Welcome to
Ericsson Education
RBS6601 Integration
Introduction
Instructor Information
Name
Name
DOGIA
GIATHANH
THANH
DO
Title
RANSITE
SITESOLUTION
SOLUTIONEE
Title
RAN
EricssonEducation
Education
Ericsson
GlobalServices
Services
Global
thanh.do@ericsson.com
thanh.do@ericsson.com
Mobile:++84-937503679
84-937503679
Mobile:
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 2 (83)
COURSE Agenda
Introduction
RBS6601 Configuration
RBS6601 Node B Connection
RBS6601 Integration
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 3 (83)
Introduction
WCDMA RaN
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 4 (83)
Introduction
RBS6601
RRU
Optical fiber
up to 40 km
Main Unit
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 5 (83)
Introduction
RBS 6601 – main remote Solution
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 6 (83)
Introduction
Main unit - duw
IP Transmission
SCU-External Alarm
TNB: Optical, TNA: Electrical
6xSFP module
RRU connection
4xE1
Local O&M via serial
Local O&M via Ethernet LAN
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 7 (83)
Introduction
Remote unit - RRUW
LMT
Optical In & Out
-48 V RET
DC
External
Alarm
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 8 (83)
Tx/Rx
Rx Connectors
Rx
EBT
COURSE Agenda
Introduction
RBS6601 Configuration
RBS6601 Integration
Prerequisites
On-site Integration
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 9 (83)
RBS6601 Configuration
DUW RESOURCES
Function of DU W: switching, traffic management, timing, baseband processing,
and radio interfacing.
Transmission
• 4 E1/T1/J1 ports, ima capable
• 100/1000BASE-T Ethernet
• Channelized STM-1
Capacity per DUW
• DUW 10 DL/UL 128/128 CE 42/12 Mbps
• DUW 20 DL/UL 384/384 CE 126/36 Mbps
• DUW 30 DL/UL 768/512 CE 252/48 Mbps
RAXL
DUW Type
TXL
CE
Nº RXM
Nº Logical
Boards
CE
Nº TXM
Nº Logical
Boards
DUW 10 01
128
1
1
128
3
1
DUW 20 01
384
3
3
384
5
1
DUW 30 01
768
4
4
768
8
1
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 10 (83)
RBS6601 Configuration
Duw20 txms & rxms
The DUW20 has 5 Resource_id that can be
combined and allocated in the following way:
• (up to) 3 for HS
• (up to) 1 for EUL
• (up to) 3 for DCH. Minimum one
resource_id needed for DCH.
The RBS 3418 can handle maximum 15 HS
Codes per HSCodeResource
The RBS6601 can handle maximum 30 HS
Codes per HSCodeResource
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 11 (83)
RBS6601 Configuration
LicensE-Virtual Fingerprint
› Virtual Fingerprint:
– In an RBS with Digital Unit WCDMA (DUW), there is no baseband backplane.
– Therefore, the RBS initial node identity is created at the first start of the node in the factory.
– This identity is distributed and stored on several Plug In Units (PIUs) in the node.
– If there is one DUW and no or only one PIU is installed in a node, the selected node ID changes
every time the DUW hard drive is formatted.
– The fingerprint of a node is visible in OSS but also in the node in the MOC Licensing MOattribute named fingerprint.
– When the duw has to be changed in an existing site, the figerprint of the old duw is overwritten
into the new duw because the rrus kept the old fingerprint in their memory.
– There is a file in the node where the fingerprint id is stored, this file is editable ( internal only )
› 0291TX> ls -la
› $ ls -la
› Directory '/c/node_id/'
› -rw-rw-rw- 0
35 20 Apr 2010 22:10:26 node_identity.txt
› $ cat node_identity.txt
› checksum:dbd5, nodeId:343398_504454
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 12 (83)
RBS6601 Configuration
LicensE-Integration Unlock
Integration Unlock WCDMA: (not in P7, available in W11)
• Integration Unlock is a function within License Control that can be
used if the operator needs to make all capacity and all features
available for a node before the official License Key File has been
delivered.
