Welcome to Ericsson Education RBS6601 Integration Introduction Instructor Information Name Name DOGIA GIATHANH THANH DO Title RANSITE SITESOLUTION SOLUTIONEE Title RAN EricssonEducation Education Ericsson GlobalServices Services Global thanh.do@ericsson.com thanh.do@ericsson.com Mobile:++84-937503679 84-937503679 Mobile: ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 2 (83) COURSE Agenda Introduction RBS6601 Configuration RBS6601 Node B Connection RBS6601 Integration ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 3 (83) Introduction WCDMA RaN ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 4 (83) Introduction RBS6601 RRU Optical fiber up to 40 km Main Unit ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 5 (83) Introduction RBS 6601 – main remote Solution ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 6 (83) Introduction Main unit - duw IP Transmission SCU-External Alarm TNB: Optical, TNA: Electrical 6xSFP module RRU connection 4xE1 Local O&M via serial Local O&M via Ethernet LAN ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 7 (83) Introduction Remote unit - RRUW LMT Optical In & Out -48 V RET DC External Alarm ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 8 (83) Tx/Rx Rx Connectors Rx EBT COURSE Agenda Introduction RBS6601 Configuration RBS6601 Integration Prerequisites On-site Integration ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 9 (83) RBS6601 Configuration DUW RESOURCES Function of DU W: switching, traffic management, timing, baseband processing, and radio interfacing. Transmission • 4 E1/T1/J1 ports, ima capable • 100/1000BASE-T Ethernet • Channelized STM-1 Capacity per DUW • DUW 10 DL/UL 128/128 CE 42/12 Mbps • DUW 20 DL/UL 384/384 CE 126/36 Mbps • DUW 30 DL/UL 768/512 CE 252/48 Mbps RAXL DUW Type TXL CE Nº RXM Nº Logical Boards CE Nº TXM Nº Logical Boards DUW 10 01 128 1 1 128 3 1 DUW 20 01 384 3 3 384 5 1 DUW 30 01 768 4 4 768 8 1 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 10 (83) RBS6601 Configuration Duw20 txms & rxms The DUW20 has 5 Resource_id that can be combined and allocated in the following way: • (up to) 3 for HS • (up to) 1 for EUL • (up to) 3 for DCH. Minimum one resource_id needed for DCH. The RBS 3418 can handle maximum 15 HS Codes per HSCodeResource The RBS6601 can handle maximum 30 HS Codes per HSCodeResource ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 11 (83) RBS6601 Configuration LicensE-Virtual Fingerprint › Virtual Fingerprint: – In an RBS with Digital Unit WCDMA (DUW), there is no baseband backplane. – Therefore, the RBS initial node identity is created at the first start of the node in the factory. – This identity is distributed and stored on several Plug In Units (PIUs) in the node. – If there is one DUW and no or only one PIU is installed in a node, the selected node ID changes every time the DUW hard drive is formatted. – The fingerprint of a node is visible in OSS but also in the node in the MOC Licensing MOattribute named fingerprint. – When the duw has to be changed in an existing site, the figerprint of the old duw is overwritten into the new duw because the rrus kept the old fingerprint in their memory. – There is a file in the node where the fingerprint id is stored, this file is editable ( internal only ) › 0291TX> ls -la › $ ls -la › Directory '/c/node_id/' › -rw-rw-rw- 0 35 20 Apr 2010 22:10:26 node_identity.txt › $ cat node_identity.txt › checksum:dbd5, nodeId:343398_504454 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 12 (83) RBS6601 Configuration LicensE-Integration Unlock Integration Unlock WCDMA: (not in P7, available in W11) • Integration Unlock is a function within License Control that can be used if the operator needs to make all capacity and all features available for a node before the official License Key File has been delivered. • It makes all capacities and features in the node available for a period of 7 days. It can be used once per node, after that time it is not possible to activate it again in that node • Integration unlock can be invoked manually using the COLI command license iu activate in the node. To check how many days are left, the command license iu status can be used. ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 13 (83) RBS6601 Configuration REQUIRED RAN RELEASES ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 14 (83) RBS6601 Configuration Radio Building Blocks (RBB) › A Radio Building Block (RBB) is a unique way of combining RUs or RRUs in one sector. The RBB defines the capacity for a sector and the connections to the antenna system and the Digital Units (DUs). › RBBs are named as follows: RBB[Tx][Rx]_[C][V], where: – Tx Number of TX branches – Rx Number of RX branches (excluding co-siting RX ports) – C Number of CPRI links – V Version RBB12_1A RBB22_1A ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 15 (83) RBB22_2A RBS6601 Configuration Radio Building Blocks › Some basic RBB configuration ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 16 (83) RBS6601 Configuration Digital building block (dbb) › Each DBB defines a unique way of combining DUs with connections between DUs and