaching beds shall be more than _____meters apart on centers and no part of the perimeter of the leaching beds shall be more than 0.9 meters from a distribution drain line. Multiple seepage pit installations shall be served through an approved distribution box or be connected in series by means of a water tight connection laid on undisturbed or compacted soil, the outlet from the pit shall have an approved vented leg fitting extending at least ______mm below the inlet fitting. each seepage pit shall be circular in shape and shall have excavated diameter of not less than_____mm. Approval shall be obtained prior to construction for any pit having an excavated diameter greater than ____m For approved type precast concrete circular sections, no brick or block shall be greater in height than its width and shall be laid flat to form atleast ____mm wall. Brick or block greater than ______mm in length shall be chamfered matching ends and be scored to provide for seepage. Excavation voids behind the brick, block, or concrete shall have aminimum of _____ clean 19.1 mm gravel or rock. All brick or block used in seepage pit construction shall have a minimum compressive strength or _______kPa. The arch or dome of any seepage pit may be constructed with an approved type hard burned clay brick, or solid concrete brick, or block laid in cement mortar./Approved brick or block laid dry. An approved cement mortar covering of at least ______mm in thickness shall be applied. Said covering to extend at least ______mm beyond the sidewalls of the pit. An approved type of one or two piece reinforced concrete slab of 17225kPa minimum compressive strenght, not less than ______mm thick and designed to support an earth load of not less than 19.2 kpa. Each cover shall be provided with a____mm minimum inspection hole with plug and cover and shall be coated on the underside with an approved bituminous or other non-permeable protective compound. The top of the arch or cover must be atleast ______mm but not more than 1.2m below the surface of the ground. When using a one or two piece concrete slab cover inlet fitting may be a _________discharghing through an opening in the top of the slab cover. shall be considered only as a temporary expedient pending the construction of a public sewer, as an overlfow facility when installed in conjunction with an existing cesspool, or as a means of sewage disposal for a limited, minor, or termporary uses when first approved by the administrative authority. 9. Romans 8:28 23 (c) NDJ 2023 less than (2) years 6.1meters 304.8mm 1.5 meters 30 days 15.2 meters 3.00 meters clear 0.60 meters 0.30 meters 1.5 meters where it is established thast apublic sewer system will be available in less than __________ and soil and ground conditions are favorable to cesspool disposal, cesspools without septic tanks may be installed for single family dwellings or for other limited uses when first approved by the administrative authority. Each cesspool, when permitted, shall conform to construction requirements for seepage pits. Shall have a minimum sidewall (not including arch) of ________meters below the inlet provided, however, that when a strata of gravel or equally pervious material of 1.2meters of thickness is found, the depth of such sidewall need not be more than 3.1 meters below the inlet. When overflow cesspools or seepage pits are added to existing installations, the effluent shall leave the existing pit through an approved vented leg extending atleast _____mm downward into such existing pit and having its outlet flow line atleast 152.4mm below the inlet. Every abandoned building (house) sewer, or part thereof, shall be plugged or capped in an approved manned within _____of the property line. Where disposal facilities are abandoned consequent to connecting any premises with the public sewer, the permittee making the connection shall fill all abandoned facilities as required by the administrative authority within ____days from the time of connecting to the public sewer. Location of building sewers from water supply wells or streams. Location of building sewers from pressure public water main. Location of building sewers distance from property lines adjoining private property,. Location of building sewers from buildings or structures. Location of building sewers from on-side domestic water service line. Location of septic tanks from buildings/structures, property line adjoining private property, seepage pits or cesspools, disposal fields, and on-site domestic water service lines. 9. Romans 8:28 24 (c) NDJ 2023 3.00 meters 15.20 meters 30.5 meters 2.40meters 1.50 meters 3 meters 1.20 meters 2.40 meters 45.70 meters 30.5meters 3.00 meters 3.70 meters 1.50 meters 3.00 meters Location of septic tanks from trees, and pressure public water main. Location of septic tanks from water supply wells and streams. Location of Disposal Fields from water supply wells Location of Disposal fields from buildings or structures. Location of disposal fields from property line adjoining private property, seepage pits or cesspools, on-site domestic water service line, and distribution box. Location of disposal fields from pressure public water main Location of disposal fields from other disposal fields. Location of seepage pit or cesspools from other buildings/structures & property line adjoining private property. Location of seepage pit or cesspools water supply wells. Location of seepage pit or cesspools from streams. Location of seepage pit or cesspools from trees. Location of seepage pit or cesspools from other seepage pits or cesspools. Location of seepage pit or cesspools from disposal fields, on-site domestic water service line, and distribution box. Location of seepage pit or cesspools from pressure public water main. 9. Romans 8:28 25 (c) NDJ 2023 9. Romans 8:28 26