Section 3 –ARCHITECTURAL PRODUCTS INFORMATION
3.1
ADHESIVES, SEALANTS & FASTENERS, WATERPROOFING
3.1.1
ADJUVATE PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s
printed technical specifications.
Location
Application
Block Walls and Concrete
Slab repairs
Wall And Ceiling Lining
Concrete Slab Construction
Joints and and around
external Columns C1
Grouting construction
repairs including
applications around base
plates, Concrete covings,
pipe penetrations through
concrete and block walls.
Acrylic Stud Adhesive is
used for adhering
plasterboard and fibre
cement wallboard to metal
studs for wall and ceiling
lining
Inserted into expansion
joints
Product Description
Adjuvate Congrout A
Adjuvate Studgrip
Adjuvate Adjufoam
ADJUVATE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP))

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.1.2
DAVCO K10 PLUS WATERPROOFING MEMBRANE
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s
printed technical specifications.
Location
Application
Product Description
Ablutions & Laundry Room
3 coat Application to Wet
Area Floor & Wall before
Tiling
Davco K10 Plus
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP))

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.1.3
GYPROCK PRODUCTS
PRODUCTS SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s
printed technical specifications.
Location
Application
Product Description
Wall & Ceiling Lining
Plasterboard Jointing
system for Wall & Ceiling
Linings
Gyprock Base Coat 45
Wall & Ceiling Lining
Plasterboard Jointing
system for Wall & Ceiling
Linings
USG Boral All Purpose Premix (Top
Coat)
GYPROCK PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP))

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.1.4
NOVATEX NOVAGROUT SMOOTH
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s
printed technical specifications.
Location
Application
Product Description
Wet Area (Ablution &
Laundry), Linen, office &
Common Room.
Tile grout for both wall &
floor Tile
Novatex Novagrout Smooth
TILE GROUT PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP))