RBBs. › DBBs are named as follows: DBB[X][Y]_[ZZ], where: › X Number of DUs › Y Number of CPRI links for DU-DU interconnection › ZZ Number that represents the CPRI port configuration DBB10_xx Block ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 17 (83) DBB21_xx Block RBS6601 Configuration DBB10_xx Connection from DU Port Connection to Sector DBB 10_01 DBB 10_02 DBB 10_21 DBB10_22 DBB10_2 3 DBB10_24 DBB10_44 DBB10_45 RI A S1 S1 S1, S2, S3 S4, S5, S6 S1, S2, S3 S1, S2 S1, S4 S1 S1 RI B S2 S2 S4, S5, S6 S3, S4 S2, S5 S1 S1 RI C S3 S3 S5, S6 S3, S6 S1 S1 RI D S1 S4 S2 S1 RI E S2 S5 S2 S2 RI F S3 S6 S2 S2 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 18 (83) RBS6601 Configuration DBB21_xx Connection from DU Port DU 1 DU 2 Connection to Sector/DU DBB21_ 01 DBB21_02 DBB21_21 DBB21_2 2 DBB21_ 23 DBB21_ 24 RI A S1 S1 S1, S2, S3, S4, S5, S6 S1, S2, S3 S1, S2 S1, S4 RI B S2 S2 - - S3, S4 S2, S5 RI C S3 S3 - - S5, S6 S3, S6 RI D - - - - - - RI E - - - - - - RI F DU 2 DU 2 DU 2 DU 2 DU 2 DU 2 RI A S4 S1 - S4, S5, S6 - - RI B S5 S2 - - - - RI C S6 S3 - - - - RI D - - - - - - RI E - - - - - - RI F DU 1 DU 1 DU 1 DU 1 DU 1 DU 1 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 19 (83) RBS6601 Configuration Example some configuration in Vietnam CONFIG DBB DU/Node RRB Min RRU/sector 3x1 10-01 1 12-1A 1 3x2 10-01 1 12-1A 1 3x3 10-01 1 22-1A 2 1 12-1A 1 ……… ……… ……… 6x1 ……… 10-02 (Parallel) 10-21 (Cascade) ……… 1x1, 1x2 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 20 (83) 1x3, 1x4 RBS6601 Configuration HSPA configuration 1 HSDPA Codes: - Cell 1-3: 1 code/cell + 27 codes dynamically shared. The number of available codes per cell varies between 1 and 15. - Cell 4-6: 1 code/cell + 27 codes dynamically shared. The number of available codes per cell varies between 1 and 15. HSDPA Users: 32 users/cell EUL Users: 16 users/cell Processing Resources - HSDPA: 2 (One allocated to cells 1-3, one allocated to cells 4-6). Both resources are configured on the same DUW. - EUL: 1 CE Available for R99 - DUW 20: 131 CE - DUW 30: 515 CE Required Licenses - HSDPA Dynamic Code Allocation Number of HSDPA codes per cell: 15 Number of HSDPA Users per Cell: 32 Enhanced Uplink Introduction Number of EUL Users per cell: 16 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 21 (83) RBS6601 Configuration HSPA configuration 2 HSDPA Codes:5 codes/cell HSDPA Users:16 users/cell EUL Users:16 users/cell Processing Resources – HSDPA: 1 – EUL: 1 CE Available for R99 – DUW 10: 65 CE – DUW 20: 321 CE – DUW 30: 705 CE Required Licenses – Enhanced Uplink Introduction – Number of EUL Users per cell: 16 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 22 (83) RBS6601 Configuration HSPA configuration 3 HSDPA Codes:2 codes/cell + 18 codes dynamically shared. The number of available codes per cell varies between 2 and 15. HSDPA Users: 16 users/cell EUL Users:16 users/cell Processing Resources - HSDPA: 1 - EUL: 1 CE Available for R99 - DUW 10: 65 CE - DUW 20: 321 CE - DUW 30: 705 CE Required Licenses - HSDPA Dynamic Code Allocation Number of HSDPA codes per cell: 15 Enhanced Uplink Introduction Number of EUL Users per cell: 16 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 23 (83) COURSE Agenda Introduction RBS6601 Configuration RBS6601 Integration Prerequisites On-site Integration ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 24 (83) RBS6601 Integration Tools list Tools for integration: Item Integration Tools No Product Name Qty Information 1 Screwdriver 1pcs W=5,5mm L=285mm, 1000Volt 2 Compass 1pcs Checking direction of antenna 3 Bitscassette 1pcs With different bits and holders 4 Side cutting pliers 1pcs 160mm, 500mm x 500mm 5 Cable knife 1pcs 6 Termination tool, KRONE 1pcs 7 RJ45 Crimping pliers 1pcs 1 2 Multimeter Digital Serial cable 1pcs 1pcs Making pins your own Serial Cable RJ 45 DB9 h. 1 ___________ 5 2 ___________ 3 3 ___________ 2 Equipments 3 Ethernet crossover cable 1pcs 4 Laptop with Element Manager Software 1pcs 5 Tems phone 1pcs For the recommended test calls: Mobile phone with the ability to display scrambling codes 6 Data card 1pcs For the recommended test HSPA calls ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 25 (83) RBS6601 Integration Tools list Thin client with – Windows (2000, XP or Vista) – Java Runtime Environment JRE 1.5 – Hyper Terminal or similar function for serial connection – Element Manager (EMAS) Software ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 26 (83) RBS6601 Integration integration process (1/4) ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 27 (83) RBS6601 Integration integration process (2/4) ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 28 (83) RBS6601 Integration integration process (3/4) ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 29 (83) RBS6601 Integration integration process (4/4) ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 30 (83) RBS6601 Integration integration workflow 1. Inform O&M team before doing activity 2. Completion the Installation 3. Add Module for Rectifier 3.1 Plug in additional Module 3.2 Commissioning 4. Verify voltage & Power on Ericsson RBS 4. Load Data Scripts into