Jet Engineering Services Title : CHECK LIST OF RELAY TESTING ELECTRICAL RELAY TEST CHECK LIST PART I Index no T-PreCom-1000-R0 Page no 1 of 1 Sr. No 1. 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 2. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 DESCRIPTION Mechanical Checks and Visual Inspections Check nameplates information (visible location) as per technical specifications. Check tightness of all screws. Check that all grounding is securely connected. Inspect for physical damage or defects Checking of display operation Checking of operation of all buttons / knobs Ensure that there is no foreign material, moisture, dust, etc., inside panels and device cases. Ensure that all relays, relay covers, meters, controls and test facilities are properly identified as per the approved drawings and relevant standards and that the identification does not obscure information displays. Electrical Tests Check calibration of leakage current meters. Insulation resistance test at 1 kV DC. All protection checking with secondary injection tests Checking of Relay settings as per chart Current injection as per IEC curve Test time recording as per Standard protocol Independent OC,SC,EF protection testing Functional test of protection, controls and interlocks. Functional test of remote alarm and indications. At each current test facility, confirm current flow and polarity in the subject phase and neutral as appropriate and according to the approved schematics. Confirm no current in the other two phases. Withdraw each relay in the current circuit one at a time and confirm that the case shorting facility is working and that at no time during its withdraw is the current circuit opened. Check test facility shorting and isolating devices for proper operation. Confirm current flow in the relay by opening the case shorting manually and confirming the meter to read zero. Confirm that any phase selector switch for metering is connected in the correct phase being tested. (for each phase of each current circuit). A final check of each relay current circuit shall be conducted by current injection at the source end while measuring magnitude. Final calibration test of all protective relays must be carried out on approved settings with the relays mounted in their cases, by secondary injection at the front panel mounted test facilities. Testing of Pickup and dropout voltage, verification of all contacts DONE REMARKS