Design & Build for Fit-out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Section 6 – Bill of Quantities Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 1/1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA requirements. (2) If CAM decides to cancel any items listed in the Bills of Quantities, the Contractor shall not claim any compensation related to the works not executed. The amount for items cancelled will be deducted from the final Contract Sum. (3) Contractor shall provide the quantities according to the design, international and Macau regulations and site requirements, and the unit prices for reference. The contract is based on lump sum fixed price. (4) The lump sum amount is the Contract Price, in which the Contractor is deemed to have included all costs, expenses and profit necessary for the Contractor's proper execution and completion of all the designs, works, services and others in accordance with the Contract. (5) No Change in the quantities described in the Bills of Quantities proposed in the Contractor's Proposal shall entitle the Contractor to any additional payment, provided that such change is found necessary for the Contractor's proper execution and completion of all the designs, works, services and others in accordance with the Contract. (6) The above items (1) to (5) apply to the whole Bills of Quantities TOTAL - Bill Nr. 1 Carried to Collection MOP$ - BQ.1/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 1/2 PRELIMINARIES A Provision of temporary hoardings and/or covered walkway with temporary lighting where necessary, to meet the requirements of CAM and the Airport Operator; maintain and remove away from site upon completion of the works or as instructed by CAM. Any existing hoarding should be dismantled, kept in good conditions and returned to CAM item B Provision of project signboards item C Environmental mitigation measures item D Safety precautions item E Site cleaning item F Contractor's workshops, offices and storage sheds item G Site survey item H Extra care required to carry out works in the interception area between Extension Building and Macau International Airport Terminal item TOTAL - Bill Nr. 1 Carried to Collection MOP$ - BQ.1/2 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 1/3 PRELIMINARIES A Contractor's all Risks insurance item B Employees' compensation insurance item C Professional indemnity insurance for professional suppliers and sub-contractors to meet the requirements of CAM item Professional indemnity insurance for designers and/or design checkers to meet the requirements of CAM item E Plant and tools item F Temporary water supply item G Temporary lighting and power item H Temporary site services item J Temporary site office including all necessary equipments and facilities item K Application for permit(s) as required by CAM or any other Macau statutory bodies/government department(s) item Working platform and scaffolding item D L M O&M manual, as-built documents, T&C report, labeling item N Site security item O Site project management item P Site debris clearance item Q BIM model item R Traffic and passengers diversion works item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 1 Carried to Collection MOP$ - BQ.1/3 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Amount (MOP$) Bill Nr. 1 PRELIMINARIES COLLECTION Page Nr. BQ.1/1 ...................... Page Nr. BQ.1/2 ...................... Page Nr. BQ.1/3 ...................... TOTAL - Bill Nr. 1 Carried to General Summary MOP$ - BQ.1/4 - Section 6 - Bill of Quantities Bill Nr. 2 Design of the Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 2/1 DESIGN OF THE WORKS NOTES : The Contractor's Designer shall prepare all design in full compliance with all relevant statuory requirements and the specifications, Design Requirement Brief and the tender document and drawings. He shall prepare and submit all relevant design reports, calculation and drawings as necessary in good quality to the client for consent. A Design of Demolition works item B Design of Architectural works item C Design of Plumbing & Drainage system item D Design of Fire Services system item E Design of Electrical Services system item F Design of MVAC System item G Design of ELV Systems and Airport Systems item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 2 Carried to Collection MOP$ - BQ.2/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 2 Design of the Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 2/2 DESIGN OF THE WORKS A Contractor's Other Costs Contractor's other costs for any item of work or obligation which is necessary for the completion of the Design of the Works as required by the Contract, but not separately itemised elsewhere in this Bill Nr. 2 (Bidder to provide detailed breakdown of the Contractor's Other Costs below) item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 2 Carried to Collection MOP$ - BQ.2/2 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 2 Design of the Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Amount (MOP$) Bill Nr. 2 DESIGN OF THE WORKS COLLECTION Page Nr. BQ.2/1 ...................... Page Nr. BQ.2/2 ...................... TOTAL - Bill Nr. 2 Carried to General Summary MOP$ - BQ.2/3 - Section 6 - Bill of Quantities Bill Nr. 3 Demolition and A&A Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 3 DEMOLITION AND A&A WORKS Demolition of existing part of Passenger Terminal Building adjacent to the new extension. The cut-off line of the demolition work shall suit the existing site conditions and the necessary alterations of existing PTB for integrating the new extension and the existing PTB. The Contractor shall provide temporary finish linings, covers, flashing plate, etc. for the cut-off line to match the existing finishes of the PTB to the satisfaction of CAM. Provide a temporary weather proof external enclosure during the construction work. Demolition of existing E&M services to suit existing site conditions and the design of the extension shall be carried out without interruption to the normal operation of the passenger terminal. Disposal of all construction waste and debris. A Room 11065 (Departure Level Canteen) Including all necessary demolition works and making good, builder's works for construction of service corridor, additional access door and access control system, and all necessary modifications to building services works. item B Room 12061 (Mezzanine Level Access Card Office) Including