Node B 5. Load Data Scripts in RNC 6. Check and clear critical hardware alarms 7. Internal alarm pass? 7.1 Pass ( go to step 8) 7.2 Not Pass : 7.2.1 Check and clear critical hardware alarms ( go to step 7) 8. Inform RNC team to activate Cells 9. Activate Cells (Site Integrated) 10. Test calls 11. Test call OK (go to step 11) 16.2 Test call Not OK 16.2.1 Trouble shooting ( go to step 10) 11. Site integration completed & then Lock the site 12. inform and upload test result to SH & submit to PM ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 31 (83) RBS6601 Integration Configuration data IP and router configuration Design documents prepare by design team (RND & ATND) Scripts for on-site loading include: – OAM Access Configuration – Site Equipment Configuration – IUB script BKK0124_OAM_01 BKK0124_SE_02 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 32 (83) BKK0124_Iub_03 COURSE Agenda Introduction RAN System Description RBS 6000 Overview RBS 6601 – Node B Connection Node B Integration Prerequisites On-site Integration ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 33 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 34 (83) On-site integration OAM CPP Basic CPP NODE RS232 Hyper Terminal OSE shell (COLI) FileZilla Total Commander HTTP (80) FTP (21) / SFTP (22) Ethernet or IPoverATM EMAS TCP IP File system CM (Configuration Mgmt) IIOP (56834) / SSLIOP (56836) MIB FM (Fault Mgmt) PM (Performance Mgmt) Scanners ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 35 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 36 (83) On-site integration Emas software › The EM installation package resides on the node and can be downloaded from a web page located on the node › The Element Management Applications and the installer require that a Java version 1.5 is installed as the Java Runtime Environment (JRE). It can be obtained by downloading JRE 1.5 from Sun at: http://java.sun.com/products/archive ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 37 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 38 (83) On-site integration Connect to node b Connect RJ45 cable to DUW on LMT-B port and Laptop on LAN port Setting IP client – IP address: 169.254.1.2 – Subnetmask: 255.255.0.0 – Default gateway: 169.254.1.1 Connect to RBS use Element Manager Software (EMAS) by fill IP address RBS (169.254.1.1) on Address box and click Connect ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 39 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 40 (83) On-site integration Load OaM Access Configuration › Step 1: In Element Manager go to Tools O&M Access Configuration ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 41 (83) On-site integration Load OaM Access Configuration › Step 2: O&M access configuration windows will showing and click Next ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 42 (83) On-site integration Load OaM Access Configuration › Step 3: tick on use configuration file if will use OAM script file (or can click Next if will configure manually). Also select wizard to make sure all configuration already corrected ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 43 (83) On-site integration Load OaM Access Configuration › Step 4: Browse to OAM script file then click Next ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 44 (83) On-site integration Load OaM Access Configuration › Step 5: if OAM script success upload to RBS will show the following picture and than click Next ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 45 (83) On-site integration Load OaM Access Configuration › Step 6: EMAS will show wizard to make sure all configuration already corrected until summary of OAM script, and then click Finish ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 46 (83) On-site integration Load OaM Access Configuration › Step 7: RBS will load all data as script ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 47 (83) On-site integration Load OaM Access Configuration › Step 8: connection to RBS will loss, and then will automatic connect to RBS ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 48 (83) On-site integration Load OaM Access Configuration › Step 9: OAM configuration successfully loaded and then click OK ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 49 (83) On-site integration Load OaM Access Configuration › Step 10: Verify that a CV is automatically created with the name OAM_... ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 50 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 51 (83) On-site integration Network Synchronization Status The system clock in the TUB or the CBU should be locked before running the Site Equipment Configuration wizard, to avoid unnecessary instability of the RBS node. › Step 1: In the RBS Element Manager View selector, select Containment (MOM based) › Step 2: Select the Synchronization=1 object and verify that nodeSystemClock is in LOCKED_MODE mode. ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 52 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 53 (83) On-site integration Verifying the oam management This activity verifies that the O&M configuration is correct from the RBS towards the OSS › Step 1: In the RBS Element Manager View selector, select IP › Step 2: Select the IpOam object and click the MO Properties tab and then the Actions tab › Step 3: From the Actions dropdown menu, select ping › Step 4: Enter the IP address (default router, …) › Step 5: Click Execute › Step 6: If the ping is successful, the following message is displayed */<address> is alive ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 54 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 55 (83) On-site integration Load Site equipment Configuration › Step 1: In Element Manager go to Tools Site Equipment Configuration ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 56 (83) On-site integration Load Site equipment Configuration › Step 2: SE configuration windows will showing and click Next ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 57 (83) On-site integration Load Site equipment Configuration › Step 3: tick on use configuration file if will use SE script file (or can click Next if will configure manually). Also select wizard to make sure all configuration already corrected ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 58 (83) On-site integration Load Site equipment Configuration › Step 4: Browse to SE script file then click Next ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 59 (83) On-site integration Load Site equipment Configuration › Step 5: if SE script will upload to RBS will show the following picture and then click Next ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 60 (83) On-site integration Load Site equipment Configuration › Step 6: EMAS will show wizard to make sure all configuration already corrected until summary of SE script, and then click Finish ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 61 (83) On-site integration Load Site equipment Configuration › Step 7: RBS will running SE script ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 62 (83) On-site integration Load Site equipment Configuration › Step 8: click OK after SE script successful and complete loaded ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 63 (83) On-site integration Load Site equipment Configuration › Step 9: Verify that a CV is automatically created with the name SITE_.... ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 64 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 65 (83) On-site integration Verifying the RbsLocalCell This activity verifies the local RBS cell connection › Step 1: In the RBS Element Manager View selector, select Radio Network › Step 2: Verify that all RbsLocalCell have the operational state Enabled. ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 66 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 67 (83) On-site integration Load IUB script › Step 1: In Element Manager go to Tools Run Command File ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 68 (83) On-site integration Load IUB script › Step 2: Check on the Halt on errors and Verbose logging on and then click Browse to find Iub script file ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 69 (83) On-site integration Load IUB script › Step 3: click Start for Running Script ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 70 (83) On-site integration Load IUB script › Step 4: after running success, don’t forget to create Configuration Version (CV) ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 71 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 72 (83) On-site integration Backup configuration version Configuration Version save the last configuration on Node B. › Step 1: In the RBS Element Manager View selector, select Software › Step 2: On the CV tab, select Create CV. ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 73 (83) On-site integration Backup configuration version Configuration Version save the last configuration on Node B. › Step 4: In Configuration Version–Create window: – Name: type “name of CV” – OperatorComment: “DTAC” and then Create › Step 5: Set Startable for created CV (startable CV will be loaded when Node B restart). ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 74 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 75 (83) On-site integration Check fingerprint › Step 1: In Element Manager windows go to Licensing view (drop down) › Step 2: on Table tab will appear fingerprint of RBS. In this example is 343401_000440 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 76 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 77 (83) On-site integration Physical connection › RS-232 Serial cable ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 78 (83) On-site integration Physical connection › Configuration Hyper Terminal software – Use hyper terminal - RS 232 from PC to Node B, port ‘LMT A’ of DUW – Press ‘Enter’ and you should see ‘$’ appearing, if not check the cable connections ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 79 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 80 (83) On-site integration HYPER TERMINAL Basic command 1. Check current ip address of Node B $ ifconfig Interface: le0 ip-address: 10.192.17.185 netmask: 255.255.255.248 broadcast: 10.192.17.191 2. Ip Node B config Should not see previous IP setting as all is lost when in backup mode - need to define $ ifconfig le0 169.254.1.1 netmask 255.255.0.0 broadcast 169.254.255.255 Interface configuration never made for le0 IP address must be set via command: Usage: ifconfig <ifname> [<address>] [netmask <mask>] [broadcast <address>] ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 81 (83) On-site integration HYPER TERMINAL Basic command 3. Check all current CV on Node B $ cv ls Please wait for list.... Name: OPER_Manual Date: Thu Jan 1 06:57:45 197 Id: 1 Type: other Package upgrade: CXP9012959/1_R9AF03 Operator: ephupha Comment: IUB_finish Status:ok …………….. 