HORNIBROOK NGI LIMITED – BUILDING DIVISION PROJECT 101 – IGAM ACCOMMODATION PROJECT OPERATION & MAINTENANCE MANUAL Date Issued xx /xx /2022 HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT TABLE OF CONTENTS SECTION 1 – DIRECTORY .....................................................................................................................................4 1.1 RESPONSIBLE PARTIES .............................................................................................................4 1.2 AUTHORS & COMPILERS..........................................................................................................5 1.3 DOCUMENT REVISIONS ...........................................................................................................6 1.4 MAIN CONTRACTOR CONTACT DETAILS .................................................................................7 1.5 SUB- CONTRACTOR CONTACT DETAILS ...................................................................................8 1.6 SUPPLIER CONTACT DETAILS ...................................................................................................9 1.7 BUILDING CERTIFICATE OF OCCUPANCY ...............................................................................13 SECTION 2 – AS BUILT DRAWINGS .............................................................................................................. 17 2.1 ARCHITECTURAL............................................................................................................................................ 17 2.2 STRUCTURAL.................................................................................................................................................. 50 2.2 CIVIL................................................................................................................................................................ 96 2.3 HYDRAULIC .................................................................................................................................................. 103 2.4 ELECTRICAL ...................................................................................................................................................105 2.5 FIRE ................................................................................................................................................................109 SECTION 3 – ARCHITECTURAL PRODUCTS INFORMATION & INSTALLATION..............................110 3.1 ADHESIVES, SEALANTS & FASTENERS,WATERPROOFING ..............................................................110 3.2 METALS AND PREFINISHED.......................................................................................................................139 3.3 STEEL FRAME WALLS PANELS, CEILING PANELS - FRAMECAD.........................................................170 3.4 ROOFING – LYSAGHT NOVALINE FASCIA SYSTEM ..........................................................................175 3.5 WINDOWS..................................................................................................................................................187 3.6 DOORS AND ACCESS PANELS................................................................................................................235 3.7 DOOR HARDWARE ....................................................................................................................................249 3.8 BATHROOM/TOILET FIXTURES & SINKS ...............................................................................................271 3.9 TOILET CUBICLE SYSTEM...........................................................................................................................306 3.10 FURNITURE & JOINERY .......................................................................................................................331 3.13 PAINTING – EXTERNAL & INTERNAL FINISHES ....................................................................................387 3.14 FIRE FIGHTING EQUIPMENT ....................................................................................................................407 3.15 CERMIC TILE & RESILENT FINISHES .........................................................................................................407 3.16 THERMAL INSULATION & PLIABLE MEMBRANE ....................................................................................407 HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT SECTION 4 – BUILDING SERVICE PRODUCT INFORMATION ..............................................................409 4.1 ELECTRICAL & COMMUNICATION..........................................................................................................409 4.2 HYDRAULIC ..................................................................................................................................................502 4.3 SEWERAGE ..................................................................................................................................................595 4.4 ROOF SOLAR SYSTEM &CONTROL PANEL ..........................................................................................597 SECTION 5 – APPENDICES .............................................................................................................................605 APPENDIX A – ELECTRICAL CERTIFICATE OF COMPLIANCE .....................................................................605 HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT SECTION 1-DIRECTORY 1.1 RESPONSIBLE PARTIES ROLE ORGANISATION 1. Principal The Commonwealth of Australia Department of Defence 2. Design Services Consultant GHD 3. Contractor HORNIBROOK NGI LTD 2022 Hornibrook NGI Ltd ADDRESS 19th Chief Engineer Works 373A Avoca Street Randwick NSW 2031 Australia 'Level 7, 16 Marcus Clarke Street Canberra ACT 2601 Australia 9 Mile, Okuk Highway P.O. Box 1812, Lae 411, Morobe Province, Papua New Guinea BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 1.2 S0654 IGAM ACCOMMODATION PROJECT AUTHORS & COMPILERS NAME TITLE / ORGANISATION 1. Andrew Gillespie-Jones Building Division Manager Hornibrook NGI Ltd 2. 3. Napoleon Simatab Johannes Kisokau 4. Julie Kanzip 5. Jovelyn Reyes HORNIBROOK NGI LTD 2022 Site Engineer Hornibrook NGI Ltd CONTACT Email: agjones@hornibrook.com.pg Ph: +675 475 8601 Fax: +675 475 8609 Add: PO Box 1812 Lae 411, Morobe Province, Papua New Guinea Email: nsimatab@hornibrook.com.pg Ph: +675 475 8601 Fax: +675 4758609 Add: PO Box 1812 Lae411, Morobe Province Papua New Guinea Senior Draftsman Hornibrook NGI Ltd Email: jkisokau@hornibrook.com.pg Ph: +675 475 8601 Fax: +675 475 8609 Add: PO Box 1812 Lae 411, Morobe Province, Papua New Guinea Estimator Hornibrook NGI Ltd Email: jkanzip@hornibrook.com.pg jjestimating@hornibrook.com.pg Ph: +675 475 8601 Fax: +675 475 8609 Add: PO Box 1812 Lae 411, Morobe Province, Papua New Guinea Estimator Hornibrook NGI Ltd Email: jreyes@hornibrook.com.pg jjestimating@hornibrook.com.pg Ph: +675 475 8601 Fax: +675 475 8609 Add: PO Box 1812 Lae 411, Morobe Province, Papua New Guinea BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 1.3 DOCUMENT R E V I SIO N S DOCUMENT 1. MEDICAL FACILITY OPERATION & MAINTENANCE MANUAL HORNIBROOK NGI LTD 2022 REVISION 02 DATE 2021 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 1.4 S0654 IGAM ACCOMMODATION PROJECT MAIN CONTRACTOR CONTACT DETAILS CONTRACTOR/ ORGANISATION Hornibrook NGI Limited Building Division HORNIBROOK NGI LTD 2022 CONTACT Email: hngi@hornibrook.com.pg Ph: +675 475 8601 Fax: +675 475 8609 P.O Box 1812 Lae 9mile Okuk Highway Morobe Province Papua New Guinea BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 1.5 S0654 IGAM ACCOMMODATION PROJECT SUB- CONTRACTOR CONTACT DETAILS SUB-CONTRACTOR CONTACT CEQ Papua New Guinea Ltd Email: info@ceq.com.au Ph: 1300 251 541 |+675 7430 5190 P.O Box 813, Port Moresby NCD Papua New Guinea SOUTH PACIFIC AIR CONDITIONING (SPAC) Email: service@spac.com.pg Ph: (675) 325 1755 Fax: 675) 325 1756 P.O Box 1981, Port Moresby NCD Papua New Guinea HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 1.6 No. 1 S0654 IGAM ACCOMMODATION PROJECT MAIN SUPPLIER CONTACT DETAILS SUPPLIER Atlas Steel PNG Products: - Geofabric - Deformed Reo Bars - Dowel Bars CONTACT Email: reosales.lae@atlassteelpng.com Ph: +675 472 1104 Fx: +675 4720639 Add: PO Box 1437 Lae 411, Morobe Province, Papua New Guinea Email: sales.pom@atlassteelpng.com.pg Ph: +675 321 1233 Fx: +675 321 1053 Add: PO Box 7079, Boroko, NCD 111 Papua New Guinea 2 ASSA ABOLY Australia Pty Ltd Products: - Lockwood Plate Door Handle - Lockwood Door Handle Email: bradfordenquiries@csr.com.au 235 Huntingdale Road Oakleigh, Victoria, 3166 