Document No. SIEMENS ENERGY Rev 0-20400-41801-90 Responsible Department: Take over Department: Document Type: SE G INP IST COE IN CAL SE G INP IST COE IN TPE TI (RESTRICTED) Valid for: Derived from: Replaces: E File no.: Checked: Approved: Language Page: ADP ADP EN Page 1 - Folder No. SE G INP IST Prepared: SK Technical Data Sheet (External pipe connections, Thermal expansion & Foundation loads) Project : Customer : Turbine : Sitson A/c Shri Vighnahar SSK Ltd Sitson A/c Shri Vighnahar SSK Ltd SST 200, G22 - 28.07.2022 First Issue SK ADP ADP Rev. Date Description Prepared Checked Approved We reserve the rights in this document and in the information contained therein. Reproduction, use, communication or disclosure to third parties without express authority is strictly forbidden. © SIEMENS LTD. Format No: IP-Q-F 3029/C Rev/Date: 29.12.2014 Power & Gas – Steam turbine Restricted Page: Technical data sheet Document No. 0-20400-41801-90 2 1. Turbine connection points No. Connection Size Rating Joint Norm 1 Live Steam 6 inch 900 lbs WNRF ANSI 2 Exhaust DN350 150 lbs WNRF Siemens Also refer steam turbine general arrangement drawing 0-04100-E41801A-01_A_002 for orientation of connections. 2. Co-ordinate axis for turbine Format No: IP-Q-F 3029/C Rev. Date: 29.12.2014 Power & Gas – Steam Turbine Restricted Rev. - Document No. Page: Technical data sheet Rev. 0-20400-41801-90 3 3. Thermal movement of connection points Normal operation Connections Movements ΔX mm ΔY mm ΔZ mm Live Steam -2.70 7.40 4.10 Exhaust -1.20 4.10 0.00 No load operation (Full speed-No load) Connections Movements ΔX mm ΔY mm ΔZ mm Live Steam -2.90 7.40 4.10 Exhaust -1.30 4.50 0.00 Note: Thermal expansion calculated with respect to fixed point of turbine as indicated in the turbine GA with ambient temperature considered as 10°C 4. Maximum allowed external forces and moments on turbine connections a. The piping must be connected without pre-stress at ambient temperature by means of fixed points, supports, springs & hangers etc adjusted in a ways that the flanges or the weld ends are located in the specified distance and parallelism. b. No additional forces are allowed when connecting the piping to the turbine. c. Allowed F&M for each connection to be within (0,F) to (M,0) Format No: IP-Q-F 3029/C Rev. Date: 29.12.2014 Power & Gas – Steam Turbine Restricted - Page: Technical data sheet Connection Fx (N) +/- Document No. Rev. 0-20400-41801-90 4 Allowed forces & moments Fy Fz Mx My (N) (N) (Nm) (Nm) +/+/+/+/- Mz (Nm) +/- Live Steam 3600 1900 3600 1300 2600 1300 Exhaust 7200 3800 7200 2600 5200 2600 d. The stated forces and moments only refer to the leak proof ness of a flanged connection with similar nominal bore and pressure stage. e. For the turbine stability check, the actual forces and moments of the connecting pipes have to be stated to SIEMENS Ltd. 5. Heat-loss from turbine approximately 5 kW Format No: IP-Q-F 3029/C Rev. Date: 29.12.2014 Power & Gas – Steam Turbine Restricted -