Schedule of Prices Summary Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description T01 Introduction, General Rules and Recommendations T02 Preliminaries T03 Demolition T04 Groundworks T05 Piling T06 Concrete T07 Formwork T08 Reinforcement T09 Prestressing T10 Precast Concrete T11 Tanking and Waterproof Membranes T12 Masonry T13 Stonework T14 Structural Steel T15 Metalwork T16 Roofing T17 Façade Systems T18 Windows T19 Glazing T20 Carpentry T21 Partitions T22 Suspended Ceilings T23 Access Floors T24 Doors T25 Hardware T26 Applied Finishes, Render and Textured Finishes T27 Tiling, Slab and Paving T28 Carpet and Resilient Finishes T29 Painting T30 Joinery T31 Furniture, Fittings and Equipment T32 Hydraulics T33 Drainage T34 Electrical Installations 5/16/2019 Page 1 Total Rawlinsons Ltd Schedule of Prices Summary Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description T35 Mechanical Installations T36 Transportation Services T37 Exterior Elements T38 Fire Protection T39 Included Sums 5/16/2019 Page 2 Total Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity 1 This schedule has been prepared as an example based on the Australian and New Zealand Standard Method of Measurement of Building Works 2018 edition to assist the New Zealand Building Industry understand the impact of the new method of measurement for Schedules of Quantities 2 This schedule generally follows the rules of the ANZSMM 2018 and the New Zealand guidance notes dated 19 February, however it also incorporates regionally appropriate amendments 3 Rawlinsons Limited accepts no liability for loss or damage occurring from this document 5/16/2019 Page 1 Unit Rate Total Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Introduction, General Rules and Recommendations KEY PARTIES Client 1 Company/Name Address Point of contact note Architect 2 Company/Name Address Point of contact note Structural Engineer 3 Company/Name Address Point of contact note Electrical Engineer 4 Company/Name Address Point of contact note Hydraulic Engineer 5 Company/Name Address Point of contact note Civil Engineer 6 Company/Name Address Point of contact note Quantity Surveyor 7 Company/Name Address Point of contact note SITE 8 Tenderers shall allow to inspect the site during the preparation of their tender submission, the point of contact for arranging site visits is (NAME) (CONTACT DETAILS). The site shall be handed over to the contractor in (NUMBER) stages on the (DATE). The site is located (DESCRIPTION OF LOCATION) with access by (DESCRIPTION OF ACCESS). note DESCRIPTION OF WORK 9 The scope of the work consists of the construction of a new building along with extensive siteworks 5/16/2019 Page 2 note Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Introduction, General Rules and Recommendations 10 Rate Total (Continued) The construction generally comprises reinforced concrete foundations and ground floor slab. Structural steel frames support the Insulated panel, Colorsteel and membrane roofing systems, internal partitioning is generally timber framed with aluminium framed glazed openings, aluminium window and external door joinery, a variety of external wall cladding, mechanical, electrical, data, plumbing, security and fire protection services, fittings and fixtures to meet a range of space requirements, floor coverings, external works and underground services duct and external drainage and site works. The approximate gross floor area is 1,280m2 note CONDITIONS OF CONTRACT 11 The Conditions of Contract are NZS 3910:2013 12 The specification section covering Special Conditions of Contract and Preliminary and General Clauses are tabulated hereunder in order that tenderers may allow for them should they deem it necessary. Refer to the Specification for full descriptions of these clauses, the headings used in this section of the Schedule of Prices should only be considered as a framework for the individual allowances that tenderers may wish to make item GENERAL CONDITIONS OF CONTRACT 13 Tenderers shall allow here for specific items as set out in the Conditions of Contract and Schedule 1 - Special Conditions of Contract - Specific Conditions of Contract item 14 The items listed below are an indication of obligations or restrictions which may be imposed on the tenderer, the tenderer shall familiarized themselves with all sections of the special conditions of contract, specifications and contract documents, any omission from the list below but otherwise noted in these documents shall be priced here item Special Conditions of Contract 15 Section 1 INTERPRETATION 16 Section 2 THE CONTRACT 17 Section 3 PERFORMANCE BOND 18 Section 4 SUBCONTRACTS 19 Section 5 GENERAL OBLIGATIONS 20 Section 6 ENGINEERS POWERS & RESPONSIBILITIES 21 Section 7 INDEMNITY 22 Costs and losses incurred by the Principal due to failure of the contractor to arrange and keep insurance as required 23 Section 8 INSURANCE 24 Section 9 VARIATIONS 25 Section 10 TIME FOR COMPLETION 5/16/2019 Page 3 item Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Introduction, General Rules and Recommendations Rate Total (Continued) Specifications TENDER CONDITIONS 26 Tenders shall be valid for a period of not less than 30 calendar days note SCHEDULE OF QUANTITIES 27 This schedule of quantities forms apart of the contract documents 28 This schedule of quantities is measured generally in accordance with the basic principles of Australian and New Zealand Standard Method of Measurement of Building Works, 2018 Edition, published by the Australian Institute of Quantity Surveyors, Master Builders of Australia Limited, New Zealand Institute of Quantity Surveyors and the Registered Master Builders Association of New Zealand, but any deviation from the same shall not form the basis of a claim by the Contractor item 29 Where dimensions are stated in the descriptions of items in the Schedule of Prices, they are generally given in the order: length x width x height item 30 The dimensions stated in this Schedule of Prices are generally those shown on the drawings but in some cases they are scaled from the drawings or have been measured on site and may not be exact. Dimensions given in descriptions should be checked on site or sizes confirmed with the Engineer if they are not clearly stated on the drawings or in the Specification item 31 Where dimensions are stated in descriptions the figures represent mm but generally mm is not included after the figure. Where a figure is not mm or quantity is stated within a description it is generally given in letters or connected with a hyphen or oblique or an abbreviation is used immediately following item GENERAL PARTICULARS Contractual Conditions Working hours 32 Working hours on the site are not restricted, the contractor is required to comply with local territorial authority consent conditions and noise and nuisance controls. item Rates and wages and prices of materials 33 Tenderers must price every item individually. In the event of a tenderer grouping items for pricing the Engineer reserves the right to break down the total price amongst the items so grouped together item 34 The rates for all items in this Schedule of Prices shall include for supplying and fixing in position except where specifically otherwise described item 5/16/2019 Page 4 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Introduction, General Rules and Recommendations 35 Rate Total (Continued) The rates for temporary works shall include unless otherwise stated for removal from site on completion and making good as necessary item Sub-letting 36 The tenderer shall not sub-let or allow the sub-letting of works by subcontractor without the approval of the Principal item Progress and final certificates 37 Progress valuations shall be in accordance with section 12 item 38 Progress valuations and progress payment schedules shall be submitted in accorance with section 12.1.1 item 39 Progress valuations shall be carried out in accordance with section 12.2 40 The final payment claim shall be submitted in accordance with section 12.4 item Variations 41 Variations shall be administered as required under section 9 and the Special Conditions of Contract item Dates for commencement and completion 42 The contractor is to provide a programme and advise a proposed completion date item Bonus for early completion 43 No bonus for early completion apply note Liquidated damages 44 Liquidated damages do not apply note Rise and fall 45 Cost fluctuations do not apply item Exemption from duty sales or other taxes Issue and return of documents 46 The Contractor shall obtain the building consent forms and documents from the Principal, retain them on site and return to the Principal on completion. item Discrepancies 47 The Contractor shall detail any discrepancies in the contract documents require clarification or determination, Specification section 1260 Project Management item Submission of priced schedule of quantities 48 The Contractor shall supply to the Engineer a priced copy of the schedule of quantities with 20 days of the award item Contract agreement stamp 5/16/2019 Page 5 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Introduction, General Rules and Recommendations Rate Total (Continued) Payment of taxes 49 Payment of taxes shall be in accordance with section 12.13 item Notices, permits, fees Liability 50 The Principals and Contractors indemnity in accordance with section 7 item Bonds, guarantees 51 The Contractor shall at its own expense provide a performance bond calculated to 10% of the contract price in accordance with 3.1 item Payment of extra monies 52 All payments will be managed through monthly progress claims note Authority approvals 53 The Contractor shall at their expense give notice and obtain all licences for Temporary Works and methods of carry out the Contract Works in accordance with 5.11.4 item 54 The Contractor shall arrange for any necessary documents and information be supplied to the client to comply with 5.11 in accordance with 5.11.5 item 55 The Contractor shall arrange for all necessary inspections required under the building consent documentation, Specification clause 1234 Documentation item 56 The Contractor shall provide for all other Producer statements, obtaining Code of Compliance Certificates and Interim Code of Compliance Certificated, etc as specified item Insurance 57 The Contractor shall provide at its own expense the following insurances; item 58 Provide for public liability insurance with cover of $10,000,000 item 59 Provide for motor vehicle third party insurance with cover of $2,000,000 item 60 Provide for insurance of the contract works and materials item 61 Provide for contractors plant and all other insurance considered necessary item 62 Provide for vibration, weakening or removal of support with cover of $1,000,000 item 63 Provide for liability under the Forest and Rural Fire Act 1977 with cover of $1,000,000 item Updating of programmes 64 The Contractor shall prepare and maintain a programme in accordance with section 5.10 5/16/2019 Page 6 item Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Introduction, General Rules and Recommendations Rate Total (Continued) Quality assurance 65 The Contractor shall prepare, provide for review and implement a quality assurance plan in accordance with section 5.18 item 66 The Contractor shall provide a Quality Assurance Certificate Civil as specified item 67 The Contractor shall provide a Quality Assurance Certificate Structural as specified item Maintenance and protection of public and private property 68 The contractor shall allow to protect public and private property in accordance with section 5.7 item Charts, schedules Notice boards 69 2400 x 1200 Project sign fixed to temporary fencing describing the project item Setting out works 70 The Contractor shall allow to set out the works, including the employment of a Registered Surveyor if required item Temporary installations 71 Temporary roads, tracks, crossings and hard-standing item Services 72 The Contractor is to allow for temporary services connections to the site, maintenance and decommissioning and removal on completion of works item 73 The Contractor is to allow for the protection of all existing services for the duration of the works item Telephone calls 74 The Contractor is required to make due allowance fore the supply, maintenance and decommissioning of telecommunications equipment to the site, including services for information technology connections item Temporary screens, fences, hoardings, guard rails etc 75 Temporary fencing, hoardings, planked footways, guardrails, gantries, overhead protection, warning and directional signs, security, etc. item Temporary sheds, sanitary accomodation, etc 76 Temporary office, storage and messing 77 Temporary ablutions Duties and attendance Work outside the contract including nominated subcontractors Supplied goods 5/16/2019 Page 7 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Introduction, General Rules and Recommendations Rate Total (Continued) Samples Testing Advertising Footpath levels Plant equipment and attendance labour Scaffolding Attendance Protection 78 Provide for protection of the completed works item 79 Provide for reinstatement of all areas of the site and leave in original condition and to the approval of the Engineer item Cleaning and removal of rubbish 80 The Contractor shall comply with the requirements in Specification section 1256 item 81 Provide for periodic cleaning during the course of the contract item 82 Provide for cleaning on completion including all glass item Handing over Defects liability 83 52 Weeks defect liability period item Security Supervision and Administration 84 Provide for all costs in connection with site supervision item 85 Provide for all costs in connection with executive on site and all off site administration including all correspondence processing claims, measuring and pricing variations for the contract period including extensions and the agreement of Final Accounts item 86 Provide for all costs in connection with the implementation, administration, training and the like for WebFM OMTrack Documents Module as documented in section 1013 of the Architectural Specification item Fire Fighting Equipment Drying Dewatering 87 The Contractor shall make due allowance for dewatering for excation works for the duration of the works item Works below water level 88 Not applicable 5/16/2019 note Page 8 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Preliminaries KEY PARTIES Client 1 Company/Name Address Point of contact note Architect 2 Company/Name Address Point of contact note Structural Engineer 3 Company/Name Address Point of contact note Electrical Engineer 4 Company/Name Address Point of contact note Hydraulic Engineer 5 Company/Name Address Point of contact note Civil Engineer 6 Company/Name Address Point of contact note Quantity Surveyor 7 Company/Lawson Morris-Whyte Address Point of contact note SITE 8 Tenderers shall allow to inspect the site during the preparation of their tender submission, the point of contact for arranging site visits is (NAME) (CONTACT DETAILS). The site shall be handed over to the contractor in (NUMBER) stages on the (DATE). The site is located (DESCRIPTION OF LOCATION) with access by (DESCRIPTION OF ACCESS). note DESCRIPTION OF WORK 9 The scope of the work consists of the construction of a new building along with extensive siteworks 5/16/2019 Page 9 note Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Preliminaries 10 Rate Total (Continued) The construction generally comprises reinforced concrete foundations and ground floor slab. Structural steel frames support the Insulated panel, Colorsteel and membrane roofing systems, internal partitioning is generally timber framed with aluminium framed glazed openings, aluminium window and external door joinery, a variety of external wall cladding, mechanical, electrical, data, plumbing, security and fire protection services, fittings and fixtures to meet a range of space requirements, floor coverings, external works and underground services duct and external drainage and site works. The approximate gross floor area is 1,280m2 note CONDITIONS OF CONTRACT 11 The Conditions of Contract are NZS 3910:2013 12 The specification section covering Special Conditions of Contract and Preliminary and General Clauses are tabulated hereunder in order that tenderers may allow for them should they deem it necessary. Refer to the Specification for full descriptions of these clauses, the headings used in this section of the Schedule of Prices should only be considered as a framework for the individual allowances that tenderers may wish to make item GENERAL CONDITIONS OF CONTRACT 13 Tenderers shall allow here for specific items as set out in the Conditions of Contract and Schedule 1 - Special Conditions of Contract - Specific Conditions of Contract item 14 The items listed below are an indication of obligations or restrictions which may be imposed on the tenderer, the tenderer shall familiarized themselves with all sections of the special conditions of contract, specifications and contract documents, any omission from the list below but otherwise noted in these documents shall be priced here item Special Conditions of Contract 15 Section 1 INTERPRETATION 16 Section 2 THE CONTRACT 17 Section 3 PERFORMANCE BOND 18 Section 4 SUBCONTRACTS 19 Section 5 GENERAL OBLIGATIONS 20 Section 6 ENGINEERS POWERS & RESPONSIBILITIES 21 Section 7 INDEMNITY 22 Costs and losses incurred by the Principal due to failure of the contractor to arrange and keep insurance as required 23 Section 8 INSURANCE 24 Section 9 VARIATIONS 25 Section 10 TIME FOR COMPLETION 5/16/2019 Page 10 item Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Preliminaries Rate Total (Continued) Specifications TENDER CONDITIONS 26 Tenders shall be valid for a period of not less than 30 calendar days note SCHEDULE OF QUANTITIES 27 This schedule of quantities forms apart of the contract documents 28 This schedule of quantities is measured generally in accordance with the basic principles of Australian and New Zealand Standard Method of Measurement of Building Works, 2018 Edition, published by the Australian Institute of Quantity Surveyors, Master Builders of Australia Limited, New Zealand Institute of Quantity Surveyors and the Registered Master Builders Association of New Zealand, but any deviation from the same shall not form the basis of a claim by the Contractor item 29 Where dimensions are stated in the descriptions of items in the Schedule of Prices, they are generally given in the order: length x width x height item 30 The dimensions stated in this Schedule of Prices are generally those shown on the drawings but in some cases they are scaled from the drawings or have been measured on site and may not be exact. Dimensions given in descriptions should be checked on site or sizes confirmed with the Engineer if they are not clearly stated on the drawings or in the Specification item 31 Where dimensions are stated in descriptions the figures represent mm but generally mm is not included after the figure. Where a figure is not mm or quantity is stated within a description it is generally given in letters or connected with a hyphen or oblique or an abbreviation is used immediately following item GENERAL PARTICULARS Contractual Conditions Working hours 32 Working hours on the site are not restricted, the contractor is required to comply with local