Project Management Project Life-cycle: Due Date: 7th Session ASSIGNMENT Select a job (in your company) that fits to the definition of a Project. Define the Life-cycle of your project with Phases. Avoid the generic Project Management Phases of Initiating, Planning, Executing, Monitoring & Controlling, and Closing (0 Marks will be awarded for the complete assignment, if this instruction is not followed). Define the Activities performed in each phase, using for example the following table: My Project’s Phases (2 Marks) Phase 1: Phase 2: My Project’s Activities (2 Marks) Effort* (0.5 Mark for each column of Effort with Max. 1.5 Marks) 1. 2. 3. 1. 2. 3. 40% 60% * Effort can be represented as factors: % Man-Hours; % Cost etc.; %Creativity; %Customer Interaction. Sum of this column should be 100%. Multiple columns can be inserted i.e. one column for each factor. Effort Draw (1 Mark) the Phases versus Effort diagram for your project’s life-cycle as: Project Life-cycle Phases Discuss, analyze and criticize the weak areas and strong areas (1 Mark). Discuss and compare your project’s life-cycle with that of your Competitor or Industry Standard (1 Mark). General Guidelines for the Assignment: • Participants will prepare and submit the assignment individually. • All assignments should be properly typed and formatted (1.5 Mark). • Only assignments that are presented in a professional way shall be acceptable. • Submit in/before 7th Session (only Soft Copy on LMS). • Place any related document in Appendix. • No late submissions shall be entertained. • Assignments shall be assessed for plagiarism also. Page 1 of 1 Dr. Rameez Khalid, Faculty, Department of Management, IBA, Karachi