• It makes all capacities and features in the node available for a
period of 7 days. It can be used once per node, after that time it is
not possible to activate it again in that node
• Integration unlock can be invoked manually using the COLI
command license iu activate in the node. To check how many
days are left, the command license iu status can be used.
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 13 (83)
RBS6601 Configuration
REQUIRED RAN RELEASES
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 14 (83)
RBS6601 Configuration
Radio Building Blocks (RBB)
› A Radio Building Block (RBB) is a unique way of combining
RUs or RRUs in one sector. The RBB defines the capacity for
a sector and the connections to the antenna system and the
Digital Units (DUs).
› RBBs are named as follows: RBB[Tx][Rx]_[C][V], where:
– Tx Number of TX branches
– Rx Number of RX branches (excluding co-siting RX ports)
– C Number of CPRI links
– V Version
RBB12_1A
RBB22_1A
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 15 (83)
RBB22_2A
RBS6601 Configuration
Radio Building Blocks
› Some basic RBB configuration
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 16 (83)
RBS6601 Configuration
Digital building block (dbb)
› Each DBB defines a unique way of combining DUs with connections
between DUs and RBBs.
› DBBs are named as follows: DBB[X][Y]_[ZZ], where:
› X Number of DUs
› Y Number of CPRI links for DU-DU interconnection
› ZZ Number that represents the CPRI port configuration
DBB10_xx Block
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 17 (83)
DBB21_xx Block
RBS6601 Configuration
DBB10_xx
Connection
from DU
Port
Connection to Sector
DBB
10_01
DBB
10_02
DBB
10_21
DBB10_22
DBB10_2
3
DBB10_24
DBB10_44
DBB10_45
RI A
S1
S1
S1, S2, S3
S4, S5, S6
S1, S2, S3
S1, S2
S1, S4
S1
S1
RI B
S2
S2
S4, S5, S6
S3, S4
S2, S5
S1
S1
RI C
S3
S3
S5, S6
S3, S6
S1
S1
RI D
S1
S4
S2
S1
RI E
S2
S5
S2
S2
RI F
S3
S6
S2
S2
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 18 (83)
RBS6601 Configuration
DBB21_xx
Connection from DU Port
DU 1
DU 2
Connection to Sector/DU
DBB21_
01
DBB21_02
DBB21_21
DBB21_2
2
DBB21_
23
DBB21_
24
RI A
S1
S1
S1, S2, S3, S4, S5, S6
S1, S2, S3
S1, S2
S1, S4
RI B
S2
S2
-
-
S3, S4
S2, S5
RI C
S3
S3
-
-
S5, S6
S3, S6
RI D
-
-
-
-
-
-
RI E
-
-
-
-
-
-
RI F
DU 2
DU 2
DU 2
DU 2
DU 2
DU 2
RI A
S4
S1
-
S4, S5, S6
-
-
RI B
S5
S2
-
-
-
-
RI C
S6
S3
-
-
-
-
RI D
-
-
-
-
-
-
RI E
-
-
-
-
-
-
RI F
DU 1
DU 1
DU 1
DU 1
DU 1
DU 1
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 19 (83)
RBS6601 Configuration
Example some configuration in Vietnam
CONFIG
DBB
DU/Node
RRB
Min RRU/sector
3x1
10-01
1
12-1A
1
3x2
10-01
1
12-1A
1
3x3
10-01
1
22-1A
2
1
12-1A
1
………
………
………
6x1
………
10-02 (Parallel)
10-21 (Cascade)
………
1x1, 1x2
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 20 (83)
1x3, 1x4
RBS6601 Configuration
HSPA configuration 1
HSDPA Codes:
- Cell 1-3: 1 code/cell + 27 codes dynamically shared.
The number of available codes per cell varies
between 1 and 15.
- Cell 4-6: 1 code/cell + 27 codes dynamically shared.
The number of available codes per cell varies
between 1 and 15.
HSDPA Users: 32 users/cell
EUL Users: 16 users/cell
Processing Resources
- HSDPA: 2 (One allocated to cells 1-3, one allocated to
cells 4-6). Both resources are configured on the same
DUW.
