Section 3 –ARCHITECTURAL PRODUCTS INFORMATION 3.1 ADHESIVES, SEALANTS & FASTENERS, WATERPROOFING 3.1.1 ADJUVATE PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Block Walls and Concrete Slab repairs Wall And Ceiling Lining Concrete Slab Construction Joints and and around external Columns C1 Grouting construction repairs including applications around base plates, Concrete covings, pipe penetrations through concrete and block walls. Acrylic Stud Adhesive is used for adhering plasterboard and fibre cement wallboard to metal studs for wall and ceiling lining Inserted into expansion joints Product Description Adjuvate Congrout A Adjuvate Studgrip Adjuvate Adjufoam ADJUVATE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.2 DAVCO K10 PLUS WATERPROOFING MEMBRANE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Ablutions & Laundry Room 3 coat Application to Wet Area Floor & Wall before Tiling Davco K10 Plus WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.3 GYPROCK PRODUCTS PRODUCTS SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Wall & Ceiling Lining Plasterboard Jointing system for Wall & Ceiling Linings Gyprock Base Coat 45 Wall & Ceiling Lining Plasterboard Jointing system for Wall & Ceiling Linings USG Boral All Purpose Premix (Top Coat) GYPROCK PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.4 NOVATEX NOVAGROUT SMOOTH PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Wet Area (Ablution & Laundry), Linen, office & Common Room. Tile grout for both wall & floor Tile Novatex Novagrout Smooth TILE GROUT PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.5 POLYFLOR KIESEL OKATMOS STAR 100 FLOORING ADHESIVE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Flooring Areas Interior Adhesive For Vinyl Tile Flooring Areas Product Description Okatmos star 100 WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.6 RLA POLYMERS TILEFLEX TILE ADHESIVE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application General Flooring & Wall Tiles Tile Adhesive Product Description TileFlex Tile Adhesive WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.7 SELLEYS PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description General Areas Gap Filler Selleys No More Gaps Multipurpose Wet Areas Silicone Sealant Selleys Wet Area Silicone Sealant Roof & Gutter Silicone Sealant Selleys Roof & Gutter Silicone Sealant WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.8 SIKA PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description General Areas Gap Filler General Areas Silicone Sealant Sikaflex Construction Sealant Sikaflex -400 Fire Roof & Gutter Silicone Sealant SikaSeal Roof & Gutter WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.2 BLOCKWORK & CONCRETE 3.2.1 BLOCKWORK PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Structural Walls Concrete Blockwalls 200mm Flush End Blocks WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.2.2 BONDEK PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description First and Second Floors Concrete Slab Reinforced Formwork Lysaght Bondek WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.2.3 PRECAST MANHOLE COVERS – MOROBE CONCRETE PRODUCTS (MCP) PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Site Drain Openings Concrete Coverings Precast Manhole Covers WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.2.4 PROMAT FIRE COLLARS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location First And Second Floors Application Product Description Service Penetrations Between Promat Promaseal Fire Collars Concrete Slabs WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.3 METALS AND PREFINISHED All steel members were sourced from local suppliers: - Mesh & Bar Industries - Barlow Industries - Atlas Steel PNG And prefabricated to specifications and dimensions in the Hornibrook NGI LTD Fabrication Division workshop. 3.4 WALL PANELS, CEILING & PLASTERBOARDS 3.4.1 FRAMECAD STEEL PANELS – WALLS & CEILINGS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Walls & Ceilings Steel Framing FRAMECAD WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.4.2 CEMINTEL EDGE CLADDING FIBRE CEMENT BOARDS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Walls & Ceilings Wall & Ceiling Linings Cemintel Edge Cladding WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.4.3 DURALINER FIBRE CEMENT BOARDS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Walls & Ceilings Wall & Ceiling Linings Duraliner Lining Board WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.4.4 GYPROCK PLASTERBOARDS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Walls & Ceilings Wall & Ceiling Linings