Australia Website: lockweb.com.au 3 BlueScope Distribution Pty Ltd Products: - Permilite Aluminium Roofing - Corrugated Solarfrost Polycarbonate - Gutter and Downpipe - Fixings Email: Dale.Girle@bluescopesteel.com Office: +617 3622 9222 Mob: +61 437 174 098 920 Nudgee Road Northgate QLD 4013 Australia Website: info@allproof.co.nzz 4 Bradford Products: - All Bradford insulation system Email: bradfordenquiries@csr.com.au Mob: +61 1300 850 305 Locked Bag 1345 North Ryde BX NSW 1670 Australia Website: www.bradfordinsulation com.au HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 5 Britex Products: - Mirror - Coat Hook S0654 IGAM ACCOMMODATION PROJECT Email: info@britex.com.au Office: +(07) 3363 2400 Fax: +(07) 3363 2444 19 Manilla St East Brisbane QLD 4169 Australia Website: britex.com.au 6 Caroma Industries Ltd Products: - Wall Basins - Sink - Tapware Email: Office: +61 7 3131 5999 7 Eagleview PI, Eagle Farm QLD 4009 Australia Website: www.caroma.com.au 7 Classic Ceramics Products: - Ceramic Tiles Email: awalker@classicceramics.com.au Office: +61 (07) 3121 5406 44-46 Annerley Rd Woolloongabba, QLD 4102 Australia Website: www.classicceramics.com.au 8 9 DuluxGroup (PNG) PTE Ltd Products: - Dulux Professional Total Prep - Dp U/Base Acrylic Prime U/Coat White - Dx S/Enamel H/Gloss E/Bright Base - Dx S/Enamel H/Gloss Vivid White - Acrathane If Clear Base 3.2l Pto - Acrathane If Pt B - Dx Mineral Turpentine - Epoxy Thinners - Paint Bruss & other Consumables Email: cs@dulux.com.pg Ph: +675 472 3633 Fax: +675 472 0260 Add: PO Box 1105 Lae, Morobe 411 Papua New Guinea G. James Windows & Doors Products: - G. James Aluminium Windows & Doors Email: goldcoast@gjames.com.au Office: +61 (07) 3121 5406 636 Southport Nerang Road, Ashmore QLD 4214 Australia Website: www.dulux.com.pg Website: www.gjames.com HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 10 Kingspan Insulation Pty Ltd Products: - Coldstore Panel KS1100CS S0654 IGAM ACCOMMODATION PROJECT Email: info@kingspaninsulation.com.pg Ph: +61 1300 247 235 Beringarra Ave, Malaga WA 6090 Australia Website: www.kingpaninsulation.com.au 11 Laticrete Pty Ltd Products - Laticrete 4237/211 Tile Adhesive - Latapoxy 300 Tile Adhesive - Spectral LOCK Pro Premium Grout - Hydro Ban Adhesive - Hydro ban 12 Mainland Plumbing & Hardware Supplies Products: - Tools & Consumables - Plumbing Materials - Adhesive & Sealant - Cement 13 Morobe Concrete Products Products: - Reinforced Concrete Culverts 14 Niugini Link Pty Ltd Products: - Thermoseal Heavy Duty750 PERF - Glasswool Anticon 60 light - Thermoplast Decorative S a r k i n g - G.James Windows & Doors 29 Telford Street Virginia, Queensland Australia Ph: +61 1800 331 012 Website: www.laticrete.com.au Email: marchay@seetokui.com Ph: (675)472 4177 Mob: (675)70748777 Fax: (675)472 3629 Lae, Morobe Province Papua New Guinea Email: sales@morobeconcreteproducts.com Ph: +675 475 5533 Mobile: +675 7117 6687 Fax: (675) 475 5534 Add: PO Box 378, Lae, Morobe Province, Papua New Guinea Email: support@niuginilink.com.au Office: +617 3205 2227 Mob: +61 427 151 086 1-3 Aldinga Street Brendale QLD 4500 Australia Website: www.niuginilink.com.au 15 Pacific Island International Products: - Hydrated Lime - Seal & Flex Adhesive - Laticrete products - Base coat - Signage - Security Fencing Materials HORNIBROOK NGI LTD 2022 Email: sales@pacificisland.com.au Office: +61 7 4412 6800 Mob: +61 499 223 771 Fax: 1/12 Northern Link Circuit, Townsville QLD 4818 Australia Website: pacificisland.com.au BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 16 PRYDE FURNITURE Products: - Laying Vinyl Email: infor@pryde.com.pg Ph: (675) 325 4233 Fax: 675) 325 0014 P.O Box 1981, Boroko, NCD Papua New Guinea 17 Raven Products Pty.Ltd Products: - All Raven Door Hardware Email: sales@raven.com.au Office: +61 8 8384 5455 18-22 Aldershot Road Lonsdale, South Australia 5160 Australia Website: www.raven.com.au 18 Remote Global Pty Ltd Products: - Laticrete products - Kingspan Cold store Panel HORNIBROOK NGI LTD 2022 Email: gbowman@remoteglobal.com.au Office: 07 3198 4559 Mob: +61 481 779 831 Fax: 07 3268 6228 75 Raubers Rd, Northgate QLD 4013 Australia BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL HORNIBROOK NGI LTD 2022 S0654 IGAM ACCOMMODATION PROJECT BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 1.7 S0654 IGAM ACCOMMODATION PROJECT BUILDING