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.1.5
POLYFLOR KIESEL OKATMOS STAR 100 FLOORING ADHESIVE
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Flooring Areas
Interior Adhesive For
Vinyl Tile Flooring Areas
Product Description
Okatmos star 100
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.1.6
RLA POLYMERS TILEFLEX TILE ADHESIVE
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
General Flooring & Wall Tiles
Tile Adhesive
Product Description
TileFlex
Tile Adhesive
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.1.7
SELLEYS PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
General Areas
Gap Filler
Selleys No More Gaps
Multipurpose
Wet Areas
Silicone Sealant
Selleys Wet Area
Silicone Sealant
Roof & Gutter
Silicone Sealant
Selleys Roof & Gutter
Silicone Sealant
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.1.8
SIKA PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
General Areas
Gap Filler
General Areas
Silicone Sealant
Sikaflex
Construction
Sealant
Sikaflex -400 Fire
Roof & Gutter
Silicone Sealant
SikaSeal Roof & Gutter
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.2
BLOCKWORK & CONCRETE
3.2.1
BLOCKWORK
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Structural Walls
Concrete Blockwalls
200mm Flush End Blocks
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.2.2
BONDEK
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
First and Second Floors
Concrete Slab Reinforced
Formwork
Lysaght Bondek
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.2.3
PRECAST MANHOLE COVERS – MOROBE CONCRETE PRODUCTS (MCP)
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Site Drain Openings
Concrete Coverings
Precast Manhole Covers
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.2.4
PROMAT FIRE COLLARS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
First And Second Floors
Application
Product Description
Service Penetrations Between Promat Promaseal Fire Collars
Concrete Slabs
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.3
METALS AND PREFINISHED
All steel members were sourced from local suppliers:
- Mesh & Bar Industries
- Barlow Industries
- Atlas Steel PNG
And prefabricated to specifications and dimensions in the Hornibrook NGI LTD
Fabrication Division workshop.
3.4
WALL PANELS, CEILING & PLASTERBOARDS
3.4.1
FRAMECAD STEEL PANELS – WALLS & CEILINGS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Walls & Ceilings
Steel Framing
FRAMECAD
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.4.2
CEMINTEL EDGE CLADDING FIBRE CEMENT BOARDS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Walls & Ceilings
Wall & Ceiling Linings
Cemintel Edge Cladding
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.4.3
DURALINER FIBRE CEMENT BOARDS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Walls & Ceilings
Wall & Ceiling Linings
Duraliner Lining Board
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.4.4
GYPROCK PLASTERBOARDS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Walls & Ceilings
Wall & Ceiling Linings
Fyrchek Plasterboards
Soundchek Plasterboards
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.4.5
JAMES HARDIE VILLABOARD LINING
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Walls & Ceilings
Wall & Ceiling Linings
Villaboard Lining
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.5
ROOFING
3.5.1
LYSAGHT PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Roof
Roofing Sheets
Lysaght Custom Orb
Roof Fascia
Fascia System
Novaline Fascia System
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.5.2
DEKS DEKTITE RUBBER FLASHINGS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Roof
Rubber Flashings
Dektite Rubber EPDM
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.6
WINDOWS
3.6.1
BREEZWAY EASYSCREEN ALTAIR LOUVRE SYSTEM
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Windows
Window & Lourve System
Easyscreen Window System
Altair Lourve System
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.6.2
SABRETOOTH SECURITY SCREEN SYSTEMS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Windows
Security Screening
Sabretooth Security Screens
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.7
DOORS AND ACCESS PANELS
3.7.1
HUME SOLICORE DOORS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Doors
Security & Accessibility
Hume Solicore
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.7.2
G.JAMES HINGED SCREEN DOORS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Doors
Security & Accessibility
G.James Hinged Door
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.7.3
CRIMSAFE SECURITY SCREENS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Doors
Security
Crimsafe Security Screens
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.8
DOOR HARDWARE
3.8.1
ALLEGION DOOR HINGE
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Doors
Accessibility
13221 Stainless steel broad
butt hinge
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.8.2
DORMAKABA PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Doors
Security & Accessibility
LT53SCP Entrance Set
Doors
Security & Accessibility
LT80SCP Storeroom Set
Doors
Security & Accessibility
Doors
Security & Accessibility
B960SSS B Series Single
Cylinder Deadbolt
Kaba NL550 Night Latch
Doors
Security & Accessibility
RTS85NHO-EN4 Door Closer
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.8.3
LOCKWOOD PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Doors
Security & Accessibility
GEN6T Keying Platform
Doors
Security & Accessibility
Doors
Security & Accessibility
GEN6T 201 Rim Cylinder With
Tail Bar
GEN6T 8221 PD Cylinder
Doors
Security & Accessibility
Doors
Accessibility
GEN6T Double Euro Cylinder
With Lazy Cam
A250SC Door Stop
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.9
BATHROOM/TOILET FIXTURES & SINKS
3.9.1
3MONKEEZ PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Toilets
Plumbing & Sanitary
Toilets
Plumbing & Sanitary
Toilets
Plumbing & Sanitary
Toilets
Plumbing & Sanitary
Toilets
Plumbing & Sanitary
AB-CIS-DF-2 Stainless Steel
Dual Flush Cistern
AB-CS-L Cleaner’s Sink With
Legs
HB-1TH Wall Mounted Hand
Basin With HBB Brackets
M-FP-WC 90-Degree Tapered
Flushpipe
In2Gr8 Metal Grate
Toilets
Sanitary
Toilets
Plumbing & Sanitary
WA-TRH6 Stainless Steel
Toilet Roll Holders
WC-SSPS Pedestal Toilet Pan
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.9.2
BRASSHARDS PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Toilet & Showers
Plumbing & Sanitary
7SC406 Male Hose Taps
Toilet & Showers
Plumbing & Sanitary
7TA027C Ezy Clean Wall Stops
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.9.3
CAROMA PIN LEVER SINK MIXER WITH GOOSENECK OUTLET
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Laundry & Common Room
Plumbing & Sanitary
Caroma Pin Lever Sink Mixer
With Gooseneck Outlet
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.9.4
CLARK SINKS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Common Room
Plumbing & Sanitary
Advance Double Centre Bowl –
1TH 3507.1
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.9.5
ENWARE TAPWARE
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Showers
Plumbing & Sanitary
Toilet Hand Basins
Plumbing & Sanitary
DET354 Detention Recess
Shower Set
TFC745 Tempostop Time Flow
Basin Pillar Tap
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.9.6
METLAM PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Rooms
Sanitary
Rooms
Sanitary
ML771_6 Stainless Steel
Framed Safety Glass Mirror
102 Hat & Coat Hook
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.9.7
METLAM PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Toilet
Sanitary
RBA8110-100 Stainless Steel
Framed Mirror
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.10
TOILET CUBICLE SYSTEM – DURACUBE
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Toilets
Sanitary
Duracube 3000 Series Pedestal
Mount Overhead Braced
(3POB)
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.11
FURNITURE & WHITEGOODS
3.11.1 FANTASTIC FURNITURE PRODUCTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Common Room
Dining Chair
Avenue Dining Chair
Common Room
Dining Table
Dalkeith 8 Seater Dining Table
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.11.2 RAPIDLINE GO STATIONARY CUPBOARD
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Linen Room
Ironing Room
Office
Storeroom
Storage
GCA18 – Assembled Cupboard
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.11.3 SAMSUNG 559L REFRIGERATOR
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Common Room
Food Storage
Samsung 559L Refrigerator
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.11.4 SHARP R211DW 20L 750W MICROWAVE
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Common Room
Food Processing
Sharp R211DW 20L 750W
Microwave
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.11.5 SPEED QUEEN LWS52 TOP LOAD WASHER
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Laundry
Clothes Washing & Cleaning
LWS52 Top Load Washer
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.11.6 ZIP ECONOBOIL 5L
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Common Room
Water Heating
ZIP Econoboil 5L
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.12
JOINERY
3.12.1 CAESARSTONE COUNTERTOPS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Rooms
Office
Common Room
Linen Room
Ironing Room
Countertops
Benchtops
Caesarstone Quartz Surfaces
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.12.2 POLYTEC MDF BENCHTOPS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Rooms
Office
Common Room
Linen Room
Ironing Room
Cabinets
Shelves
Cupboards
Product Description
Polytec MR MDF 2400 x 1200 x 16mm
Edgetape ABS UG 22mm x 1mm
Edgetape ABS PG 22mm x 1mm
Colours: Cinder Matt
Polar White Matt
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.13
CERMIC TILE & RESILIENT FINISHES
3.13.1 POLYFLOR EXPONA COMMERCIAL
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Rooms
Office
Common Room
Linen Room
Ironing Room
Store Room
Vinyl Floor Tiles
Expona Luxury Vinyl Tiles
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.13.2 RAK CERAMICS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Laundry
Toilet
Common Room
Tiles & Tiling
Basic Concrete Porcelain Tiles
300 x 600 x 9mm – Black
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.14
THERMAL INSULATION & PLIABLE MEMBRANE
BRADFORD INSULATION
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Walls
Roof
Interior Acoustic & Thermal
Insulation
Acoustigard Partition Rolls
Anticon 145 Light Duty Blanket
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
3.15
PAINTING – EXTERNAL & INTERNAL FINISHES
DULUX PAINTS
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Interior Surfaces
Exterior Surfaces
Painting And Coating
Product Description