- EUL: 1
CE Available for R99
- DUW 20: 131 CE
- DUW 30: 515 CE
Required Licenses
-
HSDPA Dynamic Code Allocation
Number of HSDPA codes per cell: 15
Number of HSDPA Users per Cell: 32
Enhanced Uplink Introduction
Number of EUL Users per cell: 16
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 21 (83)
RBS6601 Configuration
HSPA configuration 2
HSDPA Codes:5 codes/cell
HSDPA Users:16 users/cell
EUL Users:16 users/cell
Processing Resources
– HSDPA: 1
– EUL: 1
CE Available for R99
– DUW 10: 65 CE
– DUW 20: 321 CE
– DUW 30: 705 CE
Required Licenses
– Enhanced Uplink Introduction
– Number of EUL Users per cell: 16
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 22 (83)
RBS6601 Configuration
HSPA configuration 3
HSDPA Codes:2 codes/cell + 18 codes dynamically
shared. The number of available codes per cell varies
between 2 and 15.
HSDPA Users: 16 users/cell
EUL Users:16 users/cell
Processing Resources
- HSDPA: 1
- EUL: 1
CE Available for R99
- DUW 10: 65 CE
- DUW 20: 321 CE
- DUW 30: 705 CE
Required Licenses
-
HSDPA Dynamic Code Allocation
Number of HSDPA codes per cell: 15
Enhanced Uplink Introduction
Number of EUL Users per cell: 16
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 23 (83)
COURSE Agenda
Introduction
RBS6601 Configuration
RBS6601 Integration
Prerequisites
On-site Integration
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 24 (83)
RBS6601 Integration
Tools list
Tools for integration:
Item
Integration
Tools
No
Product Name
Qty
Information
1
Screwdriver
1pcs
W=5,5mm L=285mm, 1000Volt
2
Compass
1pcs
Checking direction of antenna
3
Bitscassette
1pcs
With different bits and holders
4
Side cutting pliers
1pcs
160mm, 500mm x 500mm
5
Cable knife
1pcs
6
Termination tool, KRONE
1pcs
7
RJ45 Crimping pliers
1pcs
1
2
Multimeter Digital
Serial cable
1pcs
1pcs
Making pins your own Serial Cable
RJ 45
DB9 h.
1 ___________ 5
2 ___________ 3
3 ___________ 2
Equipments
3
Ethernet crossover cable
1pcs
4
Laptop with Element Manager
Software
1pcs
5
Tems phone
1pcs
For the recommended test calls:
Mobile phone with the ability to display scrambling codes
6
Data card
1pcs
For the recommended test HSPA calls
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 25 (83)
RBS6601 Integration
Tools list
Thin client with
– Windows (2000, XP or Vista)
– Java Runtime Environment JRE 1.5
– Hyper Terminal or similar
function for serial connection
– Element Manager (EMAS)
Software
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 26 (83)
RBS6601 Integration
integration process (1/4)
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 27 (83)
RBS6601 Integration
integration process (2/4)
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 28 (83)
RBS6601 Integration
integration process (3/4)
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 29 (83)
RBS6601 Integration
integration process (4/4)
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 30 (83)