territorial authority consent conditions and noise and nuisance controls. item Rates and wages and prices of materials 33 Tenderers must price every item individually. In the event of a tenderer grouping items for pricing the Engineer reserves the right to break down the total price amongst the items so grouped together item 34 The rates for all items in this Schedule of Prices shall include for supplying and fixing in position except where specifically otherwise described item 5/16/2019 Page 11 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Preliminaries 35 Rate Total (Continued) The rates for temporary works shall include unless otherwise stated for removal from site on completion and making good as necessary item Sub-letting 36 The tenderer shall not sub-let or allow the sub-letting of works by subcontractor without the approval of the Principal item Progress and final certificates 37 Progress valuations shall be in accordance with section 12 item 38 Progress valuations and progress payment schedules shall be submitted in accorance with section 12.1.1 item 39 Progress valuations shall be carried out in accordance with section 12.2 40 The final payment claim shall be submitted in accordance with section 12.4 item Variations 41 Variations shall be administered as required under section 9 and the Special Conditions of Contract item Dates for commencement and completion 42 The contractor is to provide a programme and advise a proposed completion date item Bonus for early completion 43 No bonus for early completion apply note Liquidated damages 44 Liquidated damages do not apply note Rise and fall 45 Cost fluctuations do not apply item Exemption from duty sales or other taxes Issue and return of documents 46 The Contractor shall obtain the building consent forms and documents from the Principal, retain them on site and return to the Principal on completion. item Discrepancies 47 The Contractor shall detail any discrepancies in the contract documents require clarification or determination, Specification section 1260 Project Management item Submission of priced schedule of quantities 48 The Contractor shall supply to the Engineer a priced copy of the schedule of quantities with 20 days of the award item Contract agreement stamp 5/16/2019 Page 12 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Preliminaries Rate Total (Continued) Payment of taxes 49 Payment of taxes shall be in accordance with section 12.13 item Notices, permits, fees Liability 50 The Principals and Contractors indemnity in accordance with section 7 item Bonds, guarantees 51 The Contractor shall at its own expense provide a performance bond calculated to 10% of the contract price in accordance with 3.1 item Payment of extra monies 52 All payments will be managed through monthly progress claims note Authority approvals 53 The Contractor shall at their expense give notice and obtain all licences for Temporary Works and methods of carry out the Contract Works in accordance with 5.11.4 item 54 The Contractor shall arrange for any necessary documents and information be supplied to the client to comply with 5.11 in accordance with 5.11.5 item 55 The Contractor shall arrange for all necessary inspections required under the building consent documentation, Specification clause 1234 Documentation item 56 The Contractor shall provide for all other Producer statements, obtaining Code of Compliance Certificates and Interim Code of Compliance Certificated, etc as specified item Insurance 57 The Contractor shall provide at its own expense the following insurances; item 58 Provide for public liability insurance with cover of $10,000,000 item 59 Provide for motor vehicle third party insurance with cover of $2,000,000 item 60 Provide for insurance of the contract works and materials item 61 Provide for contractors plant and all other insurance considered necessary item 62 Provide for vibration, weakening or removal of support with cover of $1,000,000 item 63 Provide for liability under the Forest and Rural Fire Act 1977 with cover of $1,000,000 item Updating of programmes 64 The Contractor shall prepare and maintain a programme in accordance with section 5.10 5/16/2019 Page 13 item Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Preliminaries Rate Total (Continued) Quality assurance 65 The Contractor shall prepare, provide for review and implement a quality assurance plan in accordance with section 5.18 item 66 The Contractor shall provide a Quality Assurance Certificate Civil as specified item 67 The Contractor shall provide a Quality Assurance Certificate Structural as specified item Maintenance and protection of public and private property 68 The contractor shall allow to protect public and private property in accordance with section 5.7 item Charts, schedules Notice boards 69 2400 x 1200 Project sign fixed to temporary fencing describing the project item Setting out works 70 The Contractor shall allow to set out the works, including the employment of a Registered Surveyor if required item Temporary installations 71 Temporary roads, tracks, crossings and hard-standing item Services 72 The Contractor is to allow for temporary services connections to the site, maintenance and decommissioning and removal on completion of works item 73 The Contractor is to allow for the protection of all existing services for the duration of the works item Telephone calls 74 The Contractor is required to make due allowance fore the supply, maintenance and decommissioning of telecommunications equipment to the site, including services for information technology connections item Temporary screens, fences, hoardings, guard rails etc 75 Temporary fencing, hoardings, planked footways, guardrails, gantries, overhead protection, warning and directional signs, security, etc. item Temporary sheds, sanitary accomodation, etc 76 Temporary office, storage and messing 77 Temporary ablutions Duties and attendance Work outside the contract including nominated subcontractors Supplied goods 5/16/2019 Page 14 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Preliminaries Rate Total (Continued) Samples Testing Advertising Footpath levels Plant equipment and attendance labour Scaffolding Attendance Protection 78 Provide for protection of the completed works item 79 Provide for reinstatement of all areas of the site and leave in original condition and to the approval of the Engineer item Cleaning and removal of rubbish 80 The Contractor shall comply with the requirements in Specification section 1256 item 81 Provide for periodic cleaning during the course of the contract item 82 Provide for cleaning on completion including all glass item Handing over Defects liability 83 52 Weeks defect liability period item Security Supervision and Administration 84 Provide for all costs in connection with site supervision item 85 Provide for all costs in connection with executive on site and all off site administration including all correspondence processing claims, measuring and pricing variations for the contract period including extensions and the agreement of Final Accounts item 86 Provide for all costs in connection with the implementation, administration, training and the like for WebFM OMTrack Documents Module as documented in section 1013 of the Architectural Specification item Fire Fighting Equipment Drying Dewatering 87 The Contractor shall make due allowance for dewatering for excation works for the duration of the works item Works below water level 88 Not applicable 5/16/2019 note Page 15 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Groundworks PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 All measurements of excavation and subsequent disposal, filling and backfilling have been measured net before excavation; allow for increase in bulk or decrease in consolidation item 4 Working space has been allowed for in accordance with Health and Safety at Work Act Regulation 24. Should any further working space be deemed necessary, tenderers shall allow for it here together with the necessary backfilling item 5 The rates for excavation shall include for excavating in any material met with, excepting hard rock, and tenderers should ascertain the nature of material to be excavated item 6 The rates shall include for levelling, grading, trimming, compacting, scabbling and similar to faces of excavations other than to reduce levels, floor slab and road pavement excavation, keeping sides plumb and consolidating item 7 The rates shall include for all clearing away and backfilling due to slips or cave-ins or over excavations that may occur during the currency of the contract item 8 The rates for excavation not exceeding 1.5m deep shall include for planking and strutting where necessary item 9 Planking and strutting shall be deemed to mean provision of everything necessary to retain the sides of excavation including sheet piling or any other means and the rates shall include for any excavation, disposal and backfilling necessitated by the planking and strutting item 10 The rates shall include for levelling, grading, trimming and similar to faces of filled areas other than to over site, floor slab and similar filling item 11 The rates shall include for dressing around and sealing paper and plastic membranes to all penertrations item 12 The rates shall include for all necessary plant and equipment, removal of spoil and debris item 13 Provide for maintaining and upholding the public roadway, footpath and adjacent buildings item 14 Provide for pumping or other means of dewatering to keep the excavation free from water item 15 Provide for the disconnecting, sealing off, diverting, removing and protecting existing services met with during the excavation and for making good any damage or disturbance to the satisfaction of the Architect and Authorities item 5/16/2019 Page 16 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Groundworks Rate Total (Continued) 16 Excavations for services are to be included with their respective items in other Sections/Trades and a note will be made giving cross references item 17 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 18 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 19 Allow for quality assurance processes as specified item 20 Allow for all inspections and testing as specified item BULK EXCAVATION & FILLING 21 Site clearance - Removal and disposal of vegetation, including shrubs, redundant fencing and rubbish 1 item 22 Strip top soil and turf from section and remove from site, 400 deep 23 Strip top soil and turf from section and stockpile on site, 400 deep (for use in bunding) 24 Provide grading, dry density and optimum water content results by NZS 4402:1986, Test 4.1.3 Vibrating Hammer for proposed backfill material 25 Cut to waste unsuitable material - PROVISIONAL ITEM 26 Import, place, condition and compact AP65 in maximum layers of 250 deep 120 m3 27 Remove from stockpile, screen as necessary and spread topsoil as per plans 250 m3 28 Remove to waste excess topsoil 250 m3 125 m2 2,000 m2 3 no 50 m3 MAIN BUILDING EXCAVATION 29 Excavate in hardfill for concrete ground beam 0-1m deep with 600 extra width for working space each side and stockpile on site 556 m3 30 Excavate in hardfill for concrete ground beam 1-2m deep with 600 extra width for working space each side and stockpile on site 66 m3 31 Excavate in hardfill for concrete ground beam 1-2m deep with 600 extra width for working space each side and remove from site 166 m3 32 Excavate in hardfill for concrete pad 1-2m deep with 600 extra width for working space each side and remove from site 196 m3 5/16/2019 Page 17 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Groundworks 33 Rate Total (Continued) Excavate in hardfill for concrete slab thickening 300 deep and remove from site including battering 60 m2 FILLING 34 Backfill to boxing space from stockpiles 0-1m deep 246 m3 35 Backfill to boxing space from stockpiles 1-2m deep 266 m3 SAND BLINDING 36 25 Thick sand blinding beneath concrete slab 1,090 m2 PAPER AND PLASTIC MEMBRANES 37 250 Micron damp proof membrane beneath slab and foundations 1,949 m2 End of Section 5/16/2019 Page 18 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Concrete PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 Concrete shall be Special grade or High grade complying with NZS 3109 : 1997 and shall be from an approved ready-mix plant item 4 All concrete is to be placed into formwork unless otherwise stated item 5 The rates for concrete shall include for placing concrete, vibrating where required, for pouring around rod or mesh reinforcement and for grouting up holes of spacers item 6 The rates shall include for additional concrete required to conform to structural and excavated tolerances item 7 The rates shall include for pour joints and joints shown on the drawings that do not require formwork item 8 The rates for concrete shall include for finishing surfaces to falls or to the required specification and for curing and protecting exposed surfaces item 9 The rates shall include for making good after the removal of formwork and casting in all required items item 10 The rates shall include for scabbling other than that required by ANZSMM item 11 The rates for concrete shall include for water stops, sleeves, chases, penetrations, forming of small recesses, sinkings for floor springs, pockets, cutting and pinning, building in etc item 12 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 13 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 14 Allow for all producer statements as specified item 15 Allow for all method statements as specified item 16 Allow for 10 year guarantee covering joints generally as specified item 17 Allow for 2 year guarantee covering slabs generally as specified item 18 Allow for all quality assurance processes as specified item 19 Allow for all inspections and testing as specified item 5/16/2019 Page 19 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Concrete 20 Rate Total (Continued) Allow for providing samples of materials and finishes item MAIN BUILDING FOUNDATIONS 25 MPa Reinforced Concrete at 28 days 21 In foundation beams 22 In foundation pad 244 m3 65 m3 Sundries 23 U2 Finish to top of foundation beam 24 U2 FInish to top of foundation pad 375 m2 82 m2 GROUND SLAB & THICKENINGS 30 MPa Special Grade Reinforced Concrete at 28 days 25 In slab 0-100 thick :[773 m2] 78 m3 26 In slab 0-100 thick to falls :[16 m2] 27 In slab 100-200 thick :[197 m2] 35 m3 28 In slab 100-200 thick to falls :[105 m2] 19 m3 29 In slab thickening 63 m3 30 In strip drain encasement 2 m3 3 m3 Sundries 31 U3 Finish to slab 970 m2 32 U3 Finish to slab to falls 121 m2 33 30 x 6 Sawcut including approved sealant 202 m 34 40 x 6 Sawcut including approved sealant 84 m Sundries from other trades Structural Steel 35 Mastic sealant around base of steel column 67 m Floor Screed 36 Allow for 10 year manufacturer warranty as specified 37 Ardex Grout & FLC to falls to shower floor item 5 m2 Take delivery and cast in the following items from other trades: Windows 38 40 x 5 EA Cast in to slab as door sill including ties, 900 long (detail 19/A4.02) 1 no Carpentry 39 M16 x 400 4.6/S Threaded rod 85 no 40 M20 x 340 8.8/S Hold down bolt 2 no 5/16/2019 Page 20 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Concrete 41 Rate Total (Continued) M20 x 400 4.6/S Threaded rod 173 no Structural Steel 42 M16 x 320 8.8/S Hold down bolt including 50 x 50 x 6 anchor plate 2 no 43 M20 x 590 4.6/TB Hold down bolt including 50 x 50 x 6 anchor plate 32 no 44 M20 x 600 8.8/S Hold down bolt 11 no 45 M24 x 580 8.8/TB Hold down bolt 286 no 46 M24 x 610 4.6/TB Hold down bolt 16 no 47 M24 x 630 8.8/TB Hold down bolt including 50 x 50 x 6 anchor plate 48 250 x 100 x 12 Anchor plate 22 no 49 540 x 270 x 12 Anchor plate 11 no 50 480 x 310 x 12 Anchor plate 33 no 51 290 x 130 x 16 Anchor plate 8 no 8 no NIB UPSTANDS 30 MPa Reinforced Concrete at 28 days 52 In nib upstand :[52 m] 3 m3 COLUMN ENCASEMENT 30 MPa Reinforced Concrete at 28 days 53 In column encasement 1 m3 Sundries 54 U3 Finish to top of encasement 1 m2 End of Section 5/16/2019 Page 21 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Formwork PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The rates shall include for all necessary boarding, supports, erecting, framing, temporary cambering, cutting, perforations for reinforcing bars, bolts, straps, ties,hangers, pipes and similar, angles, removal, cleaning, wetting and treatment with separating agent before placing concrete, chamfered edges and splayed internal angles less than 50mm wide on face, filling tie bolt holes, strutting left after removal of formwork item 4 All formwork shall comply with standard of NZS 3114 item 5 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 6 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item MAIN BUILDING FOUNDATIONS F1 Formwork to:7 Side of foundation beam 481 m2 8 Side of foundation pad 104 m2 GROUND SLAB & THICKENINGS F1 Formwork to:9 Side of strip drain encasement 12 m2 F5 Formwork to:10 Side of thickening 11 Side of edge thickening 5 m2 90 m2 Sundries 12 Form 500 x 500 x 150 deep recess for power box in slab 4 no 13 Form 1120 x 900 shower floor set-down and to falls 4 no 14 Form 140 x 45 rebate at edge of concrete slab 11 m 15 Form 180 x 35 rebate at edge of concrete slab 4 m 16 Form 370 x 25 sloping rebate at edge of concrete slab 33 m 17 Form 75 x 110 recess in slab for strip drain 13 m 18 Form 150 x 50 recess in slab for shower strip drain 5/16/2019 Page 22 4 m Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Formwork Rate Total (Continued) NIB UPSTANDS F5 Formwork to:19 Side of nib upstand, 0 - 250 high 147 m Sundries 20 Form 90 x 50 rebate to edge of nib upstand 19 m 21 Form 100 x 50 rebate to edge of nib upstand 4 m COLUMN ENCASEMENT F5 Formwork to:22 Side of column encasement 2 m2 End of Section 5/16/2019 Page 23 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Reinforcement PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 Deformed mild steel bars described with the prefix D, plain round mild steel bars described with the prefix R, high yield deformed bars with the prefix H and high yield plain round steel bars with the prefix HR shall comply with NZS 3402. Welded mesh fabric reinforcement and workmanship shall conform to the requirements of NZS 3109 item 4 Laps to all bars have been measured as shown on the drawings, as nominated by engineer or at 8m centres as per ANZSMM 2018 NZ Guidance Notes item 5 Allow for welding and weld testing shall comply with NZS 4702 item 6 The weights of rod reinforcement have been calculated from standard tables. Rates shall include for rolling margin item 7 The rates shall include for cleaning, fabrication, placing, the provision of all necessary temporary fixings and supports including tie wire and chair supports item 8 The rates shall include for supplying rod reinforcement in lengths up to 10m where required item 9 The rates for mesh reinforcement shall include for laps; all areas have been measured net item 10 Reinforcing steel shall be manufactured by an approved supplier as specified item 11 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 12 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 13 Allow for all quality assurance processes as specified item 14 Allow for all producer and method statements as specified item 15 Allow for all inspections and testing as specified item 16 Allow for all bending schedules as specified item MAIN BUILDING FOUNDATIONS 17 XD10 Starter drilled and epoxied into foundation beam with Hilti HIT RE-500, 600 long 5/16/2019 Page 24 32 no Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Reinforcement Rate Total (Continued) 18 XD10 U-bar 7 kg 19 D12 Starter 303 kg 20 XR12 Stirrup 21 XD12 U-bar 22 XD16 Rod 42 kg 23 XD20 Rod 745 kg 24 XD25 Rod 26,471 kg 10,496 kg 105 kg SLAB, THICKENINGS & NIBS 25 XD10 Rod 105 kg 26 XD10 Starter 182 kg 27 XR10 Stirrup 1,341 kg 28 D12 Starter 1,800 kg 29 XD12 Rod 8,555 kg 30 XD16 Starter 31 XD16 Rod 1,159 kg 32 XD20 Rod 9,524 kg 219 kg End of Section 5/16/2019 Page 25 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Tanking and Waterproof Membranes PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The rates for tanking and waterproofing shall include for temprary screeds, grounds and rules item 4 The rates shall include for scabbling other than that required by ANZSMM item 5 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 6 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item Tanking and Waterproofing Membranes 7 STO Flexyl or liquid DPM to rebate, 340 girth 79 m 8 Ardex WPM 001 waterproofing liquid to sill rebate, 370 girth 56 m 9 12 EPS Rigid insulation protection to waterproofing, 150 high 65 m 5/16/2019 Page 26 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Masonry PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 Materials and workmanship shall comply with NZS 4210. Concrete blocks shall be Firth or similar approved units item 4 Mortar shall comply with Specification Clause 3.7.3 item 5 The preambles and rates to include clauses of the Reinforcing Steel trade section shall apply equally to this section item 6 The rates shall include for leaving loose bricks or blocks for cleaning out cavities, leaving weep holes, forming cavities, forming rebates reveals and pointing and cleaning down to reveals where necessary item 7 The rates shall include for fractional size blocks, plain and plain return blocks and similar blocks, all necessary machine cutting, cutting to form bond, cutting or forming chases for edges of floor slabs, cutting or leaving holes and openings as recesses for and building in pipes, conduits, sleeves and similar as required for all trades item 8 The rates shall include for leaving surfaces rough or raking out joints for plastering and flashings, knocking off angles in preparation for plastering, bedding frames or plates, building in joists, bearers, or similar, temporary supports to openings, templates, and for all necessary making good item 9 The rates shall include for plumbing angles and reveals to openings etc., all temporary tomming and supports and for protecting adjacent surfaces and finished work item 10 The rates shall include for cleaning down as the work proceeds and on completion item 11 Provide for making and testing samples of mortar and grout as Specified item 12 The rates shall include for all construction joints as required item 13 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 14 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 15 Allow for all quality assurance processes as specified item 16 Allow for all inspections as specified item 17 Allow for all producer statements as specified item 5/16/2019 Page 27 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Masonry 18 Rate Total (Continued) Allow for all testing as specified item MAIN BUILDING BLOCKWORK Firth 20 Series RC Masonry Blocks, laid in stretcher bond and pointed as specified 19 In solid filled exterior wall 58 m2 20 In solid filled interior wall 20 m2 21 400 high lintel block course to four openings 22 Plain end blocks 23 Half high block course 7 m 24 Raking cut 200 thick block course for 3.0m high internal wall 8 m 25 Form fair external angle 16 m 26 Form tee intersection 10 m 6 m 18 m Grout 27 20 MPa course grout to all cores of 20 series block wall approx. 88m2 8 m3 Reinforcing Steel 28 XD16 Rod 829 kg End of Section 5/16/2019 Page 28 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Structural Steel PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 Structural Steelwork shall comply with BS:4360, or AS:1204 workmanship with NZS:3404, welding and weld testing with NZS:4702 item 4 The weights have been calculated from standard tables: no allowance has been made for rolling margin item 5 Where lengths are stated in the descriptions they are approximate only item 6 Dimensions for all steelwork must be checked on site item 7 The rates shall include for all shop fabrication work, marking, drillings for bolts including those securing timbers, etc shown or noted on steelwork drawing, black bolts, nuts and any type of washer, riveted work, counter sinking, and tapping for bolts or machine screws item 8 The rates shall include for cutting to dead lengths, notching and machining ends and bearings item 9 The rates shall include for supply, fabrication, delivery, hoisting and erection of members, except where otherwise described item 10 The rates for continuous members shall include for welded joints in the length item 11 Bolts shall include for nuts, washers and tapered washers as required item 12 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 13 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item 14 The heaviest lift is ... item 15 The highest lift is ... item GENERAL 16 Allow for all quality assurance processes as specified item 17 Allow for shop drawings as specified item 18 Allow for the provision of all necessary temporary bracing and similar items required for erection item 19 Allow for all testing and inspections as specified item 20 Allow for all submittals as specified item 5/16/2019 Page 29 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Structural Steel 21 Rate Total (Continued) Allow for all producer statements as specified item MAIN BUILDING FRAMES The Following Hoisted Fixed at Ground Floor Level with Bolted Connections 22 700WB130 Portal column :[2/4.3] 1,112 kg 23 700WB130 Portal beam comprising of three sections bolted together :[2/3.2 1/17.4] 3,083 kg 24 310UB46 Column :[5/4.8 5/5.2] 2,297 kg 25 250UB37 Column :[7/3.9 6/4.2 8/4.6 6/4.7 6/5.1] 5,473 kg 26 200UB30 Column :[1/4.4] 27 150 x 9 SHS Column (In 4 no; total weight 792 kg) 21 m 28 150 x 9 SHS Diagonal brace (In 4 no; total weight 1,018 kg) 27 m 29 125 x 9 SHS Column (In 3 no; total weight 337 kg) 11 m 30 89 x 6 SHS Column (In 13 no; total weight 701 kg) 48 m 31 6 End plate (In 20 no) 19 kg 32 8 Stiffener (In 4 no) 33 10 Plates, stiffeners and cleats (In 4 no) 34 12 Stiffener (In 156 no) 291 kg 35 16 End and base plates (In 34 no) 323 kg 36 20 Plates and stiffeners (In 19 no) 362 kg 37 32 Base plate (In 37 no) 38 M16 x 0-100 8.8/S Bolt fixing steel to steel 39 M16 x 0-100 Threaded stud welded to steelwork 40 M20 x 0-100 8.8/TB Bolt fixing steel to steel 84 no 41 M20 x 0-100 8.8/S Bolt fixing steel to steel 32 no 42 220 x 180 x 20 Thick high strength non-shrink grout pack 1 no 43 250 x 100 x 20 Thick high strength non-shrink grout pack 13 no 44 280 x 140 x 20 Thick high strength non-shrink grout pack 3 no 45 480 x 310 x 30 Thick high strength non-shrink grout pack 33 no 46 500 x 260 x 30 Thick high strength non-shrink grout pack 4 no 47 540 x 240 x 30 Thick high strength non-shrink grout pack 11 no 48 740 x 290 x 30 Thick high strength non-shrink grout pack 2 no 130 kg 4 kg 10 kg 1,365 kg 4 no 294 no Supply the following to the Concrete Contractor to be cast in 49 40 x 5 Equal Angle (In 1 no) 5/16/2019 3 kg Page 30 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Structural Steel Rate Total (Continued) 50 M16 x 300-400 8.8/S Hold down bolt including 50 x 50 x 6 anchor plate 2 no 51 M20 x 500-600 4.6/TB Hold down bolt including 50 x 50 x 6 anchor plate 52 M24 x 500-600 8.8/TB Hold down bolt 286 no 53 M24 x 600-700 4.6/TB Hold down bolt 16 no 54 M24 x 600-700 8.8/TB Hold down bolt including 50 x 50 x 6 anchor plate 55 12 Anchor plate (In 44 no) 614 kg 56 16 Anchor plate (In 8 no) 38 kg 32 no 8 no The Following Hoisted Fixed at First Floor Level Approximately 3.5m Average Above Ground Level 57 310UB46 Beam :[2/2.4 2/3.0 1/3.6 2/4.2 3/4.6] 1,678 kg 58 250UB37 Beam :[26/3.3] 3,150 kg 59 200UB30 Beam :[1/0.8 1/2.9 1/7.3] 326 kg 60 180UB22 Outrigger :[9/0.8 2/1.3] 209 kg 61 180UB22 Beam :[6/3.1] 413 kg 62 250 PFC Trimmer (In 14 no) 63 100 x 6 SHS Stub post (In 3 no; total weight 17 kg) 64 89 x 6 SHS Column (In 25 no; total weight 1,256 kg) 65 100 x 8 EA (In 3 no) 66 6 End plate (In 38 no) 67 8 Plates and cleats (In 2 no) 68 10 Cleats and stiffeners (In 359 no) 69 12 Plates and stiffeners (In 48 no) 95 kg 70 16 Splice and end plates (In 69 no) 159 kg 71 25 Splice plate (In 22 no) 366 kg 72 M16 x 0-100 8.8/S Bolt fixing steel to steel 172 no 73 M20 x 0-100 Threaded stud welded to steelwork 80 no 74 M24 x 0-100 8.8/TB Bolt fixing steel to steel 88 no 2,228 kg 1 m 86 m 6 kg 204 kg 3 kg 1,200 kg ROOF FRAMING The Following Hoisted Fixed at Roof Level Approximately 5.0m average Above Ground Level 75 410UB60 Rafter :[10/3.0 5/3.4 5/7.7] 5,063 kg 76 310UB46 Rafter :[10/4.4] 1,996 kg 77 310UB46 Beam :[18/2.7] 2,191 kg 5/16/2019 Page 31 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Structural Steel Rate Total (Continued) 78 250UB37 Rafter :[18/3.0 14/3.7] 3,902 kg 79 250 PFC Beam (In 10 no) 1,318 kg 80 150PFC Rafter (In 2 no) 81 150 x 9 SHS Beam (In 8 no; total weight 1,697 kg) 45 m 82 150 x 6 SHS Beam (In 23 no; total weight 2,018 kg) 77 m 83 75 x 6 EA Fly brace (In 32 no) 105 kg 84 65 x 5 EA Roller door support (In 8 no) 147 kg 85 6 Plates and cleats (In 416 no) 86 8 Plates, cleats and stiffeners (In 76 no) 92 kg 87 10 Plates. cleats and stiffeners (In 18 no) 52 kg 88 10 Continuous tie plate (In 2 no) 89 12 Plates, cleats and stiffeners (In 511 no) 90 16 Splice plate (In 52 no) 59 kg 91 25 Splice plate (In 26 no) 432 kg 92 M12 x 0-100 4.6/S Bolt fixing steel to steel 56 no 93 M16 x 0-100 4.6/S Bolt fixing steel to steel 1,252 no 94 M16 x 0-100 8.8/S Bolt fixing steel to steel 30 no 95 M20 x 0-100 8.8/S Bolt fixing steel to steel 354 no 96 M20 x 0-100 8.8/TB Bolt fixing steel to steel 792 no 97 M24 x 0-100 8.8/TB Bolt fixing steel to steel 104 no 98 XR20 Bracing rod 719 kg 99 Turnbuckle to XR20 bracing rod including fixings (detail 2/A06-11) 48 no 100 End to XR20 bracing rod including fixings (detail 4/A06-11) 96 no 101 DHS200/18 Purlin 102 800 Long purlin brace 224 kg 1,233 kg 195 kg 2,236 kg 1,221 m 144 no PRIMING Prepare and apply one coat of Dulux Luxaprime ZP to specified thickness to:103 Interior steelwork (all members girthed) 104 Touch up priming areas after erection 1,172 m2 item Prepare and apply Dulux Quit Rust Metal Primer to:105 Exterior steelwork (all members girthed) 106 Touch up priming areas after erection 5/16/2019 838 m2 item Page 32 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Metalwork PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The weights have been calculated from standard tables: no allowance has been made for rolling margin. The weights of galvanised steel exclude the additional weight of galvanising item 4 Where lengths are stated in the descriptions they are approximate only item 5 Dimensions for all metalwork must be checked on site item 6 The rates shall include for cutting to length, splay cut or machined ends, holes, slots, packers, spacers, etc., and for templates and the like item 7 The rates shall include for supply, fabrication, and fixing of members complete except where otherwise described item 8 The rates shall include for all welding, both in the shop and on the site including preparation, sealing runs, grinding smooth where required and for welded joints in the length of continuous members item 9 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 10 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item METAL WALL CLADDING 11 Provide 15 year manufacturer warranty as specified item 12 Provide 5 year installation warranty as specified item 13 0.55 BMT Dimond LT7 Colour Coated ZR8 wall cladding fixed to cavity battens 85 m2 14 Ecofoam closure strip 26 m 15 18 Wide cavity closer 72 m 0.55 BMT Colour Coated Flashings 16 160 Girth three times bent soffit flashing 20 m 17 250 Girth four times bent flashing at plaster cladding junction 11 m 18 370 Girth six times bent top hat flashing 7 m 19 410 Girth seven times bent corner flashing 7 m METAL SOFFIT LINING 5/16/2019 Page 33 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Metalwork 20 Rate Total (Continued) Dimond Baby Iron Colour Coated soffit lining fixed to under side of steel purlins 315 m2 0.55 BMT Colour Coated Flashings 21 210 Girth five times bent soffit flashing 72 m 22 300 Girth four times bent end flashing 49 m INTERNAL HANDRAILS 23 Stainless Steel 304 Grade sloping handrail including ramps, stop ends, bends and standoff brackets fixed to timber framing 22 m End of Section 5/16/2019 Page 34 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Roofing PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 All roofing has been measured net with no allowance made for side or other laps item 4 The rates for membrane roofing shall include for fair edges, dressing over angle fillets, turning into grooves, all other labours, internal and external angles, fillets, circular edges, separation strips other than those specifically detailed in the contract documents, nails, screws and similar items, temporary screeds, rules and grounds item 5 The rates for Membrane Roofing shall include for preparation of surfaces item 6 The rates shall include for nails, screws, clips, rivets, straps and similar items 7 The rates for flashings shall include for folding and bending to shape, laps, joints, expansion joints, soakers, clips and shaping at angles and ends, and for bituminous breather underlay item 8 Sealant shall be of an approved type and compatible with the roof coverings item 9 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 10 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item MAIN BUILDING INSULATED PANEL ROOFING 11 Provide 15 year manufacturers warranty as specified item 12 Provide 2 year installation warranty as specified item 13 Kingspan KS1000 RW Insulated panel roofing with 60 PIR board insulation fixed to steel purlins 632 m2 14 Kingspan KS1000 RW Insulated panel roofing with 60 PIR insulation fixed to timber roof framing 361 m2 15 Form downturn at eaves 16 Profiled closure strip including gun grade sealant 17 6 x 4 Continuous run of butyl sealant 96 m 18 Foam filler at ridge including gun grade sealant at top and bottom 24 m 5/16/2019 93 m 187 m Page 35 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Roofing Rate Total (Continued) 19 Foam filler at barge 46 m 20 Site applied insulation at eave (detail 18/A4.05) 85 m 0.55 BMT Coil Coated Roof Flashings 21 180 Girth two times bent eaves flashing 45 m 22 350 Girth three times bent apron flashing notched for ribs 44 m 23 460 Girth three times bent ridge flashing notched for ribs 24 m 24 470 Girth three times bent barge flashing 26 m 25 500 Girth five times bent barge flashing 20 m 26 Z Flashing under barge flashing including 6 x 4 butyl sealant (detail 32/A4.06) 46 m Roof Penetrations 27 Form 800 x 400 roof penetration for extract duct, seal and flash to approval 1 no METAL ROOFING 28 Provide manufacturer warranty as specified item 29 Provide 5 year installation warranty as specified item 30 Dimond Veedek 0.55 BMT Colour ZR8 coated roofing fixed to steelwork 419 m2 31 Thermoplast 990 foil and R3.2 115 thick insulation fitted between timber roof framing 419 m2 32 Thermakraft 405 roof underlay on drainage matt 424 m2 33 Aumesh safety netting fixed to timber framing 419 m2 34 Form downturn at eaves 51 m 35 Form stop end at end of sheet 35 m 36 Ecofoam closure strip 113 m 0.55 Colour Coated Roof Flashings 37 180 Girth two times bent eaves flashing 51 m 38 370 Girth two times bent apron flashing notched for ribs 11 m 39 390 Girth four times bent apron flashing notched for ribs 27 m 40 510 Girth five times bent barge flashing 24 m MEMBRANE ROOFING 41 Provide 20 year manufacturer warranty as specified item 42 Provide 5 year installer warranty as specified item 43 Provide all information required for compliance as specified item 44 Allow for all testing as specified item 5/16/2019 Page 36 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Roofing Rate Total (Continued) 45 Nuraply 3PM base & top coat torch on membrane on plywood substrate (plywood measured elsewhere) 81 m2 46 Form 70 downturn at drip edge 59 m 47 Dress membrane 200 up timber framed wall 54 m 48 Dress membrane 680 up and over parapet wall 11 m 0.55 Colour Coated Roof Flashings 49 80 Girth two times bent flashing at wall junction 14 m 50 150 Girth three times bent edge flashing 19 m 51 490 Girth four times bent parapet cap flashing 11 m Roof Outlets 52 Roof drainage outlet c/w bronze cast dome and insert for 65 downpipe including forming penetration 3 no FASCIAS 1.2 ZR8 Colour Coated Mild Steel 53 260 Girth three times bent fascia 23 m 54 360 Girth six times bent fascia 49 m 55 380 Girth seven times bent fascia 73 m 56 470 Girth four times fascia 24 m 57 540 Girth seven times bent fascia 28 m RAINWATER SYSTEM 58 Provide warranty as specified item 59 Allow to test rainwater disposal system item 60 Dimond 300 Colour coated spouting including 50 x 5 exposed folded brackets fixed to timber framing 95 m 61 Dimond 300 Colour coated spouting including 50 x 5 exposed folded brackets bolt fixed to steel purlins 49 m 62 Colour coated rainwater head including overflow and 100 downpipe outlet and any gratings necessary 2 no 63 150 Downpipe outlet to gutter 5 no 64 Stop end to gutter 12 no 65 150 Colour coated 0.7 downpipe including adjustable standoff brackets 25 m 66 Bend to 150 downpipe 7 no 67 Connect 150 downpipe to drain 5 no 68 100 Colour coated 0.7 downpipe including adjustable standoff brackets 7 m 69 Bend to 100 downpipe 4 no 5/16/2019 Page 37 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Roofing Rate Total (Continued) 70 Connect 100 downpipe to drain 2 no 71 65 Colour coated 0.7 downpipe including adjustable standoff brackets 9 m 72 Bend to 65 downpipe 3 no 73 Connect 65 downpipe to drain 3 no End of Section 5/16/2019 Page 38 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Windows PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 Aluminium windows shall comply with NZS:4211 and AAA performance requirements item 4 The sizes and descriptions in this schedule are approximate only and the sub-contractor shall submit details for approval before commencing manufacture. All dimensions must be checked on site item 5 All aluminium members shall be of heavy gauge extruded aluminium alloy with a satin powdercoated finish item 6 All glass and glazing shall be in accordance with NZS 4223:1991 item 7 The rates shall include for glazing, which has NOT been measured separately item 8 The rates shall include for neoprene rubber gaskets, mastics, special glazing compounds, and matching clip in glazing beads item 9 The rates shall include for frames, mullions, transoms and glazing bars and beads, trims, caulking and pointing, sashes, casements, hinges, fastenings and other hardware item 10 Flashings where shown have been measured separately. Rates shall include for all other flashings required to make the windows watertight item 11 Reveal linings shall be grooved to suit wall linings of varying thicknesses item 12 The rates shall include for all necessary