Case Scenario:
A fixed roof tank storing flammable material is having inert gas
blanketing. The outlet of nitrogen blanket is taken to a LP flare
system. Below is the sequence of pressure set point engineering
(refer figure 7.37 below also):
1. First, calculate the inbreathing and outbreathing flow rates
based on API 2000.
2. Next based on the flowrate of out-breathing to LP flare and the
back pressure of flare, calculate the pressure drop in the flare
header, to arrive at the pressure required at outlet of out-breathing
control valve. Let us say the friction drop in LP header is 150 mm
WC (mm water column), & pressure at valve outlet is 400 mm WCg.
3. Next step is to provide certain pressure drop across the out
breathing control valve. This pressure drop should be at least
1/3rd of friction drop in outlet line to flare, for good controllability.
In this example, we provide 50 mm WC across valve.
4. Once the inlet pressure to out breathing control valve is
established, this is the top setpoint of pressure in the tank
pressure controlling range. In example thus, top operating pressure
is 450 mm WCg. At this point, the control valve is fully open.
5. The high pressure alarm on tank needs to be set above this
Mihir’s handbook of Chemical Process Engineering
pressure of point (4). Thus, high pressure alarm will be 500 mm
WCg.
6. The breather valve positive pressure will be above the high
pressure alarm setpoint. Thus, this will be 550 mm WCg. Note that
breather valve will have 10% accumulation, thus, it will be fully
open at 605 mm WCg.
7. The emergency vent valve setpoint will accordingly be above the
breather valve positive set pressure. The setpoint of emergency
valve is also the design pressure of tank on positive side. In our
example, emergency valve will be set at 650 mm WCg. This is also
the design pressure of tank. One can however keep design pressure
little above emergency valve set point also. Both are acceptable.
8. Now, one needs to provide an operating range for tank operation.
Thus, the outbreathing control valve will be fully closed at 350 mm
WCg inlet pressure.
9. There is a dead band normally provided between the closing of
inlet control valve and opening of outlet control valve. In our
example, this will be between 200 mm WCg and 350 mm WCg.
10. Thus, inlet control valve will start to open at 200 mm WCg. It
will be fully open at 100 mm WCg.
11. Still if pressure in tank drops, the low pressure alarm will come
in at 50 mm WCg.
12. The inbreathing set point of PVRV will be set at (-22 mm WCg)
and with 10% accumulation it will be full open at (-25 mm WCg).
13. Thus tank design pressure can be set at (-25 mm WCg).
In summary, tank design pressure is (-25) / 650 mm WCg.
Mihir’s handbook of Chemical Process Engineering
Fig 7.37: the typical setting of tank pressures
The above diagram shows establishing of key pressures for an
atmospheric storage tank. The Pressure/Vacuum (PV) Valve is
really two valves in one. One is for pressure, and the other is for
vacuum. The principle of operation is the same. As the pressure on
the pressure side of a PV valve rises, the force due to pressure
reduces the seating force of the pallet and it starts to leak. Leakage,
however, is relatively insignificant until the set point is reached, at
Mihir’s handbook of Chemical Process Engineering
which point the flow increases dramatically and follows the flow
curves given by the manufacturer. Beyond the set point, PV valves
do not “pop” open, but slowly lift as the overpressure (the actual
upstream pressure above the value of the setpoint) increases.
A narrow operating pressure range becomes particularly more
important for systems that have inert gas blanketing or large tanks
with shallow roof angles that have a very low failure pressure. The
problems with sufficient margins to allow vents to operate within
the design pressure of the tank become more acute for large
diameter tanks. Smaller tanks can frequently take the higher
pressures without the need for special design consideration,
whereas large tanks will be damaged if the internal pressure
exceeds the design pressure.
Emergency vent valves are simply large PV valves capable of
venting greater than normal venting loads caused by emergency
conditions.
Mihir’s handbook of Chemical Process Engineering
Fig 7.38: Typical Inert Gas Blanketed Tank with a vent to flare
7.4.13 Process Datasheet Preparation:
i) Choosing Tank / Storage Vessel Type
Operation at above 18 kPag (2.5 psig) should preferably consider a
bullet (a horizontal pressure vessel with L:D ratio that may exceed
5:1).
In some applications, provision of a spheroid or sphere will prove
more economic than use of multiple bullets.
Mihir’s handbook of Chemical Process Engineering
Note: Tanks handling liquids with solids contamination require
special attention.
ii) Optimizing Vessel Size
The following guidelines should be followed in optimizing
dimensions:
a) Tanks:
As a general rule, storage tanks should be limited to a maximum
height of 25 m (80 ft) and 60 m (200 ft) diameter.
As a general rule, the cheapest tank will have a height: diameter
ratio of 1, although standard tank dimensions should be used
wherever shop built tanks are used as this will help reduce cost.
b) Drums / Bullets:
Normal Length / Diameter (L/D) ratio is 2:1 to 5:1 for horizontal
bullets with > 3:1 often being the most economic in low-pressure
applications. As pressure increases, the economic L/D tends to
increase. The higher range of L/D’s is advantageous for horizontal
separators and settlers. Also, refer to chapter 9 on “Separators” for
more information on L/D.
Minimum drum size should be 610 mm (24”) inside diameter (ID).
Small drums can sometimes be fabricated more economically using
24 or 30” outside diameter pipe.
Start by specifying inside diameters and T/T lengths in 152 mm
(6”) increments. The Mechanical Engineer responsible for the
design of the vessels may come back to Process if a more
economical design is possible. This could occur where using
standard plate sizes in 610 mm (2 ft) increments are a better fit, or
Mihir’s handbook of Chemical Process Engineering
in very high pressure and/or alloy services they may suggest
tighter dimensions down to 75 mm (3”) or even 25 mm (1”)
increments in order to reduce cost. The Process Engineer should
adjust the elevations on the vessel sketch he has provided, once
overall dimensions are finalized, with all levels referenced to the
bottom of the shell.
Table 7.9 provides nominal standard capacities of vertical Steel
cylindrical Storage tanks in m3
iii) Nozzle Sizing and Location
It is not possible for Process Engineering to definitively locate all
major nozzles. This is due to the uncertainty of vessel
reinforcement pad sizes and other mechanical details. However,
Process Engineering must indicate the number, size, and general
location.
**********************************************************************************