CERTIFICATE OF OCCUPANCY: YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT Section 2 –AS BUILT DRAWINGS SECTION REVISION PREPARED BY DRAWN BY REMARKS 2.1. ARCHITECTURAL DRAWING 01 HNGI JOEHANNES K 2.2. CIVIL DRAWING 01 HNGI 2.3. ELECTRICAL DRAWING 01 CEQ 2.4. MECHANICAL DRAWING 01 SPAC 2.5. HYDRAULIC SERVICES DRAWING 01 HNGI AS-BUILT DRAWING IN PROGRESS YET TO SUBMIT 2.1 ARCHITECTURAL DRAWING HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 2.2. CIVIL DRAWING YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 2.3. ELECTRICAL DRAWING YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 2.4. MECHANICAL DRAWING YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 2.5. HYDRAULIC SERVICES YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 2.6. STRUCTURAL YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT Section 3 –ARCHITECTURAL PRODUCTS INFORMATION 3.1 ADHESIVES, SEALANTS & FASTENERS, WATERPROOFING 3.1.1 ADJUVATE PRODUCTS ADJUVATE PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Block Walls and Concrete Slab repairs Wall And Ceiling Lining Concrete Slab Construction Joints and and around external Columns C1 HORNIBROOK NGI LTD 2022 Application Grouting construction repairs including applications around base plates, Concrete covings, pipe penetrations through concrete and block walls. Acrylic Stud Adhesive is used for adhering plasterboard and fibre cement wallboard to metal studs for wall and ceiling lining Inserted into expansion joints Product Description Adjuvate Congrout A Adjuvate Studgrip Adjuvate Adjufoam BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT ADJUVATE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.2 WATERPROOFING MEMBRANE DAVCO K10 PLUS WATERPROOFING MEMBRANE PRODUCT SCHEDULE HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Ablutions & Laundry Room 3 coat Application to Wet Area Floor & Wall before Tiling Davco K10 Plus HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT WATERPROOFING MEMBRANE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.3 GYPROCK PRODUCTS HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT GYPROCK PRODUCTS SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Wall & Ceiling Lining Plasterboard Jointing system for Wall & Ceiling Linings Gyprock Base Coat 45 Wall & Ceiling Lining Plasterboard Jointing system for Wall & Ceiling Linings USG Boral All Purpose Premix (Top Coat) HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT GYPROCK PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.3 NOVATEX NOVAGROUT SMOOTH HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT NOVATEX NOVAGROUT SMOOTH PRODUCT SCHEDULE Installation is in accordance with the relevant Australian Standard requirements and as per the Manufacturer’s printed technical specifications. Location Application Product Description Wet Area (Ablution & Laundry), Linen, office & Common Room. Tile grout for both wall & floor Tile Novatex Novagrout Smooth HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT TILE GROUT PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.2 SEALANT & ADHESIVE HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.1.21 SEALANT & ADHESIVE PRODUCT SCHEDULE Adhesive & Selant Used Ardex Se - Coloured Silicon for Sanitary Installation Sealant Bostik Xtreme Fire Seal - Sealant Bostik _ Seal N Flex - Sealant Selleys Butyl Mastic - Sealant Selley N-Mastic - Sealant Selleys Parfix All Purpose Silicon Clear - Silicon Sealant Location Application Parafix bathroom And Kitchen - Silicon Sealant White Window Sill Seal Gap between Window sill and block wall Window & Ceiling Seal gap between Cold Store Panel & Window frame and sub-frames Parafix Roof, Gutter & Concrete - Silicon Rubber Sealant Anti Fungal Silicon Sealant No More Solder Termite Proof Silicone -Sealant & Adhesive Soudal Trade All Purpose Silicone Sealant Soudal T-Rex Power Crystal - Sealant Adhesive Sikadur - 31 Cf Normal - Adhesive Sikaflex -11fc - Adhesive Supaseal Pu - Joint Sealant & Adhesive HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.1.22 ADHESIVE SEALANT PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.1.3 FIXINGS HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.1.31 STAINLESS STEEL FASTERNERS & FIXINGS (BOLTS, ANCHOR BOLTS, NUTS & SCREWS) PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.2 TIMBER PRODUCT, FINISHERS AND