packings, grounds, wedges and fixing item 13 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 14 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item ALUMINIUM WINDOWS 15 Provide for shop drawings as specified item 16 Provide a five year written manufacturer warranty as specified item 17 Provide a two year written installation warranty as specified item 18 Allow for ten year written manufacturer warranty covering glazing as specified item 5/16/2019 Page 39 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Windows Rate Total (Continued) 19 Provide samples as specified item 20 Provide certificates as specified item 21 Allow for design to wind pressure parameters as specified item APL Architectural Series Aluminium Powdercoated Double Glazed Window Section, Complete with Rebated Timber Reveals 22 700 x 2665 High window with one fixed pane and one awning hung sash (W02, W03) 2 no 23 1040 x 1765 High window with one awning hung sash (W06) 1 no 24 2770 x 1390 High window with two fixed panes and one awning hung sash (W08, W09) 2 no 25 3012 x 2665 High window with four fixed panes (W04, W05) 2 no 26 3400 x 2850 High window with four fixed panes and two awning hung sashes (W01) 1 no 27 4512 x 1785 High window with three fixed panes (W07) 1 no APL Metro Series Aluminium Powdercoated Double Glazed Window Section, Complete with Rebated Timber Reveals 28 800 x 800 High window with one awning hung sash (W10, W11, W12, W20) 4 no 29 1500 x 950 High window with one fixed pane and one awning hung sash (W26, W27) 2 no 30 1600 x 840 High window with one fixed pane and one awning hung sash (W14, W15, W16, W18, W19) 5 no 31 1600 x 1180 High window with one fixed pane and one awning hung sash (W21, W22, W23, W24, W25) 5 no 32 2970 x 950 High window with five fixed panes (W17) 1 no 33 3000 x 1000 High window with one fixed pane and two awning hung sashes (W13) 1 no FLASHINGS Powdercoated Aluminium Flashings 34 80 Girth three times bent head flashing. Detail 23/A4.05 34 m 35 140 Girth two times bent jamb flashing. Detail 6/A4.03 6 m 36 160 Girth two times bent jamb flashing. Detail 5/A4.03 11 m 37 200 Girth three times bent jamb flashing. Detail 4/A4.03 6 m Plastic Flashings 38 110 Wide vertical plastic soaker flashing. Detail 24/A4.05 81 m 2.0 Powdercoated Aluminium Flashings 39 180 Girth three times bent sill flashing. Detail 21/A4.05 8 m Sundries 5/16/2019 Page 40 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Windows Rate Total (Continued) 40 Allow for 10 year warranty for the supply and installation of sealants 41 Sika AT-Facade silicone air seal on PEF backing rod 42 Grout infill to concrete slab edge rebate following threshold installation. Detail 2S/A4.01 item 169 m 10 m End of Section 5/16/2019 Page 41 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Glazing PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 All glass and glazing shall be in accordance with NZS 4223 : 1991 item 4 Glazing to metal windows and doors has been scheduled in the Metal Windows and Doors trade section item 5 The rates shall include for all putties, mastics, special glazing compounds and all necessary materials for the completion of the glazing and for preparing and sealing rebates item 6 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 7 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 8 Provide 10 year manufacturer warranty as specified item 9 Provide samples as specified item MIRRORS 10 460 x 1000 x 6 Thick mirror with ground edges fixed to plasterboard lined wall 4 no 11 485 x 1000 x 6 Thick mirror with ground edges fixed to plasterboard lined wall 1 no 12 570 x 1000 x 6 Thick mirror with ground edges fixed to plasterboard lined wall 1 no 13 895 x 1000 x 6 Thick mirror with ground edges fixed to plasterboard lined wall 4 no SPLASHBACKS 14 2090 x 450 Low iron colourback glass splashback fixed to plasterboard wall including sealant 1 no 15 2160 x 585 Low iron colourback glass splashback fixed to plasterboard wall including sealant 1 no 16 2813 x 585 Low iron colourback glass splashback fixed to plasterboard wall including sealant 1 no 17 3100 x 585 Low iron colourback glass splashback fixed to plasterboard wall including sealant 1 no 18 5005 x 585 Low iron colourback glass splashback fixed to plasterboard wall including sealant 1 no 5/16/2019 Page 42 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Glazing Unit Rate Total (Continued) End of Section 5/16/2019 Page 43 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Carpentry PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 All materials and workmanship shall comply with NZS 3604 item 4 The rates shall include for all labour cutting, notching, boring or checking for ventilation, fixing to other timbers, packings and wedges as required, morticing, tenoning, arris-rounding, thicknessing or gauging where required and all other machining item 5 The rates shall include for all labours in framing, notching and fitting around projections, pipes, light fittings, hatches, grilles and similar complete with all cleats, packers, wedges and similar and all nails and screws item 6 The rates for bolts and Dynabolts shall include for holes in the timber, for necessary nuts and washers and for building in, casting in and recessing heads as required item 7 The rates for building paper shall include for flashing tape to openings, parapet walls and the like item 8 The sizes given of thicknessed, gauged or dressed timbers are nominal sizes. Where finished sizes are required these are described as (fin) item 9 All timbers, unless otherwise described shall be gauged H1.2 treated MSG8 Grade Pinus Radiata item 10 Damp proof course shall comply with AS/NZS 2904 and AS/NZS 4347.0 item 11 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 12 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 13 Allow for all quality assurance processes as specified item 14 Allow for all producer statements as specified item MAIN BUILDING UPPER ROOF AND SOFFIT FRAMING 15 100 x 50 Blocking 47 m 16 150 x 50 Blocking 180 m 17 150 x 50 Outrigger 175 m 18 150 x 50 Purlin 603 m 5/16/2019 Page 44 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) 19 150 x 50 Trimmer 47 m 20 2/150 x 50 Trimmer 69 m 21 2/250 x 50 HySpan rafter 14 m H3.2 Treated 22 150 x 100 Firring 41 m Sundries 23 M16 x 0-100 4.6/S Bolt fixing timber to steelwork 17 no 24 M16 x 200-300 4.6/S Bolt fixing timber to steelwork 18 no 25 4/53 x 0.9 Galvanised Lumberlok multi-brace strap 64 m 26 Lumberlok 110 x 150 long Z275 multigrip 260 no LOWER ROOF AND SOFFIT FRAMING 27 75 x 50 Blocking 27 m 28 100 x 50 Blocking 56 m 29 150 x 50 Plate 11 m 30 150 x 50 Blocking 33 m 31 150 x 50 Trimmer 6 m 32 200 x 50 Purlin 8 m 33 200 x 50 Plate fixed to blockwork 8 m 34 200 x 50 Soffit dwang 35 250 x 50 HySpan rafter 36 250 x 50 Trimmer 52 m 37 250 x 50 Trimmer fixed to blockwork 10 m 38 250 x 50 Blocking 39 2/150 x 50 Purlin 15 m 381 m 199 m 9 m H3.2 Treated 40 100 x 75 Packer 41 270 x 40 Shaped packer beneath parapet cap 129 m 11 m Sundries 42 M16 x 200-300 4.6/S Threaded rod drilled and epoxied into blockwall with Hilti HIT-RE 500 54 no 43 Pair of Lumberlok 110 x 150 long Z275 Multigrip 249 no 44 2/6kN twisted sheet brace straps 108 no EXTERNAL WALL FRAMING 45 75 x 75 Packer 15 m 46 100 x 50 Packer fixed to steelwork 38 m 5/16/2019 Page 45 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) 47 100 x 50 Packer 98 m 48 100 x 100 Packer 32 m 49 150 x 50 Bottom plate fixed to concrete 54 m 50 150 x 50 Bottom plate 51 150 x 50 Stud 52 150 x 50 Dwang 53 150 x 50 Top plate 76 m 54 150 x 50 Packer 95 m 55 150 x 50 Plate fixed to steelwork 39 m 56 150 x 50 Blocking 49 m 57 150 x 75 Plate fixed to steelwork 4 m 58 150 x 100 Plate fixed to steelwork 33 m 59 200 x 30 Packer 49 m 60 200 x 50 Bottom plate 39 m 61 200 x 50 Stud 815 m 62 200 x 50 Dwang 399 m 63 200 x 50 Top plate 39 m 64 200 x 50 Blocking 31 m 65 200 x 50 Plate fixed to steelwork 76 m 66 200 x 50 Plate fixed to blockwork 9 m 67 200 x 100 Tapered plate fixed to blockwork 6 m 68 250 x 50 Plate fixed to steelwork 87 m 69 2/150 x 50 Bottom plate 18 m 70 2/150 x 50 Bottom plate fixed to concrete 14 m 71 2/150 x 50 Lintel 72 2/150 x 50 Top plate 31 m 73 2/150 x 50 Plate fixed to steelwork 44 m 74 2/200 x 50 Bottom plate 26 m 75 2/200 x 50 Bottom plate fixed to concrete 76 2/200 x 50 LVL HySpan lintel 12 m 77 2/200 x 50 Top plate 29 m 78 3/150 x 50 Lintel 58 m 9 m 1,225 m 606 m 6 m 4 m H3.1 Treated 79 18 x 45 Cavibat 5/16/2019 1,163 m Page 46 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) 80 45 x 10 Packer 36 m 81 45 x 20 Cavity batten 244 m 82 70 x 20 Packer 199 m 83 100 x 20 Packer 15 m H5 Treated 84 70 x 12 Packer 92 m Sundries 85 Bolt fix 50 timber to steelwork 180 no 86 100-200 Long bolt fixing timber to timber 51 no 87 200-300 Long bolt fixing timber to timber 48 no 88 M16 x 100-200 4.6/S Bolt fixing timber to steelwork 148 no 89 M16 x 200-300 long 4.6/S Coach bolt fixing timber to steelwork 152 no 90 M16 x 300-400 Threaded rod drilled and epoxied into blockwall with Hilti HIT-RE 500 41 no 91 M16 x 200-300 4.6/S Bolt fixing timber to steelwork 87 no 92 Gib Handibrac hold-down including fixings 28 no 93 Damp proof course 150 wide 68 m 94 Damp proof course 200 wide 6 m Supply the following to be cast in by the Concrete Contractor 95 M16 x 300-400 4.6/S Threaded rod 85 no 96 M20 x 300-400 4.6/S Threaded rod 49 no INTERNAL WALL FRAMING 97 45 x 20 Batten 535 m 98 75 x 50 Packer 22 m 99 100 x 30 Packer 11 m 100 100 x 50 Threshold plate 101 100 x 50 Bottom plate fixed to concrete 54 m 102 100 x 50 Bottom plate 82 m 103 100 x 50 Stud 104 100 x 50 Dwang 693 m 105 100 x 50 Top plate 149 m 106 100 x 50 Plate fixed to steelwork 107 150 x 50 Bottom plate fixed to concrete 108 150 x 50 Bottom plate 109 150 x 50 Stud 5/16/2019 8 m 1,724 m 60 m 101 m 13 m 1,890 m Page 47 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) 110 150 x 50 Dwang 905 m 111 150 x 50 Top plate 130 m 112 150 x 50 Plate fixed to steelwork 59 m 113 150 x 75 Plate fixed to steelwork 42 m 114 200 x 50 Plate fixed to blockwork 10 m 115 200 x 50 Plate fixed to steelwork 12 m 116 200 x 50 Bottom plate fixed to concrete 21 m 117 200 x 50 Bottom plate 118 200 x 50 Stud 343 m 119 200 x 50 Dwang 155 m 120 200 x 50 Top plate 28 m 121 2/100 x 50 Bottom plate 19 m 122 2/100 x 50 Top plate 19 m 123 2/150 x 50 Bottom plate fixed to concrete 43 m 124 2/150 x 50 Bottom plate 125 2/150 x 50 Top plate 126 2/150 x 50 Lintel 8 m 127 2/200 x 50 Bottom plate fixed to concrete 4 m 128 2/200 x 50 Top plate 4 m 129 2/250 x 50 LVL HySpan lintel 5 m 5 m 9 m 52 m Sundries 130 Fix 50 bottom plate to concrete floor 277 no 131 M16 x 100-200 4.6/S Coach bolt fixing timber to steelwork 240 no 132 M16 x 300-400 Threaded rod drilled and epoxied into blockwall with Hilti HIT-RE 500 29 no 133 Gib Handibrac hold-down including fixings 28 no 134 Damp proof course 100 wide 54 m 135 Damp proof course 150 wide 143 m 136 Damp proof course 200 wide 24 m Supply the following to be cast in by the Concrete Contractor 137 M20 x 400 4.6/S Threaded rod 124 no FIRST FLOOR FRAMING 138 200 x 75 Plate fixed to steelwork 139 250 x 50 HySpan floor joist 743 m 140 250 x 50 Blocking 256 m 5/16/2019 85 m Page 48 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) 141 2/250 x 50 Trimmer 26 m 142 2/180 x 50 Blocking 85 m Sundries 143 M12 x 0-100 4.6/S Bolt fixing timber to steelwork 848 no 144 110 x 150 Long Z275 Galvanised steel nail on plate 358 no 145 Form 2100 x 900 timber shower floor to falls including furring strips, timber framing and flooring 4 no FLOORING 146 20 Particle board fixed to floor framing 219 m2 CANOPY FRAMING 147 75 x 50 Soffit batten 222 m 148 100 x 50 Jack stud 7 m 149 100 x 50 Blocking 3 m 150 150 x 50 Joist 77 m 151 200 x 50 Joist 77 m 152 200 x 50 Trimmer 51 m 153 200 x 50 Trimmer fixed to steelwork 59 m H3.2 Treated 154 30 x 30 Triangular shaped fillet 67 m 155 50 x 30 Tapered purlin 39 m 156 75 x 75 Tapered purlin 226 m Sundries 157 Bolt fixing 50 timber to steelwork 112 no PLYWOOD SARKING CCA D-D Grade H1.2 treated Ecoply 158 19 Thick plywood ceiling diaphragm fixed to timber ceiling framing 253 m2 CCA CD Grade H3.2 treated Ecoply 159 12 Thick plywood roof diaphragm fixed to timber roof framing 268 m2 160 17.5 Thick plywood roof diaphragm fixed to timber roof framing 151 m2 161 18 Thick plywood fixed to canopy roof framing 61 m2 162 18 Thick plywood fixed to inside face of parapet wall 12 m2 BUILDING PAPER 163 Watergate Plus 295 wall underlay to timber framed wall 123 m2 164 Flexible flashing tape to window and door reveals 363 m 5/16/2019 Page 49 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) INSULATION 165 Allow for manufacturer warranty covering Autex products as specified item 166 R3.2 140 Thick fibre glass wall insulation 757 m2 167 R2.4 90 Thick fibre glass wall insulation 527 m2 168 R1.8 75 Thick fibre glass wall insulation 438 m2 169 50 Thick Autex GreenStuf AAB insulation to ceiling 113 m2 EXTERNAL LININGS 170 Allow for 10 year manufacturer warranty for sealants as specified item 171 Allow for 5 year installation warranty for sealants as specified item 6 Fibre Cement soffit lining with expressed joints, fixed in accordance with manufacturers instructions 172 Allow for 15 year manufacturer warranty as specified item 173 Allow for 2 year installation warranty as specified item 174 To timber framing 123 m2 175 Level 4 stopping to fibre cement soffit lining 123 m2 176 120 Girth two times bent 0.55 colour coated soffit flashing 25 m 9 Fibre Cement Eterpan, fixed in accordance with manufacturers instructions 177 To timber framed door reveal, 250 wide 96 m H3.1 Plywood Air Barriers and Bracing 178 15 Thick CCA CD Grade plywood bracing fixed to timber framed wall 135 m2 179 7 Thick CCA Ecoply air barrier 516 m2 1500 x 300 x 30 Thick Moeding Alphaton extruded clay tiles kiln fried on and including horizontal rail system, fixed in accordance with manufacturers instructions 180 Provide site specific warranty as specified item 181 Provide samples as specified item 182 Provide spares as specified item 183 Provide all information required for code compliance item 184 Allow for wind and seismic design as specified item 185 Rates shall include for tile clips, fixings, profiles and weather seals as required item 186 To timber framed wall 94 m2 187 To steelwork 28 m2 5/16/2019 Page 50 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) 188 160 Girth two times bent 1.2 aluminium powdercoated side flashing 23 m 189 Proprietary cavity closer 46 m Nuwall E200 vertical extruded aluminium cladding, fixed in accordance with manufacturers instructions 190 Allow for 100 year manufacturer warranty as specified item 191 Allow for 2 year installation warranty as specified item 192 Provide copies of all relevant Nu-Wall maintenance information as specified item 193 Provide all information required for code compliance as specified item 194 To wall cavity battens 317 m2 195 Slotted base channel 161 m 196 Proprietary cavity closure 161 m 197 Female/male external corner including foam closer and cap 198 Internal corner including foam closer and cap 199 Jamb flashing cap including base NC139, NC138 and closed ceill foam tape 200 35 x 35 x 5 Thick aluminium angle at edge of cladding 3 m 201 Bead of sealant between angle and cladding 3 m 202 PEF Backing rod and sealant 3 m 50 m 4 m 271 m INTERNAL LININGS Fibre Cement Board Wall Linings 203 Allow for shop drawings as specified item 204 9 Refined Eterpan panel with negative detail/expressed joints fixed to timber framing 181 m2 205 Level 5 stopping to fibre cement lining 181 m2 206 22 x 22 x 1.6 Thick EA anodised aluminium angle adhesive fixed to base of eterpan wall lining 30 m 207 35 x 35 x 1.6 Thick EA aluminium angle 32 m 208 Bead of sealant between lining and roof covering 24 m 209 9 Refined Eterpan lining fixed to timber wall framing 41 m2 210 Level 5 stopping to fibre cement lining 41 m2 Plywood Wall Linings 211 12 Thick BD grade Ecoply fixed to timber framed wall 239 m2 212 Ditto 250 wide 114 m 213 15 Thick CCA CD grade Ecoply bracing fixed to timber framing 251 m2 5/16/2019 Page 51 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpentry Rate Total (Continued) INTERNAL TRIM Aluminium Trim 214 100 High Forman Monz FBS009 powdercoated aluminium skirting 405 m Timber Trim (All Pinus Radiata Clears) 215 300 x 45 Mitred skirting to stairs, stepped to suit treads and risers 216 180 x 40 Dressed balustrade capping 217 45 x 20 Architrave 18 m 5 m 246 m ACCESS HATCHES 218 560 x 560 Unihatch ceiling access hatch fixed in timber framing including surround and sealant 10 no ROOF SAFETY SYSTEM 219 Design and build a roof safety system complete to architects approval item End of Section 5/16/2019 Page 52 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Suspended Ceilings PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The rates shall include for all straight cutting and waste, cutting around openings and the like and for all things which penetrate the ceiling system. Openings for recessed downlights have been measured item 4 The rates shall include for seismic bracing etc., and compliance with NZS 1170 which are not shown on the drawings item 5 The rates shall include for all fixings as detailed and required item 6 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 7 Systems installed under this contract shall be installed and fixed in accordance with NZS 4219; allow for all earthquake protection/requirements in accordance with the Specification item 8 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item SUSPENSION SYSTEM 9 Rates shall include for all penetrations as required item 10 Rates shall include for all perimeter trims as required item Rondo Keylock Two-Way Exposed Suspension System to Suit 1200 x 600 Ceiling Tiles 11 Suspension system suspended average 600 (0-1000) from timber floor framing 27 m2 12 Suspension system suspended average 1600 (1000-2000) from steel roof framing 150 m2 13 Junction of ceiling with walls including any cutting, edge trims and additional suspension 165 m Rondo Keylock Two-Way Exposed Suspension System to Suit 13 Plasterboard 14 Suspension system suspended 0-1000 from timber roof framing 15 Suspension system suspended 1000-2000 from steel roof framing 16 Junction of ceiling with walls including any cutting, edge trims and additional suspension 5/16/2019 Page 53 410 m2 74 m2 600 m Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Suspended Ceilings Rate Total (Continued) Rondo Keylock Two-Way Exposed Suspension System to Suit Two Layers of 13 Plasterboard 17 Suspension system suspended average 600 (0-1000) from timber floor framing 18 Junction of ceiling with walls including any cutting, edge trims and additional suspension 113 m2 73 m CEILING TILES 19 600 x 1200 Armstrong ceiling tiles in suspension grid 177 m2 GENERAL 20 Provide samples as specified item 21 Provide information for operation and maintenance as specified item 22 Provide spare tiles as specified item End of Section 5/16/2019 Page 54 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Doors PREAMBLES 1 Items shall be fixed to timber unless otherwise described item 2 The rates shall include for frames, mullions, transoms, glazing bars and beads, trims, caulking and pointing, doors, sliding tracks, hinges and fastenings item 3 The rates shall include for re-assembly or part assembly on site as necessary item 4 All sizes given are approximate and must be checked on site prior to manufacture item 5 All glass and glazing shall be in accordance with NZS 4223:1991 item 6 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 7 Allow for the preparation of shop drawings as specified item 8 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item DOOR AND FRAME SETS 9 Allow for all CS For Doors warranties as specified item 10 Allow for shop drawings as specified item 11 Door dimensions stated are leaf width x leaf height note Solid core flush panel paint quality doors with Hallmark Streamline Aluminium Powdercoated frames 12 760 x 2200 High single leaf doorset (D.06) 1 no 13 860 x 2200 High single leaf doorset (D09, D10, D12, D45 to D47, D49, D52 to D55, D57 to D68) 23 no 14 910 x 2200 High single leaf doorset (D02 to D05, D14, D16 to D19, D23 to D30, D32, D33) 18 no 15 910 x 2200 High single leaf cavity sliding doorset (D05) 1 no 16 1620 x 2200 High double leaf doorset (D11, D15) 2 no 17 1620 x 2200 High double leaf extended swing doorset (D74) 1 no 18 2000 x 2200 High double leaf doorset (D13) 1 no 19 2762 x 2231 High four leaf top hung bifolding doorset (D07) 1 no Solid core flush panel paint quality doors and sidelights with Hallmark Stremline Aluminium Powdercoated frames 20 860 x 2200 High single leaf doorset with 1800 wide toughened glazed sidelight with vision strip (D09/W28) 1 no 21 910 x 2200 High single leaf doorset with 2100 wide toughened glazed sidelight with vision strip (D23/W29) 1 no 5/16/2019 Page 55 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Doors Rate Total (Continued) Miscellaneous 22 Undercut door for mechanical services 21 no FIRE DOOR AND FRAME SETS 23 Allow for 5 year warranty for supply and installation item 24 Door dimensions stated are leaf width x leaf height note -/30/30sm Solid core flush panel paint quality doors with Hallmark Steel Fire Door Aluminium Powdercoated frame 25 860 x 2200 High single leaf doorset (D71, D72) 2 no 26 860 x 2200 High single leaf doorset with glazed vision panel (D69, D70) 2 no -/30/30sm Solid core metal faced doors with steel powdercoated frame 27 860 x 2200 High single leaf doorset (D56) 1 no ALUMINIUM DOORS APL Architectural Series Aluminium Powdercoated Double Safety Glazed Door and Frame Sections, Complete with Rebated Timber Reveals and 3M Manifestations 28 890 x 2440 High single door (D31, D36, D43) 3 no 29 1000 x 2400 High single door (D73) 1 no 30 1590 x 2400 High double door (D44, D48, D50, D51) 4 no 31 3250 x 2826 High double door with four fixed sidelights (D01) 1 no 32 4580 x 2572 High double sliding door with two fixed sidelights (D21, D22) 2 no ALUMINIUM INTERNAL DOORS AND BORROWED LIGHTS 33 Allow for shop drawings as specified item Pasa020 105 Series Aluminium Powdercoated Laminated Single Glazed Door and Borrowed Light Sections, Complete with Frame and 3M Manifestations 34 2725 x 2232 High overall single door with fixed sidelight (W28) 1 no 35 3059 x 2416 High overall single door with fixed sidelight (W29) 1 no ROLLER SECTIONAL DOORS 36 Rates are to include for 3-phase motor, door controller, driver warning lights and sensors and remote controls item 37 Rates are to include for glazing and powdercoated Aluminium infill panels item 38 Provide one year written manufacturer warranty as specified item 39 Provide one year written installation warranty as specified item 40 Provide shop drawings as specified item 5/16/2019 Page 56 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Doors Rate Total (Continued) 41 Provide information for operation and maintenance as specified item 42 Provide producer statement as specified item Metalbilt Steel Roller Shutter Aluminium Powdercoated door and frame sections 43 4000 x 4000 High automatic sectional door with twenty glazed panels and eight aluminium infill panels (D24, D35, D37, D38, D39, D40, D41, D42) 8 no 44 1500 x 2200 High single manually operated roller shutter door (D08, D20) 2 no Sundries 45 Sika AT-Facade silicone air seal on PEF backing rod 46 Grout infill to concrete slab edge rebate following threshold installation. Detail 2S/A4.01 5/16/2019 Page 57 194 m 5 m Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Hardware PREAMBLES 1 The rates shall include for matching fixings item 2 Refer to manufacturers literature for methods of fixing item 3 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 4 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item HARDWARE 5 Allow for samples as specified item Miscellaneous Hardware 6 750 x 750 x 32 L-shaped stainless steel grab rail 1 no 7 200 Long Caroma Cosmo towel rail with chrome finish 2 no 8 600 Long Caroma Cosmo towel rail with chrome finish 12 no 9 Caroma Liano toilet roll holder with chrome finish 10 no 10 Robinhood Deluxe ironing centre IC1300 1 no 11 LL432SPDP Hat & coat hook 9 no 12 LBRS0706 Braille signage (M/F disabled) 1 no 13 LBRS703 Braille signage (Unisex) 9 no 14 LBRS0704 Braille signage (Shower) 4 no 15 Allow for all construction keying item 16 Allow for master keying and keys item Hardware to Timber Doors 17 L3572ZSC Classroom function mortice lock 18 L1801/70SC Square end plate with cylinder hole and 70 lever 21 no 19 L1905/70SC Square end plate with 70 lever 35 no 20 7714DASIL DA Size 1-4 P/A DC Formed cover closer adjustable backcheck 35 no 21 LA350SC Door stop wall mounted 46 no 22 910 Wide x 200 high kick plate 54 no 23 CL100SC Cavity slider accessible bathroom sliding door lock 1 no 24 L3574ETSC Privacy latch 9 no 25 L1814/70SC Square end plate with privacy indicator emergency turn and 70 lever 9 no 26 L1904/70SC Square end plate with turn and 70 lever 9 no 5/16/2019 6 no Page 58 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hardware Total (Continued) 27 LP2SS LW Pull handle 28 L3574SC Mortice passage latch 16 no 29 L1805/70SC Square end plate and 70 lever 16 no 30 L3570XTSC Mortice night latch cylinder and turn 1 no 31 L1376SC 1370 Series oval cylinder escutcheon 4 no 32 LL841SPDP Flush bolt 150 zinc s/chrome 33 DW131SC Dust socket 6 no 34 L3572XSC Storeroom function mortice lock 3 no 35 L3570XSC Night latch single cylinder 3 no 36 L3572XTSC Entry lock mortice lock 2 no 37 L1904/70SC Square end plate with turn and 70 lever 2 no 38 7726DASIL Size 2-6 closer adjustable backcheck delayed action 2 no 39 L3570ELM1SC Electric mortice lock 60 backset 10 no 40 LLC8810 Lead cover 10 no 41 L7580SC LW Roller bolt SC 5/16/2019 Rate 7 no 11 no 2 no Page 59 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Applied Finishes, Render and Textured Finishes PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The rates shall include for: item 4 temporary grounds, screeds and similar item 5 bedding, grouting and pointing materials item 6 cutting and/or making good around pipes, sanitary fixtures and similar item 7 labour to internal angles item 8 curing of finished work item 9 cleaning down and polishing item 10 covering, protecting and masking surfaces item 11 Fixing and stopping shall be in accordance with manufacturer's instructions to the standard required for the various finishes item 12 The rates shall include for external salient angles, edges set and finished flush with solid plastering in same plane, cutting and making good around sprinkler heads and similar items item 13 The rates shall include for forming and stopping internal and external angles to walls and fair edges, cutting and fitting into grooved and rebated reveals, cutting and fitting around light fittings, switches and the like and stopping around penetrations item 14 Rates for fire stopping shall include for labelling all service penetrations as specified item 15 Rates shall include for forming control joints item 16 The rates shall include for all noise and fire sealants as required item 17 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 18 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item BATTENS 19 Gib ST-001 clip on furring channel fixed to timber framed wall 377 m CEILINGS 13 Standard Gib 20 To suspension system 5/16/2019 338 m2 Page 60 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Applied Finishes, Render and Textured Finishes Rate Total (Continued) 13 Aqualine Gib 21 To suspension system 145 m2 16 Fyreline 22 To suspension system 113 m2 WALLS 13 Standard Gib 23 To timber framed wall 983 m2 24 To timber framed wall 0-250 25 To timber framed wall as substrate 157 m2 26 To Gib clip and furring channel 103 m2 64 m 13 Aqualine Gib 27 To timber framed wall 422 m2 28 To timber framed wall 0-250 28 m 29 To timber framed wall as substrate 67 m2 30 To Gib clip and furring channel 45 m2 13 Gib Fyreline - GBTL 60 31 To timber framed wall 156 m2 STOPPING 32 Level 4 stopping to Gib wall lining 2,337 m2 33 Level 4 stopping to Gib ceiling lining 596 m2 34 Stopping internal angle between ceiling and wall 962 m End of Section 5/16/2019 Page 61 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Tiling, Slab and Paving PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The rates shall include for thoroughly cleaning and preparing surfaces item 4 The rates shall include for temporary grounds, screeds and similar item 5 The rates shall include for bedding, grouting and pointing materials item 6 The rates shall include for all straight cutting and for making good around openings, pipes, sleeves and the like item 7 The rates shall include for labour to internal angles item 8 The rates shall include curing, cleaning down and polishing of finished work item 9 The rates shall include for covering, protecting and masking all surfaces necessary item 10 The rates shall include for forming all necessary construction and expansion joints and sealing with an approved sealant item 11 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 12 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item SPLASHBACKS 13 Allow for 10 year manufacturer warranty as specified item 14 Allow for 2 year installation warranty as specified item 150 x 100 Glazed Ceramic White Tiles 15 To plasterboard wall 150 high 7 m 16 Approved sealant at junction with plasterboard wall 16 m End of Section 5/16/2019 Page 62 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Carpet and Resilient Finishes PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The rates shall include for all straight cutting and for cutting and fitting and making good around fittings and openings, pipes, sleeves and the like item 4 The rates shall include for vacuuming or mopping, cleaning, covering and protecting and masking any surfaces necessary item 5 The rates for floor coverings shall include for all preparation of surfaces item 6 The rates for laying carpets shall include for cutting, sewing, matching pattern or run at all junctions, all waste, stretching and laying all in accordance with best trade practice item 7 The rates for all work shall include for adhesives where required item 8 The rates for coving to form skirting shall include for any timber fillets or other backing necessary, and for internal angles, external angles and stop ends item 9 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 10 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item CARPET 11 Provide 15 year material supply warranty as specified item 12 Provide 2 year material installer warranty as specified item 13 Provide samples as specified item 14 Provide reserve material as specified item Shaw Show Difuse 59575 610 x 610 Carpet Tiles in Random Pattern Direct Stuck with Approved Adhesive and in Accordance with the Specification 15 To concrete floor 16 To timber stair treads, risers and landings 17 To timber floor 363 m2 19 m2 150 m2 ENTRANCE MAT 18 Allow for 5 year manufacturer warranty as specified item 19 Provide 1 year installation warranty as specified item 5/16/2019 Page 63 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpet and Resilient Finishes 20 Rate Total (Continued) Allow for samples as specified item Advanced Coral Tread Coralduo Entry Matt with and including Low Profile ALF3510 Matwell Frame 21 3620 x 2580 Matwell fixed to concrete 1 no EPOXY FLOORING 22 Provide material supply warranty as specified item 23 Provide material installer warranty as specified item Dulux Luxafloor Rollcoat PC227 Two Pack High Solids Epoxy Floor Coating 24 To concrete floor 32 m2 25 2 Thick black vinyl water resistant skirting glue fixed to concrete nib, 0-250 high 30 m VINYL 26 Provide 5 year material supply warranty as specified item 27 Provide 1 year material installer warranty as specified item 28 Provide samples as specified item 29 Provide certificates as specified item 30 Allow for testing as specified item Jacobsens 2.0 Tarkett Optima IQ Vinyl Adhesive Fixed in Accordance with the Specification 31 To concrete floor 32 Cove flooring 0-250 up wall 33 To timber floor 84 m2 121 m 37 m2 Jacobsens 2.0 Granit Safe T Vinyl Thermowelded and Adhesive Fixed in Accordance with the Specification 34 To concrete floor 25 m2 35 Cove flooring 0-250 up wall 36 To timber floor 9 m2 37 Cove flooring 0-250 up shower threshold 8 m 149 m Jacobsens 2.0 Protect Wall Vinyl Resilient Wall Surface Fixed in Accordance with the Specification 38 To plasterboard lined wall 97 m2 POLISHED CONCRETE 39 Grind, polish and seal concrete floor as specified 42 m2 TRIM 40 TD1. Tredsafe DT036 carpet to vinyl trim 17 m 41 TD2. Tredsafe DT031 carpet to concrete trim 85 m 5/16/2019 Page 64 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Carpet and Resilient Finishes Rate Total (Continued) 42 TD4 Ecoglo F4151-CP3 Series step noising contrast strip 31 m 43 Tredsafe DT061 to top of coved vinyl 73 m 44 Anodised carpet edge at door sill 11 m AQURON 2000 45 Provide 15 year warranty as specified item 46 Aquaron 2000 sealer applied to concrete floor prior to laying vinyl 109 m2 End of Section 5/16/2019 Page 65 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Painting PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 The rates shall include for the provision, erection and removal of scaffolding, preparation, rubbing down between coats and similar work, the protection and/or masking of floors, fittings and similar work, removing and replacing door and window furniture and removing splash and spray marks item 4 The rates shall include for painting in selected colours in respective spaces and differing on several walls etc., and for cutting-in to line where required item 5 Make good and touch up paintwork in this trade and after all other trades on completion item 6 Provide for setting up samples where required item 7 Provide a warranty as per Dulux Specifications item 8 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 9 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 10 Allow for manufacturer warranties as specified item 11 Allow for applicator warranties as specified item MAIN BUILDING EXTERIOR Apply one coat of Dulux 1 Step Acrylic Primer Sealer & Undercoat and two coats of Dulux Weathershield to:12 Fibre cement soffit lining 123 m2 Approved paint system to:13 Plastered concrete nib, 0-250 high 81 m Apply two coats of Dulux Weathershield X10 to:14 Exterior steelwork (all members girthed) 838 m2 INTERIOR Apply one coat of non-conductive high build epoxy or moisture cured refined tar urethane to specified thickness to:15 Base of steel column, 0-250 girth (Typical column at slab edge/S03-01) 5/16/2019 Page 66 67 m Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Painting Rate Total (Continued) Apply two coats of Dulux Aquanamel to:16 Exposed interior steelwork (all members girthed) 27 m2 Apply one coat of Dulux Professional Enviro2 Acrylic Sealer Undercoat and two coats of Dulux Professional Enviro2 Interior to:17 Plasterboard wall lining 18 Fibre cement board wall lining 19 Concrete masonry wall 1,871 m2 181 m2 88 m2 Apply one coat of Dulux Professional Enviro2 Acrylic Sealer Undercoat and two coats of Dulux Professional Enviro2 Ceiling Flat to:20 Plasterboard ceiling lining 550 m2 Apply one coat of Dulux 1 Step Acrylic Sealer Undercoat and two coats of Dulux Wash & Wear Plus Kitchen & Bathroom to:21 Plasterboard wall lining 236 m2 22 Fibre cement board wall lining 41 m2 23 Plasterboard ceiling lining 47 m2 Apply one coat of ZONE CAP100, two coats of ZONE CAP200-1S and one coat of ZONE CAP830 to the specified thicknesses to:24 Plywood wall lining 239 m2 Apply one coat of Dulux 1 Step Acrylic Primer Sealer & Undercoat and two coats of Dulux Aquanamel to:25 Door leaves 236 m2 26 Timber trim, 0-250 girth 5 m 27 Timber trim 7 m2 28 Window and door reveals/architraves 0-250 girth 246 m CARPORT Apply two coats of Dulux Weathershield X10 to:29 Exterior steelwork (all members girthed) 119 m2 End of Section 5/16/2019 Page 67 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Joinery PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 All timber shall be dressed and the sizes stated are nominal except where described as (fin) finished item 4 Joinery timber, except where otherwise described shall be Medium Density Fibreboard item 5 The rates for joinery items, except where otherwise described, shall include for supply and delivery to site, hanging, fixing or placing in position item 6 The rates shall include for all labours in framing, notching and fitting around projections, pipes, light fittings, hatches, grilles and similar complete with all cleats, packers, wedges and similar and all nails and screws item 7 Items shall be fixed to timber unless otherwise described item 8 The rates shall include for re-assembly or part assembly on site as necessary item 9 All sizes given are approximate and must be checked on site prior to manufacture item 10 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 11 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item 12 Refer to Specification and the notes on A6 series drawings for details of materials and hardware for each type of joinery unit item 13 Rates for joinery units are to include for all hardware and fittings described and shown on the drawings including electromagnetic locks item 14 Rates for plywood locker units are to include for timber bearers Chemfix anchored to concrete slab item JOINERY FITTINGS 15 2813 Long x 600 deep x 915 high kitchenette base cupboard unit with Formica top with sink aperture. Drg A6.01 1 no 16 2813 Long x 430 maximum deep x 900 high kitchenette wall cupboard unit. Drg A6.01 1 no 17 1750 Long x 500 deep x 760 high projector screen base cupboard unit with Formica worktop. Drg A6.01 1 no 5/16/2019 Page 68 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Joinery Rate Total (Continued) 18 2160 Long x 600 deep x 915 high office base cupboard unit with Formica worktop. Drg A6.01 1 no 19 1630 Long x 800 deep x 2400 high office open shelving unit. Drg A6.01 1 no 20 4415 Long x 580 deep x 2400 high pantry open shelving unit. Drg A6.02 1 no 21 11025 Girth x 915 high L-shaped on plan kitchen base cupboard unit with Formica top with sink aperture and 2100 high fridge/freezer unit. Drg A6.02 1 no 22 2110 Long x 330 deep x 750 high kitchen open shelving wall unit. Drg A6.02 1 no 23 3250 Long x 915 high kitchen island base drawer unit with Formica worktop. Drg A6.02 1 no 24 3100 Long x 600 deep x 900 high workshop base cupboard unit with Formica worktop. Drg A6.09 1 no 25 3100 Long x 450 deep x 750 high workshop open shelving wall unit. Drg A6.09 1 no 26 3000 x 750 high office bench unit with Formica workshop including concealed wall bracket fixings. Drg A6.09 1 no STAIRCASES 27 1047 Wide staircase comprising 40 thick treads and half landing, 20 thick risers and 300 x 45 stringers, total rise 3750. Drg A6.04 1 no End of Section 5/16/2019 Page 69 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Hydraulics PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 All work shall comply with N.Z. Building Code Sections G1, G12 and G13 item 4 The rates for flashings shall include for folding and bending to shape, laps, joints, expansion joints soakers, clips and shaping at angles and ends item 5 The rates shall include for sockets, running joints, connectors, back nuts, nipples, connections, incidental fittings, clips, saddles, brackets, straps, hangers, screws, nails, explosive and low velocity tool fasteners and other metal fastenings anchors and/or systems and fixing complete including cutting and forming holes, supplying and building in sleeves other than fire rated sleeves item 6 The rates for pipework shall include for pipework less than 32 diameter shall include for all bends, elbows, tees, junctions, cleaning eyes and the like. The rates for tees and junctions shall include for any bends necessary for the required sweep. The rates for irregular tees and junctions shall include for any necessary reducers item 7 The rates for pipework shall included for all Acoustic Measures as Specified item 8 The rates for pipework shall include for setting out sleeves through wall, floors and ceilings and for escutcheons at wall and ceiling penetrations. item 9 The rates for pipework shall include for supplying and installing fire stop collars and all other fire rating measures as required. item 10 The rates for pipework in trenches shall include for warning tape and trace wire as Specified item 11 The rates for pipe insulation shall include for cutting and trimming around equipment, fixings, valves and the like. The rates for insulation to pipes less than 32 diameter shall include for all bends, elbows, tees, junctions, cleaning eyes and the like item 12 The rates for valves shall include for all additional metalwork requirements for supports, anchors, brackets etc, mating flanges, gaskets, bolt unions etc and the preparation of pipe ends item 13 The rates for cylinders and tanks shall include for seismic bracing as required by NZS 4603:1985 item 14 Rates for pipework shall include for expansion joints as required item 5/16/2019 Page 70 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hydraulics Rate Total (Continued) 15 Systems installed under this contract shall be installed and fixed in accordance with NZS 4219; allow for all earthquake protection/requirements in accordance with the Specification item 16 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item 17 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item GENERAL 18 Pay all fees and charges in connection with the plumbing installation, comply with all regulations and by-laws, give all necessary notices and obtain permits item 19 Prepare and supply shop drawings as specified item 20 Provide construction drawings as specified item 21 Provide vermin proofing as required item 22 Provide fire separation as required item 23 Give all notices and obtain all approvals as specified item 24 Apply for and pay all fees required for water connections item 25 Prepare, maintain and provide as-built drawings as specified item 26 Prepare and provide maintenance manuals as specified item 27 Provide a 12 month guarantee and maintenance for the plumbing works as specified item 28 Provide labelling and identification as specified item 29 Provide producer statements on completion item 30 Provide for all quality assurance and associated documentation as specified item 31 Allow for anchor blocks as specified item 32 Allow for all cleaning, flushing and sterilising systems as specified item 33 Allow for all testing and commissioning as specified item BUILDERS WORK 34 Provide for co-operating with other trades and for cutting holes, chases, recesses, etc., supplying and building in all sleeves and fixings as required through concrete, blockwork, timber and other materials, making good finishes around same and for all sundry labours item SANITARY FITTINGS 35 Rates shall include for brackets, flush pipes, overflows, plugs and washers and similar items where required 5/16/2019 Page 71 item Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hydraulics Rate Total (Continued) 36 Mercer Riva stainless steel bowl, face based. 1 no 37 Heritage EcoGranit Egmont 1160-20 double bowl with drainer 1 no 38 Caroma Care 800 wall faced Invisi ii suite with backrest 1 no 39 Caroma Leda vitreous china dual flush wall faced ROM boxed close-coupled toilet suite 4 no 40 Caroma Integra 500 wall basin 1 no 41 Caroma Cube extension wall basin 1 no 42 Caroma Opal 510 wall basin with Opal shroud 4 no 43 Mercer Questo Laundry tub 1 no 44 Mercer X1 XL cleaners sink 1 no 45 3599 Long x 600 wide BA wash bench top with 150 upstand and end panels, including two stainless steel sink inserts. Drg A6.01 1 no RING MAIN HOT WATER SYSTEM 46 Rates for hot water cylinders are to include for all TPR, drain cock, drip trays, overflows and tundishes as necessary, including connections to drains item 47 Rates for hot water cylinders are to include for all wall brackets, supports, frames, additional ceiling or roof framing and seismic restraints as required item 48 315 hot water cylinder (3x6kw) including all necessary short lengths of pipes, fittings, valves, bypasses, control panels, alarms, equipment, etc which constitute the assembly 2 no 49 Pumpset including: single action pump, one non return valve, one isolating valve and unions 1 no 50 UV sterilizer set including: UV sterilizer test points and isolating valve. 1 no HYDROTAP 51 Zip Hydrotap G4 commercial. HT1708 2 no TAPS AND VALVES 52 Methven Minimalist basin mixer. Echo Vision EV 9101 53 Robertson Retta mixer with pullout spray 1 no 54 Methven Minimalist shower mixer 8 no 55 Methven Minimalist slide shower with soap holder 8 no 56 Zum sink faucet (Z-SF) 2 no 57 Hose tap 15mm female chrome plates with lockshield cover and vacuum breaker 7 no 58 Fox automatic demand valve and hose tap, complete including all fittings and controls 1 no 5/16/2019 Page 72 10 no Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hydraulics Rate Total (Continued) TRAPS AND WASTES 59 Rates for traps shall include for any connections or joints to piping and fixtures, appliances or equipment item 60 40 PVC trap 12 no 61 50 PVC trap 3 no 62 Floor waste gulley with boss junction and Easiclean grating 5 no 63 Floor waste gulley with boss junction to channel drain outlet, with strainer basket 4 no 64 65 Untrapped floor waste outlet to channel drain outlet, with strainer basket 5 no 65 Allproof Equator V900E channel 4 no 66 Allproof Revolver shower waste, vinyl finish with Duco cast iron body with combined flashing clamp and gravel stop with polyethylene dome 4 no TRAP PRIMING DEVICES 67 Rates for trap priming devices shall include for all associated isolating valves, solenoid valves and air gap backflow prevention item 68 Rates for trap priming devices shall include for all pipework serving their relative gulley traps, complete, including tundishes item 69 Trap priming device 2 no SOIL WASTE AND VENT PIPEWORK 70 Rates for soil, waste and vent pipework shall include for inspection points item uPVC 71 40 Waste pipework below slab 72 40 Waste pipework in wall framing, ceiling space and joinery 73 50 Waste and vent pipework in wall framing, ceiling space and joinery 74 50 Waste pipework below slab 1 m 75 65 Waste pipework below slab 45 m 76 65 Waste and vent pipework in wall framing, ceiling space and joinery 52 m 77 100 Waste pipework below slab 78 100 Waste and vent pipework run in wall framing and ceiling space 18 m 79 40 bend 12 no 80 50 bend 16 no 81 65 bend 20 no 5/16/2019 19 m 7 m 35 m 110 m Page 73 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hydraulics Rate Total (Continued) 82 100 bend 28 no 83 50 x 50 x 40 junction 1 no 84 65 x 65 x 40 junction 10 no 85 65 x 65 x 50 junction 2 no 86 65 x 100 x 65 junction 19 no 87 100 x 100 x 50 junction 11 no 88 100 x 100 x 65 junction 16 no 89 100 x 100 x 100 junction 16 no 90 Flexible connection hydraulic/civil 100 pipe 6 no 91 Penetrate roof, form flashing, bird-proof cowl to 65 terminal vent 2 no 92 PVC tundish with Hepvo waterless valve 9 no 93 AAV to sink waste 1 no 94 Connect washing machine drain to sink waste 2 no 95 Provide fixture overflow facilities as specified item Wrap under-slab pipework in two layers of bubble-wrap 96 40 Waste pipework below slab 3 m 97 50 Waste pipework below slab 1 m 98 65 Waste pipework below slab 11 m 99 100 Waste pipework below slab 17 m Wrap waste pipework with Allproof Acoustiflex Acoustic Lagging 100 40 Waste pipework in wall framing, ceiling space and joinery 7 m 101 50 Waste pipework in wall framing, ceiling space and joinery 31 m 102 65 Waste pipework in wall framing, ceiling space and joinery 44 m 103 100 Waste pipework run in wall framing and ceiling space 18 m HOT AND COLD WATER Pipework - Aquatherm PPR for 32 and Over and Fusiotherm or Pex for Pipe 25 and Under 104 15 Pipe run in wall framing and ceiling space 315 m 105 20 Pipe run in wall framing and ceiling space 113 m 106 25 Pipe run in wall framing and ceiling space 129 m 107 32 Pipe run in wall framing and ceiling space 30 m 108 40 Pipe run in wall framing and ceiling space 65 m 109 40 bend 7 no 110 40 x 32 x 32 tee 1 no 5/16/2019 Page 74 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hydraulics Rate Total (Continued) 111 40 x 40 x 15 tee 1 no 112 40 x 40 x 20 tee 3 no 113 40 x 40 x 25 tee 4 no 114 Provide chrome plated tails where pipework is exposed adjacent fittings item Valves and Fittings 115 15 ISO valve 43 no 116 25 Isolating valve 1 no 117 25 Non return valve 1 no 118 32 Isolating valve 2 no 119 32 Non return valve 1 no 120 40 Isolating valve 2 no 121 40 Strainer 1 no 122 40 Pressure limiting valve 1 no 123 40 Non return valve 1 no 124 Expansion control valve 1 no 125 160 PVC pipe at cold water slab entry penetration, fill with compressible foam 2 no BACKUP SUPPLY PUMPSET 126 SHM04P07M single phase pump set with steady press control including isolating valves 1 no INSULATION Cold Water - 13 Armaflex insulation 127 15 Pipe run in wall framing and ceiling space 214 m 128 20 Pipe run in wall framing and ceiling space 54 m 129 25 Pipe run in wall framing and ceiling space 71 m 130 32 Pipe run in wall framing and ceiling space 16 m 131 40 Pipe run in wall framing and ceiling space 65 m 132 25 Isolating valve 1 no 133 25 Non return valve 1 no 134 32 Isolating valve 1 no 135 40 Isolating valve 2 no 136 40 Strainer 1 no 137 40 Pressure limiting valve 1 no 138 40 Non return valve 1 no Hot Water - 19 Armaflex insulation 5/16/2019 Page 75 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hydraulics Rate Total (Continued) 139 15 Pipe run in wall framing and ceiling space 101 m 140 20 Pipe run in wall framing and ceiling space 60 m 141 25 Pipe run in wall framing and ceiling space 58 m 142 32 Pipe run in wall framing and ceiling space 14 m 143 32 Isolating valve 1 no 144 32 Non return valve 1 no 145 Pumpset and valves 1 no 146 Sterilizer set and valves 1 no 147 Thermo-blending set and valves 2 no CIVIL WORKS Pipework 148 12.7 Copper (Fox valve hydraulic line) including excavation 0-1m deep and backfilling 12 m 149 40 PE80 PM12 pipe including trench excavation 0-1m deep and backfilling 22 m 150 40 PE80 PM12 pipe above ground 11 m 151 40 bend 152 63 PE80 PN2 pipe including trench excavation 0-1m deep and backfilling 153 63 bend 154 100 UPVC Pn12 pipe including trench excavation 0-1m deep and backfilling 162 m 155 150 UPVC Pn12 pipe including trench excavation 0-1m deep and backfilling 248 m 156 100 45 Deg bend, including thrust block 1 no 157 100 11.5 Deg bend, including thrust block 3 no 158 150 22.5 Deg bend, including thrust block 1 no 159 150 11.25 Deg bend, including thrust block 2 no 160 100 End cap including thrust block 1 no 161 150 End cap including thrust block 1 no 162 100/32 Tapping band 2 no 163 40/12.7 Reducer 1 no 164 150/100 Tee including thrust block 2 no 8 no 30 m 4 no Valves 165 100 Sluice valve, including valve riser and lid 7 no 166 32 Gate valve, steam riser, cast box and lid 2 no 5/16/2019 Page 76 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Hydraulics Rate Total (Continued) 167 64 Gate valve, steam riser, cast box and lid 1 no 168 Fox demand valve and hose tap on 25 pipe 1 no Water Connections 169 Rates for street connections are to include for all necessary road closures and traffic management, excavation, shoring, backfill and making good all surfaces and kerbs 170 Connect 100 pipe to existing 100 in Johns Road item 1 no Meters 171 Commercial water meter on 100 pipe, including coordination with CCC 2 no Backflow Preventer 172 Rates for backflow preventer are to include for all associated valves and fittings, strainers, pipework, chambers including excavation and backfill, concrete pads and plinths, etc 173 Backflow preventer on 100 pipe, including all fittings, bends, strainers, valves, risers complete 1 no 174 Backflow preventer chamber and lid 1 no item Water Tank 175 25,000L water tank, including connections, drainage points, filter/strainer, ballcock, isolating valves, complete 1 no End of Section 5/16/2019 Page 77 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Drainage PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 All work shall comply with NZ Drainage and Plumbing Regulations 1978 with amendments thereto and to the requirements of the Territorial Authority item 4 PVC pipes to foul sewer and stormwater drains shall comply with NZS 7649 and be jointed to approval item 5 The rates shall include for maintaining faces of drain pipe trenches and pits, backfilling, disposal of surplus spoil, forming pockets beneath collars and all jointing and other incidental materials item 6 The rates for excavation shall include for excavation in any material met with excepting hard rock, grading bottoms, boning to true and even gradients, forming grooves for pipe collars, and bedding item 7 Provide for temporary lights, barricades and all other items deemed necessary for the proper protection of the work, the public, and all other property item 8 Keep excavations free from storm or percolating water by pumping or other approved means item 9 Pay all fees and charges in connection with the drainage installation, comply with all regulations and by-laws, submit all plans, give all necessary notices and obtain consents item 10 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 11 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item 12 Allow for testing and inspections as Specified item FOUL DRAINAGE uPVC 13 100 Pipe including trench excavation 0-1m deep and approved bedding 71 m 14 100 Bend 15 no 15 100 x 100 x 100 Junction 5 no 16 100 Inspection joint/bend 8 no 17 Connect 100 pipe to wastewater 1 no 18 Connect 100 pipe to manhole 2 no 5/16/2019 Page 78 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Drainage Rate Total (Continued) 19 Connect 100 pipe to oil interceptor 2 no 20 Connect 100 pipe to diversion chamber 1 no Valves 21 100 Reflux valve 1 no STORMWATER DRAINAGE uPVC 22 80 SN8 Pipe including trench excavation 0-1m deep and approved bedding 47 m 23 80 bend 5 no 24 80 x 80 x 80 junction 2 no 25 Connect 80 pipe to drainage channel 3 no 26 100 Pipe including trench excavation 0-1m deep and approved bedding 27 Connect 100 pipe to drainage channel 28 100 Bend 29 100 x 150 x 80 Junction 1 no 30 100 x 150 x 150 Junction 6 no 31 Connect 100 pipe to downpipe 4 no 32 Connect 100 pipe to sump 1 no 33 Connect 100 pipe to soakage pit 1 no 34 Connect 100 pipe to sprinkler room 1 no 139 m 1 no 11 no MANHOLES 35 Rates for manholes are to include for excavation, sand, gravel or other special backfilling and stating the nature of the material and method of consolidating and all components item Stormwater 36 1200 Diameter manhole with Korum lid for pump lift test 1 no 37 Actuated stormwater/wastewater diversion chamber including DN600 concrete manhole and lid 1 no 38 900 Diameter perforated manhole including galvanised scruffy dome and base (Basin/CC-300, drainage gravel measured elsewhere) 1 no Foul Sewer 39 Hynds OG1KIT oil interceptor 1 no 40 CSS SD303-1 Manhole with drop structure as per CSS SD 305 1 no Pump Testing Manhole 41 1200 Diameter x 1.5-2m deep Humes concrete pipe for pump testing including with cast iron lid and excavation 5/16/2019 Page 79 1 no Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Drainage Rate Total (Continued) SUMPS AND GULLY TRAPS 42 Rates for sumps and gully traps are to include for excavation, bedding and setting in concrete, backfilling and making good item 43 CSS SD325 Single sump with grate 1 no 44 CSS SD325 Double sump with grate 2 no 45 CSS SD327 Corner sump with grate 2 no 46 Overflow relief gully tied into building foundations encased in concrete 1 no 47 50 Diameter x 600 long concrete drainage chamber 1 no 48 3150 x 2450 Overflow weir including anti scour mat 1 no SOAKAGE PITS 49 2000 x 1000 x 1-2m Deep soakage pit including excavation and fill with free draining boulders 1 no 50 3000 x 3000 x 4-5m Deep soakage pit including excavation and fill with free draining boulders 1 no 51 300 Diameter x 3200 long perforated pipe placed in drainage pit including Humes 3001 cast iron lid and 20MPa concrete surround 1 no 52 A29 Geofabric filter material 59 m2 DRAINAGE CHANNELS 53 Rates for drainage channels are to include for excavation, bedding and setting in concrete, backfilling, sealants and making good 54 Accrete Two-Stage drainage channel and threshold grate 16 m 55 Stop end 16 no 56 Drain outlet 57 200 ACO slot drain with grate 58 Stop end 2 no 59 Drain outlet 1 no 60 100 Wide Hynds Hauraton Recyfix Plus 100 constant depth drainage channel with Class D DI galvanised mesh grate and inline sump 61 Stop end 4 no 62 Drain outlet 2 no 63 100 Wide Hynds Hauraton Recyfix Plus 100 constant depth drainage channel with Class D DI galvanised mesh grate and inline sump 64 Stop end 8 no 65 Drain outlet 4 no 5/16/2019 item 8 no 25 m Page 80 44 m 20 m Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Drainage Rate Total (Continued) 66 Ultra Drain UD60 channel drain with grate 12 m 67 Stop end 2 no 68 Drain outlet 1 no 69 Sump to Ultra drain 1 no End of Section 5/16/2019 Page 81 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Electrical Installations PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Quantities item 3 All work shall be in accordance with the Electrical Workers Regulations 1993 and the Electrical Technical Safety Regulations 1993 and all amendments thereto, including all Standards and Codes item 4 The rates shall include for screws, nails, bolts, nuts, nipples, standard cable fixing or supporting clips, saddles, brackets, straps, rivets, plugs and similar items and all incidental accessories item 5 Work described as laid in trench shall include for excavation, maintaining faces of excavation, backfilling, compaction, cable covers, warning tape and disposal of surplus spoil item 6 The rates for electrical conduits, fittings, equipment and similar items shall include for all fixings to various building surfaces item 7 Except where otherwise described, all subcircuit cabling shall be TPS run concealed; where within masonry walls shall be TPS enclosed in rigid PVC conduit; where complete circuit is installed within masonry floors or walls shall be TPS or PVC cables enclosed in steel conduit item 8 The rates for subcircuiting