all necessary demolition works and making good, builder's works for modification and extension of office and counter, additional building services for extension of office, and all necessary modifications to building services works. item C Diversion of existing E&M services for carrying out demolition works and reinstatement if necessary item Necessary reinstatment works item D Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 3 Carried to General Summary MOP$ - BQ.3/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/1 ARCHITECTURAL WORKS According to the approved drawings, furnish and install all building materials for the following area, including all partition brick walls shown in the drawings. No matter mentioned or not, the corresponding items and the necessary materials, fittings, accessories, works, etc., should also be included to completely execute the detailed works: A B C Room No.G-001 area and the corresponding items are as follows: Floor:Carpet(F4), 30mm thk. marble(F6); Skirting:500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:Baffle ceiling(C9);Remarks: Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3); Provide Seating system(R12); Design layout and provide planters (Qty. refer to existing PTB) (refer to appendix 2)(R13); Design layout and provide Trash bin (Qty. refer to existing PTB) (R14);Design layout and provide Boarding gate counter (refer to appendix 3)(R15);Provide carpet (refer to appendix 7) (R27); Revise / updated existing ceiling hung signage at NEW PTB public area(R28);Design and provise all rooms signage(R29)。 (refer to appendix 8) lot Room No.G-002 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6);Skirting: 500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB) (S3);Wall:Stone paint up to false ceiling(W4); Ceiling:Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3); Provide immigration counter include divide s.s. handrail (same as existing)(R16);Revise / updated existing ceiling hung signage at NEW PTB public area(R28);Design and provise all rooms signage(R29)。 lot Room No.G-003 area and the corresponding items are as follows: Floor:Cement mortar leveling(F8);Wall:Emulsion paint on 6mm thk. internal plaster up to false ceiling / full height (W3); Ceiling:Emulsion paint on 6mm thk. Internal plaster ceiling (C2); Remarks:Design and provise all rooms signage (R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/2 ARCHITECTURAL WORKS A B C D E Room No.G-004 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6),Wall:20mm thk marble on wall plaster with tile adhesive up to false ceiling(W2) ,Ceiling: Aluminium ceiling strip(C5);Remarks: Design refer to arrival landside north washroom (refer to appendix 4)(R17);Design and provise all rooms signage(R29)。 lot Room No.G-005 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3) ,Ceiling: 600x600mm acoustic ceiling tile with exposed grid (C1);Remarks: Interior design and provide all furniture (R11);Design and provise all rooms signage(R29)。 lot Room No.G-006 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3) ,Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design and provise all rooms signage(R29)。 lot Room No.G-007 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3) ,Ceiling: 600x600mm acoustic ceiling tile with exposed grid (C1), Remarks:Design and provise all rooms signage(R29)。 lot Room No.G-008 area and the corresponding items are as follows: Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2) ;Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1),Ceiling: Aluminium ceiling strip(C5),Remarks:Design and provise all rooms signage(R29);Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )(R30)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /2 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/3 ARCHITECTURAL WORKS A B C Room No.G-009 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks: Design and provise all rooms signage(R29)。 Room No.G-010 area and the corresponding items are as follows: Floor:300x300x8mm non-slip homogeneous tile on floor screed (F2),Skirting:300mmx100mm(H) homogeneous tile skirting(S2) ,Wall:Emulsion paint on 6mm thk. internal plaster up to flase ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Interior design and provide all furniture(R11);Design and provise all rooms signage (R29)。 Room No.M-001area and the corresponding items are as follows: Floor:Carpet(F4);Wall:Wood veneer finsih with acrylic letter with back LED and LED light strip(W7), Ceiling:Wood ceiling strip(C6),Remarks:Interior design refer to sterile corridor design proposal (refer to appendix 5)(R19) ,Design and provide the carpet at the loading bridge(R24) ;Revise / updated existing ceiling hung signage at NEW PTB public area(R28);Design and provise all rooms signage(R29)。 lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /3 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/4 ARCHITECTURAL WORKS A B C D Room No.1-001 area and the corresponding items are as follows: Floor:Carpet(F4), 30mm thk. marble(F6);Skirting: 500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB) (S3);Wall:Stone paint up to false ceiling(W4);Ceiling: Baffle ceiling(C9);Remarks: Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3); Provide Seating system (R12); Design layout and provide planters (Qty. refer to existing PTB) (refer to appendix 2)(R13);Design layout and provide Trash bin (Qty. refer to existing PTB)(R14); Design layout and provide Boarding gate counter (refer to appendix 3)(R15);Design and provide filming wall artwork on curtain wall(Option) (refer to appendix 6)(R23); Provide s.s. bumper rail at escalator (same as existing PTB)(R25) ;Design and provide marble floor in lift car (lift no. S1, P13, P14) (R26);Provide carpet (refer to appendix 7)(R27); Revise / updated existing ceiling hung signage at NEW PTB public area(R28);Design and provise all rooms signage(R29)。 (refer to appendix 8) lot Room No.1-002 area and the corresponding items are as follows: Floor:Cement mortar leveling(F8);Wall: Emulsion paint on 6mm thk. internal plaster up to false ceiling / full height(W3); Ceiling:Emulsion paint on 6mm thk. internal plaster(C2), Remarks:Design and provise all rooms signage(R29)。 lot Room No.1-003 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6),Wall:20mm thk marble on wall plaster with tile adhesive up to false ceiling(W2), Ceiling: Aluminium ceiling strip(C5);Remarks:High level interior design, include 2 person sofa, console, mirror and wash basin(R21);Design and provise all rooms signage(R29)。 