Metalshield Quick Dry Enamel – Clearbase
Mineral Turpentine
Mouldshield Low Sheen – Vivid White/Iced
Aniseed
Mouldshield Semigloss – Vivid White/Irish
Moor
Professional Total Prep
Professional Oil Based Primer Sealer
Undercoat
Super Cover Ceiling White
Super Enamel High Gloss – Vivid White/Ultra
Deep Base/Extra Bright Base
Wash & Wear Semi Gloss – Bracken Green
Weathershield Exterior Gloss – Vivid
White/Iced Aniseed
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
Section 4 – BUILDING SERVICE PRODUCT INFORMATION
4.1
MECHANICAL – LG 12000 BTU SPLIT AIR CONDITIONER
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Office
Store Room
Cooling System
LG 12000 BTU Split Air
Conditioner
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
4.2
HYDRAULIC – GRUNDFOS PRESSURE PUMP
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Ground Floor
Water Pressure Control
System
Hydro Solo-E CRIE 20-4
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
4.3
ROOF SOLAR SYSTEM & FALL ARREST ANCHOR SYSTEM
4.3.1
SOLARHART SPLIT SYSTEM SOLAR WATER HEATER – 413MLV36
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Product Description
Roof
Solar Water Heaters
Solarhart Split System Solar
Water Heater – 413MLV36
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)
4.3.2
SAYFA FALL ARREST ANCHOR SYSTEM
PRODUCT SCHEDULE
Installation is in accordance with the relevant Australian Standard requirements and as per the
Manufacturer’s printed technical specifications.
Location
Application
Roof
Fall Arrest System
Product Description


SL209A Travel 8 Top Mount
Intermediate Universal
Plate
SL203A Travel 8 End
Stanchion Anchor
WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION
I
Inspection & Test Plan (ITP)

II
Product Data Sheet

III
Usage Direction

IX
Handling Precaution

V
First Aid Instructions

VI
Field Inspection Checklist (FIC)
VII
Non-Confirmation Report (NCR)