RBS6601 Integration
integration workflow
1. Inform O&M team before doing activity
2. Completion the Installation
3. Add Module for Rectifier
3.1 Plug in additional Module
3.2 Commissioning
4. Verify voltage & Power on Ericsson RBS
4. Load Data Scripts into Node B
5. Load Data Scripts in RNC
6. Check and clear critical hardware alarms
7. Internal alarm pass?
7.1 Pass ( go to step 8)
7.2 Not Pass :
7.2.1 Check and clear critical hardware alarms ( go to step 7)
8. Inform RNC team to activate Cells
9. Activate Cells (Site Integrated)
10. Test calls
11. Test call OK (go to step 11)
16.2 Test call Not OK
16.2.1 Trouble shooting ( go to step 10)
11. Site integration completed & then Lock the site
12. inform and upload test result to SH & submit to PM
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 31 (83)
RBS6601 Integration
Configuration data
IP and router configuration Design documents prepare by design
team (RND & ATND)
Scripts for on-site loading include:
– OAM Access Configuration
– Site Equipment Configuration
– IUB script
BKK0124_OAM_01
BKK0124_SE_02
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 32 (83)
BKK0124_Iub_03
COURSE Agenda
Introduction
RAN System Description
RBS 6000 Overview
RBS 6601 – Node B Connection
Node B Integration
Prerequisites
On-site Integration
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 33 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 34 (83)
On-site integration
OAM CPP Basic
CPP NODE
RS232
Hyper
Terminal
OSE shell (COLI)
FileZilla
Total
Commander
HTTP (80)
FTP (21) / SFTP (22)
Ethernet
or
IPoverATM
EMAS
TCP
IP
File system
CM (Configuration Mgmt)
IIOP (56834)
/
SSLIOP (56836)
MIB
FM (Fault Mgmt)
PM (Performance Mgmt)
Scanners
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 35 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 36 (83)
On-site integration
Emas software
› The EM installation package resides
on the node and can be downloaded
from a web page located on the
node
› The Element Management
Applications and the installer require
that a Java version 1.5 is installed
as the Java Runtime Environment
(JRE). It can be obtained by
downloading JRE 1.5 from Sun at:
http://java.sun.com/products/archive
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 37 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 38 (83)
On-site integration
Connect to node b
Connect RJ45 cable to DUW on
LMT-B port and Laptop on LAN port
Setting IP client
– IP address: 169.254.1.2
– Subnetmask: 255.255.0.0
– Default gateway: 169.254.1.1
Connect to RBS use Element
Manager Software (EMAS) by fill IP
address RBS (169.254.1.1) on
Address box and click Connect
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 39 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 40 (83)
On-site integration
Load OaM Access Configuration
› Step 1: In Element Manager go to Tools O&M Access Configuration
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 41 (83)
On-site integration
Load OaM Access Configuration
› Step 2: O&M access configuration windows will showing and click Next
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 42 (83)
On-site integration
Load OaM Access Configuration
› Step 3: tick on use configuration file if will use OAM script file (or can click Next
if will configure manually). Also select wizard to make sure all configuration
already corrected
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 43 (83)
On-site integration
Load OaM Access Configuration
› Step 4: Browse to OAM script file then click Next
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 44 (83)
On-site integration
Load OaM Access Configuration
› Step 5: if OAM script success upload to RBS will show the following picture
and than click Next
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 45 (83)
On-site integration
Load OaM Access Configuration
› Step 6: EMAS will show wizard to make sure all configuration already
corrected until summary of OAM script, and then click Finish
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 46 (83)
On-site integration
Load OaM Access Configuration
› Step 7: RBS will load all data as script
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 47 (83)
On-site integration
Load OaM Access Configuration
› Step 8: connection to RBS will loss, and then will automatic connect to RBS
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 48 (83)
On-site integration
Load OaM Access Configuration
› Step 9: OAM configuration successfully loaded and then click OK
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 49 (83)
On-site integration
Load OaM Access Configuration
› Step 10: Verify that a CV is automatically created with the name OAM_...
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 50 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 51 (83)
On-site integration
Network Synchronization Status
The system clock in the TUB or the CBU should be locked before running the
Site Equipment Configuration wizard, to avoid unnecessary instability of the
RBS node.
› Step 1: In the RBS Element
Manager View selector, select
Containment (MOM based)
› Step 2: Select the
Synchronization=1 object and
verify that nodeSystemClock is in
LOCKED_MODE mode.
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 52 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 53 (83)
On-site integration
Verifying the oam management
This activity verifies that the O&M configuration is correct from the RBS towards
the OSS
› Step 1: In the RBS Element
Manager View selector, select IP
› Step 2: Select the IpOam object
and click the MO Properties tab
and then the Actions tab
› Step 3: From the Actions dropdown menu, select ping
› Step 4: Enter the IP address
(default router, …)
› Step 5: Click Execute
› Step 6: If the ping is successful,
the following message is displayed
*/<address> is alive
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 54 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 55 (83)
On-site integration
Load Site equipment Configuration
› Step 1: In Element Manager go to Tools Site Equipment Configuration
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 56 (83)
On-site integration
Load Site equipment Configuration
› Step 2: SE configuration windows will showing and click Next
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 57 (83)
On-site integration
Load Site equipment Configuration
› Step 3: tick on use configuration file if will use SE script file (or can click Next if
will configure manually). Also select wizard to make sure all configuration
already corrected
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 58 (83)
On-site integration
Load Site equipment Configuration
› Step 4: Browse to SE script file then click Next
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 59 (83)
On-site integration
Load Site equipment Configuration
› Step 5: if SE script will upload to RBS will show the following picture and then
click Next
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 60 (83)
On-site integration
Load Site equipment Configuration
› Step 6: EMAS will show wizard to make sure all configuration already
corrected until summary of SE script, and then click Finish
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 61 (83)
On-site integration
Load Site equipment Configuration
› Step 7: RBS will running SE script
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 62 (83)
On-site integration
Load Site equipment Configuration
› Step 8: click OK after SE script successful and complete loaded
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 63 (83)
On-site integration
Load Site equipment Configuration
› Step 9: Verify that a CV is automatically created with the name SITE_....
