CPCCBC4010B-UNGRADED
Assessment 5 : Answer sheet
Please type your answers in black font. (Calibri 12 point)
STUDENT DETAILS
Student Name:
TAFE ID:
UNIT AND ASSESSMENT DETAILS
Unit Number:
Assessment No:
LA Number:
DECLARATION
I hold a copy of this assessment.
I have completed all parts of the assessment.
I hereby certify that no part of this assessment or product has been
copied from any other student’s work or from any other source except
where due acknowledgement is made in the assessment.
Student’s signature:
(Electronic Signature is accepted)
Note: OTEN has the right to reject your assessment if the above declaration has not been
completed
LA023647, Assessment 5 Answer sheet, CPCCBC4010B-UNGRADED, Ed 1
© New South Wales Technical and Further Education Commission, 2019 (TAFE NSW), Archive version 2, January 2019
1
What you have to do
Refer to

Project 1 on the OLS and

the sketching guidelines, to help you complete the questions below.
Please type your answers in black font. (Calibri 12 point)
Sketching guidelines

This assessment contains a number of tasks requiring you to prepare
sketches of relevant construction details. The sketches are to be prepared to
a standard acceptable to allow communication of a detail as would occur on
a construction site. Many details are communicated in this manner and
everyone involved with building sites should be skilled in the preparation of
sketches.
 Sketches are freehand drawings. Line work and proportion are important
considerations that must be satisfied in the assessment. Select a scale/size
appropriate to the detail.
 It is not expected everyone will have these skills at the commencement of
this assessment. This first assessment may be presented with a mix of
freehand sketches and ruled drawings. All should be completed in pencil on
A4 size paper. Refer to the project documentation before commencing the
drawings to clearly identify and comply with the documents. This question
may require you to carry out research of the topics to broaden your
knowledge before attempting the answers.
 Submissions, which are assessed to be not of an acceptable standard, will
be returned with a request to resubmit the assessment.
Question 1
The reinforced concrete ‘slab on ground’ flooring system for the 2 storey dwelling detailed in
the plans is to be constructed. The site will be excavated to provide a level ‘bench’
incorporating cut and fill. Piers will be required to support the slab on an even foundation.
a) Prepare a sketch of the plan view of the slab indicating the possible location of the
piers. You can assume the piers are 300mm in diameter. (Hint: position piers at all
corners/beams intersections, then place between these at maximum 1800 centres)
b) Provide a section in parts (‘break’ the sketch to show relevant parts of the slab)
through the slab from front to back and through the garage, detailing the use of the
void formers and the reinforcement. Indicate the foundation and any change in floor
level.
c) Prepare a typical section through the edge beam of the slab. Clearly show the
external wall detail to 300mm above the slab.
All the sketches are to be fully labelled and notated. Relevant dimensions should be
provided. In general, an A4 page will be appropriate for each sketch. Provide a border and a
title to each of your drawings.
2
LA023647, Assessment 5 Answer sheet, CPCCBC4010B-UNGRADED, Ed 1
© New South Wales Technical and Further Education Commission, 2019 (TAFE NSW), Archive version 2, January 2019
Question 2
Prepare a sketch of the joint between the external wall frames and the first floor joists. Fully
label the sketch and provide dimensions and member sizes. Clearly show the fitout of the
building on this sketch including:
Ceiling and wall linings
Full external wall detail
Flooring
Skirting boards etc
Question 3
Prepare a sketch detailing the head flashing over a window in the external wall. Clearly
label all components and provide sizes of elements where appropriate
Question 4
Sketch a full detail of the waterproofing to the shower in the ensuite. A full detail will show
all parts of the waterproofing, including wall, floor, floor waste and hob. Include two options
for the construction of the shower base:
a) Detail a hob constructed with a brick on edge clearly locating the position of the
shower screen on the hob.
b) No hob with the floor level continuous from the bathroom into the shower.
Also provide a sketch detailing the waterproofing at the doorway to prevent moisture
escaping to adjoining rooms.
Alternative details for the construction of the cottage
Question 5
The foundation on the site of Project 1, following a geotechnical report, is found to be
moderately reactive clay.
The clay extends from below the topsoil on the site to a depth of approximately 750mm. By
providing a sketch, propose an alternative footing system for the construction of the cottage.
Fully detail the footing specifying concrete and reinforcement. Provide all relevant
dimensions.
Should the clay, after excavation commences, prove to be at a greater depth, say an
average of 1500mm below the cleared site, propose another footing system and fully sketch
the detail.
LA023647, Assessment 5 Answer sheet, CPCCBC4010B-UNGRADED, Ed 1
© New South Wales Technical and Further Education Commission, 2019 (TAFE NSW), Archive version 2, January 2019
3
Question 6
Provide a full detail of two floor systems necessary for the following footing systems:
Floor system 1:
a platform floor incorporating bearers and joists with particle board flooring and including a
suitable insulation system.
Floor system 2:
a concrete floor system to replicate the qualities of the slab on ground and suitable for the
new footing systems. Australian Standard 2870 – Residential Slabs and Footings may be
useful if you need to research this detail.
Question 7
Sketch a section through the roof of the cottage with conventional timber framing in lieu of
prefabricated trusses. Fully notate the sketch with details and dimensions of the materials
proposed. (You need not design member sizes, but you should provide ‘indicative’ sizes for
each of the roof framing members.) Your detail will need to include a number of sketches
with a plan view (showing the roofing member layout) and one section as a minimum.
NOTE: This is a competency-based assessment. You will receive a result of Satisfactory
or Unsatisfactory. This means that you must satisfactorily complete each question (or
part thereof) to meet the competency requirements set out in the training package. If you
do not meet the competency requirements, you will need to resubmit your assessment
until competency is achieved.
Checklist
I have:

named my file appropriately.

surname_Your first initial.Unit number_assessment number (e.g. Smith
S.4002A_A2)

completed the Assessment cover sheet

submitted my assessment report as a single combined PDF file.

answered all questions in the manner described

clearly identified my answers

saved a copy of the assessment on my computer

checked spelling, grammar and punctuation

presented my own work, used only my own words, except where cited, and

followed the presentation guidelines found on the OLS
If you require clarification, please contact your teacher at OTEN to discuss.