lot Room No.1-004 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6),Wall:20mm thk marble on wall plaster with tile adhesive up to false ceiling(W2),Ceiling: Aluminium ceiling strip(C5);Remarks:Design refer to arrival landside north washroom (refer to appendix 4)(R17);Design and provise all rooms signage(R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /4 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/5 ARCHITECTURAL WORKS A B C Room No.1-005 area and the corresponding items are as follows: Floor:Carpet(F4),30mm thk. marble(F6);Skirting: 500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB) (S3);Wall:Stone paint up to false ceiling(W4);Ceiling: Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3); Design layout and provide planters (Qty. refer to existing PTB) (refer to appendix 2)(R13);Design layout and provide Trash bin (Qty. refer to existing PTB)(R14);Design and provide marble floor in lift car (lift no. S1, P13, P14)(R26); Revise / updated existing ceiling hung signage at NEW PTB public area(R28);Design and provise all rooms signage (R29)。 Room No.1-006 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6),Wall:Stone paint up to false ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal plaster (C2),Remarks:Design and provise all rooms signage (R29)。 Room No.1-007 area and the corresponding items are as follows: Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1),Ceiling: Existing ceiling(C4),Remarks:Design and provise all rooms signage(R29),Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )(R30)。 D Room No.1-008 area and the corresponding items are as follows: Floor:300x300x8mm non-slip homogeneous tile on floor screed (F2),Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1),Ceiling:Alminium ceiling strip(C5),Remarks:Design and provise all rooms signage(R29),Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )(R30)。 E Room No.1-009 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1), Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 200x200mm hanging aluminium grid ceiling(C8),Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3); Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /5 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/6 ARCHITECTURAL WORKS A B C D E F Room No.1-010 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 200x200mm hanging aluminium grid ceiling(C8), Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3);Design and provise all rooms signage(R29)。 lot Room No.1-011 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 200x200mm hanging aluminium grid ceiling(C8), Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3);Design and provise all rooms signage(R29)。 lot Room No.1-012 area and the corresponding items are as follows: Floor:Cement mortar leveling(F8),Skirting: Existing finish (S5),Wall: Existing finish(W5),Ceiling:Existing ceiling (C4),Remarks:Design and provise all rooms signage(R29)。 lot Room No.1-013 area and the corresponding items are as follows: Floor:Cement mortar leveling(F8),Skirting: Existing finish (S5),Wall: Existing finish(W5),Ceiling:Existing ceiling (C4),Remarks:Design and provise all rooms signage(R29)。 lot Room No.1-014 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1), Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9);Design layout and provide reception counter (R18);Design and provise all rooms signage(R29)。 lot Room No.1-015 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height (W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9);Design layout and provide reception counter (R18);Design and provise all rooms signage(R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /6 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/7 ARCHITECTURAL WORKS A B C D E Room No.1-017 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1), Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9);Design and provise all rooms signage(R29)。 lot Room No.1-018 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3) ,Ceiling: 600x600mm acoustic ceiling tile with exposed grid (C1),Remarks:Design loose furniture layout only(R9) ;Design and provise all rooms signage(R29)。 lot Room No.1-019 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1),Wall: Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9),Design layout and provide reception counter (R18),Design and provise all rooms signage(R29)。 lot Room No.1-020 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1) ,Remarks:Design loose furniture layout only(R9) ,Design layout and provide reception counter(R18) ,Design and provise all rooms signage(R29)。 lot Room No.1-021 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1), Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /7 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/8 ARCHITECTURAL WORKS A B C D E Room No.1-022 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6), Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Stone paint up to false ceiling(W4), Ceiling: Baffle ceiling(C9),Remarks:Interior design and provide all furniture(R11);Design layout and provide reception counter(R18);Design and provise all rooms signage(R29)。 Room No.1-023 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Acoustic panels combines the natural appearance of wood with unique features for high quality acoustics(W8),Ceiling:Emulsion paint on gypsum board false ceiling(C3),Remarks:Interior design and provide all furniture(R11);Design and provise all rooms signage( R29)。 Room No.1-024 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.1-025 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.1-026 area and the corresponding items are as follows: Floor: Epoxy paint on power floated concrete surface(F7), Skirting:300mmx100mm(H) homogeneous tile skirting(S2), Wall: Emulsion paint on 6mm thk. internal plaster up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /8 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/9 ARCHITECTURAL WORKS A B C D Room No.1-027 area and the corresponding items are as follows: Floor:600x600mm high pressure laminated raised floor(F5), Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling:Emulsion paint on 6mm thk. internal plaster(C2),Remarks:Design and provise all rooms signage(R29)。 lot Room No.1-028 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height (W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9);Design and provise all rooms signage(R29)。 