LYANTONDE TECHNICAL INSTITUTE P.O BOX 37, LYANTONDE YEAR TWO INDUSTRIAL TRAINING REPORT UNDER TAKEN AT MIREMBE VILLAGE IN BUSABALA CELL IN WAKISO DISTRICT BY AYEBAZIBWE SIMON UBT269/2021/T/C/M/114 AN INDUSTRIAL TRAINING REPORT SUBMITTED TO THE DEPARTMENT OF BUILDING AND CONSTRUCTION IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF NATIONAL CERTIFICATE IN BUILDING AND CONSTRUCTION BY UGANDA BUSINESS AND TECHNICAL EXAMINATIONS BOARD FIELD SUPERVISOR: …………………………………………………………………. SIGNATURE: …………………………………………………………………….. …………………………………………….. DATE: ACKNOWLEDGEMENT My great thanks to the Almighty God for the courage and wisdom throughout my industrial training without forgetting my Engineer Mr. Paul Sonko for his guidance , training , courage and advice May the Lord answer his prayers. i EXECUTIVE SUMMARY The industrial training was done in Mirembe village in Busabala cell Wakiso District and we accomplished foundation , boundary wall and plastering for ceilings. We accomplished a boundary wall, plastering a ceiling and construction of a foundation for storey house of Mr. Kasule Joseph in Mirembe village , Busabala cell Wakiso district and these were steps we followed during completion , excavation of foundation for a boundary wall , setting and construction , plastering , construction of foundation and many tools were used and these were hoes, spades, wheel barrows, brick towel , plastering trowel , wooden float, tape measures , water levels, hammers , hand saw , pangas etc. ii LIST OF ABBREVIATIONS Fig: Figure LTI : Lyantonde Technical Institute NCBC : National certificate in Building and construction UBTEB: Uganda Business and Technical Examinations Board iii APPROVAL This is to approve that AYEBAZIBWE SIMON has done year two industrial training under my supervision an it is now ready for submission to UBTEB as part of fulfilment of the award of NCBC. Name of Supervisor: …………………………………………………………………….. Signature: ……………………………………………………………………………………. iv TABLE OF CONTENTS Acknowledgement ………………………………………………………………………………………………………………i Executive summary …………………………………………………………………………………………………………….ii List of Abbreviations …………………………………………………………………………………………………………..iii Approval …………………………………………………………………………………………………………………………….iv Table of contents ………………………………………………………………………………………………………………..v List of tables ………………………………………………………………………………………………………………………vi Introduction ………………………………………………………………………………………………………………………..1 CHAPTER : PRESENTATION 1: 1 Excavation of foundation for boundary wall …………………………………………………………………..2 1:2 Construction of boundary wall …………………………………………………………………………………………3 1:3 Plastering of ceiling ………………………………………………………………………………………………………….4 1:4 Setting and Excavation ……………………………………………………………………………………………………..5 1:5 Construction of foundation ……………………………………………………………………………………………….6 1:6 Filling of foundation with soil ……………………………………………………………………………………………..7 1:7 Filling of Foundation with hard core ………………………………………………………………………………….. 8 Problems …………………………………………………………………………………………………………………………………..9 Solutions …………………………………………………………………………………………………………………………………..9 Conclusions ……………………………………………………………………………………………………………………………10 Recommendations …………………………………………………………………………………………………………………11 References ……………………………………………………………………………………………………………………………..12 Appendices ……………………………………………………………………………………………………………………………..13 INTRODUCTION I did my industrial training in Wakiso District , Busabala cell. OBJECTIVES To learn the spirit of togetherness and work with my fellow engineers during the industrial training To relate the theory I studied in school with the practical work . To gain skills in plastering , building foundation and some parts in setting. STRUCTURAL ORGANISATION My industrial training was organized under Mr Kasule Joseph 1 1:1 EXCAVATION FOUNDATION FOR BOUNDARY WALL We started by measuring the width of the foundation for the boundary wall whereby I used two feet that is the width of the foundation for the boundary wall . We used pick axes , hoes , spades , wheel barrows , tape measure to measure and excavate. 2 1:2 CONSTRUCTION OF BOUNDARY WALL We started filling big hard core and mortar in the foundation , after reaching the level of the ground we started building relatively small hard core on building line to make work smart. Then after we continued by building cellular blocks and we also included pillars in the boundary wall which was of width 400mm and the pillars’ height was 2,800mm and from the pillar we built a stretcher of blocks and between two pillars most especially at a distance of 1300mm 3 1:3 PLASTERING OF CEILING We started by spreading the mortar to a ceiling made out of maxi pands and here we used the ratio of 1:3 cement sand ratio respectively and after plasting process ended that is cutting of mortar using straight edge and angle line to make it flat and accurate and we continued finishing it using a wooden float and after we used steel float to spread the lime on the finished ceiling. 4 1:4 SETTING AND EXCAVATION Here we used a method of 3:4;5 for setting out and when we finished setting out we started excavating the trench for foundation and pillars where the foundation for the pillar was in square form that is 4ft by 4ft and the foundation for brick work was 2 ft width and 2 ft deep And here are the tools we used during setting tape measure , claw hammer and materials are Kamba, nails and pegs. 5 1:5 CONSTRUCTION OF FOUNDATION We started by inserting column basements of reinforcements in the foundation and we followed columns also made in reinforcements and here columns were built following plumb bob measurements in order to get accurate straight column and then after we put there concrete until the level of foundation for bricks. After steel work , we continued to build foundation using bricks while building it using header bond Also here we used tools like claw hammer, tape measure, brick trowel and building line. 6 1:6 BACK FILL FOUNDATION After construction we filled marram in the foundation and after we compact marram using compactor We filled foundation with marram and left with one course above the marram to receive hard core . here we used spades, wheel barrows and soil compactor. 7 1:7 FILLING OF FOUNDATION WITH HARD CORE We filled the foundation with hard core by following the building line at the top of brick work in order to get the accurate and flat foundation . And after filling the foundation with hardcore we put their little marram to prevent marram from injuring the water proof layer(polythene) Here we used a club hammer , spades, wheel barrows. 8 PROBLEMS FACED DURING THE INDUSTRIAL TRAINING Long distance from where I rent to site Language barrier Shortage of working materials SOLUTIONS TO PROBLEMS ABOVE 9 I keep learning their languages like Lusoga The problem of shortage of water was solved by pumping water directly from lake Victoria My Engineer gives me money for transport from home to working place. CONCLUSION I conclude by saying that my industrial training was ended very well and I have gained very many skills . Although I have counted some problems but the industrial training was successfully done whereby now I can relate the practical solution to the community as a way of basifying my level 10 RECOMMENDATIONS In order to improve on skills, the following recommendations should be done such as - 11 The period of industrial training should be increased at least 3 months for better skills. The institute should provide log books for their children who are in training REFERENCES Grass well, JW 2013, Research design, Qualitative and mixed methods approach 4 th Edition , sage publications . APPENDIX Fig.5 Construction of foundation Fig.2 Construction of boundary wall Fig.3 plastering of ceiling Fig. 4 Setting and excavation Fig.6 Backfill of foundation Fig1. Excavation of foundation for boundary wall Fig.7 filling of foundation with hardcore