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 64 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 65 (83)
On-site integration
Verifying the RbsLocalCell
This activity verifies the local RBS cell connection
› Step 1: In the RBS Element
Manager View selector, select
Radio Network
› Step 2: Verify that all
RbsLocalCell have the
operational state Enabled.
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 66 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 67 (83)
On-site integration
Load IUB script
› Step 1: In Element Manager go to Tools Run Command File
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 68 (83)
On-site integration
Load IUB script
› Step 2: Check on the Halt on errors and Verbose logging on and then click
Browse to find Iub script file
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 69 (83)
On-site integration
Load IUB script
› Step 3: click Start for Running Script
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 70 (83)
On-site integration
Load IUB script
› Step 4: after running success, don’t forget to create Configuration Version (CV)
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 71 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 72 (83)
On-site integration
Backup configuration version
Configuration Version save the last configuration on Node B.
› Step 1: In the RBS Element
Manager View selector, select
Software
› Step 2: On the CV tab, select
Create CV.
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 73 (83)
On-site integration
Backup configuration version
Configuration Version save the last configuration on Node B.
› Step 4: In Configuration
Version–Create window:
– Name: type “name of CV”
– OperatorComment: “DTAC”
and then Create
› Step 5: Set Startable for created
CV (startable CV will be loaded
when Node B restart).
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 74 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 75 (83)
On-site integration
Check fingerprint
› Step 1: In Element Manager windows go to Licensing view (drop down)
› Step 2: on Table tab will appear fingerprint of RBS. In this example is
343401_000440
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 76 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 77 (83)
On-site integration
Physical connection
› RS-232 Serial cable
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 78 (83)
On-site integration
Physical connection
› Configuration Hyper Terminal software
– Use hyper terminal - RS 232 from PC to Node B, port ‘LMT A’ of DUW
– Press ‘Enter’ and you should see ‘$’ appearing, if not check the cable connections
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 79 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 80 (83)
On-site integration
HYPER TERMINAL Basic command
1. Check current ip address of Node B
$ ifconfig
Interface: le0
ip-address: 10.192.17.185
netmask: 255.255.255.248
broadcast: 10.192.17.191
2. Ip Node B config
Should not see previous IP setting as all is lost when in backup mode - need to define
$ ifconfig le0 169.254.1.1 netmask 255.255.0.0 broadcast 169.254.255.255
Interface configuration never made for le0
IP address must be set via command:
Usage: ifconfig <ifname> [<address>] [netmask <mask>] [broadcast <address>]
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 81 (83)
On-site integration
HYPER TERMINAL Basic command
3. Check all current CV on Node B
$ cv ls
Please wait for list....
Name: OPER_Manual
Date: Thu Jan 1 06:57:45 197
Id: 1
Type: other
Package upgrade: CXP9012959/1_R9AF03
Operator: ephupha
Comment: IUB_finish
Status:ok
……………..
4. Check CV startable
$ cv cu
Startable: rbs_basic_cv
Loaded: rbs_basic_cv
Rollback status: Rollback is on
Rollback init timer: 30
Rollback init counter: 5
Rollback counter: 3
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 82 (83)
On-site integration
HYPER TERMINAL Basic command
5. Make new CV
$ cv mk <CV_name>
$ cv mk IuB_Config_CV
Please wait while database is writing to disk.
