National Grid sa
C6Ullÿ«
ENGINEERING & DESIGN DEPARTMENT
ENGINEERING DIVISION - SOUTH
1st Floor, SEC-SOA Headquarters
25-08-2021 / (17-01-1443H)
SUBMITTAL REVIEW REPLY FORM
LETTER No.
21-02216-30501401
PROJECT TITLE
Construction of 4 - Circuits 132kV UGTL To Transfer
Connection of Alurfan substation & KKAB substation
From Khamis North to KMH-BSP
PTS No.
19SC135
CONTRACT No.
44000013152
Substation- Project Division - South
Lines and Telecom Projects Division - South
Civil & Electromechanical Projects Division- South
Submittal Reference No.
HaiflSEC/15SR1184. DTS-UR/074/Rev 01. dated 01/08/2021.
received 02/08/2021 (056412)
Document Description
CT & VT Sizing and Adequacy Calculation for 132kV Line Protection
Feeder W601 At A1 Urfan Substation
Contractor Name
Haif Company
E&DD/ENGINEERING- SOUTH
X
Response:
(A)Acceptable
(B)Acceptable with Minor
Comments/notes/remarks
(C)Comments
(D)Rejected
Should you have any question, please contact us on extension 19254.
ABDULLAH M. AL-SHEHRI
Group Leader
Attachment: a/s
c/c. Project File (w/att)
E&DD Letter File
E&DD LETTER NO. 21-02216-30501401
Project:
Contractor's Ref
Document Description
No
1
2
3
Construction of 4 - Circuits 132kV UGTL To Transfer Connection of Alurfan substation & KKAB
substation From Khamis North to KMH-BSP
Haif/SEC/15SR1184, DTS-UR/074/Rev 01. dated 01/08/2021, received 02/08/2021 (056412)
CT & VT Sizing and Adequacy Calculation for 132kV Line Protection Feeder W601 At A1 Urfan
Substation
NG Comments
Approved/ Proposed SLD with CT/ VT Data is missing
along with the submittal. This document is required
to validate the location of new/ existing CTs in its
respective line bays.
Approved SLD with CT/ VT Data shall be provided for
other end (Main end) as well to review & compare
the CT parameters.
Magnetization curves of CTs at both ends (Main and
Remote end) shall be arranged and plotted in one
plane to conclude the mismatches/ differences, as
the CTs are being used for Differential Protection as
well.
Contractor Response
4
5
/bijÿkr/mirza
l"Provided SLDs at KMH BSP and Al-Urfan SS show
that the CT parameters for line protection are not
identical to each other. Please clarify the mismatch.
2 -As per Al-Urfan SS SLD with CT/ VT Data, please
clarify whether Vk value is 1200 or 600V. Please
arrange the site name plate data of CTs for
verification.
3 -Confirm the provision of Cable Tail Protection at
Al-Urfan, please communicate the cable length
from GISto gantry" .
CTs are not identical to KMH BSP side line
protection CTs. Please clarify.
•
Existing AMR SLD already received and
updated as per (Attach-1)
Noted & kindly refer to KMH BSP S/S CT/VT
SLD as per (Attach-2)
Kindly note that exiting CT shall be used as
per PTS, however CT sizing calculation was
prepared to check if CT fulfilled relay
requirement or not.
X/R = 4.79 is being used in CT Sizing calculation. If this
value is taken from Planning Department then
respective email confirmation to be attached for
reference. If the values are taken from PTS, then it is
strongly recommended to consider the latest/
updated X/R value from Planning Division to avoid
any real time mismatch.
Source/ Detail of Line parameters being used for the
NG Comments
Kindly note that we already used X/R ratio
from previous As Built Calculation " DWG:
XC-11-21-SH" as per (Attach-3)
Kindly note that existing lines shall be used
This provided document is an As-Built of around
1990. Such an old document reference shall not be
taken as a reference for X/R value. Please arrange
this value from SEC Planning Division.
Provided reference is taken from Issued settings of
E&DD LETTER NO. 21-02216-30501401
Project:
Contractor's Ref
Document Description
6
7
8
9
Construction of 4 - Circuits 132kV UGTL To Transfer Connection of Alurfan substation & KKAB
substation From Khamis North to KMH-BSP
Haif/SEC/15SR1184, DTS-UR/074/Rev 01, dated 01/08/2021, received 02/08/2021 (056412)
CT & VT Sizing and Adequacy Calculation for 132kV Line Protection Feeder W601 At A1 Urfan
Substation
OHL shall be provided and attached in appendix of
the document. If existing Lines are being used, then
its positive and zero sequence impedances shall be
taken from Planning Division. If new OHL is to be
provided, then respective Conductor Data schedule
shall be arranged from pre-qualified vendor.
Approved/ Proposed Relay list (along with respective
ordering codes) for this end shall be provided and
attached in appendix.
Approved Relay list for Main end shall also be
provided for review and comparison.
Protection Logic diagram for this end (proposed/
approved) shall be attached in appendix to validate
all the protection functions.
Approved Protection Logic Diagram for Main end
shall also be provided/ attached.
Approved Designer Logo shall be provided at the title
sheet/ cover sheet of the document.
10
11
The submitted document shall be stamped.
;UÿAKR/MIRZAjÿ
& Line parameters , positive and zero
sequence impedances already considered
as received as per (Attache-4)
the Line. If there any change in the parameters is
observed at later stages, due to whatsoever
reason, then Contractor shall be responsible for
that.
Noted & kindly refer to URFAN S/S relay list
as per (Attach-5)
Noted & kindly refer to KMH BSP S/S relay
list as per (Attach-7)
Noted.
Noted.
Provided documents is XC-1121-A-SC, which is
actually an SLD i.e. not PLD. Please arrange the
same for the verification of CTs location and
associated protection.
Provided document is SA-103957, which refers to
Noted & kindly refer to KMH BSP S/S PLD as
the Metering Logic Diagram i.e. not PLD. Please
per (Attach-8)
arrange the same.
We understand that this stamp is associated with
'ALBAHRAWY CONSULTANT'. This consultant seems
Noted & complied
to be missing in SEC approved Designer List. Please
provide the reference pre-qualification letter from
Existing URFAN S/S protection logic
diagram updated as per Attach-6 as a
proposal copy.
Noted & complied
-2-
SEC.
Comply with your response and stamp all
documents with stamp from SEC approved
E&DD LETTER NO. 21-02216-30501401
Project:
Contractor's Ref
Document Description
Construction of 4 - Circuits 132kV UGTL To Transfer Cor mection of Alurfan substation & KKAB
substation From Khamis North to KMH-BSP
Haif/SEC/15SR1184, DTS-UR/074/Rev 01, dated 01/08/20i21, received 02/08/2021 (056412)
CT & VT Sizine and Adeauacv Calculation for 132kV Linÿ Protection Feeder W601 At A1 Urfan
Substation
designer.
12
CT sizing requirements shall be as per manufacturer
and TES-P-119-28, Rev 00.
13
Sheet 04/35:
Instead of HOkV it shall be 132kV, contractor to
correct this typing mistake.
Noted & complied
VT Sizing and CT metering calculation is missing.
Contractor shall provide.
Noted and complied for VT sizing
Calculation.
However for CT metering core, all meterir ig
deivces shall be retained as per scope of
work.
14
Confirmed.
Noted.
Note: Our acceptance does not mean acceptanc
ABUBAKR/MIRZAÿ}
Noted.
Noted.