TREATMENT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.2.1 TIMBER PRESERVATIVE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.3 BUILDING ACCESS SAFETY SYSTEM HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.3.1 BUILDING ACCESS SAFETY SYSTEM PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.4 BLOCK CONSTRUCTION HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.4.1 BLOCK CONSTRUCTION PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.5 ROOFING 3.5.1 ROOF SCHEDULE HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT Profiled sheet metal roofing schedule Location Medical Centre building Product Permalite (note below) Profile LT7 Material Aluminium Base metal thickness (BMT) (mm) 0.7 mm Finish anodised marine grade aluminium Colour Sahara Fasteners Permalite Positive Fix System Insulation spacer type N/A Closed cell profiled closers All flashings Flashing and capping schedule Property Type Product Material Thickness and grade Colour Roof plumbing schedule Item Type All flashings, capping, barge boards, trims and fascia Lysaght Permalite Aluminium Min 0.9 mm To match roof sheets or as documented, anodised marine grade aluminium Product Material Half Round gutter Folded Valley gutter Downpipes Aluminium Aluminium 0.9 mm Downpipe Lysaght Permalite Lysaght Permalite By contractor Thickness/ Grade 0.9 mm 0.5 mm Leaf guard Lysaght Leaf guard Stainless Steel 316 Aluminium Eaves gutter Valley gutter 0.9 mm Colour/Shape/Size Half-round, anodised marine grade aluminium Valley, anodised marine grade aluminium Round – 150 mm diameter 4 mm mesh Roof installation schedule Item Top to Bottom Layer Material Description 1 Layer 1 Permalite Aluminium Roofing- Lt7 Roof Sheeting 2 Layer 2 Bradford Thermoseal 753hd Sarking 0 Layer 3 Anticon 60 Glasswool Blanket 4 Layer 4 Bradford Thermoseal HD 750PERF 5 Layer 5 Stainless Steel Mesh HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.5.2 ROOF PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.6 EXTERNAL CLADDING HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.6.1 EXTERNAL CLADDING SCHEDULE Profiled sheet metal cladding schedule Property Product Permalite Profile Waveline Material type Aluminium Thickness (mm) 0.7 mm Colour Glacier White Trims To match wall cladding, colour to match wall cladding Flashings and cappings To match wall cladding, colour to match wall cladding Fasteners To match wall cladding, colour to match wall cladding Installation Schedule Item 1 2 3 4 5 Internal To External Layer LAYER 1 (REFER TO BLOCK CONSTRUCTION) LAYER 2 (REFER TO STRUCTURAL TIMBE) LAYER 3 LAYER 4 LAYER 5 HORNIBROOK NGI LTD 2022 Material Description Concrete Blockwall 45x45mm KWILA TIMBER BATTEN 50mm XPS Insulation Bradford Thermoseal 753hd Sarking Permalite Waveline 16mm Glacier Whitey Colour Installation Scope 200mm Block Wall 45x45mm HWD Kwila Timber Batten ON Closed Cell Foam Tape Isolator @ 600mm Centre to Centre, Fixed to Block Wall with M8 X 80mm SS Nylon Anchor Screw @ 450mm Centre to Centre. 50mm XPS Insulation Installed Between Kwila Timber Batten Sarking Layer Over XPS Insulation 16mm Permalite Waveline 0.7 X 990 Glacier White BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.6.2 PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.7 DOORS AND DOOR HARDWARE HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.7.1 S0654 IGAM ACCOMMODATION PROJECT DOOR SCHEDULE All Doors and Door Hardware’s was installed as per the Door Schedule on Drawing EW1-MED-AR-800 and the specification. Refer to the As-Built Door Schedule for more details HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.7.2 PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) 3.8 WINDOWS AND GLAZING HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.8.1 WINDOWS AND GLAZING INSTALLATION SCHEDULE 3.8.2 WINDOWS AND GLAZING PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.9 S0654 IGAM ACCOMMODATION PROJECT CERAMIC TILING & RESIIENT FINISHES 3.9.1 FINISHES SCHEDULE All tiling work was done as per the Finishes Schedule on Drawing EW1-MED-AR-820 and the specification. As-Built drawing will include Finishes Schedule reflecting installation on site. HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.9.2 CERAMIC TILING PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.9.2 VINYL PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.10 S0654 IGAM ACCOMMODATION PROJECT