shall include for providing an earth wire to all outlets item 9 The rates for subcircuiting shall include for conduit systems, cable support and accessories, timber battens, outlets and metal flush boxes, mounting blocks, cables, fixings and connections only. Switches, plug sockets, etc., have been measured item 10 The rates for cable connections shall include for all terminal glands and accessories appropriate to the type and size of cables item 11 The rates shall include for the painting and finishing of all items of equipment supplied and installed under this section of the work item 12 Pay all fees and charges in connection with the Electrical Installation, comply with all regulations and by-laws, give all necessary notices and obtain permits item 13 Provide for fire sealant, penetrations and making good finishes around same and for all fire resisting elements as required by the specification item 14 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 5/16/2019 Page 82 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Rate Total (Continued) 15 Systems installed under this contract shall be installed and fixed in accordance with NZS 4219; allow for all earthquake protection/requirements in accordance with the Specification item 16 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 17 Provide for co-operating with other trades and for cutting holes, chases, recesses, etc., supplying and building in all sleeves and fixings as required through concrete, blockwork, timber and other materials, making good finishes around same and for all sundry labours item 18 Provide all as-built, shop drawings operation and maintenance manuals item 19 Provide all producer statements, room check lists, electrical certificates etc. item 20 Provide all guarantees and warranties item 21 Provide all instruction/training to employer's staff item 22 Allow to demonstrate all system/s to the Electrical Engineer item 23 Provide all testing and commissioning item 24 Provide for all necessary cable ladder/tray/ cable basket and associated fittings as specified, not measured hereunder item 25 Provide for all earthing item 26 Provide for all communications earthing item 27 Provide for all cable numbering and ferruling item 28 Provide for all labelling and identification item 29 Allow for full co-ordination with other contractors on site item 30 Allow for full maintenance of the completed installation for a period of 12 months item 31 Allow for all shutdowns, working outside normal hours and maintaining continual operation of electrical services during all stages of the project item 32 Provide temporary connections within the building as required item 33 Allow for any demolition and disconnection work associated with the project item 34 Penetrate, sleeve and re-seal foundation of building for 50 duct 4 no Penetrate, sleeve and re-seal foundation of building for 80 duct 2 no Penetrate, sleeve and re-seal foundation of building for 100 duct 4 no 35 36 Ducts 5/16/2019 Page 83 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Total (Continued) 37 The rates for PVC duct shall include for sundry bends (not measured hereunder), tees, sealant, draw wire, etc. 38 32 Duct/sleeve buried direct in trench complete with draw wire 50 m 39 40 Duct/sleeve buried direct in trench complete with draw wire 23 m 40 50 Duct/sleeve buried direct in trench complete with draw wire 11 m 41 50 (Red) Duct/sleeve buried direct in trench complete with draw wire 33 m 42 80 (Green) Duct/sleeve buried direct in trench complete with draw wire 33 m 43 100 Duct/sleeve buried direct in trench complete with draw wire 44 Seal end of 32 duct 4 no Seal end of 40 duct 4 no 46 Seal end of 50 duct 2 no 47 Seal end of 100 duct 10 no 48 ACO Cable pit/ draw pit complete with lid - CP 1 45 Rate item 334 m 4 no SUPPLY AUTHORITY MAIN SUPPLY 49 Allow for all Supply Authority costs and fees associated with establishing and electrical supply to the installation item 50 Allow for all fees and permits required for each stage of the contract item 51 Allow to arrange with the Supply Authority for the disconnection of the existing mains cabling and removal of metering if required item 52 Arrange with the nominated power company and energy supplier for the provision of metering item MAINS Cable 53 4 x 120mm2 1c Cu XLPE mains cable/s - underground from site transformer to MSB, drawn through duct - Cable 1 44 m Terminations 54 Terminate 4 x 1c x 120mm2 Cu XLPE mains cable/s 2 no SUBMAINS Cable 55 4 x 120mm2 1c Cu XLPE + 35mm2 ECC sub main from MSB to GCP, part run on cable tray, part run in underground duct Cable 2 40 m 56 12 Core x 2.5mm2 Control cable from MSB to GCP, part run on cable tray, part run in underground duct - Cable 3 40 m 5/16/2019 Page 84 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations 57 58 Rate Total (Continued) 4 x 70mm2 1c Cu XLPE + 25mm2 ECC sub main from MSB to DB:2, part run on cable tray, part run in underground duct Cable 5 56 m 12 Core x 2.5mm2 Control cable from MSB to DB:2, part run on cable tray, part run in underground duct - Cable 5 56 m Terminations 59 Terminate 4 x 120mm2 1c Cu XLPE + 35mm2 ECC sub main cable/s 2 no 60 Terminate 12 Core x 2.5mm2 control cable 4 no 61 Terminate 4 x 70mm2 1c Cu XLPE + 25mm2 ECC sub main 2 no SWITCHBOARDS 62 All switchboards shall include (but not limited to) earthing, switch gear, metering, CTs, controls, interconnections, load shedding, circuit breakers, fire sealing, all as specified and drawn item 63 The rates for all switchboards shall include fixing, all necessary supports, method of connection to mains, provision of metering and all details of spare capacity required item 64 The rates for switchboards shall include for interwiring and connections between components and control gear within the board 65 Main switchboard MSB, incorporating DB:1, DB:1M 1 no 66 Distribution board DB:2, incorporating DB:2A , DB:2M 1 no 67 Generator connection panel and enclosure 1 no 68 Allow to provide and install a laminated sign adjacent MSB 1 no 69 Allow to provide and install surge protection as specified item Allow to provide and install a load shedding device within the main switchboard as specified item 70 LIGHTING CIRCUITS 71 Refer to switchboard legends for full details of circuit wiring, looping and core requirements item From Local DB to lighting outlet 72 Circuit wiring to ceiling mounted lighting outlet 73 Circuit wiring to ceiling suspended lighting outlet 74 Circuit wiring to exterior pole/bollard mounted lighting outlet 75 Circuit wiring to exterior wall mounted lighting outlet 76 Circuit wiring to in-ground lighting outlet 3 no Circuit wiring to joinery mounted lighting outlet 3 no 77 78 204 no 17 no Circuit wiring to emergency/exit light outlet 5 no 30 no 21 no From Local DB to switching outlet 5/16/2019 Page 85 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Rate Total (Continued) 79 Circuit wiring to one way switch 1 no 80 Circuit wiring to timer switch T30 5 no 81 Circuit wiring to timer switch T60 5 no 82 Circuit wiring to daylight switch - Lx 1 no 83 Circuit wiring to motion detector - MD1 42 no 84 Circuit wiring to motion detector - MD2 6 no 85 Circuit wiring to motion detector - MD3 6 no 86 Circuit wiring to motion detector - MD4 1 no 87 Circuit wiring to switch plate Lx 56 no POWER CIRCUITS 88 Refer to switchboard legends for full details of circuit wiring, looping and core requirements item From Local DB to Socket outlet 89 Circuit wiring to single switched socket outlet - DR - 20A and isolator 2 no 90 Circuit wiring to single switched socket outlet - DW and isolator 1 no 91 Circuit wiring to single switched socket outlet - DH - 15A 1 no 92 Circuit wiring to single switched socket outlet - FR and isolator 1 no Circuit wiring to single switched socket outlet - G, 15A in floor box 1 no Circuit wiring to single switched socket outlet - I 1 no 95 Circuit wiring to single switched socket outlet - MW and isolator 1 no 96 Circuit wiring to single switched socket outlet - UBH, 16A and isolator 1 no 97 Circuit wiring to single switched socket outlet - WM and isolator 2 no Circuit wiring to externally mounted single switched socket outlet - IP 15A 1 no Circuit wiring to single switched socket outlet - 3 phase 32A 1 no 93 94 98 99 From Local DB to Socket outlet 100 Circuit wiring to double switched socket outlet - A 101 Circuit wiring to double switched socket outlet - ASE 1 no 102 Circuit wiring to double switched socket outlet - AU 7 no Circuit wiring to double switched socket outlet - AV 10 no 104 Circuit wiring to double switched socket outlet - B 28 no 105 Circuit wiring to double switched socket outlet - BU 17 no 106 Circuit wiring to double switched socket outlet - CP 15A 103 5/16/2019 80 no Page 86 1 no Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Circuit wiring to double switched socket outlet - DP 4 no 108 Circuit wiring to double switched socket outlet - IP53 2 no 109 Circuit wiring to double switched socket outlet - JP 1 no Circuit wiring to double switched socket outlet - J in floor box 1 no Circuit wiring to double switched socket outlet - TD 2 no Circuit wiring to double switched socket outlet - TDE 2 no 111 112 Total (Continued) 107 110 Rate 113 Circuit wiring to double switched socket outlet - TV 15 no 114 Circuit wiring to double switched socket outlet - W 6 no From Local DB to Quad Socket outlet 115 Circuit wiring to quad switched socket outlet in floor box 3 no From Local DB to Fixed Wire Outlet 116 Circuit wiring to permanent connection - AP-INL - suspended 4 no 117 Circuit wiring to permanent connection - DOOR (including all limit switches, controls etc.) 8 no 118 Circuit wiring to permanent connection - EXTRT 1 no 119 Circuit wiring to permanent connection - FAP 1 no 120 Circuit wiring to permanent connection - GATE (duct and trench measured elsewhere) 2 no Circuit wiring to permanent connection - FSPUMP (duct and trench measured elsewhere) 1 no 122 Circuit wiring to permanent connection - HOOD 2 no 123 Circuit wiring to permanent connection - HOB 2 no 124 Circuit wiring to permanent connection - HWC 1 no 125 Circuit wiring to permanent connection - HWC 3 phase 1 no 126 Circuit wiring to permanent connection - H1 8 no 127 Circuit wiring to permanent connection - H2 and thermostat 1 no 128 Circuit wiring to permanent connection - OVEN 2 no 129 Circuit wiring to permanent connection - PUMP 1 no 130 Circuit wiring to permanent connection - CPUMP 1 no 131 Circuit wiring to permanent connection - SEC 1 no 121 From Local DB to Outlet 132 Circuit wiring to isolation reset switch - KR 1 no 133 Circuit wiring to isolation reset switch - IR 1 no LIGHT FITTINGS 5/16/2019 Page 87 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations The rates for light fittings shall include for all necessary lamp holders, flexible cord connections, sleeving, control gear, lamps and tubes, diffusers, purpose made brackets and supports, etc. all as specified and detailed and for fixing to ceilings, soffits or channel unless otherwise described and shall be in accordance the Specification and Schedule of Luminaires item 135 The rates for light fittings shall include for sealant against the ingress of moisture item 136 The rates for light fittings shall include for drivers/transformers item 137 Refer to Schedule of Luminaires for full details of light fittings item 138 Light fitting type A1 12 no 139 Light fitting type B1 14 no 140 Light fitting type B2 6 no 141 Light fitting type B3D 11 no 142 Light fitting type B4 2 no 143 Light fitting type D1 1 no 144 Light fitting type D2 16 no 145 Light fitting type D3 2 no Light fitting type D4 2 no 147 Light fitting type F1 - suspended 148 Light fitting type F1E - suspended 149 Light fitting type F2 150 11 no 4 no 10 no Light fitting type F2E 4 no 151 Light fitting type F3 - suspended 2 no 152 Light fitting type F4 19 no 153 Light fitting type F5 2 no 154 Light fitting type F5 - externally mounted 4 no 155 Light fitting type H2 2 no 156 Light fitting type IG1 - in ground fitting 2 no Light fitting type IG2 - in ground fitting 1 no 158 Builders work in connection with in-ground fittings 3 no 159 Light fitting type J1 8 no 160 Light fitting type J1D 10 no 161 Light fitting type J2D 17 no 162 Light fitting type J5 21 no 163 Light fitting type J6 5 no 164 Light fitting type LED1 - joinery mounted 1 no 157 5/16/2019 Total (Continued) 134 146 Rate Page 88 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Light fitting type LED2 - joinery mounted 1 no 166 Light fitting type LED3 - joinery mounted 1 no 167 Light fitting type M1 8 no 168 Light fitting type P1 - pole mounted 5 no 169 7.6m Square pole complete with foundations, hold downs and mounting brackets 5 no 170 Builders work in connection with pole 5 no Light fitting type ST - externally mounted 2 no 172 Light fitting type W1 - externally mounted 13 no 173 Light fitting type W2 - externally mounted 6 no 174 Light fitting type W3 4 no 175 Light fitting type W4 - externally mounted 5 no 176 Light fitting type W5D 177 Light fitting type W6 4 no Light fitting type W7 4 no 178 Total (Continued) 165 171 Rate 20 no Emergency 179 Light fitting type EM1 6 no 180 Light fitting type ES1 10 no 181 Light fitting type EM2 2 no 182 Light fitting type EM3 - soffit mounted 2 no 183 Light fitting type EM3 1 no SUB CIRCUIT FITTINGS 184 185 Refer to Socket Outlet Legend for full details of sockets, isolators, plugs, flexes etc. item The rates for switches shall include for wall boxes and similar items Light Switches 186 One way switch 1 no 187 Timer switch T30 5 no 188 Timer switch T60 5 no 189 Daylight switch - Lx 1 no 190 Motion Detector - MD1 42 no 191 Motion Detector - MD2 6 no 192 Motion Detector - MD3 6 no Motion Detector - MD4 1 no 193 Switch Plates 5/16/2019 Page 89 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Rate Total (Continued) 194 Switch plate LA 2 no 195 Switch plate LB 1 no 196 Switch plate LC 5 no 197 Switch plate LD 1 no 198 Switch plate LF 20 no 199 Switch plate LG 8 no 200 Switch plate LH 3 no 201 Switch plate LJ 2 no 202 Switch plate LK 3 no 203 Switch plate LL 2 no 204 Switch plate LM 1 no 205 Switch plate LN 2 no 206 Switch plate LO 1 no 207 Switch plate LQ 1 no 208 Switch plate LR 1 no 209 Switch plate LS 3 no Single Socket Outlets 210 Single switched socket outlet - DR - 20A - complete with isolator 2 no 211 Single switched socket outlet - DW - complete with isolator 1 no 212 Single switched socket outlet - DH - 15A 1 no 213 Single switched socket outlet - FR - complete with isolator 1 no 214 Single switched socket outlet - G - 15A floor box mounted 1 no 215 Single switched socket outlet - I 1 no 216 Single switched socket outlet - MW - complete with isolator 1 no 217 Single switched socket outlet - UBH - 16A complete with isolator 1 no 218 Single switched socket outlet - WM - complete with isolator 2 no 219 Single switched socket outlet - 1 phase 15A externally mounted 1 no 220 Single switched socket outlet - 3 phase 32A 1 no Double Socket Outlets 221 Double switched socket outlet - A 222 Double switched socket outlet - ASE complete with bolt on security cover 1 no 223 Double switched socket outlet - AU 7 no Double switched socket outlet - AV 10 no 224 5/16/2019 80 no Page 90 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Double switched socket outlet - B 28 no 226 Double switched socket outlet - BU 17 no 227 Double switched socket outlet - CP - 15A 1 no 228 Double switched socket outlet - DP 4 no 229 Double switched socket outlet - IP53 2 no 230 Double switched socket outlet - JP 1 no Double switched socket outlet - J - floor box mounted 1 no Double switched socket outlet - TD 2 no Double switched socket outlet - TDE 2 no 232 233 Total (Continued) 225 231 Rate 234 Double switched socket outlet - TV 15 no 235 Double switched socket outlet - W 6 no Quad Socket Outlets 236 Quad switched socket outlet - floor box mounted 3 no Fixed Wire Outlets 237 Refer to Permanent Connection Legend for full details of fixed wire outlets, isolators, plugs, flexes etc. 238 Permanent connection - AP-INL - suspended 4 no 239 Permanent connection - DOOR - including all limit switches, controls, status lights etc. 8 no 240 Permanent connection - EXTRT 1 no 241 Permanent connection - FAP 1 no 242 Permanent connection - GATE - externally mounted 2 no Permanent connection - FSPUMP - externally mounted 1 no 244 Permanent connection - HOOD 2 no 245 Permanent connection - HOB 2 no 246 Permanent connection - HWC 1 no 247 Permanent connection - HWC -3 phase 1 no 248 Permanent connection - H1 8 no 249 Permanent connection - H2 including thermostat 1 no 250 Permanent connection - OVEN 2 no 251 Permanent connection - PUMP 1 no 252 Permanent connection - CPUMP 1 no Permanent connection - SEC 1 no 243 253 item Others 254 Floor box complete with lid and associated conduits- FB1 5/16/2019 Page 91 4 no Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Rate Total (Continued) 255 Kitchen isolation reset switch - KR 1 no 256 Iron isolation reset switch - IR 1 no Appliances 257 Thermostat T1 1 no Generator Inlet 258 Generator inlet - GEN 1 no MISCELLANEOUS Electrical Cable Tray 259 The rates for cable carriers shall include cutting and jointing cable for carriers at fittings together with cutting or forming openings in cable carriers for conduits, entries from equipment and control gear and similar items 260 The rates for cable carriers shall include for cradles, pinracks for supporting cables and similar items and suitable earthing 261 The rates for cable ladder/tray shall include fire rated suspensions as required by the specification item 262 The rates for cable ladder/tray shall include dividers to allow separation of ELV services item 263 Soffit mounted 300 ladder/tray, include all suspensions, hangers and the like 23 m Soffit mounted 300 ladder/tray (in selected colour), include all suspensions, hangers and the like 33 m Soffit mounted 450 ladder/tray, include all suspensions, hangers and the like 50 m 264 265 266 450 Bend 6 no 267 300 to 450 Bend/transition 2 no 268 300 x 450 x 450 Tee intersection 1 no 269 450 x 450 Set down 2 no Dropper 270 40 Dropper in timber framed wall 8 m ELECTRICAL FOR MECHANICAL 271 Refer to Specification EL.44 and drawings for full details of the electrical for mechanical system item 272 Design, supply, test and commission the electrical installation for Mechanical Services as required and in accordance with the Specification item 5/16/2019 Page 92 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations 273 Rate Total (Continued) Design, supply, test and commission the Mechanical Services control system including (but not limited to) detailed design, supply, installation, controls, hardware, software, wiring, terminations, containment and support, interfacing , programming and integration as required, testing, commissioning, maintenance and instruction complete, all as specified and to the approval of the engineer item ELECTRICAL FOR HYDRALUIC AND PLUMBING 274 Provide a hydraulic and plumbing control system complete, refer Specification EL.45 for full details item 275 Outlets, circuit wiring and fittings have been included in the general measure, allow here for all other hydraulic and plumbing controls including (but not limited to) cabling/wiring, isolators, cabinets, racks, relays and other associated hardware/componentry item LIGHTING CONTROL 276 Provide a lighting control system complete, refer to drawing E2.3 and specification EL.49 for full details item 277 