lot Room No.2-001 area and the corresponding items are as follows: Floor:Cement mortar leveling(F8),Wall: Existing finish( W5),Ceiling:Existing ceiling(C4),Remarks:Design and provise all rooms signage(R29)。 lot Room No.2-002 area and the corresponding items are as follows: Floor:Carpet(F4),30mm thk. marble(F6),Skirting: 500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling: Baffle ceiling(C9);Remarks: Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3);Provide Seating system(R12);Design layout and provide planters (Qty. refer to existing PTB) (refer to appendix 2)(R13);Design layout and provide Trash bin (Qty. refer to existing PTB)(R14);Design layout and provide Boarding gate counter (refer to appendix 3)( R15);Design and provide filming wall artwork on curtain wall(Option) (refer to appendix 6)(R23);Provide s.s. bumper rail at escalator (same as existing PTB)(R25);Provide carpet (refer to appendix 7)(R27);Revise / updated existing ceiling hung signage at NEW PTB public area (R28);Design and provise all rooms signage(R29)。 (refer to appendix 8) lot E Room No.2-003 area and the corresponding items are as follows: Floor:Cement mortar leveling(F8);Wall:Emulsion paint on 6mm thk. internal plaster up to false ceiling / full height(W3); Ceiling:Emulsion paint on 6mm thk. internal plaster(C2), Remarks:Design and provise all rooms signage(R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /9 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/10 ARCHITECTURAL WORKS A B C Room No.2-004 area and the corresponding items are as follows: Floor:Carpet(F4),30mm thk. marble(F6);Skirting: 500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling: Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3);Design layout and provide planters (Qty. refer to existing PTB) (refer to appendix 2)(R13);Design layout and provide Trash bin (Qty. refer to existing PTB)(R14);Design and provide marble floor in lift car (lift no. S1, P13,P14)(R26);Revise / updated existing ceiling hung signage at NEW PTB public area(R28);Design and provise all rooms signage(R29)。 Room No.2-005 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6),Wall:Stone paint up to false ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal plaster (C2),Remarks:Design and provise all rooms signage(R29)。 lot lot Room No.2-006 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6),Wall:20mm thk marble on wall plaster with tile adhesive up to false ceiling(W2), Ceiling: Aluminium ceiling strip(C5);Remarks:Design refer to arrival landside north washroom (refer to appendix 4)( R17);Design and provise all rooms signage(R29)。 lot D Room No.2-007 area and the corresponding items are as follows: Floor:30mm thk. marble(F6);Skirting:500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:Aluminium ceiling strip (C5);Remarks:Interior design and provide all furniture( R11);Design layout and provide Trash bin (Qty. refer to existing PTB)(R14);Design and provise all rooms signage( R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /10 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/11 ARCHITECTURAL WORKS A B C Room No.2-008 area and the corresponding items are as follows:Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1), Ceiling:Aluminium ceiling strip(C5),Remarks:Design and provise all rooms signage(R29);Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )( R30)。 Room No.2-009 area and the corresponding items are as follows:Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1), Ceiling:Aluminium ceiling strip(C5),Remarks:Design and provise all rooms signage(R29);Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )( R30)。 lot lot Room No.2-010 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 200x200mm hanging aluminium grid ceiling(C8), Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3);Design and provise all rooms signage(R29)。 lot D E Room No.2-011 area and the corresponding items are as follows:Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height( W3),Ceiling: 200x200mm hanging aluminium grid ceiling( C8),Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor (same as existing PTB)(R3);Design and provise all rooms signage(R29)。 Room No.2-012 area and the corresponding items are as follows: Floor: 600x600mm high pressure laminated raised floor( F5);Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3);Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9);Design and provise all rooms signage(R29)。 lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /11 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/12 ARCHITECTURAL WORKS A B C D E Room No.2-013 area and the corresponding items are as follows: Floor: 600x600mm high pressure laminated raised floor( F5);Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3);Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only(R9);Design and provise all rooms signage(R29)。 Room No.2-014 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.2-015 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.2-016 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1)Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.2-017 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks: Interior design and provide all furniture( R11);Interior design layout(R22);Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /12 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/13 ARCHITECTURAL WORKS A B C D Room No.2-018 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.2-019 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.2-020 area and the corresponding items are as follows:Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height( W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only( R9),Design and provise all rooms signage(R29)。 lot lot lot Room No.2-021 area and the corresponding items are as follows:Floor:3.0mm thk, vinyl tile on floor screed(F1), Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height( W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design loose furniture layout only( R9),Design and provise all rooms signage(R29)。 lot E Room No.2-023 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall: Acoustic panels combines the natural appearance of wood with unique features for high quality acoustics(W8),Ceiling:Emulsion paint on gypsum board false ceiling(C3);Remarks:Interior design and provide all furniture(R11);Design and provise all rooms signage( R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /13 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/14 ARCHITECTURAL WORKS A B Room No.2-024 area and the corresponding items are as follows: Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting: 100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid( C1),Remarks:Design loose furniture layout only(R9); Design and provise all rooms signage(R29)。 Room No.2-025 area and the corresponding items are as follows:Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:100mm (H) vinyl skirting(S1),Wall: Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3), Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks: Design loose furniture layout only(R9);Design and provise all rooms signage( R29)。 C Room No.3-001 area and the corresponding items are as follows: Floor:Cement mortar leveling(F8),Wall: Existing finish( W5),Ceiling:Existing ceiling(C4),Remarks:Design and provise all rooms signage(R29)。 D Room No.3-002 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15 mm thk. painted hardword skirting (S6);Wall:Wood veneer finish (W6); Ceiling:Emulsion paint on gypsum board false ceiling (C3); Remarks:Interior design and provide all furniture(R11); Design layout and provide reception counter(R18);Design and provise all rooms signage(R29)。 (refer to appendix 8) lot lot lot lot lot E Room No.3-003 area and the corresponding items are as follows: Floor: 30mm thk. marble(F6),Wall:Stone paint up to false ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal plaster(C2),Remarks:Design and provise all rooms signage (R29)。 lot F Room No.3-004 area and the corresponding items are as follows: Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1),Ceiling: Aluminium ceiling strip(C5),Remarks:Design and provise all rooms signage(R29);Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )(R30)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /14 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/15 ARCHITECTURAL WORKS A B C D E Room No.3-005 and the corresponding items are as follows: Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1),Ceiling: Aluminium ceiling strip(C5),Remarks:Design and provise all rooms signage(R29);Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )(R30)。 lot Room No.3-006 area and the corresponding items are as follows: Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to false ceiling (overall 25mm thk.)(W1),Ceiling: Aluminium ceiling strip(C5),Remarks:Design and provise all rooms signage(R29);Design layout and provide all sanitary ware (Refer to BOH washroom at existing PTB )(R30)。 lot Room No.3-007 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design and provise all rooms signage(R29)。 lot Room No.3-008 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design and provise all rooms signage(R29)。 lot Room No.3-009 area and the corresponding items are as follows:Floor:Carpet(F4),Skirting:100 mm (H) x 15mm thk. painted hardwood skirting (S6);Wall:Wood veneer finish(W6);Ceiling:Emulsion paint on gypsum board false ceiling(C3);Remarks:Interior design and provide all furniture (R11),Design layout and provide reception counter( R18);Design and provise all rooms signage(R29)。 lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /15 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/16 ARCHITECTURAL WORKS A B C D E Room No.3-010 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6);Wall:Emulsion paint on 6mm thk. internal plaster up to false ceiling / full height (W3);Ceiling: 600x600mm acoustic ceiling tile with exposed grid (C1); Remarks:Design loose furniture layout only(R9);Design and provise all rooms signage(R29)。 Room No.3-011 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Wood veneer finish(W6), Ceiling:Emulsion paint on gypsum board false ceiling(C3); Remarks:Interior design and provide all furniture(R11); Design and provise all rooms signage(R29)。(refer to appendix 9) Room No.3-012 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Wood veneer finish(W6), Ceiling:Emulsion paint on gypsum board false ceiling(C3); Remarks:Interior design and provide all furniture(R11), Design and provise all rooms signage(R29)。(refer to appendix 9) Room No.3-013 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Wood veneer finish(W6), Ceiling:Emulsion paint on gypsum board false ceiling(C3); Remarks:Interior design and provide all furniture(R11), Design and provise all rooms signage(R29)。(refer to appendix 9) Room No.3-014 area and the corresponding items are as follows:Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2),Skirting:300mmx100mm(H) homogeneous tile skirting(S2),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:Design layout and provide cabinet with wash basin(R7),Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /16 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/17 ARCHITECTURAL WORKS A B C D Room No.3-015 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Wood veneer finish(W6), Ceiling:Emulsion paint on gypsum board false ceiling(C3); Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot Room No.3-016 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Wood veneer finish(W6), Ceiling:Emulsion paint on gypsum board false ceiling(C3); Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot Room No.3-017 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1); Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot Room No.3-018 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot E Room No.3-019 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Wood veneer finish(W6), Ceiling:Emulsion paint on gypsum board false ceiling(C3); Remarks:Interior design and provide all furniture(R11), Design and provise all rooms signage(R29)。(refer to appendix 9) lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /17 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/18 ARCHITECTURAL WORKS A B C D E Room No.3-020 area and the corresponding items are as follows: Floor:Carpet (F4),Skirting:100 mm (H) x 15mm thk. painted hardwood skirting(S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot Room No.3-021 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot Room No.3-022 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-023 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-024 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /18 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/19 ARCHITECTURAL WORKS A B C D E Room No.3-025 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot Room No.3-026 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot Room No.3-027 area and the corresponding items are as follows: Floor:Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Wood veneer finish( W6),Ceiling:Emulsion paint on gypsum board false ceiling( C3);Remarks:Design loose furniture layout only(R9), Design and provise all rooms signage(R29)。 lot Room No.3-028 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-029 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /19 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/20 ARCHITECTURAL WORKS A B C D E Room No.3-030 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9);Sound isolation requirement(R20),Design and provise all rooms signage(R29)。 Room No.3-031 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9);Sound isolation requirement(R20),Design and provise all rooms signage(R29)。 Room No.3-032 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9);Sound isolation requirement(R20),Design and provise all rooms signage(R29)。 Room No.3-033 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9);Sound isolation requirement(R20),Design and provise all rooms signage(R29)。 Room No.3-034 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9);Sound isolation requirement(R20),Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /20 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/21 ARCHITECTURAL WORKS A B C D E Room No.3-035 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-036 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-037 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-038 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-039 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /21 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/22 ARCHITECTURAL WORKS A B C D E Room No.3-040 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-041 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-042 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-043 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-044 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /22 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 4/23 ARCHITECTURAL WORKS A B C D E Room No.3-045 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-046 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-047 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-048 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-049 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot lot lot lot lot TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /23 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 4/24 ARCHITECTURAL WORKS A B Room No.3-050 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 Room No.3-051 area and the corresponding items are as follows: Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted hardwood skirting (S6),Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1), Remarks:Design loose furniture layout only(R9),Design and provise all rooms signage(R29)。 lot lot Construction of corridor Construction of a corridor within the existing room 11568 on departure level using the same material and form of construction as the existing wall item Maintaining stability of the remaining parts of the existing wall during and after construction item Sealing any building services passing through the new corridor wall in the same manner as the existing building services item Any other items (to be inserted by the Contractor):- TOTAL - Bill Nr. 4 Carried to Collection MOP$ - BQ.4 /24 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Bill Nr. 4 ARCHITECTURAL WORKS COLLECTION Page Nr. BQ.4/1 ...................... Page Nr. BQ.4/2 ...................... Page Nr. BQ.4/3 ...................... Page Nr. BQ.4/4 ...................... Page Nr. BQ.4/5 ...................... Page Nr. BQ.4/6 ...................... Page Nr. BQ.4/7 ...................... Page Nr. BQ.4/8 ...................... Page Nr. BQ.4/9 ...................... Page Nr. BQ.4/10 ...................... Page Nr. BQ.4/11 ...................... Page Nr. BQ.4/12 ...................... Page Nr. BQ.4/13 ...................... Page Nr. BQ.4/14 ...................... Page Nr. BQ.4/15 ...................... Page Nr. BQ.4/16 ...................... Page Nr. BQ.4/17 ...................... Page Nr. BQ.4/18 ...................... Page Nr. BQ.4/19 ...................... Page Nr. BQ.4/20 ...................... TOTAL - Bill Nr. 4 Carried to General Summary MOP$ - BQ.4 /25 - Section 6 - Bill of Quantities Bill Nr. 4 Architectural Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Bill Nr. 4 ARCHITECTURAL WORKS COLLECTION Page Nr. BQ.4/21 ...................... Page Nr. BQ.4/22 ...................... Page Nr. BQ.4/23 ...................... Page Nr. BQ.4/24 ...................... TOTAL - Bill Nr. 4 Carried to General Summary MOP$ - BQ.4 /26 - Section 6 - Bill of Quantities Bill Nr. 5 Plumbing & Drainage System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 5 PLUMBING & DRAINAGE SYSTEM Plumbing & Drainage System A Supply and install the Plumbing System item B Supply and install the Drainage System item C Spare parts item D Material and drawing preparation and submission item E Statutory submission item F Sample boards item G Interfacing with other E&M system item H Paint works for materials and equipment item J Provision of 24-month operation maintenance and breakdown service item Connection and interfacing with existing system of the Passenger Terminal Building where necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item Testing and commissioning, including testing and commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item M All necessary modification and configuration item for interface with the existing system item K L Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 5 Carried to General Summary MOP$ - BQ.5/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 6 Fire Services System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 6 FIRE SERVICES SYSTEM Fire Services System A Supply and install the Sprinkler System item B Supply and install the Hose Reel and Fire Hydrant System item C Supply and install the Fire Alarm and Detection System item D Supply and install the Fire Extinguishing System item E Spare parts item F Material and drawing preparation and submission item G Statutory submission item H Sample boards item J Interfacing with other E&M system item K Paint works for materials and equipment item L Provision of 24-month operation maintenance and breakdown service item M Connection and interfacing with existing system of the Passenger Terminal Building where necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator N O item Testing and commissioning, including testing and commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item All necessary modification and configuration item for interface with the existing system item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 6 Carried to General Summary MOP$ - BQ.6/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 7 Electrical Services System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 7/1 ELECTRICAL SERVICES SYSTEM Electrical Services System Power Supply and Distribution System A Approved cables item B KLPE/SWAL/LSOH cables item C Trunkings item D LV Switchboard item E Termination glands item F MCB distribution boards item G Busbar chamber item H Insulated switches item J Miniature circuit breakers item K Combined MCB/RCBO units item L Moulded case circuit breakers item M Automatic change-over switches item N Changeover switch item O Isolating-switches item P Motion sensors item Q Daylight sensors item TOTAL - Bill Nr. 7 Carried to Collection MOP$ - BQ.7/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 7 Electrical Services System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 7/2 ELECTRICAL SERVICES SYSTEM Provide General Lighting and Essential Lighting System A Final circuits item B Luminaries item C Lighting control item D Wiring accessories item E Provide Essential and Emergency Lighting System item F Provide Electrical Loading Estimate item G UPS System Installation item H Provide the complete Electrical Earthing and Clean Earthing System Facilities item Provide Earthing and Lightning Protection System J Tinned copper tapes item K Earth terminals item L Test links item M Earth rod electrodes item N Spare parts item O Material and drawing preparation and submission item P Statutory submission item Q Sample boards item R Interfacing with other E&M system item S Paint works for materials and equipment item T Provision of 24-month operation maintenance and breakdown service item TOTAL - Bill Nr. 7 Carried to Collection MOP$ - BQ.7/2 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 7 Electrical Services System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 7/3 ELECTRICAL SERVICES SYSTEM A An 11kV/LV transformer unit with at least 1600kVA and associated distribution electrical system item B Electrical calculations item C Connection and interfacing with existing systems of the Passenger Terminal Building where necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item Testing and commissioning, including testing and commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item All necessary modification and configuration item for interface with the existing system item D E Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 7 Carried to Collection MOP$ - BQ.7/3 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 7 Electrical Services System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Amount (MOP$) Bill Nr. 7 ELECTRICAL SERVICES SYSTEM COLLECTION Page Nr. BQ.7/1 ...................... Page Nr. BQ.7/2 ...................... Page Nr. BQ.7/3 ...................... TOTAL - Bill Nr. 7 Carried to General Summary MOP$ - BQ.7/4 - Section 6 - Bill of Quantities Bill Nr. 8 MVAC System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 8/1 MVAC SYSTEM MVAC System A Supply and install the MVAC System item B Provide Temperature and Humidity Sensors item C Provide CO2 Sensors item D Provide dry contact from the ventilation RI/O or I/O modules item E Provide mechanical exhaust system item F Provide air purifier item G Spare parts item H Material and drawing preparation and submission item J Statutory submission item K Sample boards item L Interfacing with other E&M system item M Paint works for materials and equipment item N O P Provision of 24-month operation maintenance and breakdown service item Connection and interfacing with existing system of the Passenger Terminal Building where necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item Testing and commissioning, including testing and commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item TOTAL - Bill Nr. 8 Carried to Collection MOP$ - BQ.8/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 8 MVAC System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 8/2 MVAC SYSTEM A All necessary modification and configuration item for interface with the existing system item Any other items (to be inserted by theBidder):- TOTAL - Bill Nr. 8 Carried to Collection MOP$ - BQ.8/2 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 8 MVAC System Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Amount (MOP$) Bill Nr. 8 MVAC SYSTEM COLLECTION Page Nr. BQ.8/1 ...................... Page Nr. BQ.8/2 ...................... TOTAL - Bill Nr. 8 Carried to General Summary MOP$ - BQ.8/3 - Section 6 - Bill of Quantities Bill Nr. 9 ELV Systems and Airport Systems Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 9/1 ELV SYSTEMS AND AIRPORT SYSTEMS ELV Systems and Airport Systems A Closed Circuit Television (CCTV) System item B Public Address (PA) System item C Private Automated Branch Exchange (PABX) System item D Access Control System (ACS) item E Wireless Network (WLAN) System item F Radio Communication System item Flight Information Display System (FIDS) G Displays item H Remote reboot units item J item Voice and Data Cabling (VDC) System Master Antenna Television (MATV) System K Allow for set top boxes item L Televisions item M Final circuit in coax cables item N MATV distribution frames item O item Building Management System (BMS) TOTAL - Bill Nr. 9 Carried to Collection MOP$ - BQ.9/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 9 ELV Systems and Airport Systems Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 9/2 ELV SYSTEMS AND AIRPORT SYSTEMS A Spare parts item B Material and drawing preparation and submission item C Sample boards item D Paint works for materials and equipment item E Provision of 24-month operation maintenance and breakdown service item Connection and interfacing with existing system of the Passenger Terminal Building where necessary; allow for all cost associated with liaison with existing maintenance contractors and the airport operator item Testing and