WORK INSPECTION REQUEST (WIR) MIDFIELD TERMINAL BUILDING - ABU DHABI INTERNATIONAL AIRPORT PROJECT WIR SECTION A - DETAILS OF SCHEDULED INSPECTION BY CONTRACTOR'S CONSTRUCTION WIR NUMBER: ITERATION: TGC-MHD-FIN-WIR-00001 REVISION: R00 TO: AECOM ITP NUMBER: WIR REFERENCE ITP ACTIVITY: SECONDARY ITP REFERENCE: SECONDARY ITP ACTIVITY: TERTIARY ITP REFERENCE: TERTIARY ITP ACTIVITY: SPECIFICATION REFERENCE: FORMS NUMBER: INSPECTION TYPE: PREREQUISITE WIR: DISCIPLINE: SYSTEM: SUB SYSTEM: DRAWING REFERENCE: LOCATION: 01-PIER 1 FLOOR REFERENCE: L10 , L20 SECTOR: 1.11D, 5.12D, 5.15A PROPOSED DATE BY ORIGINATOR: 29/03/2022 00:00 LEVEL FROM: LEVEL TO: X AXIS: Y AXIS: L10,L20 ROOM NUMBER: C-L20-527-HOLDROOM-5.15A, C-L10-41-ADAC AIRSIDE OFFICE, C-L10-55-INBOUND BAGGAGE SCREEN OFFICE BIM TAG: MTB_BuCP_10_ARC-FIN_FFR-L10-0041, MTB_BuCP_10_ARC-FIN_FFR-L10-0055, MTB_BuCP_10_ARC-FIN_FFR-L100055, MTB_BuCP_20_ARC-FIN_FSM-L20-0527-5.15A, MTB_BuCP_20_ARC-FIN_FSM-L20-0527-5.15A INSPECTION DESCRIPTION: Mockup Inspection: 1- Cleaning Dusty Carpet - ( Using Special Vacuum)/ Holdroom L20- 527. 2- Cleaning Watermark - ( Using the washing machine) / Room L10-55. 3- Cleaning Oilspots- ( Using the steam & Washing machine)/ Room L10-41. EQUIPMENT REFERENCE: SUBCONTRACTOR SITE ENGINEER: SUBCONTRACTOR: SUBCONTRACTOR QC INSPECTOR: SUBCONTRACTOR QC COMMENTS SECTION FOR ORIGINATORS REFERENCE ONLY: WIR ORIGINATOR: INTERNAL REFERENCE: Mohammad Al Jboor CONTRACTOR CONSTRUCTION REVIEW CONTRACTOR CONSTRUCTION ENGINEER: CONTRACTOR CONSTRUCTION ENGINEER COMMENTS: INTERNAL REJECTION CATEGORY WIR SECTION C - ENGINEERS COMMENTS DISCIPLINE: ✕ CIVIL ✕ ARCH. ✕ STRUCTURAL STEEL ✕ MEP ELECT. ✕ MEP MECH. ✕ MEP SPEC.SYST. CMA INSPECTOR ASSIGNED: Joel Dalit CMA INSPECTOR COMMENTS: 1. Contractor to ensure that the level of cleaning for the future cleaning/inspections is as per the agreed during site walk and ADAC approval. 2. All carpet cleaning requirement for the entire MTB project that can attained as in mock up approval will not be considered as dilapidation as agreed. 3. ADAC approval attached. 4. All comments regarding Carpet cleaning to be removed from the Dilapidation report. 5. All areas required Washing & steam cleaning to be highlighted (With Photos) separately with the required area in MTB as agreed PRELIMINARY REVIEW BY CMA INSPECTOR: 2-Exceptions as Noted - Revise and Resubmit for Record CMA ENGINEER ASSIGNED: Joel Dalit ENGINEERS COMMENTS PRELIMINARY REVIEW BY CMA ENGINEER: 2-Exceptions as Noted - Revise and Resubmit for Record LEAD ENGINEER: Joel Dalit LEAD ENGINEER COMMENTS: LEAD ENGINEER FINAL REVIEW: LEAD ENGINEER APPROVED DATE: COMMENT CATEGORY: 2-Exceptions as Noted - Revise and Resubmit for Record Attached Files Filename Upload No. Uploaded By 1 Mohammad Al Jboor 1 Mohammad Al Jboor 1 Mohammad Al Jboor 1 Mohammad Al Jboor 1 Mohammad Al Jboor 1 Mohammad Al Jboor 1 Mohammad Al Jboor 0041.jpeg 055.jpeg 00411.jpeg 0527.jpeg 527_38204.jpeg oil spot 41.jpeg oil spot steam 41.jpeg 1 Mohammad Al Jboor 1 Joel Dalit watermark55.jpeg ADAC Approval for Carpet Cleaning Mock-up.pdf