Fyrchek Plasterboards Soundchek Plasterboards WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.4.5 JAMES HARDIE VILLABOARD LINING PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Walls & Ceilings Wall & Ceiling Linings Villaboard Lining WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.5 ROOFING 3.5.1 LYSAGHT PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Roof Roofing Sheets Lysaght Custom Orb Roof Fascia Fascia System Novaline Fascia System WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.5.2 DEKS DEKTITE RUBBER FLASHINGS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Roof Rubber Flashings Dektite Rubber EPDM WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.6 WINDOWS 3.6.1 BREEZWAY EASYSCREEN ALTAIR LOUVRE SYSTEM PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Windows Window & Lourve System Easyscreen Window System Altair Lourve System WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.6.2 SABRETOOTH SECURITY SCREEN SYSTEMS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Windows Security Screening Sabretooth Security Screens WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.7 DOORS AND ACCESS PANELS 3.7.1 HUME SOLICORE DOORS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Doors Security & Accessibility Hume Solicore WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.7.2 G.JAMES HINGED SCREEN DOORS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Doors Security & Accessibility G.James Hinged Door WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.7.3 CRIMSAFE SECURITY SCREENS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Doors Security Crimsafe Security Screens WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.8 DOOR HARDWARE 3.8.1 ALLEGION DOOR HINGE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Doors Accessibility 13221 Stainless steel broad butt hinge WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.8.2 DORMAKABA PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Doors Security & Accessibility LT53SCP Entrance Set Doors Security & Accessibility LT80SCP Storeroom Set Doors Security & Accessibility Doors Security & Accessibility B960SSS B Series Single Cylinder Deadbolt Kaba NL550 Night Latch Doors Security & Accessibility RTS85NHO-EN4 Door Closer WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.8.3 LOCKWOOD PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Doors Security & Accessibility GEN6T Keying Platform Doors Security & Accessibility Doors Security & Accessibility GEN6T 201 Rim Cylinder With Tail Bar GEN6T 8221 PD Cylinder Doors Security & Accessibility Doors Accessibility GEN6T Double Euro Cylinder With Lazy Cam A250SC Door Stop WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.9 BATHROOM/TOILET FIXTURES & SINKS 3.9.1 3MONKEEZ PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Toilets Plumbing & Sanitary Toilets Plumbing & Sanitary Toilets Plumbing & Sanitary Toilets Plumbing & Sanitary Toilets Plumbing & Sanitary AB-CIS-DF-2 Stainless Steel Dual Flush Cistern AB-CS-L Cleaner’s Sink With Legs HB-1TH Wall Mounted Hand Basin With HBB Brackets M-FP-WC 90-Degree Tapered Flushpipe In2Gr8 Metal Grate Toilets Sanitary Toilets Plumbing & Sanitary WA-TRH6 Stainless Steel Toilet Roll Holders WC-SSPS Pedestal Toilet Pan WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.9.2 BRASSHARDS PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Toilet & Showers Plumbing & Sanitary 7SC406 Male Hose Taps Toilet & Showers Plumbing & Sanitary 7TA027C Ezy Clean Wall Stops WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.9.3 CAROMA PIN LEVER SINK MIXER WITH GOOSENECK OUTLET PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Laundry & Common Room Plumbing & Sanitary Caroma Pin Lever Sink Mixer With Gooseneck Outlet WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.9.4 CLARK SINKS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Common Room Plumbing & Sanitary Advance Double Centre Bowl – 1TH 3507.1 WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.9.5 ENWARE TAPWARE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Showers Plumbing & Sanitary Toilet Hand Basins Plumbing & Sanitary DET354 Detention Recess Shower Set TFC745 Tempostop Time Flow Basin Pillar Tap WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.9.6 METLAM PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Rooms Sanitary Rooms Sanitary ML771_6 Stainless Steel Framed Safety Glass Mirror 102 Hat & Coat Hook WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.9.7 METLAM PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Toilet Sanitary RBA8110-100 Stainless Steel Framed Mirror WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.10 TOILET CUBICLE SYSTEM – DURACUBE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Toilets Sanitary Duracube 3000 Series Pedestal Mount Overhead Braced (3POB) WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.11 FURNITURE & WHITEGOODS 3.11.1 FANTASTIC FURNITURE PRODUCTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Common Room Dining Chair Avenue Dining Chair Common Room Dining Table Dalkeith 8 Seater Dining Table WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.11.2 RAPIDLINE GO STATIONARY CUPBOARD PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Linen Room Ironing Room Office Storeroom Storage GCA18 – Assembled Cupboard WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.11.3 SAMSUNG 559L REFRIGERATOR PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Common Room Food Storage Samsung 559L Refrigerator WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.11.4 SHARP R211DW 20L 750W MICROWAVE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Common Room Food Processing Sharp R211DW 20L 750W Microwave WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.11.5 SPEED QUEEN LWS52 TOP LOAD WASHER PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Laundry Clothes Washing & Cleaning LWS52 Top Load Washer WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.11.6 ZIP ECONOBOIL 5L PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Common Room Water Heating ZIP Econoboil 5L WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.12 JOINERY 3.12.1 CAESARSTONE COUNTERTOPS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Rooms Office Common Room Linen Room Ironing Room Countertops Benchtops Caesarstone Quartz Surfaces WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.12.2 POLYTEC MDF BENCHTOPS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Rooms Office Common Room Linen Room Ironing Room Cabinets Shelves Cupboards Product Description Polytec MR MDF 2400 x 1200 x 16mm Edgetape ABS UG 22mm x 1mm Edgetape ABS PG 22mm x 1mm Colours: Cinder Matt Polar White Matt WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.13 CERMIC TILE & RESILIENT FINISHES 3.13.1 POLYFLOR EXPONA COMMERCIAL PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Rooms Office Common Room Linen Room Ironing Room Store Room Vinyl Floor Tiles Expona Luxury Vinyl Tiles WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.13.2 RAK CERAMICS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Laundry Toilet Common Room Tiles & Tiling Basic Concrete Porcelain Tiles 300 x 600 x 9mm – Black WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.14 THERMAL INSULATION & PLIABLE MEMBRANE BRADFORD INSULATION PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Walls Roof Interior Acoustic & Thermal Insulation Acoustigard Partition Rolls Anticon 145 Light Duty Blanket WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.15 PAINTING – EXTERNAL & INTERNAL FINISHES DULUX PAINTS PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Interior Surfaces Exterior Surfaces Painting And Coating Product Description Metalshield Quick Dry Enamel – Clearbase Mineral Turpentine Mouldshield Low Sheen – Vivid White/Iced Aniseed Mouldshield Semigloss – Vivid White/Irish Moor Professional Total Prep Professional Oil Based Primer Sealer Undercoat Super Cover Ceiling White Super Enamel High Gloss – Vivid White/Ultra Deep Base/Extra Bright Base Wash & Wear Semi Gloss – Bracken Green Weathershield Exterior Gloss – Vivid White/Iced Aniseed WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) Section 4 – BUILDING SERVICE PRODUCT INFORMATION 4.1 MECHANICAL – LG 12000 BTU SPLIT AIR CONDITIONER PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Office Store Room Cooling System LG 12000 BTU Split Air Conditioner WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 4.2 HYDRAULIC – GRUNDFOS PRESSURE PUMP PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Ground Floor Water Pressure Control System Hydro Solo-E CRIE 20-4 WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 4.3 ROOF SOLAR SYSTEM & FALL ARREST ANCHOR SYSTEM 4.3.1 SOLARHART SPLIT SYSTEM SOLAR WATER HEATER – 413MLV36 PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Roof Solar Water Heaters Solarhart Split System Solar Water Heater – 413MLV36 WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 4.3.2 SAYFA FALL ARREST ANCHOR SYSTEM PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Roof Fall Arrest System Product Description SL209A Travel 8 Top Mount Intermediate Universal Plate SL203A Travel 8 End Stanchion Anchor WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR)