Uploaded by Yuen Ki Lau

ANZSMM Example Schedule

advertisement
Schedule of Prices Summary
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
T01
Introduction, General Rules and Recommendations
T02
Preliminaries
T03
Demolition
T04
Groundworks
T05
Piling
T06
Concrete
T07
Formwork
T08
Reinforcement
T09
Prestressing
T10
Precast Concrete
T11
Tanking and Waterproof Membranes
T12
Masonry
T13
Stonework
T14
Structural Steel
T15
Metalwork
T16
Roofing
T17
Façade Systems
T18
Windows
T19
Glazing
T20
Carpentry
T21
Partitions
T22
Suspended Ceilings
T23
Access Floors
T24
Doors
T25
Hardware
T26
Applied Finishes, Render and Textured Finishes
T27
Tiling, Slab and Paving
T28
Carpet and Resilient Finishes
T29
Painting
T30
Joinery
T31
Furniture, Fittings and Equipment
T32
Hydraulics
T33
Drainage
T34
Electrical Installations
5/16/2019
Page 1
Total
Rawlinsons Ltd
Schedule of Prices Summary
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
T35
Mechanical Installations
T36
Transportation Services
T37
Exterior Elements
T38
Fire Protection
T39
Included Sums
5/16/2019
Page 2
Total
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
1
This schedule has been prepared as an example based on the
Australian and New Zealand Standard Method of Measurement
of Building Works 2018 edition to assist the New Zealand
Building Industry understand the impact of the new method of
measurement for Schedules of Quantities
2
This schedule generally follows the rules of the ANZSMM 2018
and the New Zealand guidance notes dated 19 February,
however it also incorporates regionally appropriate
amendments
3
Rawlinsons Limited accepts no liability for loss or damage
occurring from this document
5/16/2019
Page 1
Unit
Rate
Total
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Introduction, General Rules and Recommendations
KEY PARTIES
Client
1
Company/Name
Address
Point of contact
note
Architect
2
Company/Name
Address
Point of contact
note
Structural Engineer
3
Company/Name
Address
Point of contact
note
Electrical Engineer
4
Company/Name
Address
Point of contact
note
Hydraulic Engineer
5
Company/Name
Address
Point of contact
note
Civil Engineer
6
Company/Name
Address
Point of contact
note
Quantity Surveyor
7
Company/Name
Address
Point of contact
note
SITE
8
Tenderers shall allow to inspect the site during the preparation
of their tender submission, the point of contact for arranging
site visits is (NAME) (CONTACT DETAILS).
The site shall be handed over to the contractor in (NUMBER)
stages on the (DATE).
The site is located (DESCRIPTION OF LOCATION) with
access by (DESCRIPTION OF ACCESS).
note
DESCRIPTION OF WORK
9
The scope of the work consists of the construction of a new
building along with extensive siteworks
5/16/2019
Page 2
note
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Introduction, General Rules and Recommendations
10
Rate
Total
(Continued)
The construction generally comprises reinforced concrete
foundations and ground floor slab. Structural steel frames
support the Insulated panel, Colorsteel and membrane roofing
systems, internal partitioning is generally timber framed with
aluminium framed glazed openings, aluminium window and
external door joinery, a variety of external wall cladding,
mechanical, electrical, data, plumbing, security and fire
protection services, fittings and fixtures to meet a range of
space requirements, floor coverings, external works and
underground services duct and external drainage and site
works. The approximate gross floor area is 1,280m2
note
CONDITIONS OF CONTRACT
11
The Conditions of Contract are NZS 3910:2013
12
The specification section covering Special Conditions of
Contract and Preliminary and General Clauses are tabulated
hereunder in order that tenderers may allow for them should
they deem it necessary. Refer to the Specification for full
descriptions of these clauses, the headings used in this section
of the Schedule of Prices should only be considered as a
framework for the individual allowances that tenderers may
wish to make
item
GENERAL CONDITIONS OF CONTRACT
13
Tenderers shall allow here for specific items as set out in the
Conditions of Contract and Schedule 1 - Special Conditions of
Contract - Specific Conditions of Contract
item
14
The items listed below are an indication of obligations or
restrictions which may be imposed on the tenderer, the
tenderer shall familiarized themselves with all sections of the
special conditions of contract, specifications and contract
documents, any omission from the list below but otherwise
noted in these documents shall be priced here
item
Special Conditions of Contract
15
Section 1 INTERPRETATION
16
Section 2 THE CONTRACT
17
Section 3 PERFORMANCE BOND
18
Section 4 SUBCONTRACTS
19
Section 5 GENERAL OBLIGATIONS
20
Section 6 ENGINEERS POWERS & RESPONSIBILITIES
21
Section 7 INDEMNITY
22
Costs and losses incurred by the Principal due to failure of the
contractor to arrange and keep insurance as required
23
Section 8 INSURANCE
24
Section 9 VARIATIONS
25
Section 10 TIME FOR COMPLETION
5/16/2019
Page 3
item
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Introduction, General Rules and Recommendations
Rate
Total
(Continued)
Specifications
TENDER CONDITIONS
26
Tenders shall be valid for a period of not less than 30 calendar
days
note
SCHEDULE OF QUANTITIES
27
This schedule of quantities forms apart of the contract
documents
28
This schedule of quantities is measured generally in
accordance with the basic principles of Australian and New
Zealand Standard Method of Measurement of Building Works,
2018 Edition, published by the Australian Institute of Quantity
Surveyors, Master Builders of Australia Limited, New Zealand
Institute of Quantity Surveyors and the Registered Master
Builders Association of New Zealand, but any deviation from
the same shall not form the basis of a claim by the Contractor
item
29
Where dimensions are stated in the descriptions of items in the
Schedule of Prices, they are generally given in the order: length
x width x height
item
30
The dimensions stated in this Schedule of Prices are generally
those shown on the drawings but in some cases they are
scaled from the drawings or have been measured on site and
may not be exact. Dimensions given in descriptions should be
checked on site or sizes confirmed with the Engineer if they are
not clearly stated on the drawings or in the Specification
item
31
Where dimensions are stated in descriptions the figures
represent mm but generally mm is not included after the figure.
Where a figure is not mm or quantity is stated within a
description it is generally given in letters or connected with a
hyphen or oblique or an abbreviation is used immediately
following
item
GENERAL PARTICULARS
Contractual Conditions
Working hours
32
Working hours on the site are not restricted, the contractor is
required to comply with local territorial authority consent
conditions and noise and nuisance
controls.
item
Rates and wages and prices of materials
33
Tenderers must price every item individually. In the event of a
tenderer grouping items for pricing the Engineer reserves the
right to break down the total price amongst the items so
grouped together
item
34
The rates for all items in this Schedule of Prices shall include
for supplying and fixing in position except where specifically
otherwise described
item
5/16/2019
Page 4
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Introduction, General Rules and Recommendations
35
Rate
Total
(Continued)
The rates for temporary works shall include unless otherwise
stated for removal from site on completion and making good as
necessary
item
Sub-letting
36
The tenderer shall not sub-let or allow the sub-letting of works
by subcontractor without the approval of the Principal
item
Progress and final certificates
37
Progress valuations shall be in accordance with section 12
item
38
Progress valuations and progress payment schedules shall be
submitted in accorance with section 12.1.1
item
39
Progress valuations shall be carried out in accordance with
section 12.2
40
The final payment claim shall be submitted in accordance with
section 12.4
item
Variations
41
Variations shall be administered as required under section 9
and the Special Conditions of Contract
item
Dates for commencement and completion
42
The contractor is to provide a programme and advise a
proposed completion date
item
Bonus for early completion
43
No bonus for early completion apply
note
Liquidated damages
44
Liquidated damages do not apply
note
Rise and fall
45
Cost fluctuations do not apply
item
Exemption from duty sales or other taxes
Issue and return of documents
46
The Contractor shall obtain the building consent forms and
documents from the Principal, retain them on site and return to
the Principal on completion.
item
Discrepancies
47
The Contractor shall detail any discrepancies in the contract
documents require clarification or determination, Specification
section 1260 Project Management
item
Submission of priced schedule of quantities
48
The Contractor shall supply to the Engineer a priced copy of the
schedule of quantities with 20 days of the award
item
Contract agreement stamp
5/16/2019
Page 5
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Introduction, General Rules and Recommendations
Rate
Total
(Continued)
Payment of taxes
49
Payment of taxes shall be in accordance with section 12.13
item
Notices, permits, fees
Liability
50
The Principals and Contractors indemnity in accordance with
section 7
item
Bonds, guarantees
51
The Contractor shall at its own expense provide a performance
bond calculated to 10% of the contract price in accordance with
3.1
item
Payment of extra monies
52
All payments will be managed through monthly progress claims
note
Authority approvals
53
The Contractor shall at their expense give notice and obtain all
licences for Temporary Works and methods of carry out the
Contract Works in accordance with 5.11.4
item
54
The Contractor shall arrange for any necessary documents and
information be supplied to the client to comply with 5.11 in
accordance with 5.11.5
item
55
The Contractor shall arrange for all necessary inspections
required under the building consent documentation,
Specification clause 1234 Documentation
item
56
The Contractor shall provide for all other Producer statements,
obtaining Code of Compliance Certificates and Interim Code of
Compliance Certificated, etc as specified
item
Insurance
57
The Contractor shall provide at its own expense the following
insurances;
item
58
Provide for public liability insurance with cover of $10,000,000
item
59
Provide for motor vehicle third party insurance with cover of
$2,000,000
item
60
Provide for insurance of the contract works and materials
item
61
Provide for contractors plant and all other insurance considered
necessary
item
62
Provide for vibration, weakening or removal of support with
cover of $1,000,000
item
63
Provide for liability under the Forest and Rural Fire Act 1977
with cover of $1,000,000
item
Updating of programmes
64
The Contractor shall prepare and maintain a programme in
accordance with section 5.10
5/16/2019
Page 6
item
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Introduction, General Rules and Recommendations
Rate
Total
(Continued)
Quality assurance
65
The Contractor shall prepare, provide for review and implement
a quality assurance plan in accordance with section 5.18
item
66
The Contractor shall provide a Quality Assurance Certificate Civil as specified
item
67
The Contractor shall provide a Quality Assurance Certificate Structural as specified
item
Maintenance and protection of public and private property
68
The contractor shall allow to protect public and private property
in accordance with section 5.7
item
Charts, schedules
Notice boards
69
2400 x 1200 Project sign fixed to temporary fencing describing
the project
item
Setting out works
70
The Contractor shall allow to set out the works, including the
employment of a Registered Surveyor if required
item
Temporary installations
71
Temporary roads, tracks, crossings and hard-standing
item
Services
72
The Contractor is to allow for temporary services connections to
the site, maintenance and decommissioning and removal on
completion of works
item
73
The Contractor is to allow for the protection of all existing
services for the duration of the works
item
Telephone calls
74
The Contractor is required to make due allowance fore the
supply, maintenance and decommissioning of
telecommunications equipment to the site, including services
for information technology connections
item
Temporary screens, fences, hoardings, guard rails etc
75
Temporary fencing, hoardings, planked footways, guardrails,
gantries, overhead protection, warning and directional signs,
security, etc.
item
Temporary sheds, sanitary accomodation, etc
76
Temporary office, storage and messing
77
Temporary ablutions
Duties and attendance
Work outside the contract including nominated subcontractors
Supplied goods
5/16/2019
Page 7
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Introduction, General Rules and Recommendations
Rate
Total
(Continued)
Samples
Testing
Advertising
Footpath levels
Plant equipment and attendance labour
Scaffolding
Attendance
Protection
78
Provide for protection of the completed works
item
79
Provide for reinstatement of all areas of the site and leave in
original condition and to the approval of the Engineer
item
Cleaning and removal of rubbish
80
The Contractor shall comply with the requirements in
Specification section 1256
item
81
Provide for periodic cleaning during the course of the contract
item
82
Provide for cleaning on completion including all glass
item
Handing over
Defects liability
83
52 Weeks defect liability period
item
Security
Supervision and Administration
84
Provide for all costs in connection with site supervision
item
85
Provide for all costs in connection with executive on site and all
off site administration including all correspondence processing
claims, measuring and pricing variations for the contract period
including extensions and the agreement of Final Accounts
item
86
Provide for all costs in connection with the implementation,
administration, training and the like for WebFM OMTrack
Documents Module as documented in section 1013 of the
Architectural Specification
item
Fire Fighting Equipment
Drying
Dewatering
87
The Contractor shall make due allowance for dewatering for
excation works for the duration of the works
item
Works below water level
88
Not applicable
5/16/2019
note
Page 8
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Preliminaries
KEY PARTIES
Client
1
Company/Name
Address
Point of contact
note
Architect
2
Company/Name
Address
Point of contact
note
Structural Engineer
3
Company/Name
Address
Point of contact
note
Electrical Engineer
4
Company/Name
Address
Point of contact
note
Hydraulic Engineer
5
Company/Name
Address
Point of contact
note
Civil Engineer
6
Company/Name
Address
Point of contact
note
Quantity Surveyor
7
Company/Lawson Morris-Whyte
Address
Point of contact
note
SITE
8
Tenderers shall allow to inspect the site during the preparation
of their tender submission, the point of contact for arranging
site visits is (NAME) (CONTACT DETAILS).
The site shall be handed over to the contractor in (NUMBER)
stages on the (DATE).
The site is located (DESCRIPTION OF LOCATION) with
access by (DESCRIPTION OF ACCESS).
note
DESCRIPTION OF WORK
9
The scope of the work consists of the construction of a new
building along with extensive siteworks
5/16/2019
Page 9
note
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Preliminaries
10
Rate
Total
(Continued)
The construction generally comprises reinforced concrete
foundations and ground floor slab. Structural steel frames
support the Insulated panel, Colorsteel and membrane roofing
systems, internal partitioning is generally timber framed with
aluminium framed glazed openings, aluminium window and
external door joinery, a variety of external wall cladding,
mechanical, electrical, data, plumbing, security and fire
protection services, fittings and fixtures to meet a range of
space requirements, floor coverings, external works and
underground services duct and external drainage and site
works. The approximate gross floor area is 1,280m2
note
CONDITIONS OF CONTRACT
11
The Conditions of Contract are NZS 3910:2013
12
The specification section covering Special Conditions of
Contract and Preliminary and General Clauses are tabulated
hereunder in order that tenderers may allow for them should
they deem it necessary. Refer to the Specification for full
descriptions of these clauses, the headings used in this section
of the Schedule of Prices should only be considered as a
framework for the individual allowances that tenderers may
wish to make
item
GENERAL CONDITIONS OF CONTRACT
13
Tenderers shall allow here for specific items as set out in the
Conditions of Contract and Schedule 1 - Special Conditions of
Contract - Specific Conditions of Contract
item
14
The items listed below are an indication of obligations or
restrictions which may be imposed on the tenderer, the
tenderer shall familiarized themselves with all sections of the
special conditions of contract, specifications and contract
documents, any omission from the list below but otherwise
noted in these documents shall be priced here
item
Special Conditions of Contract
15
Section 1 INTERPRETATION
16
Section 2 THE CONTRACT
17
Section 3 PERFORMANCE BOND
18
Section 4 SUBCONTRACTS
19
Section 5 GENERAL OBLIGATIONS
20
Section 6 ENGINEERS POWERS & RESPONSIBILITIES
21
Section 7 INDEMNITY
22
Costs and losses incurred by the Principal due to failure of the
contractor to arrange and keep insurance as required
23
Section 8 INSURANCE
24
Section 9 VARIATIONS
25
Section 10 TIME FOR COMPLETION
5/16/2019
Page 10
item
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Preliminaries
Rate
Total
(Continued)
Specifications
TENDER CONDITIONS
26
Tenders shall be valid for a period of not less than 30 calendar
days
note
SCHEDULE OF QUANTITIES
27
This schedule of quantities forms apart of the contract
documents
28
This schedule of quantities is measured generally in
accordance with the basic principles of Australian and New
Zealand Standard Method of Measurement of Building Works,
2018 Edition, published by the Australian Institute of Quantity
Surveyors, Master Builders of Australia Limited, New Zealand
Institute of Quantity Surveyors and the Registered Master
Builders Association of New Zealand, but any deviation from
the same shall not form the basis of a claim by the Contractor
item
29
Where dimensions are stated in the descriptions of items in the
Schedule of Prices, they are generally given in the order: length
x width x height
item
30
The dimensions stated in this Schedule of Prices are generally
those shown on the drawings but in some cases they are
scaled from the drawings or have been measured on site and
may not be exact. Dimensions given in descriptions should be
checked on site or sizes confirmed with the Engineer if they are
not clearly stated on the drawings or in the Specification
item
31
Where dimensions are stated in descriptions the figures
represent mm but generally mm is not included after the figure.
Where a figure is not mm or quantity is stated within a
description it is generally given in letters or connected with a
hyphen or oblique or an abbreviation is used immediately
following
item
GENERAL PARTICULARS
Contractual Conditions
Working hours
32
Working hours on the site are not restricted, the contractor is
required to comply with local territorial authority consent
conditions and noise and nuisance
controls.
item
Rates and wages and prices of materials
33
Tenderers must price every item individually. In the event of a
tenderer grouping items for pricing the Engineer reserves the
right to break down the total price amongst the items so
grouped together
item
34
The rates for all items in this Schedule of Prices shall include
for supplying and fixing in position except where specifically
otherwise described
item
5/16/2019
Page 11
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Preliminaries
35
Rate
Total
(Continued)
The rates for temporary works shall include unless otherwise
stated for removal from site on completion and making good as
necessary
item
Sub-letting
36
The tenderer shall not sub-let or allow the sub-letting of works
by subcontractor without the approval of the Principal
item
Progress and final certificates
37
Progress valuations shall be in accordance with section 12
item
38
Progress valuations and progress payment schedules shall be
submitted in accorance with section 12.1.1
item
39
Progress valuations shall be carried out in accordance with
section 12.2
40
The final payment claim shall be submitted in accordance with
section 12.4
item
Variations
41
Variations shall be administered as required under section 9
and the Special Conditions of Contract
item
Dates for commencement and completion
42
The contractor is to provide a programme and advise a
proposed completion date
item
Bonus for early completion
43
No bonus for early completion apply
note
Liquidated damages
44
Liquidated damages do not apply
note
Rise and fall
45
Cost fluctuations do not apply
item
Exemption from duty sales or other taxes
Issue and return of documents
46
The Contractor shall obtain the building consent forms and
documents from the Principal, retain them on site and return to
the Principal on completion.
item
Discrepancies
47
The Contractor shall detail any discrepancies in the contract
documents require clarification or determination, Specification
section 1260 Project Management
item
Submission of priced schedule of quantities
48
The Contractor shall supply to the Engineer a priced copy of the
schedule of quantities with 20 days of the award
item
Contract agreement stamp
5/16/2019
Page 12
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Preliminaries
Rate
Total
(Continued)
Payment of taxes
49
Payment of taxes shall be in accordance with section 12.13
item
Notices, permits, fees
Liability
50
The Principals and Contractors indemnity in accordance with
section 7
item
Bonds, guarantees
51
The Contractor shall at its own expense provide a performance
bond calculated to 10% of the contract price in accordance with
3.1
item
Payment of extra monies
52
All payments will be managed through monthly progress claims
note
Authority approvals
53
The Contractor shall at their expense give notice and obtain all
licences for Temporary Works and methods of carry out the
Contract Works in accordance with 5.11.4
item
54
The Contractor shall arrange for any necessary documents and
information be supplied to the client to comply with 5.11 in
accordance with 5.11.5
item
55
The Contractor shall arrange for all necessary inspections
required under the building consent documentation,
Specification clause 1234 Documentation
item
56
The Contractor shall provide for all other Producer statements,
obtaining Code of Compliance Certificates and Interim Code of
Compliance Certificated, etc as specified
item
Insurance
57
The Contractor shall provide at its own expense the following
insurances;
item
58
Provide for public liability insurance with cover of $10,000,000
item
59
Provide for motor vehicle third party insurance with cover of
$2,000,000
item
60
Provide for insurance of the contract works and materials
item
61
Provide for contractors plant and all other insurance considered
necessary
item
62
Provide for vibration, weakening or removal of support with
cover of $1,000,000
item
63
Provide for liability under the Forest and Rural Fire Act 1977
with cover of $1,000,000
item
Updating of programmes
64
The Contractor shall prepare and maintain a programme in
accordance with section 5.10
5/16/2019
Page 13
item
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Preliminaries
Rate
Total
(Continued)
Quality assurance
65
The Contractor shall prepare, provide for review and implement
a quality assurance plan in accordance with section 5.18
item
66
The Contractor shall provide a Quality Assurance Certificate Civil as specified
item
67
The Contractor shall provide a Quality Assurance Certificate Structural as specified
item
Maintenance and protection of public and private property
68
The contractor shall allow to protect public and private property
in accordance with section 5.7
item
Charts, schedules
Notice boards
69
2400 x 1200 Project sign fixed to temporary fencing describing
the project
item
Setting out works
70
The Contractor shall allow to set out the works, including the
employment of a Registered Surveyor if required
item
Temporary installations
71
Temporary roads, tracks, crossings and hard-standing
item
Services
72
The Contractor is to allow for temporary services connections to
the site, maintenance and decommissioning and removal on
completion of works
item
73
The Contractor is to allow for the protection of all existing
services for the duration of the works
item
Telephone calls
74
The Contractor is required to make due allowance fore the
supply, maintenance and decommissioning of
telecommunications equipment to the site, including services
for information technology connections
item
Temporary screens, fences, hoardings, guard rails etc
75
Temporary fencing, hoardings, planked footways, guardrails,
gantries, overhead protection, warning and directional signs,
security, etc.
item
Temporary sheds, sanitary accomodation, etc
76
Temporary office, storage and messing
77
Temporary ablutions
Duties and attendance
Work outside the contract including nominated subcontractors
Supplied goods
5/16/2019
Page 14
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Preliminaries
Rate
Total
(Continued)
Samples
Testing
Advertising
Footpath levels
Plant equipment and attendance labour
Scaffolding
Attendance
Protection
78
Provide for protection of the completed works
item
79
Provide for reinstatement of all areas of the site and leave in
original condition and to the approval of the Engineer
item
Cleaning and removal of rubbish
80
The Contractor shall comply with the requirements in
Specification section 1256
item
81
Provide for periodic cleaning during the course of the contract
item
82
Provide for cleaning on completion including all glass
item
Handing over
Defects liability
83
52 Weeks defect liability period
item
Security
Supervision and Administration
84
Provide for all costs in connection with site supervision
item
85
Provide for all costs in connection with executive on site and all
off site administration including all correspondence processing
claims, measuring and pricing variations for the contract period
including extensions and the agreement of Final Accounts
item
86
Provide for all costs in connection with the implementation,
administration, training and the like for WebFM OMTrack
Documents Module as documented in section 1013 of the
Architectural Specification
item
Fire Fighting Equipment
Drying
Dewatering
87
The Contractor shall make due allowance for dewatering for
excation works for the duration of the works
item
Works below water level
88
Not applicable
5/16/2019
note
Page 15
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Groundworks
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
All measurements of excavation and subsequent disposal,
filling and backfilling have been measured net before
excavation; allow for increase in bulk or decrease in
consolidation
item
4
Working space has been allowed for in accordance with Health
and Safety at Work Act Regulation 24. Should any further
working space be deemed necessary, tenderers shall allow for
it here together with the necessary backfilling
item
5
The rates for excavation shall include for excavating in any
material met with, excepting hard rock, and tenderers should
ascertain the nature of material to be excavated
item
6
The rates shall include for levelling, grading, trimming,
compacting, scabbling and similar to faces of excavations other
than to reduce levels, floor slab and road pavement excavation,
keeping sides plumb and consolidating
item
7
The rates shall include for all clearing away and backfilling due
to slips or cave-ins or over excavations that may occur during
the currency of the contract
item
8
The rates for excavation not exceeding 1.5m deep shall include
for planking and strutting where necessary
item
9
Planking and strutting shall be deemed to mean provision of
everything necessary to retain the sides of excavation including
sheet piling or any other means and the rates shall include for
any excavation, disposal and backfilling necessitated by the
planking and strutting
item
10
The rates shall include for levelling, grading, trimming and
similar to faces of filled areas other than to over site, floor slab
and similar filling
item
11
The rates shall include for dressing around and sealing paper
and plastic membranes to all penertrations
item
12
The rates shall include for all necessary plant and equipment,
removal of spoil and debris
item
13
Provide for maintaining and upholding the public roadway,
footpath and adjacent buildings
item
14
Provide for pumping or other means of dewatering to keep the
excavation free from water
item
15
Provide for the disconnecting, sealing off, diverting, removing
and protecting existing services met with during the excavation
and for making good any damage or disturbance to the
satisfaction of the Architect and Authorities
item
5/16/2019
Page 16
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Groundworks
Rate
Total
(Continued)
16
Excavations for services are to be included with their respective
items in other Sections/Trades and a note will be made giving
cross references
item
17
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
18
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
19
Allow for quality assurance processes as specified
item
20
Allow for all inspections and testing as specified
item
BULK EXCAVATION & FILLING
21
Site clearance - Removal and disposal of vegetation, including
shrubs, redundant fencing and rubbish
1 item
22
Strip top soil and turf from section and remove from site, 400
deep
23
Strip top soil and turf from section and stockpile on site, 400
deep (for use in bunding)
24
Provide grading, dry density and optimum water content results
by NZS 4402:1986, Test 4.1.3 Vibrating Hammer for proposed
backfill material
25
Cut to waste unsuitable material - PROVISIONAL ITEM
26
Import, place, condition and compact AP65 in maximum layers
of 250 deep
120 m3
27
Remove from stockpile, screen as necessary and spread
topsoil as per plans
250 m3
28
Remove to waste excess topsoil
250 m3
125 m2
2,000 m2
3 no
50 m3
MAIN BUILDING
EXCAVATION
29
Excavate in hardfill for concrete ground beam 0-1m deep with
600 extra width for working space each side and stockpile on
site
556 m3
30
Excavate in hardfill for concrete ground beam 1-2m deep with
600 extra width for working space each side and stockpile on
site
66 m3
31
Excavate in hardfill for concrete ground beam 1-2m deep with
600 extra width for working space each side and remove from
site
166 m3
32
Excavate in hardfill for concrete pad 1-2m deep with 600 extra
width for working space each side and remove from site
196 m3
5/16/2019
Page 17
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Groundworks
33
Rate
Total
(Continued)
Excavate in hardfill for concrete slab thickening 300 deep and
remove from site including battering
60 m2
FILLING
34
Backfill to boxing space from stockpiles 0-1m deep
246 m3
35
Backfill to boxing space from stockpiles 1-2m deep
266 m3
SAND BLINDING
36
25 Thick sand blinding beneath concrete slab
1,090 m2
PAPER AND PLASTIC MEMBRANES
37
250 Micron damp proof membrane beneath slab and
foundations
1,949 m2
End of Section
5/16/2019
Page 18
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Concrete
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
Concrete shall be Special grade or High grade complying with
NZS 3109 : 1997 and shall be from an approved ready-mix
plant
item
4
All concrete is to be placed into formwork unless otherwise
stated
item
5
The rates for concrete shall include for placing concrete,
vibrating where required, for pouring around rod or mesh
reinforcement and for grouting up holes of spacers
item
6
The rates shall include for additional concrete required to
conform to structural and excavated tolerances
item
7
The rates shall include for pour joints and joints shown on the
drawings that do not require formwork
item
8
The rates for concrete shall include for finishing surfaces to falls
or to the required specification and for curing and protecting
exposed surfaces
item
9
The rates shall include for making good after the removal of
formwork and casting in all required items
item
10
The rates shall include for scabbling other than that required by
ANZSMM
item
11
The rates for concrete shall include for water stops, sleeves,
chases, penetrations, forming of small recesses, sinkings for
floor springs, pockets, cutting and pinning, building in etc
item
12
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
13
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
14
Allow for all producer statements as specified
item
15
Allow for all method statements as specified
item
16
Allow for 10 year guarantee covering joints generally as
specified
item
17
Allow for 2 year guarantee covering slabs generally as specified
item
18
Allow for all quality assurance processes as specified
item
19
Allow for all inspections and testing as specified
item
5/16/2019
Page 19
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Concrete
20
Rate
Total
(Continued)
Allow for providing samples of materials and finishes
item
MAIN BUILDING
FOUNDATIONS
25 MPa Reinforced Concrete at 28 days
21
In foundation beams
22
In foundation pad
244 m3
65 m3
Sundries
23
U2 Finish to top of foundation beam
24
U2 FInish to top of foundation pad
375 m2
82 m2
GROUND SLAB & THICKENINGS
30 MPa Special Grade Reinforced Concrete at 28 days
25
In slab 0-100 thick :[773 m2]
78 m3
26
In slab 0-100 thick to falls :[16 m2]
27
In slab 100-200 thick :[197 m2]
35 m3
28
In slab 100-200 thick to falls :[105 m2]
19 m3
29
In slab thickening
63 m3
30
In strip drain encasement
2 m3
3 m3
Sundries
31
U3 Finish to slab
970 m2
32
U3 Finish to slab to falls
121 m2
33
30 x 6 Sawcut including approved sealant
202 m
34
40 x 6 Sawcut including approved sealant
84 m
Sundries from other trades
Structural Steel
35
Mastic sealant around base of steel column
67 m
Floor Screed
36
Allow for 10 year manufacturer warranty as specified
37
Ardex Grout & FLC to falls to shower floor
item
5 m2
Take delivery and cast in the following items from other trades:
Windows
38
40 x 5 EA Cast in to slab as door sill including ties, 900 long
(detail 19/A4.02)
1 no
Carpentry
39
M16 x 400 4.6/S Threaded rod
85 no
40
M20 x 340 8.8/S Hold down bolt
2 no
5/16/2019
Page 20
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Concrete
41
Rate
Total
(Continued)
M20 x 400 4.6/S Threaded rod
173 no
Structural Steel
42
M16 x 320 8.8/S Hold down bolt including 50 x 50 x 6 anchor
plate
2 no
43
M20 x 590 4.6/TB Hold down bolt including 50 x 50 x 6 anchor
plate
32 no
44
M20 x 600 8.8/S Hold down bolt
11 no
45
M24 x 580 8.8/TB Hold down bolt
286 no
46
M24 x 610 4.6/TB Hold down bolt
16 no
47
M24 x 630 8.8/TB Hold down bolt including 50 x 50 x 6 anchor
plate
48
250 x 100 x 12 Anchor plate
22 no
49
540 x 270 x 12 Anchor plate
11 no
50
480 x 310 x 12 Anchor plate
33 no
51
290 x 130 x 16 Anchor plate
8 no
8 no
NIB UPSTANDS
30 MPa Reinforced Concrete at 28 days
52
In nib upstand :[52 m]
3 m3
COLUMN ENCASEMENT
30 MPa Reinforced Concrete at 28 days
53
In column encasement
1 m3
Sundries
54
U3 Finish to top of encasement
1 m2
End of Section
5/16/2019
Page 21
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Formwork
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The rates shall include for all necessary boarding, supports,
erecting, framing, temporary cambering, cutting, perforations
for reinforcing bars, bolts, straps, ties,hangers, pipes and
similar, angles, removal, cleaning, wetting and treatment with
separating agent before placing concrete, chamfered edges
and splayed internal angles less than 50mm wide on face, filling
tie bolt holes, strutting left after removal of formwork
item
4
All formwork shall comply with standard of NZS 3114
item
5
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
6
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
MAIN BUILDING
FOUNDATIONS
F1 Formwork to:7
Side of foundation beam
481 m2
8
Side of foundation pad
104 m2
GROUND SLAB & THICKENINGS
F1 Formwork to:9
Side of strip drain encasement
12 m2
F5 Formwork to:10
Side of thickening
11
Side of edge thickening
5 m2
90 m2
Sundries
12
Form 500 x 500 x 150 deep recess for power box in slab
4 no
13
Form 1120 x 900 shower floor set-down and to falls
4 no
14
Form 140 x 45 rebate at edge of concrete slab
11 m
15
Form 180 x 35 rebate at edge of concrete slab
4 m
16
Form 370 x 25 sloping rebate at edge of concrete slab
33 m
17
Form 75 x 110 recess in slab for strip drain
13 m
18
Form 150 x 50 recess in slab for shower strip drain
5/16/2019
Page 22
4 m
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Formwork
Rate
Total
(Continued)
NIB UPSTANDS
F5 Formwork to:19
Side of nib upstand, 0 - 250 high
147 m
Sundries
20
Form 90 x 50 rebate to edge of nib upstand
19 m
21
Form 100 x 50 rebate to edge of nib upstand
4 m
COLUMN ENCASEMENT
F5 Formwork to:22
Side of column encasement
2 m2
End of Section
5/16/2019
Page 23
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Reinforcement
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
Deformed mild steel bars described with the prefix D, plain
round mild steel bars described with the prefix R, high yield
deformed bars with the prefix H and high yield plain round steel
bars with the prefix HR shall comply with NZS 3402. Welded
mesh fabric reinforcement and workmanship shall conform to
the requirements of NZS 3109
item
4
Laps to all bars have been measured as shown on the
drawings, as nominated by engineer or at 8m centres as per
ANZSMM 2018 NZ Guidance Notes
item
5
Allow for welding and weld testing shall comply with NZS 4702
item
6
The weights of rod reinforcement have been calculated from
standard tables. Rates shall include for rolling margin
item
7
The rates shall include for cleaning, fabrication, placing, the
provision of all necessary temporary fixings and supports
including tie wire and chair supports
item
8
The rates shall include for supplying rod reinforcement in
lengths up to 10m where required
item
9
The rates for mesh reinforcement shall include for laps; all
areas have been measured net
item
10
Reinforcing steel shall be manufactured by an approved
supplier as specified
item
11
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
12
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
13
Allow for all quality assurance processes as specified
item
14
Allow for all producer and method statements as specified
item
15
Allow for all inspections and testing as specified
item
16
Allow for all bending schedules as specified
item
MAIN BUILDING
FOUNDATIONS
17
XD10 Starter drilled and epoxied into foundation beam with Hilti
HIT RE-500, 600 long
5/16/2019
Page 24
32 no
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Reinforcement
Rate
Total
(Continued)
18
XD10 U-bar
7 kg
19
D12 Starter
303 kg
20
XR12 Stirrup
21
XD12 U-bar
22
XD16 Rod
42 kg
23
XD20 Rod
745 kg
24
XD25 Rod
26,471 kg
10,496 kg
105 kg
SLAB, THICKENINGS & NIBS
25
XD10 Rod
105 kg
26
XD10 Starter
182 kg
27
XR10 Stirrup
1,341 kg
28
D12 Starter
1,800 kg
29
XD12 Rod
8,555 kg
30
XD16 Starter
31
XD16 Rod
1,159 kg
32
XD20 Rod
9,524 kg
219 kg
End of Section
5/16/2019
Page 25
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Tanking and Waterproof Membranes
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The rates for tanking and waterproofing shall include for
temprary screeds, grounds and rules
item
4
The rates shall include for scabbling other than that required by
ANZSMM
item
5
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
6
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
Tanking and Waterproofing Membranes
7
STO Flexyl or liquid DPM to rebate, 340 girth
79 m
8
Ardex WPM 001 waterproofing liquid to sill rebate, 370 girth
56 m
9
12 EPS Rigid insulation protection to waterproofing, 150 high
65 m
5/16/2019
Page 26
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Masonry
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
Materials and workmanship shall comply with NZS 4210.
Concrete blocks shall be Firth or similar approved units
item
4
Mortar shall comply with Specification Clause 3.7.3
item
5
The preambles and rates to include clauses of the Reinforcing
Steel trade section shall apply equally to this section
item
6
The rates shall include for leaving loose bricks or blocks for
cleaning out cavities, leaving weep holes, forming cavities,
forming rebates reveals and pointing and cleaning down to
reveals where necessary
item
7
The rates shall include for fractional size blocks, plain and plain
return blocks and similar blocks, all necessary machine cutting,
cutting to form bond, cutting or forming chases for edges of
floor slabs, cutting or leaving holes and openings as recesses
for and building in pipes, conduits, sleeves and similar as
required for all trades
item
8
The rates shall include for leaving surfaces rough or raking out
joints for plastering and flashings, knocking off angles in
preparation for plastering, bedding frames or plates, building in
joists, bearers, or similar, temporary supports to openings,
templates, and for all necessary making good
item
9
The rates shall include for plumbing angles and reveals to
openings etc., all temporary tomming and supports and for
protecting adjacent surfaces and finished work
item
10
The rates shall include for cleaning down as the work proceeds
and on completion
item
11
Provide for making and testing samples of mortar and grout as
Specified
item
12
The rates shall include for all construction joints as required
item
13
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
14
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
15
Allow for all quality assurance processes as specified
item
16
Allow for all inspections as specified
item
17
Allow for all producer statements as specified
item
5/16/2019
Page 27
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Masonry
18
Rate
Total
(Continued)
Allow for all testing as specified
item
MAIN BUILDING
BLOCKWORK
Firth 20 Series RC Masonry Blocks, laid in stretcher bond and
pointed as specified
19
In solid filled exterior wall
58 m2
20
In solid filled interior wall
20 m2
21
400 high lintel block course to four openings
22
Plain end blocks
23
Half high block course
7 m
24
Raking cut 200 thick block course for 3.0m high internal wall
8 m
25
Form fair external angle
16 m
26
Form tee intersection
10 m
6 m
18 m
Grout
27
20 MPa course grout to all cores of 20 series block wall approx.
88m2
8 m3
Reinforcing Steel
28
XD16 Rod
829 kg
End of Section
5/16/2019
Page 28
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Structural Steel
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
Structural Steelwork shall comply with BS:4360, or AS:1204
workmanship with NZS:3404, welding and weld testing with
NZS:4702
item
4
The weights have been calculated from standard tables: no
allowance has been made for rolling margin
item
5
Where lengths are stated in the descriptions they are
approximate only
item
6
Dimensions for all steelwork must be checked on site
item
7
The rates shall include for all shop fabrication work, marking,
drillings for bolts including those securing timbers, etc shown or
noted on steelwork drawing, black bolts, nuts and any type of
washer, riveted work, counter sinking, and tapping for bolts or
machine screws
item
8
The rates shall include for cutting to dead lengths, notching and
machining ends and bearings
item
9
The rates shall include for supply, fabrication, delivery, hoisting
and erection of members, except where otherwise described
item
10
The rates for continuous members shall include for welded
joints in the length
item
11
Bolts shall include for nuts, washers and tapered washers as
required
item
12
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
13
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
14
The heaviest lift is ...
item
15
The highest lift is ...
item
GENERAL
16
Allow for all quality assurance processes as specified
item
17
Allow for shop drawings as specified
item
18
Allow for the provision of all necessary temporary bracing and
similar items required for erection
item
19
Allow for all testing and inspections as specified
item
20
Allow for all submittals as specified
item
5/16/2019
Page 29
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Structural Steel
21
Rate
Total
(Continued)
Allow for all producer statements as specified
item
MAIN BUILDING
FRAMES
The Following Hoisted Fixed at Ground Floor Level with Bolted
Connections
22
700WB130 Portal column :[2/4.3]
1,112 kg
23
700WB130 Portal beam comprising of three sections bolted
together :[2/3.2 1/17.4]
3,083 kg
24
310UB46 Column :[5/4.8 5/5.2]
2,297 kg
25
250UB37 Column :[7/3.9 6/4.2 8/4.6 6/4.7 6/5.1]
5,473 kg
26
200UB30 Column :[1/4.4]
27
150 x 9 SHS Column (In 4 no; total weight 792 kg)
21 m
28
150 x 9 SHS Diagonal brace (In 4 no; total weight 1,018 kg)
27 m
29
125 x 9 SHS Column (In 3 no; total weight 337 kg)
11 m
30
89 x 6 SHS Column (In 13 no; total weight 701 kg)
48 m
31
6 End plate (In 20 no)
19 kg
32
8 Stiffener (In 4 no)
33
10 Plates, stiffeners and cleats (In 4 no)
34
12 Stiffener (In 156 no)
291 kg
35
16 End and base plates (In 34 no)
323 kg
36
20 Plates and stiffeners (In 19 no)
362 kg
37
32 Base plate (In 37 no)
38
M16 x 0-100 8.8/S Bolt fixing steel to steel
39
M16 x 0-100 Threaded stud welded to steelwork
40
M20 x 0-100 8.8/TB Bolt fixing steel to steel
84 no
41
M20 x 0-100 8.8/S Bolt fixing steel to steel
32 no
42
220 x 180 x 20 Thick high strength non-shrink grout pack
1 no
43
250 x 100 x 20 Thick high strength non-shrink grout pack
13 no
44
280 x 140 x 20 Thick high strength non-shrink grout pack
3 no
45
480 x 310 x 30 Thick high strength non-shrink grout pack
33 no
46
500 x 260 x 30 Thick high strength non-shrink grout pack
4 no
47
540 x 240 x 30 Thick high strength non-shrink grout pack
11 no
48
740 x 290 x 30 Thick high strength non-shrink grout pack
2 no
130 kg
4 kg
10 kg
1,365 kg
4 no
294 no
Supply the following to the Concrete Contractor to be cast in
49
40 x 5 Equal Angle (In 1 no)
5/16/2019
3 kg
Page 30
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Structural Steel
Rate
Total
(Continued)
50
M16 x 300-400 8.8/S Hold down bolt including 50 x 50 x 6
anchor plate
2 no
51
M20 x 500-600 4.6/TB Hold down bolt including 50 x 50 x 6
anchor plate
52
M24 x 500-600 8.8/TB Hold down bolt
286 no
53
M24 x 600-700 4.6/TB Hold down bolt
16 no
54
M24 x 600-700 8.8/TB Hold down bolt including 50 x 50 x 6
anchor plate
55
12 Anchor plate (In 44 no)
614 kg
56
16 Anchor plate (In 8 no)
38 kg
32 no
8 no
The Following Hoisted Fixed at First Floor Level Approximately
3.5m Average Above Ground Level
57
310UB46 Beam :[2/2.4 2/3.0 1/3.6 2/4.2 3/4.6]
1,678 kg
58
250UB37 Beam :[26/3.3]
3,150 kg
59
200UB30 Beam :[1/0.8 1/2.9 1/7.3]
326 kg
60
180UB22 Outrigger :[9/0.8 2/1.3]
209 kg
61
180UB22 Beam :[6/3.1]
413 kg
62
250 PFC Trimmer (In 14 no)
63
100 x 6 SHS Stub post (In 3 no; total weight 17 kg)
64
89 x 6 SHS Column (In 25 no; total weight 1,256 kg)
65
100 x 8 EA (In 3 no)
66
6 End plate (In 38 no)
67
8 Plates and cleats (In 2 no)
68
10 Cleats and stiffeners (In 359 no)
69
12 Plates and stiffeners (In 48 no)
95 kg
70
16 Splice and end plates (In 69 no)
159 kg
71
25 Splice plate (In 22 no)
366 kg
72
M16 x 0-100 8.8/S Bolt fixing steel to steel
172 no
73
M20 x 0-100 Threaded stud welded to steelwork
80 no
74
M24 x 0-100 8.8/TB Bolt fixing steel to steel
88 no
2,228 kg
1 m
86 m
6 kg
204 kg
3 kg
1,200 kg
ROOF FRAMING
The Following Hoisted Fixed at Roof Level Approximately 5.0m
average Above Ground Level
75
410UB60 Rafter :[10/3.0 5/3.4 5/7.7]
5,063 kg
76
310UB46 Rafter :[10/4.4]
1,996 kg
77
310UB46 Beam :[18/2.7]
2,191 kg
5/16/2019
Page 31
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Structural Steel
Rate
Total
(Continued)
78
250UB37 Rafter :[18/3.0 14/3.7]
3,902 kg
79
250 PFC Beam (In 10 no)
1,318 kg
80
150PFC Rafter (In 2 no)
81
150 x 9 SHS Beam (In 8 no; total weight 1,697 kg)
45 m
82
150 x 6 SHS Beam (In 23 no; total weight 2,018 kg)
77 m
83
75 x 6 EA Fly brace (In 32 no)
105 kg
84
65 x 5 EA Roller door support (In 8 no)
147 kg
85
6 Plates and cleats (In 416 no)
86
8 Plates, cleats and stiffeners (In 76 no)
92 kg
87
10 Plates. cleats and stiffeners (In 18 no)
52 kg
88
10 Continuous tie plate (In 2 no)
89
12 Plates, cleats and stiffeners (In 511 no)
90
16 Splice plate (In 52 no)
59 kg
91
25 Splice plate (In 26 no)
432 kg
92
M12 x 0-100 4.6/S Bolt fixing steel to steel
56 no
93
M16 x 0-100 4.6/S Bolt fixing steel to steel
1,252 no
94
M16 x 0-100 8.8/S Bolt fixing steel to steel
30 no
95
M20 x 0-100 8.8/S Bolt fixing steel to steel
354 no
96
M20 x 0-100 8.8/TB Bolt fixing steel to steel
792 no
97
M24 x 0-100 8.8/TB Bolt fixing steel to steel
104 no
98
XR20 Bracing rod
719 kg
99
Turnbuckle to XR20 bracing rod including fixings (detail
2/A06-11)
48 no
100
End to XR20 bracing rod including fixings (detail 4/A06-11)
96 no
101
DHS200/18 Purlin
102
800 Long purlin brace
224 kg
1,233 kg
195 kg
2,236 kg
1,221 m
144 no
PRIMING
Prepare and apply one coat of Dulux Luxaprime ZP to specified
thickness to:103
Interior steelwork (all members girthed)
104
Touch up priming areas after erection
1,172 m2
item
Prepare and apply Dulux Quit Rust Metal Primer to:105
Exterior steelwork (all members girthed)
106
Touch up priming areas after erection
5/16/2019
838 m2
item
Page 32
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Metalwork
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The weights have been calculated from standard tables: no
allowance has been made for rolling margin. The weights of
galvanised steel exclude the additional weight of galvanising
item
4
Where lengths are stated in the descriptions they are
approximate only
item
5
Dimensions for all metalwork must be checked on site
item
6
The rates shall include for cutting to length, splay cut or
machined ends, holes, slots, packers, spacers, etc., and for
templates and the like
item
7
The rates shall include for supply, fabrication, and fixing of
members complete except where otherwise described
item
8
The rates shall include for all welding, both in the shop and on
the site including preparation, sealing runs, grinding smooth
where required and for welded joints in the length of continuous
members
item
9
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
10
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
METAL WALL CLADDING
11
Provide 15 year manufacturer warranty as specified
item
12
Provide 5 year installation warranty as specified
item
13
0.55 BMT Dimond LT7 Colour Coated ZR8 wall cladding fixed
to cavity battens
85 m2
14
Ecofoam closure strip
26 m
15
18 Wide cavity closer
72 m
0.55 BMT Colour Coated Flashings
16
160 Girth three times bent soffit flashing
20 m
17
250 Girth four times bent flashing at plaster cladding junction
11 m
18
370 Girth six times bent top hat flashing
7 m
19
410 Girth seven times bent corner flashing
7 m
METAL SOFFIT LINING
5/16/2019
Page 33
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Metalwork
20
Rate
Total
(Continued)
Dimond Baby Iron Colour Coated soffit lining fixed to under side
of steel purlins
315 m2
0.55 BMT Colour Coated Flashings
21
210 Girth five times bent soffit flashing
72 m
22
300 Girth four times bent end flashing
49 m
INTERNAL HANDRAILS
23
Stainless Steel 304 Grade sloping handrail including ramps,
stop ends, bends and standoff brackets fixed to timber framing
22 m
End of Section
5/16/2019
Page 34
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Roofing
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
All roofing has been measured net with no allowance made for
side or other laps
item
4
The rates for membrane roofing shall include for fair edges,
dressing over angle fillets, turning into grooves, all other
labours, internal and external angles, fillets, circular edges,
separation strips other than those specifically detailed in the
contract documents, nails, screws and similar items, temporary
screeds, rules and grounds
item
5
The rates for Membrane Roofing shall include for preparation of
surfaces
item
6
The rates shall include for nails, screws, clips, rivets, straps and
similar items
7
The rates for flashings shall include for folding and bending to
shape, laps, joints, expansion joints, soakers, clips and shaping
at angles and ends, and for bituminous breather underlay
item
8
Sealant shall be of an approved type and compatible with the
roof coverings
item
9
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
10
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
MAIN BUILDING
INSULATED PANEL ROOFING
11
Provide 15 year manufacturers warranty as specified
item
12
Provide 2 year installation warranty as specified
item
13
Kingspan KS1000 RW Insulated panel roofing with 60 PIR
board insulation fixed to steel purlins
632 m2
14
Kingspan KS1000 RW Insulated panel roofing with 60 PIR
insulation fixed to timber roof framing
361 m2
15
Form downturn at eaves
16
Profiled closure strip including gun grade sealant
17
6 x 4 Continuous run of butyl sealant
96 m
18
Foam filler at ridge including gun grade sealant at top and
bottom
24 m
5/16/2019
93 m
187 m
Page 35
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Roofing
Rate
Total
(Continued)
19
Foam filler at barge
46 m
20
Site applied insulation at eave (detail 18/A4.05)
85 m
0.55 BMT Coil Coated Roof Flashings
21
180 Girth two times bent eaves flashing
45 m
22
350 Girth three times bent apron flashing notched for ribs
44 m
23
460 Girth three times bent ridge flashing notched for ribs
24 m
24
470 Girth three times bent barge flashing
26 m
25
500 Girth five times bent barge flashing
20 m
26
Z Flashing under barge flashing including 6 x 4 butyl sealant
(detail 32/A4.06)
46 m
Roof Penetrations
27
Form 800 x 400 roof penetration for extract duct, seal and flash
to approval
1 no
METAL ROOFING
28
Provide manufacturer warranty as specified
item
29
Provide 5 year installation warranty as specified
item
30
Dimond Veedek 0.55 BMT Colour ZR8 coated roofing fixed to
steelwork
419 m2
31
Thermoplast 990 foil and R3.2 115 thick insulation fitted
between timber roof framing
419 m2
32
Thermakraft 405 roof underlay on drainage matt
424 m2
33
Aumesh safety netting fixed to timber framing
419 m2
34
Form downturn at eaves
51 m
35
Form stop end at end of sheet
35 m
36
Ecofoam closure strip
113 m
0.55 Colour Coated Roof Flashings
37
180 Girth two times bent eaves flashing
51 m
38
370 Girth two times bent apron flashing notched for ribs
11 m
39
390 Girth four times bent apron flashing notched for ribs
27 m
40
510 Girth five times bent barge flashing
24 m
MEMBRANE ROOFING
41
Provide 20 year manufacturer warranty as specified
item
42
Provide 5 year installer warranty as specified
item
43
Provide all information required for compliance as specified
item
44
Allow for all testing as specified
item
5/16/2019
Page 36
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Roofing
Rate
Total
(Continued)
45
Nuraply 3PM base & top coat torch on membrane on plywood
substrate (plywood measured elsewhere)
81 m2
46
Form 70 downturn at drip edge
59 m
47
Dress membrane 200 up timber framed wall
54 m
48
Dress membrane 680 up and over parapet wall
11 m
0.55 Colour Coated Roof Flashings
49
80 Girth two times bent flashing at wall junction
14 m
50
150 Girth three times bent edge flashing
19 m
51
490 Girth four times bent parapet cap flashing
11 m
Roof Outlets
52
Roof drainage outlet c/w bronze cast dome and insert for 65
downpipe including forming penetration
3 no
FASCIAS
1.2 ZR8 Colour Coated Mild Steel
53
260 Girth three times bent fascia
23 m
54
360 Girth six times bent fascia
49 m
55
380 Girth seven times bent fascia
73 m
56
470 Girth four times fascia
24 m
57
540 Girth seven times bent fascia
28 m
RAINWATER SYSTEM
58
Provide warranty as specified
item
59
Allow to test rainwater disposal system
item
60
Dimond 300 Colour coated spouting including 50 x 5 exposed
folded brackets fixed to timber framing
95 m
61
Dimond 300 Colour coated spouting including 50 x 5 exposed
folded brackets bolt fixed to steel purlins
49 m
62
Colour coated rainwater head including overflow and 100
downpipe outlet and any gratings necessary
2 no
63
150 Downpipe outlet to gutter
5 no
64
Stop end to gutter
12 no
65
150 Colour coated 0.7 downpipe including adjustable standoff
brackets
25 m
66
Bend to 150 downpipe
7 no
67
Connect 150 downpipe to drain
5 no
68
100 Colour coated 0.7 downpipe including adjustable standoff
brackets
7 m
69
Bend to 100 downpipe
4 no
5/16/2019
Page 37
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Roofing
Rate
Total
(Continued)
70
Connect 100 downpipe to drain
2 no
71
65 Colour coated 0.7 downpipe including adjustable standoff
brackets
9 m
72
Bend to 65 downpipe
3 no
73
Connect 65 downpipe to drain
3 no
End of Section
5/16/2019
Page 38
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Windows
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
Aluminium windows shall comply with NZS:4211 and AAA
performance requirements
item
4
The sizes and descriptions in this schedule are approximate
only and the sub-contractor shall submit details for approval
before commencing manufacture. All dimensions must be
checked on site
item
5
All aluminium members shall be of heavy gauge extruded
aluminium alloy with a satin powdercoated finish
item
6
All glass and glazing shall be in accordance with NZS
4223:1991
item
7
The rates shall include for glazing, which has NOT been
measured separately
item
8
The rates shall include for neoprene rubber gaskets, mastics,
special glazing compounds, and matching clip in glazing beads
item
9
The rates shall include for frames, mullions, transoms and
glazing bars and beads, trims, caulking and pointing, sashes,
casements, hinges, fastenings and other hardware
item
10
Flashings where shown have been measured separately. Rates
shall include for all other flashings required to make the
windows watertight
item
11
Reveal linings shall be grooved to suit wall linings of varying
thicknesses
item
12
The rates shall include for all necessary packings, grounds,
wedges and fixing
item
13
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
14
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
ALUMINIUM WINDOWS
15
Provide for shop drawings as specified
item
16
Provide a five year written manufacturer warranty as specified
item
17
Provide a two year written installation warranty as specified
item
18
Allow for ten year written manufacturer warranty covering
glazing as specified
item
5/16/2019
Page 39
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Windows
Rate
Total
(Continued)
19
Provide samples as specified
item
20
Provide certificates as specified
item
21
Allow for design to wind pressure parameters as specified
item
APL Architectural Series Aluminium Powdercoated Double
Glazed Window Section, Complete with Rebated Timber
Reveals
22
700 x 2665 High window with one fixed pane and one awning
hung sash (W02, W03)
2 no
23
1040 x 1765 High window with one awning hung sash (W06)
1 no
24
2770 x 1390 High window with two fixed panes and one awning
hung sash (W08, W09)
2 no
25
3012 x 2665 High window with four fixed panes (W04, W05)
2 no
26
3400 x 2850 High window with four fixed panes and two awning
hung sashes (W01)
1 no
27
4512 x 1785 High window with three fixed panes (W07)
1 no
APL Metro Series Aluminium Powdercoated Double Glazed
Window Section, Complete with Rebated Timber Reveals
28
800 x 800 High window with one awning hung sash (W10, W11,
W12, W20)
4 no
29
1500 x 950 High window with one fixed pane and one awning
hung sash (W26, W27)
2 no
30
1600 x 840 High window with one fixed pane and one awning
hung sash (W14, W15, W16, W18, W19)
5 no
31
1600 x 1180 High window with one fixed pane and one awning
hung sash (W21, W22, W23, W24, W25)
5 no
32
2970 x 950 High window with five fixed panes (W17)
1 no
33
3000 x 1000 High window with one fixed pane and two awning
hung sashes (W13)
1 no
FLASHINGS
Powdercoated Aluminium Flashings
34
80 Girth three times bent head flashing. Detail 23/A4.05
34 m
35
140 Girth two times bent jamb flashing. Detail 6/A4.03
6 m
36
160 Girth two times bent jamb flashing. Detail 5/A4.03
11 m
37
200 Girth three times bent jamb flashing. Detail 4/A4.03
6 m
Plastic Flashings
38
110 Wide vertical plastic soaker flashing. Detail 24/A4.05
81 m
2.0 Powdercoated Aluminium Flashings
39
180 Girth three times bent sill flashing. Detail 21/A4.05
8 m
Sundries
5/16/2019
Page 40
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Windows
Rate
Total
(Continued)
40
Allow for 10 year warranty for the supply and installation of
sealants
41
Sika AT-Facade silicone air seal on PEF backing rod
42
Grout infill to concrete slab edge rebate following threshold
installation. Detail 2S/A4.01
item
169 m
10 m
End of Section
5/16/2019
Page 41
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Glazing
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
All glass and glazing shall be in accordance with NZS 4223 :
1991
item
4
Glazing to metal windows and doors has been scheduled in the
Metal Windows and Doors trade section
item
5
The rates shall include for all putties, mastics, special glazing
compounds and all necessary materials for the completion of
the glazing and for preparing and sealing rebates
item
6
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
7
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
8
Provide 10 year manufacturer warranty as specified
item
9
Provide samples as specified
item
MIRRORS
10
460 x 1000 x 6 Thick mirror with ground edges fixed to
plasterboard lined wall
4 no
11
485 x 1000 x 6 Thick mirror with ground edges fixed to
plasterboard lined wall
1 no
12
570 x 1000 x 6 Thick mirror with ground edges fixed to
plasterboard lined wall
1 no
13
895 x 1000 x 6 Thick mirror with ground edges fixed to
plasterboard lined wall
4 no
SPLASHBACKS
14
2090 x 450 Low iron colourback glass splashback fixed to
plasterboard wall including sealant
1 no
15
2160 x 585 Low iron colourback glass splashback fixed to
plasterboard wall including sealant
1 no
16
2813 x 585 Low iron colourback glass splashback fixed to
plasterboard wall including sealant
1 no
17
3100 x 585 Low iron colourback glass splashback fixed to
plasterboard wall including sealant
1 no
18
5005 x 585 Low iron colourback glass splashback fixed to
plasterboard wall including sealant
1 no
5/16/2019
Page 42
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Glazing
Unit
Rate
Total
(Continued)
End of Section
5/16/2019
Page 43
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Carpentry
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
All materials and workmanship shall comply with NZS 3604
item
4
The rates shall include for all labour cutting, notching, boring or
checking for ventilation, fixing to other timbers, packings and
wedges as required, morticing, tenoning, arris-rounding,
thicknessing or gauging where required and all other machining
item
5
The rates shall include for all labours in framing, notching and
fitting around projections, pipes, light fittings, hatches, grilles
and similar complete with all cleats, packers, wedges and
similar and all nails and screws
item
6
The rates for bolts and Dynabolts shall include for holes in the
timber, for necessary nuts and washers and for building in,
casting in and recessing heads as required
item
7
The rates for building paper shall include for flashing tape to
openings, parapet walls and the like
item
8
The sizes given of thicknessed, gauged or dressed timbers are
nominal sizes. Where finished sizes are required these are
described as (fin)
item
9
All timbers, unless otherwise described shall be gauged H1.2
treated MSG8 Grade Pinus Radiata
item
10
Damp proof course shall comply with AS/NZS 2904 and
AS/NZS 4347.0
item
11
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
12
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
13
Allow for all quality assurance processes as specified
item
14
Allow for all producer statements as specified
item
MAIN BUILDING
UPPER ROOF AND SOFFIT FRAMING
15
100 x 50 Blocking
47 m
16
150 x 50 Blocking
180 m
17
150 x 50 Outrigger
175 m
18
150 x 50 Purlin
603 m
5/16/2019
Page 44
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
19
150 x 50 Trimmer
47 m
20
2/150 x 50 Trimmer
69 m
21
2/250 x 50 HySpan rafter
14 m
H3.2 Treated
22
150 x 100 Firring
41 m
Sundries
23
M16 x 0-100 4.6/S Bolt fixing timber to steelwork
17 no
24
M16 x 200-300 4.6/S Bolt fixing timber to steelwork
18 no
25
4/53 x 0.9 Galvanised Lumberlok multi-brace strap
64 m
26
Lumberlok 110 x 150 long Z275 multigrip
260 no
LOWER ROOF AND SOFFIT FRAMING
27
75 x 50 Blocking
27 m
28
100 x 50 Blocking
56 m
29
150 x 50 Plate
11 m
30
150 x 50 Blocking
33 m
31
150 x 50 Trimmer
6 m
32
200 x 50 Purlin
8 m
33
200 x 50 Plate fixed to blockwork
8 m
34
200 x 50 Soffit dwang
35
250 x 50 HySpan rafter
36
250 x 50 Trimmer
52 m
37
250 x 50 Trimmer fixed to blockwork
10 m
38
250 x 50 Blocking
39
2/150 x 50 Purlin
15 m
381 m
199 m
9 m
H3.2 Treated
40
100 x 75 Packer
41
270 x 40 Shaped packer beneath parapet cap
129 m
11 m
Sundries
42
M16 x 200-300 4.6/S Threaded rod drilled and epoxied into
blockwall with Hilti HIT-RE 500
54 no
43
Pair of Lumberlok 110 x 150 long Z275 Multigrip
249 no
44
2/6kN twisted sheet brace straps
108 no
EXTERNAL WALL FRAMING
45
75 x 75 Packer
15 m
46
100 x 50 Packer fixed to steelwork
38 m
5/16/2019
Page 45
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
47
100 x 50 Packer
98 m
48
100 x 100 Packer
32 m
49
150 x 50 Bottom plate fixed to concrete
54 m
50
150 x 50 Bottom plate
51
150 x 50 Stud
52
150 x 50 Dwang
53
150 x 50 Top plate
76 m
54
150 x 50 Packer
95 m
55
150 x 50 Plate fixed to steelwork
39 m
56
150 x 50 Blocking
49 m
57
150 x 75 Plate fixed to steelwork
4 m
58
150 x 100 Plate fixed to steelwork
33 m
59
200 x 30 Packer
49 m
60
200 x 50 Bottom plate
39 m
61
200 x 50 Stud
815 m
62
200 x 50 Dwang
399 m
63
200 x 50 Top plate
39 m
64
200 x 50 Blocking
31 m
65
200 x 50 Plate fixed to steelwork
76 m
66
200 x 50 Plate fixed to blockwork
9 m
67
200 x 100 Tapered plate fixed to blockwork
6 m
68
250 x 50 Plate fixed to steelwork
87 m
69
2/150 x 50 Bottom plate
18 m
70
2/150 x 50 Bottom plate fixed to concrete
14 m
71
2/150 x 50 Lintel
72
2/150 x 50 Top plate
31 m
73
2/150 x 50 Plate fixed to steelwork
44 m
74
2/200 x 50 Bottom plate
26 m
75
2/200 x 50 Bottom plate fixed to concrete
76
2/200 x 50 LVL HySpan lintel
12 m
77
2/200 x 50 Top plate
29 m
78
3/150 x 50 Lintel
58 m
9 m
1,225 m
606 m
6 m
4 m
H3.1 Treated
79
18 x 45 Cavibat
5/16/2019
1,163 m
Page 46
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
80
45 x 10 Packer
36 m
81
45 x 20 Cavity batten
244 m
82
70 x 20 Packer
199 m
83
100 x 20 Packer
15 m
H5 Treated
84
70 x 12 Packer
92 m
Sundries
85
Bolt fix 50 timber to steelwork
180 no
86
100-200 Long bolt fixing timber to timber
51 no
87
200-300 Long bolt fixing timber to timber
48 no
88
M16 x 100-200 4.6/S Bolt fixing timber to steelwork
148 no
89
M16 x 200-300 long 4.6/S Coach bolt fixing timber to steelwork
152 no
90
M16 x 300-400 Threaded rod drilled and epoxied into blockwall
with Hilti HIT-RE 500
41 no
91
M16 x 200-300 4.6/S Bolt fixing timber to steelwork
87 no
92
Gib Handibrac hold-down including fixings
28 no
93
Damp proof course 150 wide
68 m
94
Damp proof course 200 wide
6 m
Supply the following to be cast in by the Concrete Contractor
95
M16 x 300-400 4.6/S Threaded rod
85 no
96
M20 x 300-400 4.6/S Threaded rod
49 no
INTERNAL WALL FRAMING
97
45 x 20 Batten
535 m
98
75 x 50 Packer
22 m
99
100 x 30 Packer
11 m
100
100 x 50 Threshold plate
101
100 x 50 Bottom plate fixed to concrete
54 m
102
100 x 50 Bottom plate
82 m
103
100 x 50 Stud
104
100 x 50 Dwang
693 m
105
100 x 50 Top plate
149 m
106
100 x 50 Plate fixed to steelwork
107
150 x 50 Bottom plate fixed to concrete
108
150 x 50 Bottom plate
109
150 x 50 Stud
5/16/2019
8 m
1,724 m
60 m
101 m
13 m
1,890 m
Page 47
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
110
150 x 50 Dwang
905 m
111
150 x 50 Top plate
130 m
112
150 x 50 Plate fixed to steelwork
59 m
113
150 x 75 Plate fixed to steelwork
42 m
114
200 x 50 Plate fixed to blockwork
10 m
115
200 x 50 Plate fixed to steelwork
12 m
116
200 x 50 Bottom plate fixed to concrete
21 m
117
200 x 50 Bottom plate
118
200 x 50 Stud
343 m
119
200 x 50 Dwang
155 m
120
200 x 50 Top plate
28 m
121
2/100 x 50 Bottom plate
19 m
122
2/100 x 50 Top plate
19 m
123
2/150 x 50 Bottom plate fixed to concrete
43 m
124
2/150 x 50 Bottom plate
125
2/150 x 50 Top plate
126
2/150 x 50 Lintel
8 m
127
2/200 x 50 Bottom plate fixed to concrete
4 m
128
2/200 x 50 Top plate
4 m
129
2/250 x 50 LVL HySpan lintel
5 m
5 m
9 m
52 m
Sundries
130
Fix 50 bottom plate to concrete floor
277 no
131
M16 x 100-200 4.6/S Coach bolt fixing timber to steelwork
240 no
132
M16 x 300-400 Threaded rod drilled and epoxied into blockwall
with Hilti HIT-RE 500
29 no
133
Gib Handibrac hold-down including fixings
28 no
134
Damp proof course 100 wide
54 m
135
Damp proof course 150 wide
143 m
136
Damp proof course 200 wide
24 m
Supply the following to be cast in by the Concrete Contractor
137
M20 x 400 4.6/S Threaded rod
124 no
FIRST FLOOR FRAMING
138
200 x 75 Plate fixed to steelwork
139
250 x 50 HySpan floor joist
743 m
140
250 x 50 Blocking
256 m
5/16/2019
85 m
Page 48
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
141
2/250 x 50 Trimmer
26 m
142
2/180 x 50 Blocking
85 m
Sundries
143
M12 x 0-100 4.6/S Bolt fixing timber to steelwork
848 no
144
110 x 150 Long Z275 Galvanised steel nail on plate
358 no
145
Form 2100 x 900 timber shower floor to falls including furring
strips, timber framing and flooring
4 no
FLOORING
146
20 Particle board fixed to floor framing
219 m2
CANOPY FRAMING
147
75 x 50 Soffit batten
222 m
148
100 x 50 Jack stud
7 m
149
100 x 50 Blocking
3 m
150
150 x 50 Joist
77 m
151
200 x 50 Joist
77 m
152
200 x 50 Trimmer
51 m
153
200 x 50 Trimmer fixed to steelwork
59 m
H3.2 Treated
154
30 x 30 Triangular shaped fillet
67 m
155
50 x 30 Tapered purlin
39 m
156
75 x 75 Tapered purlin
226 m
Sundries
157
Bolt fixing 50 timber to steelwork
112 no
PLYWOOD SARKING
CCA D-D Grade H1.2 treated Ecoply
158
19 Thick plywood ceiling diaphragm fixed to timber ceiling
framing
253 m2
CCA CD Grade H3.2 treated Ecoply
159
12 Thick plywood roof diaphragm fixed to timber roof framing
268 m2
160
17.5 Thick plywood roof diaphragm fixed to timber roof framing
151 m2
161
18 Thick plywood fixed to canopy roof framing
61 m2
162
18 Thick plywood fixed to inside face of parapet wall
12 m2
BUILDING PAPER
163
Watergate Plus 295 wall underlay to timber framed wall
123 m2
164
Flexible flashing tape to window and door reveals
363 m
5/16/2019
Page 49
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
INSULATION
165
Allow for manufacturer warranty covering Autex products as
specified
item
166
R3.2 140 Thick fibre glass wall insulation
757 m2
167
R2.4 90 Thick fibre glass wall insulation
527 m2
168
R1.8 75 Thick fibre glass wall insulation
438 m2
169
50 Thick Autex GreenStuf AAB insulation to ceiling
113 m2
EXTERNAL LININGS
170
Allow for 10 year manufacturer warranty for sealants as
specified
item
171
Allow for 5 year installation warranty for sealants as specified
item
6 Fibre Cement soffit lining with expressed joints, fixed in
accordance with manufacturers instructions
172
Allow for 15 year manufacturer warranty as specified
item
173
Allow for 2 year installation warranty as specified
item
174
To timber framing
123 m2
175
Level 4 stopping to fibre cement soffit lining
123 m2
176
120 Girth two times bent 0.55 colour coated soffit flashing
25 m
9 Fibre Cement Eterpan, fixed in accordance with
manufacturers instructions
177
To timber framed door reveal, 250 wide
96 m
H3.1 Plywood Air Barriers and Bracing
178
15 Thick CCA CD Grade plywood bracing fixed to timber
framed wall
135 m2
179
7 Thick CCA Ecoply air barrier
516 m2
1500 x 300 x 30 Thick Moeding Alphaton extruded clay tiles kiln
fried on and including horizontal rail system, fixed in
accordance with manufacturers instructions
180
Provide site specific warranty as specified
item
181
Provide samples as specified
item
182
Provide spares as specified
item
183
Provide all information required for code compliance
item
184
Allow for wind and seismic design as specified
item
185
Rates shall include for tile clips, fixings, profiles and weather
seals as required
item
186
To timber framed wall
94 m2
187
To steelwork
28 m2
5/16/2019
Page 50
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
188
160 Girth two times bent 1.2 aluminium powdercoated side
flashing
23 m
189
Proprietary cavity closer
46 m
Nuwall E200 vertical extruded aluminium cladding, fixed in
accordance with manufacturers instructions
190
Allow for 100 year manufacturer warranty as specified
item
191
Allow for 2 year installation warranty as specified
item
192
Provide copies of all relevant Nu-Wall maintenance information
as specified
item
193
Provide all information required for code compliance as
specified
item
194
To wall cavity battens
317 m2
195
Slotted base channel
161 m
196
Proprietary cavity closure
161 m
197
Female/male external corner including foam closer and cap
198
Internal corner including foam closer and cap
199
Jamb flashing cap including base NC139, NC138 and closed
ceill foam tape
200
35 x 35 x 5 Thick aluminium angle at edge of cladding
3 m
201
Bead of sealant between angle and cladding
3 m
202
PEF Backing rod and sealant
3 m
50 m
4 m
271 m
INTERNAL LININGS
Fibre Cement Board Wall Linings
203
Allow for shop drawings as specified
item
204
9 Refined Eterpan panel with negative detail/expressed joints
fixed to timber framing
181 m2
205
Level 5 stopping to fibre cement lining
181 m2
206
22 x 22 x 1.6 Thick EA anodised aluminium angle adhesive
fixed to base of eterpan wall lining
30 m
207
35 x 35 x 1.6 Thick EA aluminium angle
32 m
208
Bead of sealant between lining and roof covering
24 m
209
9 Refined Eterpan lining fixed to timber wall framing
41 m2
210
Level 5 stopping to fibre cement lining
41 m2
Plywood Wall Linings
211
12 Thick BD grade Ecoply fixed to timber framed wall
239 m2
212
Ditto 250 wide
114 m
213
15 Thick CCA CD grade Ecoply bracing fixed to timber framing
251 m2
5/16/2019
Page 51
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpentry
Rate
Total
(Continued)
INTERNAL TRIM
Aluminium Trim
214
100 High Forman Monz FBS009 powdercoated aluminium
skirting
405 m
Timber Trim (All Pinus Radiata Clears)
215
300 x 45 Mitred skirting to stairs, stepped to suit treads and
risers
216
180 x 40 Dressed balustrade capping
217
45 x 20 Architrave
18 m
5 m
246 m
ACCESS HATCHES
218
560 x 560 Unihatch ceiling access hatch fixed in timber framing
including surround and sealant
10 no
ROOF SAFETY SYSTEM
219
Design and build a roof safety system complete to architects
approval
item
End of Section
5/16/2019
Page 52
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Suspended Ceilings
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The rates shall include for all straight cutting and waste, cutting
around openings and the like and for all things which penetrate
the ceiling system. Openings for recessed downlights have
been measured
item
4
The rates shall include for seismic bracing etc., and compliance
with NZS 1170 which are not shown on the drawings
item
5
The rates shall include for all fixings as detailed and required
item
6
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
7
Systems installed under this contract shall be installed and fixed
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
item
8
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
SUSPENSION SYSTEM
9
Rates shall include for all penetrations as required
item
10
Rates shall include for all perimeter trims as required
item
Rondo Keylock Two-Way Exposed Suspension System to Suit
1200 x 600 Ceiling Tiles
11
Suspension system suspended average 600 (0-1000) from
timber floor framing
27 m2
12
Suspension system suspended average 1600 (1000-2000) from
steel roof framing
150 m2
13
Junction of ceiling with walls including any cutting, edge trims
and additional suspension
165 m
Rondo Keylock Two-Way Exposed Suspension System to Suit
13 Plasterboard
14
Suspension system suspended 0-1000 from timber roof
framing
15
Suspension system suspended 1000-2000 from steel roof
framing
16
Junction of ceiling with walls including any cutting, edge trims
and additional suspension
5/16/2019
Page 53
410 m2
74 m2
600 m
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Suspended Ceilings
Rate
Total
(Continued)
Rondo Keylock Two-Way Exposed Suspension System to Suit
Two Layers of 13 Plasterboard
17
Suspension system suspended average 600 (0-1000) from
timber floor framing
18
Junction of ceiling with walls including any cutting, edge trims
and additional suspension
113 m2
73 m
CEILING TILES
19
600 x 1200 Armstrong ceiling tiles in suspension grid
177 m2
GENERAL
20
Provide samples as specified
item
21
Provide information for operation and maintenance as specified
item
22
Provide spare tiles as specified
item
End of Section
5/16/2019
Page 54
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Doors
PREAMBLES
1
Items shall be fixed to timber unless otherwise described
item
2
The rates shall include for frames, mullions, transoms, glazing
bars and beads, trims, caulking and pointing, doors, sliding
tracks, hinges and fastenings
item
3
The rates shall include for re-assembly or part assembly on site
as necessary
item
4
All sizes given are approximate and must be checked on site
prior to manufacture
item
5
All glass and glazing shall be in accordance with NZS
4223:1991
item
6
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
7
Allow for the preparation of shop drawings as specified
item
8
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
DOOR AND FRAME SETS
9
Allow for all CS For Doors warranties as specified
item
10
Allow for shop drawings as specified
item
11
Door dimensions stated are leaf width x leaf height
note
Solid core flush panel paint quality doors with Hallmark
Streamline Aluminium Powdercoated frames
12
760 x 2200 High single leaf doorset (D.06)
1 no
13
860 x 2200 High single leaf doorset (D09, D10, D12, D45 to
D47, D49, D52 to D55, D57 to D68)
23 no
14
910 x 2200 High single leaf doorset (D02 to D05, D14, D16 to
D19, D23 to D30, D32, D33)
18 no
15
910 x 2200 High single leaf cavity sliding doorset (D05)
1 no
16
1620 x 2200 High double leaf doorset (D11, D15)
2 no
17
1620 x 2200 High double leaf extended swing doorset (D74)
1 no
18
2000 x 2200 High double leaf doorset (D13)
1 no
19
2762 x 2231 High four leaf top hung bifolding doorset (D07)
1 no
Solid core flush panel paint quality doors and sidelights with
Hallmark Stremline Aluminium Powdercoated frames
20
860 x 2200 High single leaf doorset with 1800 wide toughened
glazed sidelight with vision strip (D09/W28)
1 no
21
910 x 2200 High single leaf doorset with 2100 wide toughened
glazed sidelight with vision strip (D23/W29)
1 no
5/16/2019
Page 55
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Doors
Rate
Total
(Continued)
Miscellaneous
22
Undercut door for mechanical services
21 no
FIRE DOOR AND FRAME SETS
23
Allow for 5 year warranty for supply and installation
item
24
Door dimensions stated are leaf width x leaf height
note
-/30/30sm Solid core flush panel paint quality doors with
Hallmark Steel Fire Door Aluminium Powdercoated frame
25
860 x 2200 High single leaf doorset (D71, D72)
2 no
26
860 x 2200 High single leaf doorset with glazed vision panel
(D69, D70)
2 no
-/30/30sm Solid core metal faced doors with steel
powdercoated frame
27
860 x 2200 High single leaf doorset (D56)
1 no
ALUMINIUM DOORS
APL Architectural Series Aluminium Powdercoated Double
Safety Glazed Door and Frame Sections, Complete with
Rebated Timber Reveals and 3M Manifestations
28
890 x 2440 High single door (D31, D36, D43)
3 no
29
1000 x 2400 High single door (D73)
1 no
30
1590 x 2400 High double door (D44, D48, D50, D51)
4 no
31
3250 x 2826 High double door with four fixed sidelights (D01)
1 no
32
4580 x 2572 High double sliding door with two fixed sidelights
(D21, D22)
2 no
ALUMINIUM INTERNAL DOORS AND BORROWED LIGHTS
33
Allow for shop drawings as specified
item
Pasa020 105 Series Aluminium Powdercoated Laminated
Single Glazed Door and Borrowed Light Sections, Complete
with Frame and 3M Manifestations
34
2725 x 2232 High overall single door with fixed sidelight (W28)
1 no
35
3059 x 2416 High overall single door with fixed sidelight (W29)
1 no
ROLLER SECTIONAL DOORS
36
Rates are to include for 3-phase motor, door controller, driver
warning lights and sensors and remote controls
item
37
Rates are to include for glazing and powdercoated Aluminium
infill panels
item
38
Provide one year written manufacturer warranty as specified
item
39
Provide one year written installation warranty as specified
item
40
Provide shop drawings as specified
item
5/16/2019
Page 56
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Doors
Rate
Total
(Continued)
41
Provide information for operation and maintenance as specified
item
42
Provide producer statement as specified
item
Metalbilt Steel Roller Shutter Aluminium Powdercoated door
and frame sections
43
4000 x 4000 High automatic sectional door with twenty glazed
panels and eight aluminium infill panels (D24, D35, D37, D38,
D39, D40, D41, D42)
8 no
44
1500 x 2200 High single manually operated roller shutter door
(D08, D20)
2 no
Sundries
45
Sika AT-Facade silicone air seal on PEF backing rod
46
Grout infill to concrete slab edge rebate following threshold
installation. Detail 2S/A4.01
5/16/2019
Page 57
194 m
5 m
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Hardware
PREAMBLES
1
The rates shall include for matching fixings
item
2
Refer to manufacturers literature for methods of fixing
item
3
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
4
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
HARDWARE
5
Allow for samples as specified
item
Miscellaneous Hardware
6
750 x 750 x 32 L-shaped stainless steel grab rail
1 no
7
200 Long Caroma Cosmo towel rail with chrome finish
2 no
8
600 Long Caroma Cosmo towel rail with chrome finish
12 no
9
Caroma Liano toilet roll holder with chrome finish
10 no
10
Robinhood Deluxe ironing centre IC1300
1 no
11
LL432SPDP Hat & coat hook
9 no
12
LBRS0706 Braille signage (M/F disabled)
1 no
13
LBRS703 Braille signage (Unisex)
9 no
14
LBRS0704 Braille signage (Shower)
4 no
15
Allow for all construction keying
item
16
Allow for master keying and keys
item
Hardware to Timber Doors
17
L3572ZSC Classroom function mortice lock
18
L1801/70SC Square end plate with cylinder hole and 70 lever
21 no
19
L1905/70SC Square end plate with 70 lever
35 no
20
7714DASIL DA Size 1-4 P/A DC Formed cover closer
adjustable backcheck
35 no
21
LA350SC Door stop wall mounted
46 no
22
910 Wide x 200 high kick plate
54 no
23
CL100SC Cavity slider accessible bathroom sliding door lock
1 no
24
L3574ETSC Privacy latch
9 no
25
L1814/70SC Square end plate with privacy indicator emergency
turn and 70 lever
9 no
26
L1904/70SC Square end plate with turn and 70 lever
9 no
5/16/2019
6 no
Page 58
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hardware
Total
(Continued)
27
LP2SS LW Pull handle
28
L3574SC Mortice passage latch
16 no
29
L1805/70SC Square end plate and 70 lever
16 no
30
L3570XTSC Mortice night latch cylinder and turn
1 no
31
L1376SC 1370 Series oval cylinder escutcheon
4 no
32
LL841SPDP Flush bolt 150 zinc s/chrome
33
DW131SC Dust socket
6 no
34
L3572XSC Storeroom function mortice lock
3 no
35
L3570XSC Night latch single cylinder
3 no
36
L3572XTSC Entry lock mortice lock
2 no
37
L1904/70SC Square end plate with turn and 70 lever
2 no
38
7726DASIL Size 2-6 closer adjustable backcheck delayed
action
2 no
39
L3570ELM1SC Electric mortice lock 60 backset
10 no
40
LLC8810 Lead cover
10 no
41
L7580SC LW Roller bolt SC
5/16/2019
Rate
7 no
11 no
2 no
Page 59
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Applied Finishes, Render and Textured Finishes
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The rates shall include for:
item
4
temporary grounds, screeds and similar
item
5
bedding, grouting and pointing materials
item
6
cutting and/or making good around pipes, sanitary fixtures and
similar
item
7
labour to internal angles
item
8
curing of finished work
item
9
cleaning down and polishing
item
10
covering, protecting and masking surfaces
item
11
Fixing and stopping shall be in accordance with manufacturer's
instructions to the standard required for the various finishes
item
12
The rates shall include for external salient angles, edges set
and finished flush with solid plastering in same plane, cutting
and making good around sprinkler heads and similar items
item
13
The rates shall include for forming and stopping internal and
external angles to walls and fair edges, cutting and fitting into
grooved and rebated reveals, cutting and fitting around light
fittings, switches and the like and stopping around penetrations
item
14
Rates for fire stopping shall include for labelling all service
penetrations as specified
item
15
Rates shall include for forming control joints
item
16
The rates shall include for all noise and fire sealants as
required
item
17
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
18
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
BATTENS
19
Gib ST-001 clip on furring channel fixed to timber framed wall
377 m
CEILINGS
13 Standard Gib
20
To suspension system
5/16/2019
338 m2
Page 60
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Applied Finishes, Render and Textured Finishes
Rate
Total
(Continued)
13 Aqualine Gib
21
To suspension system
145 m2
16 Fyreline
22
To suspension system
113 m2
WALLS
13 Standard Gib
23
To timber framed wall
983 m2
24
To timber framed wall 0-250
25
To timber framed wall as substrate
157 m2
26
To Gib clip and furring channel
103 m2
64 m
13 Aqualine Gib
27
To timber framed wall
422 m2
28
To timber framed wall 0-250
28 m
29
To timber framed wall as substrate
67 m2
30
To Gib clip and furring channel
45 m2
13 Gib Fyreline - GBTL 60
31
To timber framed wall
156 m2
STOPPING
32
Level 4 stopping to Gib wall lining
2,337 m2
33
Level 4 stopping to Gib ceiling lining
596 m2
34
Stopping internal angle between ceiling and wall
962 m
End of Section
5/16/2019
Page 61
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Tiling, Slab and Paving
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The rates shall include for thoroughly cleaning and preparing
surfaces
item
4
The rates shall include for temporary grounds, screeds and
similar
item
5
The rates shall include for bedding, grouting and pointing
materials
item
6
The rates shall include for all straight cutting and for making
good around openings, pipes, sleeves and the like
item
7
The rates shall include for labour to internal angles
item
8
The rates shall include curing, cleaning down and polishing of
finished work
item
9
The rates shall include for covering, protecting and masking all
surfaces necessary
item
10
The rates shall include for forming all necessary construction
and expansion joints and sealing with an approved sealant
item
11
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
12
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
SPLASHBACKS
13
Allow for 10 year manufacturer warranty as specified
item
14
Allow for 2 year installation warranty as specified
item
150 x 100 Glazed Ceramic White Tiles
15
To plasterboard wall 150 high
7 m
16
Approved sealant at junction with plasterboard wall
16 m
End of Section
5/16/2019
Page 62
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Carpet and Resilient Finishes
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The rates shall include for all straight cutting and for cutting and
fitting and making good around fittings and openings, pipes,
sleeves and the like
item
4
The rates shall include for vacuuming or mopping, cleaning,
covering and protecting and masking any surfaces necessary
item
5
The rates for floor coverings shall include for all preparation of
surfaces
item
6
The rates for laying carpets shall include for cutting, sewing,
matching pattern or run at all junctions, all waste, stretching and
laying all in accordance with best trade practice
item
7
The rates for all work shall include for adhesives where
required
item
8
The rates for coving to form skirting shall include for any timber
fillets or other backing necessary, and for internal angles,
external angles and stop ends
item
9
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
10
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
CARPET
11
Provide 15 year material supply warranty as specified
item
12
Provide 2 year material installer warranty as specified
item
13
Provide samples as specified
item
14
Provide reserve material as specified
item
Shaw Show Difuse 59575 610 x 610 Carpet Tiles in Random
Pattern Direct Stuck with Approved Adhesive and in
Accordance with the Specification
15
To concrete floor
16
To timber stair treads, risers and landings
17
To timber floor
363 m2
19 m2
150 m2
ENTRANCE MAT
18
Allow for 5 year manufacturer warranty as specified
item
19
Provide 1 year installation warranty as specified
item
5/16/2019
Page 63
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpet and Resilient Finishes
20
Rate
Total
(Continued)
Allow for samples as specified
item
Advanced Coral Tread Coralduo Entry Matt with and including
Low Profile ALF3510 Matwell Frame
21
3620 x 2580 Matwell fixed to concrete
1 no
EPOXY FLOORING
22
Provide material supply warranty as specified
item
23
Provide material installer warranty as specified
item
Dulux Luxafloor Rollcoat PC227 Two Pack High Solids Epoxy
Floor Coating
24
To concrete floor
32 m2
25
2 Thick black vinyl water resistant skirting glue fixed to concrete
nib, 0-250 high
30 m
VINYL
26
Provide 5 year material supply warranty as specified
item
27
Provide 1 year material installer warranty as specified
item
28
Provide samples as specified
item
29
Provide certificates as specified
item
30
Allow for testing as specified
item
Jacobsens 2.0 Tarkett Optima IQ Vinyl Adhesive Fixed in
Accordance with the Specification
31
To concrete floor
32
Cove flooring 0-250 up wall
33
To timber floor
84 m2
121 m
37 m2
Jacobsens 2.0 Granit Safe T Vinyl Thermowelded and
Adhesive Fixed in Accordance with the Specification
34
To concrete floor
25 m2
35
Cove flooring 0-250 up wall
36
To timber floor
9 m2
37
Cove flooring 0-250 up shower threshold
8 m
149 m
Jacobsens 2.0 Protect Wall Vinyl Resilient Wall Surface Fixed
in Accordance with the Specification
38
To plasterboard lined wall
97 m2
POLISHED CONCRETE
39
Grind, polish and seal concrete floor as specified
42 m2
TRIM
40
TD1. Tredsafe DT036 carpet to vinyl trim
17 m
41
TD2. Tredsafe DT031 carpet to concrete trim
85 m
5/16/2019
Page 64
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Carpet and Resilient Finishes
Rate
Total
(Continued)
42
TD4 Ecoglo F4151-CP3 Series step noising contrast strip
31 m
43
Tredsafe DT061 to top of coved vinyl
73 m
44
Anodised carpet edge at door sill
11 m
AQURON 2000
45
Provide 15 year warranty as specified
item
46
Aquaron 2000 sealer applied to concrete floor prior to laying
vinyl
109 m2
End of Section
5/16/2019
Page 65
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Painting
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
The rates shall include for the provision, erection and removal
of scaffolding, preparation, rubbing down between coats and
similar work, the protection and/or masking of floors, fittings
and similar work, removing and replacing door and window
furniture and removing splash and spray marks
item
4
The rates shall include for painting in selected colours in
respective spaces and differing on several walls etc., and for
cutting-in to line where required
item
5
Make good and touch up paintwork in this trade and after all
other trades on completion
item
6
Provide for setting up samples where required
item
7
Provide a warranty as per Dulux Specifications
item
8
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
9
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
10
Allow for manufacturer warranties as specified
item
11
Allow for applicator warranties as specified
item
MAIN BUILDING
EXTERIOR
Apply one coat of Dulux 1 Step Acrylic Primer Sealer &
Undercoat and two coats of Dulux Weathershield to:12
Fibre cement soffit lining
123 m2
Approved paint system to:13
Plastered concrete nib, 0-250 high
81 m
Apply two coats of Dulux Weathershield X10 to:14
Exterior steelwork (all members girthed)
838 m2
INTERIOR
Apply one coat of non-conductive high build epoxy or moisture
cured refined tar urethane to specified thickness to:15
Base of steel column, 0-250 girth (Typical column at slab
edge/S03-01)
5/16/2019
Page 66
67 m
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Painting
Rate
Total
(Continued)
Apply two coats of Dulux Aquanamel to:16
Exposed interior steelwork (all members girthed)
27 m2
Apply one coat of Dulux Professional Enviro2 Acrylic Sealer
Undercoat and two coats of Dulux Professional Enviro2 Interior
to:17
Plasterboard wall lining
18
Fibre cement board wall lining
19
Concrete masonry wall
1,871 m2
181 m2
88 m2
Apply one coat of Dulux Professional Enviro2 Acrylic Sealer
Undercoat and two coats of Dulux Professional Enviro2 Ceiling
Flat to:20
Plasterboard ceiling lining
550 m2
Apply one coat of Dulux 1 Step Acrylic Sealer Undercoat and
two coats of Dulux Wash & Wear Plus Kitchen & Bathroom to:21
Plasterboard wall lining
236 m2
22
Fibre cement board wall lining
41 m2
23
Plasterboard ceiling lining
47 m2
Apply one coat of ZONE CAP100, two coats of ZONE
CAP200-1S and one coat of ZONE CAP830 to the specified
thicknesses to:24
Plywood wall lining
239 m2
Apply one coat of Dulux 1 Step Acrylic Primer Sealer &
Undercoat and two coats of Dulux Aquanamel to:25
Door leaves
236 m2
26
Timber trim, 0-250 girth
5 m
27
Timber trim
7 m2
28
Window and door reveals/architraves 0-250 girth
246 m
CARPORT
Apply two coats of Dulux Weathershield X10 to:29
Exterior steelwork (all members girthed)
119 m2
End of Section
5/16/2019
Page 67
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Joinery
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
All timber shall be dressed and the sizes stated are nominal
except where described as (fin) finished
item
4
Joinery timber, except where otherwise described shall be
Medium Density Fibreboard
item
5
The rates for joinery items, except where otherwise described,
shall include for supply and delivery to site, hanging, fixing or
placing in position
item
6
The rates shall include for all labours in framing, notching and
fitting around projections, pipes, light fittings, hatches, grilles
and similar complete with all cleats, packers, wedges and
similar and all nails and screws
item
7
Items shall be fixed to timber unless otherwise described
item
8
The rates shall include for re-assembly or part assembly on site
as necessary
item
9
All sizes given are approximate and must be checked on site
prior to manufacture
item
10
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
11
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
12
Refer to Specification and the notes on A6 series drawings for
details of materials and hardware for each type of joinery unit
item
13
Rates for joinery units are to include for all hardware and fittings
described and shown on the drawings including
electromagnetic locks
item
14
Rates for plywood locker units are to include for timber bearers
Chemfix anchored to concrete slab
item
JOINERY FITTINGS
15
2813 Long x 600 deep x 915 high kitchenette base cupboard
unit with Formica top with sink aperture. Drg A6.01
1 no
16
2813 Long x 430 maximum deep x 900 high kitchenette wall
cupboard unit. Drg A6.01
1 no
17
1750 Long x 500 deep x 760 high projector screen base
cupboard unit with Formica worktop. Drg A6.01
1 no
5/16/2019
Page 68
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Joinery
Rate
Total
(Continued)
18
2160 Long x 600 deep x 915 high office base cupboard unit
with Formica worktop. Drg A6.01
1 no
19
1630 Long x 800 deep x 2400 high office open shelving unit.
Drg A6.01
1 no
20
4415 Long x 580 deep x 2400 high pantry open shelving unit.
Drg A6.02
1 no
21
11025 Girth x 915 high L-shaped on plan kitchen base
cupboard unit with Formica top with sink aperture and 2100
high fridge/freezer unit. Drg A6.02
1 no
22
2110 Long x 330 deep x 750 high kitchen open shelving wall
unit. Drg A6.02
1 no
23
3250 Long x 915 high kitchen island base drawer unit with
Formica worktop. Drg A6.02
1 no
24
3100 Long x 600 deep x 900 high workshop base cupboard unit
with Formica worktop. Drg A6.09
1 no
25
3100 Long x 450 deep x 750 high workshop open shelving wall
unit. Drg A6.09
1 no
26
3000 x 750 high office bench unit with Formica workshop
including concealed wall bracket fixings. Drg A6.09
1 no
STAIRCASES
27
1047 Wide staircase comprising 40 thick treads and half
landing, 20 thick risers and 300 x 45 stringers, total rise 3750.
Drg A6.04
1 no
End of Section
5/16/2019
Page 69
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Hydraulics
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
All work shall comply with N.Z. Building Code Sections G1, G12
and G13
item
4
The rates for flashings shall include for folding and bending to
shape, laps, joints, expansion joints soakers, clips and shaping
at angles and ends
item
5
The rates shall include for sockets, running joints, connectors,
back nuts, nipples, connections, incidental fittings, clips,
saddles, brackets, straps, hangers, screws, nails, explosive and
low velocity tool fasteners and other metal fastenings anchors
and/or systems and fixing complete including cutting and
forming holes, supplying and building in sleeves other than fire
rated sleeves
item
6
The rates for pipework shall include for pipework less than 32
diameter shall include for all bends, elbows, tees, junctions,
cleaning eyes and the like. The rates for tees and junctions
shall include for any bends necessary for the required sweep.
The rates for irregular tees and junctions shall include for any
necessary reducers
item
7
The rates for pipework shall included for all Acoustic Measures
as Specified
item
8
The rates for pipework shall include for setting out sleeves
through wall, floors and ceilings and for escutcheons at wall and
ceiling penetrations.
item
9
The rates for pipework shall include for supplying and installing
fire stop collars and all other fire rating measures as required.
item
10
The rates for pipework in trenches shall include for warning
tape and trace wire as Specified
item
11
The rates for pipe insulation shall include for cutting and
trimming around equipment, fixings, valves and the like. The
rates for insulation to pipes less than 32 diameter shall include
for all bends, elbows, tees, junctions, cleaning eyes and the like
item
12
The rates for valves shall include for all additional metalwork
requirements for supports, anchors, brackets etc, mating
flanges, gaskets, bolt unions etc and the preparation of pipe
ends
item
13
The rates for cylinders and tanks shall include for seismic
bracing as required by NZS 4603:1985
item
14
Rates for pipework shall include for expansion joints as
required
item
5/16/2019
Page 70
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hydraulics
Rate
Total
(Continued)
15
Systems installed under this contract shall be installed and fixed
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
item
16
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
17
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
GENERAL
18
Pay all fees and charges in connection with the plumbing
installation, comply with all regulations and by-laws, give all
necessary notices and obtain permits
item
19
Prepare and supply shop drawings as specified
item
20
Provide construction drawings as specified
item
21
Provide vermin proofing as required
item
22
Provide fire separation as required
item
23
Give all notices and obtain all approvals as specified
item
24
Apply for and pay all fees required for water connections
item
25
Prepare, maintain and provide as-built drawings as specified
item
26
Prepare and provide maintenance manuals as specified
item
27
Provide a 12 month guarantee and maintenance for the
plumbing works as specified
item
28
Provide labelling and identification as specified
item
29
Provide producer statements on completion
item
30
Provide for all quality assurance and associated documentation
as specified
item
31
Allow for anchor blocks as specified
item
32
Allow for all cleaning, flushing and sterilising systems as
specified
item
33
Allow for all testing and commissioning as specified
item
BUILDERS WORK
34
Provide for co-operating with other trades and for cutting holes,
chases, recesses, etc., supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, making good finishes around same and for all
sundry labours
item
SANITARY FITTINGS
35
Rates shall include for brackets, flush pipes, overflows, plugs
and washers and similar items where required
5/16/2019
Page 71
item
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hydraulics
Rate
Total
(Continued)
36
Mercer Riva stainless steel bowl, face based.
1 no
37
Heritage EcoGranit Egmont 1160-20 double bowl with drainer
1 no
38
Caroma Care 800 wall faced Invisi ii suite with backrest
1 no
39
Caroma Leda vitreous china dual flush wall faced ROM boxed
close-coupled toilet suite
4 no
40
Caroma Integra 500 wall basin
1 no
41
Caroma Cube extension wall basin
1 no
42
Caroma Opal 510 wall basin with Opal shroud
4 no
43
Mercer Questo Laundry tub
1 no
44
Mercer X1 XL cleaners sink
1 no
45
3599 Long x 600 wide BA wash bench top with 150 upstand
and end panels, including two stainless steel sink inserts. Drg
A6.01
1 no
RING MAIN HOT WATER SYSTEM
46
Rates for hot water cylinders are to include for all TPR, drain
cock, drip trays, overflows and tundishes as necessary,
including connections to drains
item
47
Rates for hot water cylinders are to include for all wall brackets,
supports, frames, additional ceiling or roof framing and seismic
restraints as required
item
48
315 hot water cylinder (3x6kw) including all necessary short
lengths of pipes, fittings, valves, bypasses, control panels,
alarms, equipment, etc which constitute the assembly
2 no
49
Pumpset including: single action pump, one non return valve,
one isolating valve and unions
1 no
50
UV sterilizer set including: UV sterilizer test points and isolating
valve.
1 no
HYDROTAP
51
Zip Hydrotap G4 commercial. HT1708
2 no
TAPS AND VALVES
52
Methven Minimalist basin mixer. Echo Vision EV 9101
53
Robertson Retta mixer with pullout spray
1 no
54
Methven Minimalist shower mixer
8 no
55
Methven Minimalist slide shower with soap holder
8 no
56
Zum sink faucet (Z-SF)
2 no
57
Hose tap 15mm female chrome plates with lockshield cover
and vacuum breaker
7 no
58
Fox automatic demand valve and hose tap, complete including
all fittings and controls
1 no
5/16/2019
Page 72
10 no
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hydraulics
Rate
Total
(Continued)
TRAPS AND WASTES
59
Rates for traps shall include for any connections or joints to
piping and fixtures, appliances or equipment
item
60
40 PVC trap
12 no
61
50 PVC trap
3 no
62
Floor waste gulley with boss junction and Easiclean grating
5 no
63
Floor waste gulley with boss junction to channel drain outlet,
with strainer basket
4 no
64
65 Untrapped floor waste outlet to channel drain outlet, with
strainer basket
5 no
65
Allproof Equator V900E channel
4 no
66
Allproof Revolver shower waste, vinyl finish with Duco cast iron
body with combined flashing clamp and gravel stop with
polyethylene dome
4 no
TRAP PRIMING DEVICES
67
Rates for trap priming devices shall include for all associated
isolating valves, solenoid valves and air gap backflow
prevention
item
68
Rates for trap priming devices shall include for all pipework
serving their relative gulley traps, complete, including tundishes
item
69
Trap priming device
2 no
SOIL WASTE AND VENT PIPEWORK
70
Rates for soil, waste and vent pipework shall include for
inspection points
item
uPVC
71
40 Waste pipework below slab
72
40 Waste pipework in wall framing, ceiling space and joinery
73
50 Waste and vent pipework in wall framing, ceiling space and
joinery
74
50 Waste pipework below slab
1 m
75
65 Waste pipework below slab
45 m
76
65 Waste and vent pipework in wall framing, ceiling space and
joinery
52 m
77
100 Waste pipework below slab
78
100 Waste and vent pipework run in wall framing and ceiling
space
18 m
79
40 bend
12 no
80
50 bend
16 no
81
65 bend
20 no
5/16/2019
19 m
7 m
35 m
110 m
Page 73
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hydraulics
Rate
Total
(Continued)
82
100 bend
28 no
83
50 x 50 x 40 junction
1 no
84
65 x 65 x 40 junction
10 no
85
65 x 65 x 50 junction
2 no
86
65 x 100 x 65 junction
19 no
87
100 x 100 x 50 junction
11 no
88
100 x 100 x 65 junction
16 no
89
100 x 100 x 100 junction
16 no
90
Flexible connection hydraulic/civil 100 pipe
6 no
91
Penetrate roof, form flashing, bird-proof cowl to 65 terminal
vent
2 no
92
PVC tundish with Hepvo waterless valve
9 no
93
AAV to sink waste
1 no
94
Connect washing machine drain to sink waste
2 no
95
Provide fixture overflow facilities as specified
item
Wrap under-slab pipework in two layers of bubble-wrap
96
40 Waste pipework below slab
3 m
97
50 Waste pipework below slab
1 m
98
65 Waste pipework below slab
11 m
99
100 Waste pipework below slab
17 m
Wrap waste pipework with Allproof Acoustiflex Acoustic
Lagging
100
40 Waste pipework in wall framing, ceiling space and joinery
7 m
101
50 Waste pipework in wall framing, ceiling space and joinery
31 m
102
65 Waste pipework in wall framing, ceiling space and joinery
44 m
103
100 Waste pipework run in wall framing and ceiling space
18 m
HOT AND COLD WATER
Pipework - Aquatherm PPR for 32 and Over and Fusiotherm or
Pex for Pipe 25 and Under
104
15 Pipe run in wall framing and ceiling space
315 m
105
20 Pipe run in wall framing and ceiling space
113 m
106
25 Pipe run in wall framing and ceiling space
129 m
107
32 Pipe run in wall framing and ceiling space
30 m
108
40 Pipe run in wall framing and ceiling space
65 m
109
40 bend
7 no
110
40 x 32 x 32 tee
1 no
5/16/2019
Page 74
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hydraulics
Rate
Total
(Continued)
111
40 x 40 x 15 tee
1 no
112
40 x 40 x 20 tee
3 no
113
40 x 40 x 25 tee
4 no
114
Provide chrome plated tails where pipework is exposed
adjacent fittings
item
Valves and Fittings
115
15 ISO valve
43 no
116
25 Isolating valve
1 no
117
25 Non return valve
1 no
118
32 Isolating valve
2 no
119
32 Non return valve
1 no
120
40 Isolating valve
2 no
121
40 Strainer
1 no
122
40 Pressure limiting valve
1 no
123
40 Non return valve
1 no
124
Expansion control valve
1 no
125
160 PVC pipe at cold water slab entry penetration, fill with
compressible foam
2 no
BACKUP SUPPLY PUMPSET
126
SHM04P07M single phase pump set with steady press control
including isolating valves
1 no
INSULATION
Cold Water - 13 Armaflex insulation
127
15 Pipe run in wall framing and ceiling space
214 m
128
20 Pipe run in wall framing and ceiling space
54 m
129
25 Pipe run in wall framing and ceiling space
71 m
130
32 Pipe run in wall framing and ceiling space
16 m
131
40 Pipe run in wall framing and ceiling space
65 m
132
25 Isolating valve
1 no
133
25 Non return valve
1 no
134
32 Isolating valve
1 no
135
40 Isolating valve
2 no
136
40 Strainer
1 no
137
40 Pressure limiting valve
1 no
138
40 Non return valve
1 no
Hot Water - 19 Armaflex insulation
5/16/2019
Page 75
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hydraulics
Rate
Total
(Continued)
139
15 Pipe run in wall framing and ceiling space
101 m
140
20 Pipe run in wall framing and ceiling space
60 m
141
25 Pipe run in wall framing and ceiling space
58 m
142
32 Pipe run in wall framing and ceiling space
14 m
143
32 Isolating valve
1 no
144
32 Non return valve
1 no
145
Pumpset and valves
1 no
146
Sterilizer set and valves
1 no
147
Thermo-blending set and valves
2 no
CIVIL WORKS
Pipework
148
12.7 Copper (Fox valve hydraulic line) including excavation
0-1m deep and backfilling
12 m
149
40 PE80 PM12 pipe including trench excavation 0-1m deep and
backfilling
22 m
150
40 PE80 PM12 pipe above ground
11 m
151
40 bend
152
63 PE80 PN2 pipe including trench excavation 0-1m deep and
backfilling
153
63 bend
154
100 UPVC Pn12 pipe including trench excavation 0-1m deep
and backfilling
162 m
155
150 UPVC Pn12 pipe including trench excavation 0-1m deep
and backfilling
248 m
156
100 45 Deg bend, including thrust block
1 no
157
100 11.5 Deg bend, including thrust block
3 no
158
150 22.5 Deg bend, including thrust block
1 no
159
150 11.25 Deg bend, including thrust block
2 no
160
100 End cap including thrust block
1 no
161
150 End cap including thrust block
1 no
162
100/32 Tapping band
2 no
163
40/12.7 Reducer
1 no
164
150/100 Tee including thrust block
2 no
8 no
30 m
4 no
Valves
165
100 Sluice valve, including valve riser and lid
7 no
166
32 Gate valve, steam riser, cast box and lid
2 no
5/16/2019
Page 76
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Hydraulics
Rate
Total
(Continued)
167
64 Gate valve, steam riser, cast box and lid
1 no
168
Fox demand valve and hose tap on 25 pipe
1 no
Water Connections
169
Rates for street connections are to include for all necessary
road closures and traffic management, excavation, shoring,
backfill and making good all surfaces and kerbs
170
Connect 100 pipe to existing 100 in Johns Road
item
1 no
Meters
171
Commercial water meter on 100 pipe, including coordination
with CCC
2 no
Backflow Preventer
172
Rates for backflow preventer are to include for all associated
valves and fittings, strainers, pipework, chambers including
excavation and backfill, concrete pads and plinths, etc
173
Backflow preventer on 100 pipe, including all fittings, bends,
strainers, valves, risers complete
1 no
174
Backflow preventer chamber and lid
1 no
item
Water Tank
175
25,000L water tank, including connections, drainage points,
filter/strainer, ballcock, isolating valves, complete
1 no
End of Section
5/16/2019
Page 77
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Drainage
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
All work shall comply with NZ Drainage and Plumbing
Regulations 1978 with amendments thereto and to the
requirements of the Territorial Authority
item
4
PVC pipes to foul sewer and stormwater drains shall comply
with NZS 7649 and be jointed to approval
item
5
The rates shall include for maintaining faces of drain pipe
trenches and pits, backfilling, disposal of surplus spoil, forming
pockets beneath collars and all jointing and other incidental
materials
item
6
The rates for excavation shall include for excavation in any
material met with excepting hard rock, grading bottoms, boning
to true and even gradients, forming grooves for pipe collars,
and bedding
item
7
Provide for temporary lights, barricades and all other items
deemed necessary for the proper protection of the work, the
public, and all other property
item
8
Keep excavations free from storm or percolating water by
pumping or other approved means
item
9
Pay all fees and charges in connection with the drainage
installation, comply with all regulations and by-laws, submit all
plans, give all necessary notices and obtain consents
item
10
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
11
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
12
Allow for testing and inspections as Specified
item
FOUL DRAINAGE
uPVC
13
100 Pipe including trench excavation 0-1m deep and approved
bedding
71 m
14
100 Bend
15 no
15
100 x 100 x 100 Junction
5 no
16
100 Inspection joint/bend
8 no
17
Connect 100 pipe to wastewater
1 no
18
Connect 100 pipe to manhole
2 no
5/16/2019
Page 78
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Drainage
Rate
Total
(Continued)
19
Connect 100 pipe to oil interceptor
2 no
20
Connect 100 pipe to diversion chamber
1 no
Valves
21
100 Reflux valve
1 no
STORMWATER DRAINAGE
uPVC
22
80 SN8 Pipe including trench excavation 0-1m deep and
approved bedding
47 m
23
80 bend
5 no
24
80 x 80 x 80 junction
2 no
25
Connect 80 pipe to drainage channel
3 no
26
100 Pipe including trench excavation 0-1m deep and approved
bedding
27
Connect 100 pipe to drainage channel
28
100 Bend
29
100 x 150 x 80 Junction
1 no
30
100 x 150 x 150 Junction
6 no
31
Connect 100 pipe to downpipe
4 no
32
Connect 100 pipe to sump
1 no
33
Connect 100 pipe to soakage pit
1 no
34
Connect 100 pipe to sprinkler room
1 no
139 m
1 no
11 no
MANHOLES
35
Rates for manholes are to include for excavation, sand, gravel
or other special backfilling and stating the nature of the material
and method of consolidating and all components
item
Stormwater
36
1200 Diameter manhole with Korum lid for pump lift test
1 no
37
Actuated stormwater/wastewater diversion chamber including
DN600 concrete manhole and lid
1 no
38
900 Diameter perforated manhole including galvanised scruffy
dome and base (Basin/CC-300, drainage gravel measured
elsewhere)
1 no
Foul Sewer
39
Hynds OG1KIT oil interceptor
1 no
40
CSS SD303-1 Manhole with drop structure as per CSS SD 305
1 no
Pump Testing Manhole
41
1200 Diameter x 1.5-2m deep Humes concrete pipe for pump
testing including with cast iron lid and excavation
5/16/2019
Page 79
1 no
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Drainage
Rate
Total
(Continued)
SUMPS AND GULLY TRAPS
42
Rates for sumps and gully traps are to include for excavation,
bedding and setting in concrete, backfilling and making good
item
43
CSS SD325 Single sump with grate
1 no
44
CSS SD325 Double sump with grate
2 no
45
CSS SD327 Corner sump with grate
2 no
46
Overflow relief gully tied into building foundations encased in
concrete
1 no
47
50 Diameter x 600 long concrete drainage chamber
1 no
48
3150 x 2450 Overflow weir including anti scour mat
1 no
SOAKAGE PITS
49
2000 x 1000 x 1-2m Deep soakage pit including excavation and
fill with free draining boulders
1 no
50
3000 x 3000 x 4-5m Deep soakage pit including excavation and
fill with free draining boulders
1 no
51
300 Diameter x 3200 long perforated pipe placed in drainage pit
including Humes 3001 cast iron lid and 20MPa concrete
surround
1 no
52
A29 Geofabric filter material
59 m2
DRAINAGE CHANNELS
53
Rates for drainage channels are to include for excavation,
bedding and setting in concrete, backfilling, sealants and
making good
54
Accrete Two-Stage drainage channel and threshold grate
16 m
55
Stop end
16 no
56
Drain outlet
57
200 ACO slot drain with grate
58
Stop end
2 no
59
Drain outlet
1 no
60
100 Wide Hynds Hauraton Recyfix Plus 100 constant depth
drainage channel with Class D DI galvanised mesh grate and
inline sump
61
Stop end
4 no
62
Drain outlet
2 no
63
100 Wide Hynds Hauraton Recyfix Plus 100 constant depth
drainage channel with Class D DI galvanised mesh grate and
inline sump
64
Stop end
8 no
65
Drain outlet
4 no
5/16/2019
item
8 no
25 m
Page 80
44 m
20 m
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Drainage
Rate
Total
(Continued)
66
Ultra Drain UD60 channel drain with grate
12 m
67
Stop end
2 no
68
Drain outlet
1 no
69
Sump to Ultra drain
1 no
End of Section
5/16/2019
Page 81
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Electrical Installations
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Quantities
item
3
All work shall be in accordance with the Electrical Workers
Regulations 1993 and the Electrical Technical Safety
Regulations 1993 and all amendments thereto, including all
Standards and Codes
item
4
The rates shall include for screws, nails, bolts, nuts, nipples,
standard cable fixing or supporting clips, saddles, brackets,
straps, rivets, plugs and similar items and all incidental
accessories
item
5
Work described as laid in trench shall include for excavation,
maintaining faces of excavation, backfilling, compaction, cable
covers, warning tape and disposal of surplus spoil
item
6
The rates for electrical conduits, fittings, equipment and similar
items shall include for all fixings to various building surfaces
item
7
Except where otherwise described, all subcircuit cabling shall
be TPS run concealed; where within masonry walls shall be
TPS enclosed in rigid PVC conduit; where complete circuit is
installed within masonry floors or walls shall be TPS or PVC
cables enclosed in steel conduit
item
8
The rates for subcircuiting shall include for providing an earth
wire to all outlets
item
9
The rates for subcircuiting shall include for conduit systems,
cable support and accessories, timber battens, outlets and
metal flush boxes, mounting blocks, cables, fixings and
connections only. Switches, plug sockets, etc., have been
measured
item
10
The rates for cable connections shall include for all terminal
glands and accessories appropriate to the type and size of
cables
item
11
The rates shall include for the painting and finishing of all items
of equipment supplied and installed under this section of the
work
item
12
Pay all fees and charges in connection with the Electrical
Installation, comply with all regulations and by-laws, give all
necessary notices and obtain permits
item
13
Provide for fire sealant, penetrations and making good finishes
around same and for all fire resisting elements as required by
the specification
item
14
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
5/16/2019
Page 82
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Rate
Total
(Continued)
15
Systems installed under this contract shall be installed and fixed
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
item
16
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
17
Provide for co-operating with other trades and for cutting holes,
chases, recesses, etc., supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, making good finishes around same and for all
sundry labours
item
18
Provide all as-built, shop drawings operation and maintenance
manuals
item
19
Provide all producer statements, room check lists, electrical
certificates etc.
item
20
Provide all guarantees and warranties
item
21
Provide all instruction/training to employer's staff
item
22
Allow to demonstrate all system/s to the Electrical Engineer
item
23
Provide all testing and commissioning
item
24
Provide for all necessary cable ladder/tray/ cable basket and
associated fittings as specified, not measured hereunder
item
25
Provide for all earthing
item
26
Provide for all communications earthing
item
27
Provide for all cable numbering and ferruling
item
28
Provide for all labelling and identification
item
29
Allow for full co-ordination with other contractors on site
item
30
Allow for full maintenance of the completed installation for a
period of 12 months
item
31
Allow for all shutdowns, working outside normal hours and
maintaining continual operation of electrical services during all
stages of the project
item
32
Provide temporary connections within the building as required
item
33
Allow for any demolition and disconnection work associated
with the project
item
34
Penetrate, sleeve and re-seal foundation of building for 50 duct
4 no
Penetrate, sleeve and re-seal foundation of building for 80 duct
2 no
Penetrate, sleeve and re-seal foundation of building for 100
duct
4 no
35
36
Ducts
5/16/2019
Page 83
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Total
(Continued)
37
The rates for PVC duct shall include for sundry bends (not
measured hereunder), tees, sealant, draw wire, etc.
38
32 Duct/sleeve buried direct in trench complete with draw wire
50 m
39
40 Duct/sleeve buried direct in trench complete with draw wire
23 m
40
50 Duct/sleeve buried direct in trench complete with draw wire
11 m
41
50 (Red) Duct/sleeve buried direct in trench complete with draw
wire
33 m
42
80 (Green) Duct/sleeve buried direct in trench complete with
draw wire
33 m
43
100 Duct/sleeve buried direct in trench complete with draw wire
44
Seal end of 32 duct
4 no
Seal end of 40 duct
4 no
46
Seal end of 50 duct
2 no
47
Seal end of 100 duct
10 no
48
ACO Cable pit/ draw pit complete with lid - CP 1
45
Rate
item
334 m
4 no
SUPPLY AUTHORITY MAIN SUPPLY
49
Allow for all Supply Authority costs and fees associated with
establishing and electrical supply to the installation
item
50
Allow for all fees and permits required for each stage of the
contract
item
51
Allow to arrange with the Supply Authority for the disconnection
of the existing mains cabling and removal of metering if
required
item
52
Arrange with the nominated power company and energy
supplier for the provision of metering
item
MAINS
Cable
53
4 x 120mm2 1c Cu XLPE mains cable/s - underground from
site transformer to MSB, drawn through duct - Cable 1
44 m
Terminations
54
Terminate 4 x 1c x 120mm2 Cu XLPE mains cable/s
2 no
SUBMAINS
Cable
55
4 x 120mm2 1c Cu XLPE + 35mm2 ECC sub main from MSB
to GCP, part run on cable tray, part run in underground duct Cable 2
40 m
56
12 Core x 2.5mm2 Control cable from MSB to GCP, part run on
cable tray, part run in underground duct - Cable 3
40 m
5/16/2019
Page 84
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
57
58
Rate
Total
(Continued)
4 x 70mm2 1c Cu XLPE + 25mm2 ECC sub main from MSB to
DB:2, part run on cable tray, part run in underground duct Cable 5
56 m
12 Core x 2.5mm2 Control cable from MSB to DB:2, part run on
cable tray, part run in underground duct - Cable 5
56 m
Terminations
59
Terminate 4 x 120mm2 1c Cu XLPE + 35mm2 ECC sub main
cable/s
2 no
60
Terminate 12 Core x 2.5mm2 control cable
4 no
61
Terminate 4 x 70mm2 1c Cu XLPE + 25mm2 ECC sub main
2 no
SWITCHBOARDS
62
All switchboards shall include (but not limited to) earthing,
switch gear, metering, CTs, controls, interconnections, load
shedding, circuit breakers, fire sealing, all as specified and
drawn
item
63
The rates for all switchboards shall include fixing, all necessary
supports, method of connection to mains, provision of metering
and all details of spare capacity required
item
64
The rates for switchboards shall include for interwiring and
connections between components and control gear within the
board
65
Main switchboard MSB, incorporating DB:1, DB:1M
1 no
66
Distribution board DB:2, incorporating DB:2A , DB:2M
1 no
67
Generator connection panel and enclosure
1 no
68
Allow to provide and install a laminated sign adjacent MSB
1 no
69
Allow to provide and install surge protection as specified
item
Allow to provide and install a load shedding device within the
main switchboard as specified
item
70
LIGHTING CIRCUITS
71
Refer to switchboard legends for full details of circuit wiring,
looping and core requirements
item
From Local DB to lighting outlet
72
Circuit wiring to ceiling mounted lighting outlet
73
Circuit wiring to ceiling suspended lighting outlet
74
Circuit wiring to exterior pole/bollard mounted lighting outlet
75
Circuit wiring to exterior wall mounted lighting outlet
76
Circuit wiring to in-ground lighting outlet
3 no
Circuit wiring to joinery mounted lighting outlet
3 no
77
78
204 no
17 no
Circuit wiring to emergency/exit light outlet
5 no
30 no
21 no
From Local DB to switching outlet
5/16/2019
Page 85
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Rate
Total
(Continued)
79
Circuit wiring to one way switch
1 no
80
Circuit wiring to timer switch T30
5 no
81
Circuit wiring to timer switch T60
5 no
82
Circuit wiring to daylight switch - Lx
1 no
83
Circuit wiring to motion detector - MD1
42 no
84
Circuit wiring to motion detector - MD2
6 no
85
Circuit wiring to motion detector - MD3
6 no
86
Circuit wiring to motion detector - MD4
1 no
87
Circuit wiring to switch plate Lx
56 no
POWER CIRCUITS
88
Refer to switchboard legends for full details of circuit wiring,
looping and core requirements
item
From Local DB to Socket outlet
89
Circuit wiring to single switched socket outlet - DR - 20A and
isolator
2 no
90
Circuit wiring to single switched socket outlet - DW and isolator
1 no
91
Circuit wiring to single switched socket outlet - DH - 15A
1 no
92
Circuit wiring to single switched socket outlet - FR and isolator
1 no
Circuit wiring to single switched socket outlet - G, 15A in floor
box
1 no
Circuit wiring to single switched socket outlet - I
1 no
95
Circuit wiring to single switched socket outlet - MW and isolator
1 no
96
Circuit wiring to single switched socket outlet - UBH, 16A and
isolator
1 no
97
Circuit wiring to single switched socket outlet - WM and isolator
2 no
Circuit wiring to externally mounted single switched socket
outlet - IP 15A
1 no
Circuit wiring to single switched socket outlet - 3 phase 32A
1 no
93
94
98
99
From Local DB to Socket outlet
100
Circuit wiring to double switched socket outlet - A
101
Circuit wiring to double switched socket outlet - ASE
1 no
102
Circuit wiring to double switched socket outlet - AU
7 no
Circuit wiring to double switched socket outlet - AV
10 no
104
Circuit wiring to double switched socket outlet - B
28 no
105
Circuit wiring to double switched socket outlet - BU
17 no
106
Circuit wiring to double switched socket outlet - CP 15A
103
5/16/2019
80 no
Page 86
1 no
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Circuit wiring to double switched socket outlet - DP
4 no
108
Circuit wiring to double switched socket outlet - IP53
2 no
109
Circuit wiring to double switched socket outlet - JP
1 no
Circuit wiring to double switched socket outlet - J in floor box
1 no
Circuit wiring to double switched socket outlet - TD
2 no
Circuit wiring to double switched socket outlet - TDE
2 no
111
112
Total
(Continued)
107
110
Rate
113
Circuit wiring to double switched socket outlet - TV
15 no
114
Circuit wiring to double switched socket outlet - W
6 no
From Local DB to Quad Socket outlet
115
Circuit wiring to quad switched socket outlet in floor box
3 no
From Local DB to Fixed Wire Outlet
116
Circuit wiring to permanent connection - AP-INL - suspended
4 no
117
Circuit wiring to permanent connection - DOOR (including all
limit switches, controls etc.)
8 no
118
Circuit wiring to permanent connection - EXTRT
1 no
119
Circuit wiring to permanent connection - FAP
1 no
120
Circuit wiring to permanent connection - GATE (duct and trench
measured elsewhere)
2 no
Circuit wiring to permanent connection - FSPUMP (duct and
trench measured elsewhere)
1 no
122
Circuit wiring to permanent connection - HOOD
2 no
123
Circuit wiring to permanent connection - HOB
2 no
124
Circuit wiring to permanent connection - HWC
1 no
125
Circuit wiring to permanent connection - HWC 3 phase
1 no
126
Circuit wiring to permanent connection - H1
8 no
127
Circuit wiring to permanent connection - H2 and thermostat
1 no
128
Circuit wiring to permanent connection - OVEN
2 no
129
Circuit wiring to permanent connection - PUMP
1 no
130
Circuit wiring to permanent connection - CPUMP
1 no
131
Circuit wiring to permanent connection - SEC
1 no
121
From Local DB to Outlet
132
Circuit wiring to isolation reset switch - KR
1 no
133
Circuit wiring to isolation reset switch - IR
1 no
LIGHT FITTINGS
5/16/2019
Page 87
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
The rates for light fittings shall include for all necessary lamp
holders, flexible cord connections, sleeving, control gear, lamps
and tubes, diffusers, purpose made brackets and supports, etc.
all as specified and detailed and for fixing to ceilings, soffits or
channel unless otherwise described and shall be in accordance
the Specification and Schedule of Luminaires
item
135
The rates for light fittings shall include for sealant against the
ingress of moisture
item
136
The rates for light fittings shall include for drivers/transformers
item
137
Refer to Schedule of Luminaires for full details of light fittings
item
138
Light fitting type A1
12 no
139
Light fitting type B1
14 no
140
Light fitting type B2
6 no
141
Light fitting type B3D
11 no
142
Light fitting type B4
2 no
143
Light fitting type D1
1 no
144
Light fitting type D2
16 no
145
Light fitting type D3
2 no
Light fitting type D4
2 no
147
Light fitting type F1 - suspended
148
Light fitting type F1E - suspended
149
Light fitting type F2
150
11 no
4 no
10 no
Light fitting type F2E
4 no
151
Light fitting type F3 - suspended
2 no
152
Light fitting type F4
19 no
153
Light fitting type F5
2 no
154
Light fitting type F5 - externally mounted
4 no
155
Light fitting type H2
2 no
156
Light fitting type IG1 - in ground fitting
2 no
Light fitting type IG2 - in ground fitting
1 no
158
Builders work in connection with in-ground fittings
3 no
159
Light fitting type J1
8 no
160
Light fitting type J1D
10 no
161
Light fitting type J2D
17 no
162
Light fitting type J5
21 no
163
Light fitting type J6
5 no
164
Light fitting type LED1 - joinery mounted
1 no
157
5/16/2019
Total
(Continued)
134
146
Rate
Page 88
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Light fitting type LED2 - joinery mounted
1 no
166
Light fitting type LED3 - joinery mounted
1 no
167
Light fitting type M1
8 no
168
Light fitting type P1 - pole mounted
5 no
169
7.6m Square pole complete with foundations, hold downs and
mounting brackets
5 no
170
Builders work in connection with pole
5 no
Light fitting type ST - externally mounted
2 no
172
Light fitting type W1 - externally mounted
13 no
173
Light fitting type W2 - externally mounted
6 no
174
Light fitting type W3
4 no
175
Light fitting type W4 - externally mounted
5 no
176
Light fitting type W5D
177
Light fitting type W6
4 no
Light fitting type W7
4 no
178
Total
(Continued)
165
171
Rate
20 no
Emergency
179
Light fitting type EM1
6 no
180
Light fitting type ES1
10 no
181
Light fitting type EM2
2 no
182
Light fitting type EM3 - soffit mounted
2 no
183
Light fitting type EM3
1 no
SUB CIRCUIT FITTINGS
184
185
Refer to Socket Outlet Legend for full details of sockets,
isolators, plugs, flexes etc.
item
The rates for switches shall include for wall boxes and similar
items
Light Switches
186
One way switch
1 no
187
Timer switch T30
5 no
188
Timer switch T60
5 no
189
Daylight switch - Lx
1 no
190
Motion Detector - MD1
42 no
191
Motion Detector - MD2
6 no
192
Motion Detector - MD3
6 no
Motion Detector - MD4
1 no
193
Switch Plates
5/16/2019
Page 89
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Rate
Total
(Continued)
194
Switch plate LA
2 no
195
Switch plate LB
1 no
196
Switch plate LC
5 no
197
Switch plate LD
1 no
198
Switch plate LF
20 no
199
Switch plate LG
8 no
200
Switch plate LH
3 no
201
Switch plate LJ
2 no
202
Switch plate LK
3 no
203
Switch plate LL
2 no
204
Switch plate LM
1 no
205
Switch plate LN
2 no
206
Switch plate LO
1 no
207
Switch plate LQ
1 no
208
Switch plate LR
1 no
209
Switch plate LS
3 no
Single Socket Outlets
210
Single switched socket outlet - DR - 20A - complete with
isolator
2 no
211
Single switched socket outlet - DW - complete with isolator
1 no
212
Single switched socket outlet - DH - 15A
1 no
213
Single switched socket outlet - FR - complete with isolator
1 no
214
Single switched socket outlet - G - 15A floor box mounted
1 no
215
Single switched socket outlet - I
1 no
216
Single switched socket outlet - MW - complete with isolator
1 no
217
Single switched socket outlet - UBH - 16A complete with
isolator
1 no
218
Single switched socket outlet - WM - complete with isolator
2 no
219
Single switched socket outlet - 1 phase 15A externally mounted
1 no
220
Single switched socket outlet - 3 phase 32A
1 no
Double Socket Outlets
221
Double switched socket outlet - A
222
Double switched socket outlet - ASE complete with bolt on
security cover
1 no
223
Double switched socket outlet - AU
7 no
Double switched socket outlet - AV
10 no
224
5/16/2019
80 no
Page 90
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Double switched socket outlet - B
28 no
226
Double switched socket outlet - BU
17 no
227
Double switched socket outlet - CP - 15A
1 no
228
Double switched socket outlet - DP
4 no
229
Double switched socket outlet - IP53
2 no
230
Double switched socket outlet - JP
1 no
Double switched socket outlet - J - floor box mounted
1 no
Double switched socket outlet - TD
2 no
Double switched socket outlet - TDE
2 no
232
233
Total
(Continued)
225
231
Rate
234
Double switched socket outlet - TV
15 no
235
Double switched socket outlet - W
6 no
Quad Socket Outlets
236
Quad switched socket outlet - floor box mounted
3 no
Fixed Wire Outlets
237
Refer to Permanent Connection Legend for full details of fixed
wire outlets, isolators, plugs, flexes etc.
238
Permanent connection - AP-INL - suspended
4 no
239
Permanent connection - DOOR - including all limit switches,
controls, status lights etc.
8 no
240
Permanent connection - EXTRT
1 no
241
Permanent connection - FAP
1 no
242
Permanent connection - GATE - externally mounted
2 no
Permanent connection - FSPUMP - externally mounted
1 no
244
Permanent connection - HOOD
2 no
245
Permanent connection - HOB
2 no
246
Permanent connection - HWC
1 no
247
Permanent connection - HWC -3 phase
1 no
248
Permanent connection - H1
8 no
249
Permanent connection - H2 including thermostat
1 no
250
Permanent connection - OVEN
2 no
251
Permanent connection - PUMP
1 no
252
Permanent connection - CPUMP
1 no
Permanent connection - SEC
1 no
243
253
item
Others
254
Floor box complete with lid and associated conduits- FB1
5/16/2019
Page 91
4 no
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Rate
Total
(Continued)
255
Kitchen isolation reset switch - KR
1 no
256
Iron isolation reset switch - IR
1 no
Appliances
257
Thermostat T1
1 no
Generator Inlet
258
Generator inlet - GEN
1 no
MISCELLANEOUS
Electrical Cable Tray
259
The rates for cable carriers shall include cutting and jointing
cable for carriers at fittings together with cutting or forming
openings in cable carriers for conduits, entries from equipment
and control gear and similar items
260
The rates for cable carriers shall include for cradles, pinracks
for supporting cables and similar items and suitable earthing
261
The rates for cable ladder/tray shall include fire rated
suspensions as required by the specification
item
262
The rates for cable ladder/tray shall include dividers to allow
separation of ELV services
item
263
Soffit mounted 300 ladder/tray, include all suspensions,
hangers and the like
23 m
Soffit mounted 300 ladder/tray (in selected colour), include all
suspensions, hangers and the like
33 m
Soffit mounted 450 ladder/tray, include all suspensions,
hangers and the like
50 m
264
265
266
450 Bend
6 no
267
300 to 450 Bend/transition
2 no
268
300 x 450 x 450 Tee intersection
1 no
269
450 x 450 Set down
2 no
Dropper
270
40 Dropper in timber framed wall
8 m
ELECTRICAL FOR MECHANICAL
271
Refer to Specification EL.44 and drawings for full details of the
electrical for mechanical system
item
272
Design, supply, test and commission the electrical installation
for Mechanical Services as required and in accordance with the
Specification
item
5/16/2019
Page 92
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
273
Rate
Total
(Continued)
Design, supply, test and commission the Mechanical Services
control system including (but not limited to) detailed design,
supply, installation, controls, hardware, software, wiring,
terminations, containment and support, interfacing ,
programming and integration as required, testing,
commissioning, maintenance and instruction complete, all as
specified and to the approval of the engineer
item
ELECTRICAL FOR HYDRALUIC AND PLUMBING
274
Provide a hydraulic and plumbing control system complete,
refer Specification EL.45 for full details
item
275
Outlets, circuit wiring and fittings have been included in the
general measure, allow here for all other hydraulic and
plumbing controls including (but not limited to) cabling/wiring,
isolators, cabinets, racks, relays and other associated
hardware/componentry
item
LIGHTING CONTROL
276
Provide a lighting control system complete, refer to drawing
E2.3 and specification EL.49 for full details
item
277
Light fittings, circuit wiring and fittings have been included in the
general measure, allow here for all other lighting controls
including (but not limited to) cabling/wiring, ELV wiring,
cabinets, racks, relays and other associated
hardware/componentry
item
PILOT LIGHTING
278
Provide a lighting control system complete, refer Specification
EL.48 for full details
item
279
Light fittings, circuit wiring and fittings have been included in the
general measure, allow here for all other pilot lighting controls
including (but not limited to) cabling/wiring, ELV wiring,
cabinets, racks, relays and other associated
hardware/componentry
item
EMERGENCY LIGHTING
280
Provide an evacuation lighting control system complete, refer
Specification EL.50 for full details
item
281
Light fittings and circuit wiring have been included in the
general measure, allow here for all other emergency lighting
controls including (but not limited to) fittings, cabling/wiring,
cabinets, racks, relays and other associated
hardware/componentry
item
CHORUS CABLING
282
Allow to notify Client who will arrange disconnection and
isolation of the existing incoming Chorus lines
item
283
Liaise with Chorus and the Client to enable incoming Chorus
services to be re-established
item
STRUCTURED CABLING CAT 6
5/16/2019
Page 93
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Refer to Specification EL.51.2, EL.52 and EL.53 and drawings
for full details of structured cabling systems
item
285
Structured cabling, equipment and outlets have been measured
as a guide only, contractors are to allow for all
controls/isolators/switches including (but not limited to) cabling,
wiring, fittings, brackets and other associated
hardware/componentry
item
286
Chorus demarcation frame
item
287
Customer demarcation frame
item
288
Patch panel
item
Structured cabling
item
290
Data outlet - D1
291
Data outlet - D1W
292
Data outlet - D2
18 no
Data outlet - TV/D2
10 no
294
Data outlet - D3
16 no
295
Data outlet - D4
2 no
Data outlet - D6
1 no
293
296
297
Total
(Continued)
284
289
Rate
20 no
6 no
Patch cords
item
AV SYSTEM AND TELEVISION AERIAL SYSTEM
298
Refer to Specification EL.54, EL.55 and drawings for full details
of the Audio and Visual systems
item
299
AV System equipment and outlets have been measured as a
guide only, contractors are to allow for all design,
controls/isolators/switches including (but not limited to) cabling,
wiring, fittings, brackets and other associated
hardware/componentry
item
300
AV Outlet - TV
10 no
301
AV Outlet - TV1
3 no
302
AV Outlet - TV4
1 no
303
AV Outlet - BP
2 no
304
AV Outlet - SPK 1
1 no
305
AV Outlet - SPK 2
6 no
306
AV Outlet - SPK 3
1 no
307
AV Outlet - SPK 4
2 no
Speaker AA
4 no
309
AV Outlet - AV1
1 no
310
AV Outlet - AV2
1 no
308
5/16/2019
Page 94
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Rate
Total
(Continued)
311
AV Outlet - AV3
1 no
312
AV Outlet - AV4
1 no
313
AV Outlet - AV5
1 no
314
AV Outlet - AV6
1 no
315
AV Outlet - AV7
1 no
316
AV Outlet - AV8
2 no
317
AV Outlet - AV9
2 no
318
Antenna [UHF, FM and satellite]
item
SECURITY SYSTEM
319
Refer to Specification EL.56 and drawings for full details of the
security system
item
320
Security cabling, equipment, doors and outlets have been
measured as a guide only, contractors are to allow for all
controls/isolators/switches including (but not limited to) cabling,
wiring, fittings, brackets and other associated
hardware/componentry
item
321
Gallagher Controller 6000 control panel
item
322
Expanders as required, including power supply.
item
323
Connection to an off site main client computer.
item
324
T Series readers as indicated on drawings
item
325
Key drawer locking system
item
326
Connections to door hardware
item
327
Interface to the buildings fire alarm system
item
328
Interface with door hold back systems
item
329
Rack mounted PC
item
330
Programming of the system/s
item
331
MIFARE tag or card Allow to provide and programme 200
cards.
200 no
Doors
332
Rates for security to doors shall include (but not be limited to)
the following;
- Electromagnetic Lock x 1 (Allow to wire and connect
electromagnetic lock)
- T20 Access reader on the exterior of the building
- Bond sensing of strike lock
- Localised alarm if door held open for set period
- Door locked 24/7. Double badge to unlock door
- Interconnection to Gallagher based system
- Suitably rated power supply with 25% spare capacity
- Interconnection to building fire alarm system to unlock on fire
condition
5/16/2019
Page 95
item
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
Total
(Continued)
333
SD01 Entry Single Swing Door
1 no
334
SD03 Internal Single Swing Door
1 no
335
SD14 Internal Single Swing Door
1 no
336
SD19 Internal Single Swing Door
1 no
337
SD31 Entry Single Swing Door
1 no
338
SD32 Internal Single Swing Door
1 no
339
SD36 Entry Single Swing Door
1 no
340
SD43 Entry Single Swing Door
1 no
341
SD48 Entry Double Swing Door
1 no
342
SD56 Internal Single Swing Door
1 no
343
SD69 Internal Single Swing Door
1 no
344
SD70 Internal Single Swing Door
1 no
SD73 Entry Single Swing Door
1 no
345
Rate
GATE ACCESS
346
Refer to Specification EL.57 and drawings for full details of the
gates access system
item
347
Engage a specialist contractor to provide and install the entry
gate management system
item
348
Allow to interface the gate system with the Gallagher security
system
item
349
Gate 1 access control system including (but not be limited to)
the following;
- Induction coil set in to concrete slab
- Keypad/prox reader KP
- Gate motor controller
- Safety beam sender/receiver CB
- Strobe light & bollard ST
- IP66 Emergency stop
- In-ground coil
1 no
350
Gate 2 access control system including (but not be limited to)
the following;
- Induction coil set in to concrete slab
- Keypad/prox reader KP
- Gate motor controller
- Safety beam sender/receiver CB
- Strobe light & bollard ST
- IP66 Emergency stop
- In-ground coil
1 no
INTERCOM SYSTEM
351
Refer to Specification EL.58 and drawings for full details of the
intercom system
item
352
Engage a specialist contractor to provide and install the video
intercom system
item
5/16/2019
Page 96
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Electrical Installations
353
Rate
Total
(Continued)
Allow to interface the intercom system with the Gallagher
security system and other systems throughout the building
item
FIRE DOOR HOLD BACK
354
Refer to Specification EL.59 and drawings for full details of the
smoke stop and fire door hold back system
item
355
Engage a specialist contractor to provide and install the smoke
stop and fire door hold back system
item
356
Allow to interface the hold back system with the Gallagher
security system and other systems throughout the building
item
End of Section
5/16/2019
Page 97
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Mechanical Installations
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Quantities
item
3
The rates shall include for sockets, running joints, connectors,
back nuts, nipples and pipe and duct fixings such as supporting
clips, saddles, brackets, hangers, straps, screws, nails,
explosive and low velocity tool fastening anchorsand/or
systems and fixing complete including cutting and forming
holes, supplying and building in sleeves other than fire rated
sleeves
item
4
Prices are to include for all labour, plant, materials, necessary
for the complete and proper performance of the work, including
the supply and installation of all steel or other grilles associated
with the mechanical services in accordance with the
Specification
item
5
Prices are to include for fire protection collars, dampers and
seals for all penetrations through fire rated walls by pipework,
ducts and any other equipment provided in this Trade as
required.
item
6
Rates are to include for all pipe and fitting supports and
expansion, movement and settlement provisions
item
7
The rates for pipe insulation shall include for cutting and
trimming around equipment, fixings, valves and the like. The
rates for insulation to pipes less than 32 diameter shall include
for all bends, elbows, tees, junctions, cleaning eyes and the like
item
8
Rates for pipe work shall include for protection where passing
through and/or under floor slabs as required
item
9
The rates shall include for painting and finishing of all items of
equipment supplied and installed under this section of work
item
10
Rates shall include for all costs involved in carrying out the work
in stages and at different times during the contract period to suit
the construction programme and sequence of work
item
11
Systems installed under this contract shall be installed and fixed
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
item
12
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
item
Provide for paying all royalties, expenses and claims in
connection with patent rights and indemnify the Architect,
Engineer and Employer against any such claims
item
13
5/16/2019
Page 98
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Mechanical Installations
Rate
Total
(Continued)
14
Pay all fees and charges in connection with the Mechanical
Services installation, comply with all regulations and by-laws
give all necessary notices and obtain permits as required
item
15
Provide for supervision and programming
item
16
Allow for all identification, labelling etc., all in accordance with
the Specification
item
17
Provide suppliers certificates of compliance as specified
item
18
Provide layout and system design drawings as specified
item
19
Provide contractors certificate of compliance as specified
item
20
Provide design and workmanship requirements as specified
item
21
Provide samples as specified
item
22
Allow for testing and commissioning as specified
item
23
Provide operational information as specified
item
24
Provide a twelve month guarantee for the works as specified
item
25
Provide for extended guarantees as specified
item
26
Provide for quality assurance as specified
item
27
Provide for maintenance manuals and data sheets as specified
item
28
Provide for shop drawings and as built drawings as specified
item
29
Allow for maintenance as specified
item
30
Provide technical details for plant as specified
item
31
Allow for spares, tools and the like
item
32
Allow to supply and install all other equipment and supply all
labour not specifically scheduled and necessary to render the
systems fully functional as Specified
item
33
Allow for the design, fabrication and installation of plant support
as required
item
PLANT AND EQUIPMENT
34
Rates for plant and equipment shall include for flexible
connections to ductwork as necessary
item
35
Rates for plant and equipment shall include for support,
hangers, plinths, platforms, vibration and isolation mounts,
flexible connections etc., as required to ductwork and
ancillaries, supply of motor starters, speed controllers and
handling/ coordination of relevant switchgear
item
Heat Recovery Ventilators
36
Rates for HRVs are to include for air filters on return and fresh
air connections
37
Air Change HRV-IC-400 (HRV2)
1 no
38
Air Change ERV-IC-300 (HRV1)
1 no
5/16/2019
Page 99
item
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Mechanical Installations
39
Rate
Total
(Continued)
Air Change ERV-IC-300 (HRV3)
1 no
Dehumidifiers
40
Air Solutions Aider 80L portable dehumidifier (D1)
1 no
Fans
41
Fantech TD-350/125SIL (EF1)
1 no
42
Fantech WJ-200RILKIT (EF2)
1 no
43
Fantech TD-350/125SIL (EF3)
1 no
44
Fantech EWE154 (EF4)
1 no
45
Fantech JCE-202-3 (TF1)
1 no
46
Fantech TD-500/150SIL (TF2)
1 no
Heat Pumps
47
Rates for heat pump units are to include for all refrigerant and
condensate pipework between them and their respective
cassette unit and all other condensate pipework, drain trays,
and tundishes as necessary, including connections to drains
48
Daikin FFQ50C2VEB compact cassette (HP1)
1 no
49
Daikin FFQ35C2VEB compact cassette (HP2)
1 no
50
Daikin FFQ50C2VEB compact cassette (HP3)
1 no
51
Daikin FFQ50C2VEB compact cassette (HP4)
1 no
52
Daikin FFQ35C2VEB compact cassette (HP5)
1 no
53
Daikin FHQ50BW1A under ceiling suspended (HP6)
1 no
54
Daiken RXS50K2V1B HP1/OU outdoor unit
1 no
55
Daiken RXS35K2V1B HP2/OU outdoor unit
1 no
56
Daiken RXS50K2V1B HP3/OU outdoor unit
1 no
57
Daiken RXS50K2V1B HP4/OU outdoor unit
1 no
58
Daiken RXS50K2V13 HP5/OU outdoor unit
1 no
59
Daiken RZQ55OAV1 HP6/OU outdoor unit
1 no
item
Electric Heaters
60
Devi Comfortline CL750 ceiling mounted radiant panel (EH1,
EH4)
15 no
61
Devi Comfortline CL 30 suspended radiant panel (EH2)
6 no
62
Devi Comfortline CL 18 suspended radiant panel (EH3)
2 no
63
Smooth-Air EDH3030PW duct heater (DH1)
3 no
64
Wall mounted panel heater - H1
8 no
65
Wall mounted panel heater - H2
1 no
DUCTS
5/16/2019
Page 100
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Mechanical Installations
66
Rate
Total
(Continued)
All ductwork support and ancillaries shall comply with the duct
construction manual of SMACNA Inc (USA) low velocity
systems
item
Rigid Circular Ducts
67
125 Diameter rigid ductwork
68
Bend to 125 diameter duct
69
150 Diameter rigid ductwork
70
Bend to 150 diameter duct
7 no
71
Blank end to 150 diameter duct
3 no
72
125 Spigot to 150 diameter duct
11 no
73
150 Spigot to 150 diameter duct
3 no
74
150 to 125 Diameter duct reducer
1 no
75
200 Diameter rigid ductwork
76
Bend to 200 diameter duct
4 no
77
Blank end to 200 diameter duct
5 no
78
125 spigot to 200 diameter duct
1 no
79
150 spigot to 200 diameter duct
8 no
80
200 spigot to 200 diameter duct
1 no
81
200 to 150 Diameter duct reducer
2 no
82
250 Diameter rigid ductwork
83
Bend to 250 diameter duct
4 no
84
250 to 200 Diameter duct reducer
1 no
85
150 Spigot to 250 diameter duct
1 no
86
300 Diameter rigid ductwork
36 m
87
Bend to 300 diameter duct
11 no
88
Blank end to 300 diameter duct
2 no
89
125 Spigot to 300 diameter duct
3 no
90
150 Spigot to 300 diameter duct
1 no
91
200 Spigot to 300 diameter duct
2 no
92
300 to 250 Diameter duct reducer
1 no
93
350 Diameter rigid ductwork
31 m
94
Bend to 350 diameter duct
10 no
95
Blank end to 350 diameter duct
1 no
96
350 to 200 Diameter duct reducer
2 no
97
150 Spigot to 350 diameter duct
2 no
5/16/2019
12 m
1 no
88 m
38 m
31 m
Page 101
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Mechanical Installations
98
200 Spigot to 350 diameter duct
99
Connect ductwork to range hood
Rate
Total
(Continued)
1 no
item
Insulated Flexible Ductwork
100
125 Diameter flexible ductwork
49 m
101
150 Diameter flexible ductwork
71 m
102
200 Diameter flexible ductwork
10 m
103
250 Diameter flexible ductwork
8 m
Fire Dampers
104
Halton BSD-PW fire damper to 150 diameter duct
2 no
105
Halton BSD-PW fire damper to 200 diameter duct
3 no
106
Halton BSD-PW fire damper to 300 diameter duct
1 no
Dampers
107
Butterfly damper to 125 diameter duct
17 no
108
Butterfly damper to 150 diameter duct
14 no
109
Butterfly damper to 200 diameter duct
1 no
110
Butterfly damper to 250 diameter duct
2 no
INSULATION
111
Rates for insulation to pipework and ductwork shall include for
application and forming around brackets, hangers, flanges,
fittings, valves etc., pockets, sockets and the like
item
25 Thick Insulation to Outside of Ducts
112
125 Diameter rigid ductwork
12 m
113
150 Diameter rigid ductwork
58 m
114
200 Diameter rigid ductwork
38 m
115
250 Diameter rigid ductwork
23 m
116
300 Diameter rigid ductwork
36 m
117
350 Diameter rigid ductwork
31 m
GRILLES, DIFFUSERS AND ROOF COWLS
118
Grilles and diffusers shall be powder coated
item
119
Rates shall include for insulated cushion boxes, opposed blade
dampers, spigots and concealed fixings as required
item
120
Rates for grilles and louvres that penetrate the external
envelope shall include for alls sealants and flashings to make it
weathertight
item
121
Holyoake CMP 51 225 x 225 grille (S1)
1 no
122
Holyoake CMP-51-OBD 150 x 150 grille (S2)
4 no
5/16/2019
Page 102
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Mechanical Installations
Rate
Total
(Continued)
123
Holyoake CMP11 300 x 300 grille (S3)
1 no
124
Holyoake CMP 21-OBD 225 x 225 grille (S4)
1 no
125
Holyoake CMP 21 225 x 225 grille (S5)
1 no
126
Holyoake CMP 21 300 x 300 grille (S6)
1 no
127
Holyoake LDH1200 300 x 150 grille (S7)
2 no
128
Holyoake CMP3-11-OBD 150 x 150 grille (S8)
10 no
129
Holyoake CMP-11-OBD 150 x 150 grille (S9)
5 no
130
Holyoake RLL23-RC25 250 x 250 grille (T1)
3 no
131
Holyoake RLL23-RC 150 x 150 (T2)
1 no
132
Holyoake Pair of RLL23-RC25 450 x 200 grille (T3)
2 no
133
Holyoake Pair of RLL23-RC25 300 x 150 grille (T4)
5 no
134
Holyoake RLL23-RC25 175 x 175 grille (E1)
15 no
135
Holyoake RLL23-RC25 150 x 150 grille (E2)
3 no
136
Holyoake LDH1200 450 x 200 grille (E3)
1 no
137
Holyoake OHL-F-45 600 x 450 louvre (L1)
6 no
138
Holyoake OHL-F-45 300 x 250 louvre (L2)
2 no
139
Holyoake OHL-F-45 650 x 450 louvre (L3)
2 no
140
810 x 1210 Holyoake aluminium powdercoated laminated argon
filled double glazed low-E3 window, complete with
programmable remote control, rain sensor and rebated timber
reveal (W_LO-01)
1 no
CONTROL SYSTEMS
141
The control system has been included in the Electrical Services
section of this Schedule of Quantities
item
ELECTRICAL FOR MECHANICAL
142
The electrical for mechanical system has been included in the
Electrical Services section of this Schedule of Quantities
item
BUILDERS WORK
143
Allow for all builders work in connection including cutting holes,
chases, recesses etc, supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, include for fire rating as required and making
good
item
End of Section
5/16/2019
Page 103
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Exterior Elements
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
3
Refer to the relevant trade sections of this schedule of
quantities for the appropriate preamble items
item
4
All measurement of excavation, filling and backfilling is in
accordance with Section 4 Groundworks
item
5
All measurement of concrete is in accordance with Section 6
Concrete
item
6
The rates shall include for levelling, grading, trimming and
similar items in preparing surfaces of filling to all surfaces for
road pavements
item
7
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
8
Provide for making and testing samples of mortar and grout as
specified
item
9
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
GENERAL
10
Provide Quality Assurance Certificate as specified
item
11
Provide for quality management
item
12
Provide producer statements as specified
item
13
Carry out all testing as specified
item
14
Provide as-builts as specified
item
15
Provide traffic management as specified
item
16
Provide health and safety management plan as specified
item
EROSION AND SEDIMENT CONTROL
17
Refer to Erosion & Sediment Control Management Plan
(ESCMP) along with Environment Canterbury's Erosion and
Sediment Control Guidelines 2007. Rates to include installation,
maintenance throughout the course of the contract,
removal/restoration of control measures as contract progress.
Install devices as appropriate for current stages only
item
18
Allow for all inspections and testing as specified
item
19
Stabilised vehicle entrance/exit points onto council roads are to
be maintained throughout the course of the contract
item
5/16/2019
Page 104
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Exterior Elements
Rate
Total
(Continued)
20
Form 500 tall earth bund, using on site topsoil, around the
perimeter of the site. Bund is to prevent uncontrolled vehicle
movements across the site and separate clean and dirty water
diversion paths - PROVISIONAL ITEM
300 m
21
Surface stabilisation for all exposed areas which are likely to be
left without any erosion and/or dust controls for more than 5
days. Sprayed with suitable stabilising agent - PROVISIONAL
ITEM
4,000 m2
22
Installation and removal of silt fencing as required (Refer Ecan
ESC design guide for installation details) - PROVISIONAL ITEM
200 m
EXCAVATION AND FILL
23
Trim and compact subgrade to CBR min 5
2,771 m2
24
AP7 Sand blinding, nominal thickness
2,448 m2
25
150 Thick AP65 sub base
2,448 m2
26
250 Thick AP65 sub base
324 m2
27
100 M/4 AP40 base-course
28
Excavate in hardfill for concrete edge thickening including
battering
2,771 m2
25 m3
ASPHALT
29
Provide for testing as specified
30
50 Thick AC16 asphalt including seal coat
item
324 m2
PAVING
31
Rates for paving shall include for construction joints, dowel
bars, sawcuts, placing and finishing
item
32
Rates shall include for curing compounds as required
item
33
Concrete paving shall be laid to falls and crossfalls
item
34
G500E-SE72 seismic mesh to paving
2,448 m2
35
D12 bar at pavement slab perimeter
4,353 kg
36
100 Thick 30 MPa utility concrete paving coloured with 4kg/m3
black oxide. P2
1,991 m2
37
100 Thick 30 MPa exposed aggregate "Canterbury Concrete
Waimak". P3
38
100 Thick 30 MPa coloured concrete, Peter Fell #260. P4
394 m2
64 m2
KERBS
39
Concrete kerb and channel to CSS SD601-1 including
excavation, backfill, forming, reinforcing etc
189 m
40
Form 1000 wide drop in kerb and channel for overflow
1 no
41
Concrete nib kerb to CSS SD602-2 including excavation,
backfill, forming, reinforcing etc
5/16/2019
Page 105
207 m
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Exterior Elements
Rate
Total
(Continued)
STORMWATER BASIN
Basin Fill
42
150 Deep sandy top soil (3 parts sand to 1 part top soil)
155 m2
43
200 Deep screened top soil
295 m2
44
250 Deep 19 premix sand
155 m2
45
300 Deep AP40
46
Geo-synthetic clay liner
257 m2
47
Reinstated pit run
310 m3
48
Uniformly graded 100-50 clean free draining boulders
84 m3
49
Bidm A29 geofabric
98 m2
50
200 Deep river boulders to overflow
77 m3
3 m2
Concrete Weir Wall
51
250 Deep TNZ M/4 AP40 basecourse
24 m2
52
20 MPa concrete foundation including placing and finishing
6 m3
53
260 High edge formwork
8 m2
54
20 MPa concrete wall including placing and finishing
4 m3
55
Formwork to sides of wall
56
HD12 Rod
57
200 Wide stormwater pipe outfall including Denso tape
38 m2
489 kg
1 no
ROAD MARKING
58
Allow for applicator warranty as specified
59
Approved carpark delineation lines
60
Approved disabled carpark sign
item
89 m
2 no
GABION RETAINING WALL
61
Excavate for gabion wall 0-1.5m deep and remove from site
198 m3
62
CCC AP65 or similar granular backfill in compacted layers
63
Bidim A14 or similar between gabion and backfill
165 m2
64
1000 x 1000 x 1500 Gabion unit with basket and rockfill as per
Specification
114 no
99 m3
FENCING
65
1800 High chain link fence set in to concrete kerb including
posts
165 m
66
1800 High Boundaryline Durapanel 'Vecta' style steel panel
fence including posts and footings
2 m
IRRIGATION
67
Design and install irrigation system as specified
5/16/2019
item
Page 106
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Exterior Elements
Rate
Total
(Continued)
TIMBER FENCE & SEATS
68
1800 High board and batten fence including excavation,
foundations, posts and finish
17 m
69
Single leaf pedestrian gate including all hardware
1 no
70
3000 Long x 700 wide timber box seat including internal timber
frame, all supports and fixings
2 no
SOFT LANDSCAPING/PLANTING
71
100 Deep good quality screened soil, spread and prepared
ready for lawn sowing
756 m2
72
Hydroseed standard mix lawn
756 m2
73
Good quality screened soil, spread and prepared ready for
planting areas 545m2
164 m3
74
100 Deep good quality mulch spread over planting areas
545 m2
75
Alnus Cordata/Italian Alder tree 45 litre planted in tree pit,
including excavation, carting away spoil, approved topsoil
backfill, two timber stakes and hessian ties
1 no
76
Cordyline Australis/Grass Palm tree 30 litre planted in tree pit,
including excavation, carting away spoil, approved topsoil
backfill, two timber stakes and hessian ties
1 no
77
Fagus Sylvatica 'Dawyck Gold'/European Beech tree 45 litre
planted in tree pit, including excavation, carting away spoil,
approved topsoil backfill, two timber stakes and hessian ties
3 no
78
Platanus Orientalis/Oriental Plane Tree 45 litre planted in tree
pit, including excavation, carting away spoil, approved topsoil
backfill, two timber stakes and hessian ties
4 no
79
1500 x 1500 x 1000 High precast concrete tree frame
4 no
80
Coprosma Propinqua 'Red Rocks'/Coprosma 'Red Rocks' 3L
81
Apodasmia Similis/OiOi 3L
328 no
82
Chionochloa Flavicans/Minature Toetoe 3L
136 no
83
Coprosma Hawera/Hawera Coprosma 3L
210 no
84
Muehlenbeckia Astonii/Shrubby tororaro 3L
206 no
85
Provide 6 month maintenance period
19 no
item
MISCELLANEAOUS
86
Horizon SF3000 bollard, including concrete footing, excavation
and backfill as required
87
7300 Wide commercial vehicle crossing to CCC SD607 &
SD611 with dished channel to align with existing
1 no
88
8200 Wide commercial vehicle crossing to CCC SD607 &
SD611 with dished channel to align with existing
1 no
89
27200 Wide commercial vehicle crossing to CCC SD607 &
SD611 with dished channel to align with existing
1 no
5/16/2019
Page 107
12 no
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Exterior Elements
Rate
Total
(Continued)
90
2400 x 1200 Double sided free standing static sign including
excavation and foundations
91
Hapuka Rock
1 no
15 no
End of Section
5/16/2019
Page 108
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Fire Protection
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Quantities
item
3
The rates shall include for all costs involved in carrying out the
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
item
4
Systems installed under this contract shall be installed and fixed
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
item
5
The Contractor shall take all necessary steps to ensure that all
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
item
6
Provide for fire sealant, penetrations and making good finishes
around same and for all fire resisting elements as required by
the specification
item
7
Pay all fees and charges in connection with the Fire Protection
Installation, comply with all regulations and by-laws, give all
necessary notices and obtain permits
item
GENERAL
8
Provide all as-built, shop drawings, operation and maintenance
manuals
item
9
Provide for all service and maintenance logbooks
item
10
Provide for a Certificate of Compliance for the sprinkler system
item
11
Provide for a Certificate of Compliance for the fire alarm system
item
12
Provide for all labelling and identification
item
13
Provide all guarantees and warranties
item
14
Provide all instruction/training to employer's staff
item
15
Provide for all completion documentation, producer statements
etc.
item
16
Allow for all inspections, commissioning, acceptance testing
and final completion
item
17
Allow for the service and maintenance period as specified
item
FIRE PROTECTION
18
Design, supply, install, test, commission and maintain the fire
sprinkler system in accordance with the Fire Protection
Specification (section B) and NZS 4541
item
19
Provide hand held fire fighting equipment in accordance with
the Fire Protection Specification (section B) and NZS 4503
item
5/16/2019
Page 109
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Fire Protection
20
Rate
Total
(Continued)
Design, supply, install, test, commission and maintain the fire
alarm systems in accordance with the Fire Protection
Specification (section B) and NZS 4512
item
BUILDERS WORK
21
Provide for co-operating with other trades and for cutting holes,
chases, recesses, etc., supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, making good finishes around same and for all
sundry labours
item
SUPPLIED RATES
22
Fire alarm panel
1 no
23
Alarm acknowledgment unit (reset switch)
1 no
24
ASE device and connection
1 no
25
Manual call point
1 no
26
Sprinkler head (below ceiling)
1 no
27
Sprinkler head (concealed)
1 no
28
Sprinkler head (cover-plate)
1 no
29
Sprinkler head (external)
1 no
30
Portable hand held fire extinguisher
1 no
31
Evacuation sounder recessed
1 no
32
Evacuation sounder surface mounted
1 no
33
Fire rated wiring
1 m
34
Non fire rated wiring
1 m
35
Non PVC rated wiring
1 m
Pipework insulation
1 m
36
Labour
37
Sprinkler Labour (ordinary time)
1 hr
38
Sprinkler Labour (overtime)
1 hr
39
Fire Alarm Labour (ordinary time)
1 hr
40
Fire Alarm Labour (overtime)
1 hr
41
Design Engineer
1 hr
42
Administration
1 hr
43
Mark up on materials
%
44
Mark up on Subcontractors
%
45
Main contractors margin
%
End of Section
5/16/2019
Page 110
Rawlinsons Ltd
Schedule of Prices
Details: Example Schedule in ANZSMM 2018
Project: ANZSMM Training
Building:
Item
Description
Quantity
Unit
Rate
Total
Included Sums
PREAMBLES
1
Refer to the Drawings and Specification for full details and
descriptions of materials and workmanship
item
2
Refer to the General and Special Conditions of Contract and
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
item
MONETARY ALLOWANCES
3
Allow the provisional sum of $1,000 (One Thousand Dollars) for
internal door signage
item
4
Allow the provisional sum of $7,500 (Seven Thousand Five
Hundred Dollars) for the feature wall and footings
item
5
Allow the provisional sum of $10,000 (Ten Thousand Dollars)
for precast concrete walls and footings
item
6
Allow the provisional sum of $1,000 (One Thousand Dollars) for
wall access hatches
item
7
Allow the provisional sum of $2,500 (Two Thousand Five
Hundred Dollars) for concrete pad under exterior AC units
item
End of Section
5/16/2019
Page 111
Rawlinsons Ltd