THERMAL INSULATION AND PLIABLE MEMBRANES 3.10.1 KS1100CS SUSPENDED CEILING PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.11 PAINTING 3.11.1 PAINTING SCHEDULE All painting works including surface preparation, priming, moisture sealing, undercoating, painting trade works was done as per the Finishes Schedule on Drawing EW1-MED-AR-820 and the specification. Refer to the As-Built Finishes Schedule for more details HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.11.2 PAINT PRODUCT DOCUMENTATION – DULUX PAINT SYSTEM I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.11.3 PAINT PRODUCT DOCUMENTATION – EPOXY PAINT SYSTEM I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.12 S0654 IGAM ACCOMMODATION PROJECT MISCELLANEOUS FURNITURE FIXTURES & MEDICAL EQUIPMENT 3.12.1 FF&E 3.12.11 FF&E SCHEDULE All FFE was procured as per the FF&E Schedule on Drawing EW1-MED-AR-830 and will be installed. As-Built drawing will include FF&E Schedule reflecting installed FF&E. YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.12.11 FF&E PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) S0654 IGAM ACCOMMODATION PROJECT YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.12.2 FURNITURE 3.12.21 MEDICAL FACILITY FURNITURE SCHEDULE All furniture was procured as pe the furniture Schedule on Drawing EW1-MED-AR-840 and will be installed. As-Built drawing will provide Furniture Schedule reflecting installed furniture. YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.12.22 MEDICAL FACILITY FURNITURE PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) S0654 IGAM ACCOMMODATION PROJECT YET TO SUBMIT 3.12.3 HYDRAULIC FIXTURES HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3.12.31 HYDRAULIC FIXTURES SCHEDULE All hydraulic fixtures were procured as per the hydraulic fixtures schedule on Drawing EW1-MED-AR-850 and will be installed. As-Built drawing will Include hydraulic fixtures schedule reflecting installed fixtures. YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.12.32 MEDICAL FACILITY HYDRAULIC FIXTURES PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) S0654 IGAM ACCOMMODATION PROJECT 3.12.4 MEDICAL EQUIPMENT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT 3..12.41 MEDICAL EQUIPMENT SCHEDULE All Medical equipment was procured as pe the MEQ Schedule on Drawing EW1-MED-AR-860 and will be installed. As-Built drawing will Include MEQ schedule reflecting installed Equipment. YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.12.42 MEDICAL EQUIPMENT PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) HORNIBROOK NGI LTD 2022 S0654 IGAM ACCOMMODATION PROJECT BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.13 S0654 IGAM ACCOMMODATION PROJECT FIRE STOPPING 3.13.1 FIRE STOPPING PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.14 S0654 IGAM ACCOMMODATION PROJECT JOINERY 3.14.1 JOINERY PRODUCT DOCUMENTATION I Inspection & Test Plan (ITP)) II Product Data Sheet III Usage Direction IX Handling Precaution V First Aid Instructions VI Field Inspection Checklist (FIC) VII Non-Confirmation Report (NCR) YET TO SUBMIT HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 3.15 S0654 IGAM ACCOMMODATION PROJECT SIGNAGE 3.18.1 SIGNAGE SCHEDULE All signage will be installed as per Drawing EW1-MED-AR-900. As-Built drawing will include Signage Schedule reflecting installation on site. SIGNAGE SAMPLES WILL BE INCLUDED ONCE INSTALLED ON SITE. SIGNAGE SAMPLE YET TO ATTACHED HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT Section 4 -BUILDING SERVICE PRODUCT INFORMATION 4.1 INCINERATOR O&M MANUAL REFER TO INCINERATOR OPERATIONS AND MAINTENANCE MANUAL 4.2 HYDRAULIC SERVICES O&M MANUAL HNGI YET TO SUBMIT AS-BUILT AND O&M MANUAL HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 4.3 S0654 IGAM ACCOMMODATION PROJECT ELECTRICAL & COMMUNICATION – MJ ELECTRICAL O&M MANUAL REFER TO MJ ELECTRICAL O&M MANUAL HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL 4.4 S0654 IGAM ACCOMMODATION PROJECT MECHANICAL SERVICES O&M MANUAL SUB-CONTRACTOR YET TO SUBMIT AS-BUILT AND O&M MANUAL HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL S0654 IGAM ACCOMMODATION PROJECT APPENDICES Appendix A-1 - BUILDING INSPECTION FORM YET TO ATTACHED HORNIBROOK NGI LTD 2022 BUILDING DIVISION OPERATIONS & MAINTENANCE MANUAL HORNIBROOK NGI LTD 2022 S0654 IGAM ACCOMMODATION PROJECT BUILDING DIVISION