Writing the database file can take minutes...
ok
$
6. Set startable CV
$ cv set <CV_name>
7. Delete CV
$ cv rm <CV_name>
$ cv rm IuB_Config_CV
ok
$
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 83 (83)
On-site integration
HYPER TERMINAL Basic command
8. Read current clock for Node B
$ readclock
Date: 2011-01-18 Time: 10:00:29. Tuesday
$
9. Set clock to Node B
$ setclock yyyy-mm-dd hh:mm:ss
$ setclock 2011-01-18 09:59:00
Date and time set ok
$
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 84 (83)
On-site integration
HYPER TERMINAL Basic command
10. Integration Unlock is a function within License Control that can be used if the
operator needs to make all capacity and all features available for a node
before the official KF has been delivered.
* invoke manually using command
$ license iu activate
* To check how many days are left
$ license iu status
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 85 (83)
On-site integration
HYPER TERMINAL Basic command
11. Restart Node B
* To put Node B in back up mode, Note IP address, subnetmast all will be lost
$ reload -OSE Delta PowerPC krn-750/R2.1.2
Welcome to OSE Shell OSE4.3.
Stop due to remain in backup set
* To put Node B in normal mode
$ reload
OSE Delta PowerPC krn-750/R2.1.2
Welcome to OSE Shell OSE4.3.
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 86 (83)
On-site integration
› OAM CPP Basic
› EMAS software
–
–
–
–
–
–
–
–
–
Connect to Node B
Load OAM Access Configuration
Network Synchronization Status
Verifying The OAM Management
Load Site Equipment Configuration
Verifying The RbsLocalCell
Load IUB Script
Backup Configuration Version
Check Fingerprint
› Hyper Terminal
– Physical Connection
– Basic Command
› LED indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 87 (83)
On-site integration
LED Indicators
DUW Version 1 LED Indicators
Marking
I
O
Indicator
Information
Operational
Color
Yellow
Green
Mode
Off
Unlocked
On
Locked
Blink (0.5 Hz)
Shutdown in progress
Blink (16 Hz)
Busy
Off
Power not present
On
Power present
Blink (0.5 Hz)
Blink (2 Hz)
Blink (16 Hz)
F
Fault
Red
Indicates
Dependent resource missing, DU in
autonomous mode
Load or testing in progress
Initial boot test
Off
No fault detected in DU
On
Fault detected in DU
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 88 (83)
On-site integration
LED Indicators
DUW
Version 1 LED Indicators
Marking
Indicator
Color
Mode
Indicates
LMT B
Interface
Green
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
TN A
Interface
(1)
ET A
ET B
(1)
TN B
RI A – RI
F
Interface
Interface
Interface
Interface
Green
Green
Green
Green
Green
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 89 (83)
On-site integration
Optical Indicators
DUW Version 2 LED Indicators
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 90 (83)
On-site integration
Optical Indicators
DUW Version 2 LED Indicators
Marking
Indicator
Color
Mode
Indicates
EC
Interface
Green
Off
Link is down (EC cable is not connected)
On
Link is up (EC cable is connected)
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
Off
Link is down
On
Link is up
LMT B
TN A
ET A
ET B
TN B
A–F
Interface
Interface
Interface
Interface
Interface
Interface
Green
Green
Green
Green
Green
Green
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 91 (83)
On-site integration
Optical Indicators
RRUW LEDl Indicators
Markin
g
Indicator
Color
Mode
Indicates
Fault
Red
Off
No fault detected in RRUS
On
Fault detected in RRUS
Off
RRUS not operational
On
Power present
Blink (2 Hz)
Load or testing in progress
Blink (0,5
Hz)
Dependent resource missing
Off
The RRUS is not in maintenance mode.
On
The RRUS is in maintenance mode.
Blink (0.5
Hz)
Shutdown in progress
Off
Disconnected
On
Connected
Operational
Maintenance
1,
2
Interface
Green
Blue (1)
Green
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 92 (83)
Questions & Comments??
Thank you for listening!
Contact:
Thanh.do@ericsson.com
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 93 (83)
ETV/OCR/V Thanh Do | Ericsson AB 2011 | RBS6601 Integration | 2011-05-11 | Page 94 (83)
Download