4. Check CV startable $ cv cu Startable: rbs_basic_cv Loaded: rbs_basic_cv Rollback status: Rollback is on Rollback init timer: 30 Rollback init counter: 5 Rollback counter: 3 ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 82 (83) On-site integration HYPER TERMINAL Basic command 5. Make new CV $ cv mk <CV_name> $ cv mk IuB_Config_CV Please wait while database is writing to disk. Writing the database file can take minutes... ok $ 6. Set startable CV $ cv set <CV_name> 7. Delete CV $ cv rm <CV_name> $ cv rm IuB_Config_CV ok $ ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 83 (83) On-site integration HYPER TERMINAL Basic command 8. Read current clock for Node B $ readclock Date: 2011-01-18 Time: 10:00:29. Tuesday $ 9. Set clock to Node B $ setclock yyyy-mm-dd hh:mm:ss $ setclock 2011-01-18 09:59:00 Date and time set ok $ ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 84 (83) On-site integration HYPER TERMINAL Basic command 10. Integration Unlock is a function within License Control that can be used if the operator needs to make all capacity and all features available for a node before the official KF has been delivered. * invoke manually using command $ license iu activate * To check how many days are left $ license iu status ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 85 (83) On-site integration HYPER TERMINAL Basic command 11. Restart Node B * To put Node B in back up mode, Note IP address, subnetmast all will be lost $ reload -OSE Delta PowerPC krn-750/R2.1.2 Welcome to OSE Shell OSE4.3. Stop due to remain in backup set * To put Node B in normal mode $ reload OSE Delta PowerPC krn-750/R2.1.2 Welcome to OSE Shell OSE4.3. ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 86 (83) On-site integration › OAM CPP Basic › EMAS software – – – – – – – – – Connect to Node B Load OAM Access Configuration Network Synchronization Status Verifying The OAM Management Load Site Equipment Configuration Verifying The RbsLocalCell Load IUB Script Backup Configuration Version Check Fingerprint › Hyper Terminal – Physical Connection – Basic Command › LED indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 87 (83) On-site integration LED Indicators DUW Version 1 LED Indicators Marking I O Indicator Information Operational Color Yellow Green Mode Off Unlocked On Locked Blink (0.5 Hz) Shutdown in progress Blink (16 Hz) Busy Off Power not present On Power present Blink (0.5 Hz) Blink (2 Hz) Blink (16 Hz) F Fault Red Indicates Dependent resource missing, DU in autonomous mode Load or testing in progress Initial boot test Off No fault detected in DU On Fault detected in DU ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 88 (83) On-site integration LED Indicators DUW Version 1 LED Indicators Marking Indicator Color Mode Indicates LMT B Interface Green Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up TN A Interface (1) ET A ET B (1) TN B RI A – RI F Interface Interface Interface Interface Green Green Green Green Green ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 89 (83) On-site integration Optical Indicators DUW Version 2 LED Indicators ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 90 (83) On-site integration Optical Indicators DUW Version 2 LED Indicators Marking Indicator Color Mode Indicates EC Interface Green Off Link is down (EC cable is not connected) On Link is up (EC cable is connected) Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up Off Link is down On Link is up LMT B TN A ET A ET B TN B A–F Interface Interface Interface Interface Interface Interface Green Green Green Green Green Green ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 91 (83) On-site integration Optical Indicators RRUW LEDl Indicators Markin g Indicator Color Mode Indicates Fault Red Off No fault detected in RRUS On Fault detected in RRUS Off RRUS not operational On Power present Blink (2 Hz) Load or testing in progress Blink (0,5 Hz) Dependent resource missing Off The RRUS is not in maintenance mode. On The RRUS is in maintenance mode. Blink (0.5 Hz) Shutdown in progress Off Disconnected On Connected Operational Maintenance 1, 2 Interface Green Blue (1) Green ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 92 (83) Questions & Comments?? Thank you for listening! Contact: Thanh.do@ericsson.com ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 93 (83) ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 94 (83)