commissioning, including testing and commissioning together with existing system where necessary; allow for all cost for liaison with existing maintenance contractors and the airport operator item All necessary modification and configuration item for interface with the existing system item F G H Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 9 Carried to Collection MOP$ - BQ.9/2 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 9 ELV Systems and Airport Systems Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Amount (MOP$) Bill Nr. 9 ELV SYSTEMS AND AIRPORT SYSTEMS COLLECTION Page Nr. BQ.9/1 ...................... Page Nr. BQ.9/2 ...................... TOTAL - Bill Nr. 9 Carried to General Summary MOP$ - BQ.9/3 - Section 6 - Bill of Quantities Bill Nr. 10 Builder's works in connection with Building Services Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 10 BUILDER'S WORKS IN CONNECTION WITH BUILDING SERVICES Allow for Builder's works in connection with building services A Diversion of existing utility services item B Equipment Room item C Communication and IT Room item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 10 Carried to General Summary MOP$ - BQ.10/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 11 Miscellaneous Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 11 MISCELLANEOUS Signage A Design and install necessary signage and take down unnecessary signage for existing PTB and North Extension to suit new layout design. item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 11 Carried to General Summary MOP$ - BQ.11/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 12 Civil Works Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 12 CIVIL WORKS A Topographic, utility and geotechnical surveys item B Site clearance and demolition of existing pavement item C Subgrade preparation for Bus Staging Area pavement item D Block paving on sand bedding and lean concrete base for Bus Staging Area item E Block paving and kerb for footpath island item F Pedestrian canopy for footpath item G Surface water drainage gullies and pipework item H Surface water drainage manholes or manhole alterations item J Line markings item K Perimeter fence item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 12 Carried to General Summary MOP$ - BQ.12/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 13 Decorative solar film replacement on Upper Part of Glass Façade in the Airside Departure Hall Rate Amount Quantity Unit (MOP$) (MOP$) Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Bill Nr. 13 DECORATIVE SOLAR FILM REPLACEMENT ON UPPER PART OF GLASS FACADE IN THE AIRSIDE DEPARTURE HALL Decorative solar film A Ascertain the correctness of application area item B Supply of 3M ScotchcalTM Perforated Window Graphic Film 7725-R314 or equivalent subject to CAM’s approval prior to actual application item Printing on the decorative solar film using the design provided by CAM item Application of the printed decorative solar film to the glass facade item C D Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 13 Carried to General Summary MOP$ - BQ.13/1 - Section 6 - Bill of Quantities Bill Nr. 14 Remote Boarding Gate (OPTIONAL) Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 14/1 REMOTE BOARDING GATE (OPTIONAL) Preliminaries A Insurance item B Site survey report item C Hoarding item D Notice board & signage item E Site mobilization item F Safety precautions item G Safety precautions item H Material submission item J Shop drawings item K Detailed design drawings item L As-built document item M O & M manual item N T & C report item O Access card item P Provision of 24-month operation maintenance and breakdown service item Design work Q Remote boarding gate item TOTAL - Bill Nr. 14 Carried to Collection MOP$ - BQ.14/1 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 14 Remote Boarding Gate (OPTIONAL) Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Quantity Unit Rate (MOP$) Bill Nr. 14/2 REMOTE BOARDING GATE (OPTIONAL) Fabrication and Site Construction Works A Remote boarding gate item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 14 Carried to Collection MOP$ - BQ.14/2 - Amount (MOP$) Section 6 - Bill of Quantities Bill Nr. 14 Remote Boarding Gate (OPTIONAL) Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Amount (MOP$) Bill Nr. 14 REMOTE BOARDING GATE (OPTIONAL) COLLECTION Page Nr. BQ.14/1 ...................... Page Nr. BQ.14/2 ...................... TOTAL - Bill Nr. 14 Carried to General Summary MOP$ - BQ.14/3 - Section 6 - Bill of Quantities Bill Nr. 15 AVDGS System (OPTIONAL) Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Item Description Quantity Unit Rate (MOP$) Bill Nr. 15 AVDGS SYSTEM (OPTIONAL) A B C D AVDGS display units; weatherproof; consisting of various LCD or LED modules for Distance-toRun Indicator, Azimuth Guidance Indicators, sensor units, Main Display Panels, optical transceivers/ receivers, surge arrestors and mountings and fixings item AVDGS operator control panels with emergency stop buttons, housings, mountings, surge arrestor and fixings; including interconnecting cables and conduits to AVDGS display unit item Control cables; cable containiment including trunkings, conduits, flexible conduits, all necessary earthing and bonding, fixing and all necessary accessories; power provision to above equipment item All necessary modification and configuration item for interface with the existing system item Any other items (to be inserted by the Bidder):- TOTAL - Bill Nr. 15 Carried to General Summary MOP$ - BQ.15/1 - Amount (MOP$) Section 6 - Bill of Quantities General Summary (CORE ITEMS) Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Amount (MOP$) GENERAL SUMMARY (CORE ITEMS) Bill Nr. 1 Preliminaries 2 Design of the Works 3 Demolition 4 Architectural Works 5 Plumbing & Drainage System 6 Fire Services System 7 Electrical Services System 8 MVAC System 9 ELV Systems and Airport Systems 10 Builder's Works in connection with Building Services 11 Miscellaneous 12 Civil Works 13 Decorative Solar Film Replacement On Upper Part Of Glass Facade In The Airside Departure Hall TOTAL (MOP$) - GS(CORE)/1 - Section 6 - Bill of Quantities General Summary (OPTIONAL ITEMS) Design and Build for Fit-Out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Description Item Amount (MOP$) GENERAL SUMMARY (OPTIONAL ITEMS) Bill Nr. 14 Remote Boarding Gate (Optional) 15 AVDGS system (Optional) TOTAL (MOP$) - GS (OPTIONAL)/1 -