METHOD OF STATEMENT
1. Project Start
2. Plan Capacity and work load
3. Scheduling of Activities
4. Materials and Services Approval Required
5. Design and Engineering
6. Obtain Materials and Service Approval
7. Purchasing
8. Inspection and testing satisfactory (after Completed)
9. Shipping to site
10. Site works
11. Outstanding Activities
12. Technical Completion
13. As Built Drawings and Final Documents
14. Preliminary Acceptance
15. Final Receipt and Release
16. Final Acceptance
17. Project Complete
PERMISSION AND PERMITS TO WORK
1. Permission from Saudi Arabia Governments (work related only)
2. Permission from SEC -EOA permit to work PTW (work & activity related only)
ENGINEERING DESIGN CRITERIA AND REQUIREMENTS
1.
ENVIRONMENTAL CONDITIONS
2.
SOIL THERMAL RESISTIVITY
TESTING AND COMMISSIONING PLAN
1. Pre-Commissioning Activities
2. In or directed by Commissioning plan
3. Factory Acceptance Test (FAT)
4. Site Acceptance Test (SAT)
5. SEC-EOA Acceptance
6. Other (if any)
7. Commissioning Test Plans
8. In or directed by Commissioning plan
9. Setting to work Initial Adjustments
10. Inspections
11. Initial Testing and Final Testing
12. Submittal Of Operation and Manual
PROCUREMENT PLAN
1. Material Requirement and Identification
2. Process control and Inspection
3. Long Lead Items
4. Vendor and Manufactures Qualification
5. Material Requisition
6. Submittal, Review Approval, Inspection and Acceptance
PURCHASING
1. Purchase Order (PO)
2. Purchase Requisition (PR) Submittal
3. Inspection Test and Satisfactory
4. Factory Acceptance Test (FAT)
5. SEC-EOA Acceptance
6. Released For shipment certificate
7. Shipping and Delivery
8. Site Acceptance Test (SAT)
9. Rectification (if necessary)
10. SEC-EOA Acceptance
11. Inspection and Receiving at Store
12. Installation of Approved Materials and Equipment’s
CONTRACTOR/COMPANY’S CONSTRUCTION SITE OFFICE AND FACILITY
1. Electricity Connection/Electrical Wiring
2. Telephone Connection
3. Water Supply Connection
4. Drainage Connection
5. Quality of Temporary WORK
6. Star Safety and Health Management System
7. Housekeeping and Cleanliness
8. Demobilization
9. Security Arrangement
QUALITY ASSURANCE/QUALITY CONTROL REQUIREMENTS
1. Quality Management
2. PROJECT Quality Plan / Quality Program]
3. Procurement Control
4. Quality Audit
5. Non-Conformance Control
6. Corrective Action
7. Quality Records
8. Control of Inspection, Measuring and Testing Equipment
9. Document Control
10. Material/Equipment Handling, Storage, Identification and Control
11. Inspection Checklist and RFI Formats (depends on activity as per schedule -C)
12. Field Testing/Inspection and Construction/Installation Control
13. Quality Control Plan/Inspection and Test Plan
14. Manufacturers/Suppliers
15. Quality Assurance and Quality Control Services
[Independent Inspection Agency]
16. Release for Shipment Certificate
17. Receipt Inspection
18. Independent Testing Laboratory
19. Inspection by COMPANY REPRESENTATIVE
20. COMPANY’s Quality Assessment (Audit) Right
21. Quality Control on CONTRACTOR’S Workmanship
22. Additional Requirements (if any)
23. Operation and maintenance manuals
24. Technical data manuals
25. Test record book
POWER CABLE INSTALLATION
1. Cable Pulling Tension and Sidewall Pressure Calculations
2. Preparation of Trench
3. Running Out of Cables
4. Cable Splicing and Terminations
5. General Requirements
6. Certification of Splicing Personnel
7. Cable Tagging
8. Installation of Link Box
CABLE TRENCHES AND DIRECTIONAL DRILLING
REQUIREMENTS
A. General Requirements
B. Other Underground Utilities
C. Trenching in High Water Table Areas
D. Maintenance of Cable Trenches
E. Other Trenching Requirements
F. Horizontal Directional Drilling
G. CABLE DUCTBANKS
H. General Requirements
I. Bell Ends
J. Testing and Cleaning
CONCRETE
1. Surfaces Below Grade
2. Surface above Grade
3. Concrete Bonding Agent
4. Concrete Formwork
5. Ties and Anchors
6. Concrete Test
7. Curing
8. CONCRETE ENCASED DUCTBANKS
9. ASPHALT CONCRETE PAVEMENT
10. Tack Coat
11. Bituminous Paving Mixture
12. Asphalt Concrete Mix Design
13. REINFORCING STEEL
14. BACKFILL MATERIALS
TRENCH REINSTATEMENT TO SUB-BASE
A. Sand Backfill
B. Cable Protection
C. Cable Tiles
D. Steel Wire Mesh
E. Warning Tape
F. Warning Post
ASPHALT REINSTATEMENT
A. General Paving Requirements for Hot Asphalt Mix
B. Placing of Mixture
C. Compacting the Mixture
D. Compaction and Testing Requirements
CABLE ROUTING INSIDE SUBSTATION BASEMENT ROOM
A. Responsibility During Installation
B. Access to Substation Entry (all related permits)
C. Work Procedure and methods
OTHER INSTALLATION REQUIREMENTS
D. Responsibility During Installation
E. Access to Public and Private Properties
F. Traffic Diversions
ELECTRICAL TESTS FOR NEW 69kV XLPE CABLES
(After completing cable installation)
A. Cable Jacket Test
B. Conductor Continuity and Phasing Tests
C. Metallic Shield Continuity Test
D. Cable Insulation Test by Megohmmeter
E. Cable Profile Radar Test
F. High Voltage AC Test or VLF Test
G. Grounding Resistance Measurement at Link Boxes and Splices/Terminations at
H. Link Boxes and Contact Resistance of each Cad Weld Joint.
I. Cable Impedance Measurement
J. Mutual Impedance test
K. Conductor Resistance and Shield Resistance Test