Light fittings, circuit wiring and fittings have been included in the general measure, allow here for all other lighting controls including (but not limited to) cabling/wiring, ELV wiring, cabinets, racks, relays and other associated hardware/componentry item PILOT LIGHTING 278 Provide a lighting control system complete, refer Specification EL.48 for full details item 279 Light fittings, circuit wiring and fittings have been included in the general measure, allow here for all other pilot lighting controls including (but not limited to) cabling/wiring, ELV wiring, cabinets, racks, relays and other associated hardware/componentry item EMERGENCY LIGHTING 280 Provide an evacuation lighting control system complete, refer Specification EL.50 for full details item 281 Light fittings and circuit wiring have been included in the general measure, allow here for all other emergency lighting controls including (but not limited to) fittings, cabling/wiring, cabinets, racks, relays and other associated hardware/componentry item CHORUS CABLING 282 Allow to notify Client who will arrange disconnection and isolation of the existing incoming Chorus lines item 283 Liaise with Chorus and the Client to enable incoming Chorus services to be re-established item STRUCTURED CABLING CAT 6 5/16/2019 Page 93 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Refer to Specification EL.51.2, EL.52 and EL.53 and drawings for full details of structured cabling systems item 285 Structured cabling, equipment and outlets have been measured as a guide only, contractors are to allow for all controls/isolators/switches including (but not limited to) cabling, wiring, fittings, brackets and other associated hardware/componentry item 286 Chorus demarcation frame item 287 Customer demarcation frame item 288 Patch panel item Structured cabling item 290 Data outlet - D1 291 Data outlet - D1W 292 Data outlet - D2 18 no Data outlet - TV/D2 10 no 294 Data outlet - D3 16 no 295 Data outlet - D4 2 no Data outlet - D6 1 no 293 296 297 Total (Continued) 284 289 Rate 20 no 6 no Patch cords item AV SYSTEM AND TELEVISION AERIAL SYSTEM 298 Refer to Specification EL.54, EL.55 and drawings for full details of the Audio and Visual systems item 299 AV System equipment and outlets have been measured as a guide only, contractors are to allow for all design, controls/isolators/switches including (but not limited to) cabling, wiring, fittings, brackets and other associated hardware/componentry item 300 AV Outlet - TV 10 no 301 AV Outlet - TV1 3 no 302 AV Outlet - TV4 1 no 303 AV Outlet - BP 2 no 304 AV Outlet - SPK 1 1 no 305 AV Outlet - SPK 2 6 no 306 AV Outlet - SPK 3 1 no 307 AV Outlet - SPK 4 2 no Speaker AA 4 no 309 AV Outlet - AV1 1 no 310 AV Outlet - AV2 1 no 308 5/16/2019 Page 94 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Rate Total (Continued) 311 AV Outlet - AV3 1 no 312 AV Outlet - AV4 1 no 313 AV Outlet - AV5 1 no 314 AV Outlet - AV6 1 no 315 AV Outlet - AV7 1 no 316 AV Outlet - AV8 2 no 317 AV Outlet - AV9 2 no 318 Antenna [UHF, FM and satellite] item SECURITY SYSTEM 319 Refer to Specification EL.56 and drawings for full details of the security system item 320 Security cabling, equipment, doors and outlets have been measured as a guide only, contractors are to allow for all controls/isolators/switches including (but not limited to) cabling, wiring, fittings, brackets and other associated hardware/componentry item 321 Gallagher Controller 6000 control panel item 322 Expanders as required, including power supply. item 323 Connection to an off site main client computer. item 324 T Series readers as indicated on drawings item 325 Key drawer locking system item 326 Connections to door hardware item 327 Interface to the buildings fire alarm system item 328 Interface with door hold back systems item 329 Rack mounted PC item 330 Programming of the system/s item 331 MIFARE tag or card Allow to provide and programme 200 cards. 200 no Doors 332 Rates for security to doors shall include (but not be limited to) the following; - Electromagnetic Lock x 1 (Allow to wire and connect electromagnetic lock) - T20 Access reader on the exterior of the building - Bond sensing of strike lock - Localised alarm if door held open for set period - Door locked 24/7. Double badge to unlock door - Interconnection to Gallagher based system - Suitably rated power supply with 25% spare capacity - Interconnection to building fire alarm system to unlock on fire condition 5/16/2019 Page 95 item Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations Total (Continued) 333 SD01 Entry Single Swing Door 1 no 334 SD03 Internal Single Swing Door 1 no 335 SD14 Internal Single Swing Door 1 no 336 SD19 Internal Single Swing Door 1 no 337 SD31 Entry Single Swing Door 1 no 338 SD32 Internal Single Swing Door 1 no 339 SD36 Entry Single Swing Door 1 no 340 SD43 Entry Single Swing Door 1 no 341 SD48 Entry Double Swing Door 1 no 342 SD56 Internal Single Swing Door 1 no 343 SD69 Internal Single Swing Door 1 no 344 SD70 Internal Single Swing Door 1 no SD73 Entry Single Swing Door 1 no 345 Rate GATE ACCESS 346 Refer to Specification EL.57 and drawings for full details of the gates access system item 347 Engage a specialist contractor to provide and install the entry gate management system item 348 Allow to interface the gate system with the Gallagher security system item 349 Gate 1 access control system including (but not be limited to) the following; - Induction coil set in to concrete slab - Keypad/prox reader KP - Gate motor controller - Safety beam sender/receiver CB - Strobe light & bollard ST - IP66 Emergency stop - In-ground coil 1 no 350 Gate 2 access control system including (but not be limited to) the following; - Induction coil set in to concrete slab - Keypad/prox reader KP - Gate motor controller - Safety beam sender/receiver CB - Strobe light & bollard ST - IP66 Emergency stop - In-ground coil 1 no INTERCOM SYSTEM 351 Refer to Specification EL.58 and drawings for full details of the intercom system item 352 Engage a specialist contractor to provide and install the video intercom system item 5/16/2019 Page 96 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Electrical Installations 353 Rate Total (Continued) Allow to interface the intercom system with the Gallagher security system and other systems throughout the building item FIRE DOOR HOLD BACK 354 Refer to Specification EL.59 and drawings for full details of the smoke stop and fire door hold back system item 355 Engage a specialist contractor to provide and install the smoke stop and fire door hold back system item 356 Allow to interface the hold back system with the Gallagher security system and other systems throughout the building item End of Section 5/16/2019 Page 97 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Mechanical Installations PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Quantities item 3 The rates shall include for sockets, running joints, connectors, back nuts, nipples and pipe and duct fixings such as supporting clips, saddles, brackets, hangers, straps, screws, nails, explosive and low velocity tool fastening anchorsand/or systems and fixing complete including cutting and forming holes, supplying and building in sleeves other than fire rated sleeves item 4 Prices are to include for all labour, plant, materials, necessary for the complete and proper performance of the work, including the supply and installation of all steel or other grilles associated with the mechanical services in accordance with the Specification item 5 Prices are to include for fire protection collars, dampers and seals for all penetrations through fire rated walls by pipework, ducts and any other equipment provided in this Trade as required. item 6 Rates are to include for all pipe and fitting supports and expansion, movement and settlement provisions item 7 The rates for pipe insulation shall include for cutting and trimming around equipment, fixings, valves and the like. The rates for insulation to pipes less than 32 diameter shall include for all bends, elbows, tees, junctions, cleaning eyes and the like item 8 Rates for pipe work shall include for protection where passing through and/or under floor slabs as required item 9 The rates shall include for painting and finishing of all items of equipment supplied and installed under this section of work item 10 Rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 11 Systems installed under this contract shall be installed and fixed in accordance with NZS 4219; allow for all earthquake protection/requirements in accordance with the Specification item 12 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL item Provide for paying all royalties, expenses and claims in connection with patent rights and indemnify the Architect, Engineer and Employer against any such claims item 13 5/16/2019 Page 98 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Mechanical Installations Rate Total (Continued) 14 Pay all fees and charges in connection with the Mechanical Services installation, comply with all regulations and by-laws give all necessary notices and obtain permits as required item 15 Provide for supervision and programming item 16 Allow for all identification, labelling etc., all in accordance with the Specification item 17 Provide suppliers certificates of compliance as specified item 18 Provide layout and system design drawings as specified item 19 Provide contractors certificate of compliance as specified item 20 Provide design and workmanship requirements as specified item 21 Provide samples as specified item 22 Allow for testing and commissioning as specified item 23 Provide operational information as specified item 24 Provide a twelve month guarantee for the works as specified item 25 Provide for extended guarantees as specified item 26 Provide for quality assurance as specified item 27 Provide for maintenance manuals and data sheets as specified item 28 Provide for shop drawings and as built drawings as specified item 29 Allow for maintenance as specified item 30 Provide technical details for plant as specified item 31 Allow for spares, tools and the like item 32 Allow to supply and install all other equipment and supply all labour not specifically scheduled and necessary to render the systems fully functional as Specified item 33 Allow for the design, fabrication and installation of plant support as required item PLANT AND EQUIPMENT 34 Rates for plant and equipment shall include for flexible connections to ductwork as necessary item 35 Rates for plant and equipment shall include for support, hangers, plinths, platforms, vibration and isolation mounts, flexible connections etc., as required to ductwork and ancillaries, supply of motor starters, speed controllers and handling/ coordination of relevant switchgear item Heat Recovery Ventilators 36 Rates for HRVs are to include for air filters on return and fresh air connections 37 Air Change HRV-IC-400 (HRV2) 1 no 38 Air Change ERV-IC-300 (HRV1) 1 no 5/16/2019 Page 99 item Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Mechanical Installations 39 Rate Total (Continued) Air Change ERV-IC-300 (HRV3) 1 no Dehumidifiers 40 Air Solutions Aider 80L portable dehumidifier (D1) 1 no Fans 41 Fantech TD-350/125SIL (EF1) 1 no 42 Fantech WJ-200RILKIT (EF2) 1 no 43 Fantech TD-350/125SIL (EF3) 1 no 44 Fantech EWE154 (EF4) 1 no 45 Fantech JCE-202-3 (TF1) 1 no 46 Fantech TD-500/150SIL (TF2) 1 no Heat Pumps 47 Rates for heat pump units are to include for all refrigerant and condensate pipework between them and their respective cassette unit and all other condensate pipework, drain trays, and tundishes as necessary, including connections to drains 48 Daikin FFQ50C2VEB compact cassette (HP1) 1 no 49 Daikin FFQ35C2VEB compact cassette (HP2) 1 no 50 Daikin FFQ50C2VEB compact cassette (HP3) 1 no 51 Daikin FFQ50C2VEB compact cassette (HP4) 1 no 52 Daikin FFQ35C2VEB compact cassette (HP5) 1 no 53 Daikin FHQ50BW1A under ceiling suspended (HP6) 1 no 54 Daiken RXS50K2V1B HP1/OU outdoor unit 1 no 55 Daiken RXS35K2V1B HP2/OU outdoor unit 1 no 56 Daiken RXS50K2V1B HP3/OU outdoor unit 1 no 57 Daiken RXS50K2V1B HP4/OU outdoor unit 1 no 58 Daiken RXS50K2V13 HP5/OU outdoor unit 1 no 59 Daiken RZQ55OAV1 HP6/OU outdoor unit 1 no item Electric Heaters 60 Devi Comfortline CL750 ceiling mounted radiant panel (EH1, EH4) 15 no 61 Devi Comfortline CL 30 suspended radiant panel (EH2) 6 no 62 Devi Comfortline CL 18 suspended radiant panel (EH3) 2 no 63 Smooth-Air EDH3030PW duct heater (DH1) 3 no 64 Wall mounted panel heater - H1 8 no 65 Wall mounted panel heater - H2 1 no DUCTS 5/16/2019 Page 100 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Mechanical Installations 66 Rate Total (Continued) All ductwork support and ancillaries shall comply with the duct construction manual of SMACNA Inc (USA) low velocity systems item Rigid Circular Ducts 67 125 Diameter rigid ductwork 68 Bend to 125 diameter duct 69 150 Diameter rigid ductwork 70 Bend to 150 diameter duct 7 no 71 Blank end to 150 diameter duct 3 no 72 125 Spigot to 150 diameter duct 11 no 73 150 Spigot to 150 diameter duct 3 no 74 150 to 125 Diameter duct reducer 1 no 75 200 Diameter rigid ductwork 76 Bend to 200 diameter duct 4 no 77 Blank end to 200 diameter duct 5 no 78 125 spigot to 200 diameter duct 1 no 79 150 spigot to 200 diameter duct 8 no 80 200 spigot to 200 diameter duct 1 no 81 200 to 150 Diameter duct reducer 2 no 82 250 Diameter rigid ductwork 83 Bend to 250 diameter duct 4 no 84 250 to 200 Diameter duct reducer 1 no 85 150 Spigot to 250 diameter duct 1 no 86 300 Diameter rigid ductwork 36 m 87 Bend to 300 diameter duct 11 no 88 Blank end to 300 diameter duct 2 no 89 125 Spigot to 300 diameter duct 3 no 90 150 Spigot to 300 diameter duct 1 no 91 200 Spigot to 300 diameter duct 2 no 92 300 to 250 Diameter duct reducer 1 no 93 350 Diameter rigid ductwork 31 m 94 Bend to 350 diameter duct 10 no 95 Blank end to 350 diameter duct 1 no 96 350 to 200 Diameter duct reducer 2 no 97 150 Spigot to 350 diameter duct 2 no 5/16/2019 12 m 1 no 88 m 38 m 31 m Page 101 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Mechanical Installations 98 200 Spigot to 350 diameter duct 99 Connect ductwork to range hood Rate Total (Continued) 1 no item Insulated Flexible Ductwork 100 125 Diameter flexible ductwork 49 m 101 150 Diameter flexible ductwork 71 m 102 200 Diameter flexible ductwork 10 m 103 250 Diameter flexible ductwork 8 m Fire Dampers 104 Halton BSD-PW fire damper to 150 diameter duct 2 no 105 Halton BSD-PW fire damper to 200 diameter duct 3 no 106 Halton BSD-PW fire damper to 300 diameter duct 1 no Dampers 107 Butterfly damper to 125 diameter duct 17 no 108 Butterfly damper to 150 diameter duct 14 no 109 Butterfly damper to 200 diameter duct 1 no 110 Butterfly damper to 250 diameter duct 2 no INSULATION 111 Rates for insulation to pipework and ductwork shall include for application and forming around brackets, hangers, flanges, fittings, valves etc., pockets, sockets and the like item 25 Thick Insulation to Outside of Ducts 112 125 Diameter rigid ductwork 12 m 113 150 Diameter rigid ductwork 58 m 114 200 Diameter rigid ductwork 38 m 115 250 Diameter rigid ductwork 23 m 116 300 Diameter rigid ductwork 36 m 117 350 Diameter rigid ductwork 31 m GRILLES, DIFFUSERS AND ROOF COWLS 118 Grilles and diffusers shall be powder coated item 119 Rates shall include for insulated cushion boxes, opposed blade dampers, spigots and concealed fixings as required item 120 Rates for grilles and louvres that penetrate the external envelope shall include for alls sealants and flashings to make it weathertight item 121 Holyoake CMP 51 225 x 225 grille (S1) 1 no 122 Holyoake CMP-51-OBD 150 x 150 grille (S2) 4 no 5/16/2019 Page 102 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Mechanical Installations Rate Total (Continued) 123 Holyoake CMP11 300 x 300 grille (S3) 1 no 124 Holyoake CMP 21-OBD 225 x 225 grille (S4) 1 no 125 Holyoake CMP 21 225 x 225 grille (S5) 1 no 126 Holyoake CMP 21 300 x 300 grille (S6) 1 no 127 Holyoake LDH1200 300 x 150 grille (S7) 2 no 128 Holyoake CMP3-11-OBD 150 x 150 grille (S8) 10 no 129 Holyoake CMP-11-OBD 150 x 150 grille (S9) 5 no 130 Holyoake RLL23-RC25 250 x 250 grille (T1) 3 no 131 Holyoake RLL23-RC 150 x 150 (T2) 1 no 132 Holyoake Pair of RLL23-RC25 450 x 200 grille (T3) 2 no 133 Holyoake Pair of RLL23-RC25 300 x 150 grille (T4) 5 no 134 Holyoake RLL23-RC25 175 x 175 grille (E1) 15 no 135 Holyoake RLL23-RC25 150 x 150 grille (E2) 3 no 136 Holyoake LDH1200 450 x 200 grille (E3) 1 no 137 Holyoake OHL-F-45 600 x 450 louvre (L1) 6 no 138 Holyoake OHL-F-45 300 x 250 louvre (L2) 2 no 139 Holyoake OHL-F-45 650 x 450 louvre (L3) 2 no 140 810 x 1210 Holyoake aluminium powdercoated laminated argon filled double glazed low-E3 window, complete with programmable remote control, rain sensor and rebated timber reveal (W_LO-01) 1 no CONTROL SYSTEMS 141 The control system has been included in the Electrical Services section of this Schedule of Quantities item ELECTRICAL FOR MECHANICAL 142 The electrical for mechanical system has been included in the Electrical Services section of this Schedule of Quantities item BUILDERS WORK 143 Allow for all builders work in connection including cutting holes, chases, recesses etc, supplying and building in all sleeves and fixings as required through concrete, blockwork, timber and other materials, include for fire rating as required and making good item End of Section 5/16/2019 Page 103 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Exterior Elements PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item 3 Refer to the relevant trade sections of this schedule of quantities for the appropriate preamble items item 4 All measurement of excavation, filling and backfilling is in accordance with Section 4 Groundworks item 5 All measurement of concrete is in accordance with Section 6 Concrete item 6 The rates shall include for levelling, grading, trimming and similar items in preparing surfaces of filling to all surfaces for road pavements item 7 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 8 Provide for making and testing samples of mortar and grout as specified item 9 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item GENERAL 10 Provide Quality Assurance Certificate as specified item 11 Provide for quality management item 12 Provide producer statements as specified item 13 Carry out all testing as specified item 14 Provide as-builts as specified item 15 Provide traffic management as specified item 16 Provide health and safety management plan as specified item EROSION AND SEDIMENT CONTROL 17 Refer to Erosion & Sediment Control Management Plan (ESCMP) along with Environment Canterbury's Erosion and Sediment Control Guidelines 2007. Rates to include installation, maintenance throughout the course of the contract, removal/restoration of control measures as contract progress. Install devices as appropriate for current stages only item 18 Allow for all inspections and testing as specified item 19 Stabilised vehicle entrance/exit points onto council roads are to be maintained throughout the course of the contract item 5/16/2019 Page 104 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Exterior Elements Rate Total (Continued) 20 Form 500 tall earth bund, using on site topsoil, around the perimeter of the site. Bund is to prevent uncontrolled vehicle movements across the site and separate clean and dirty water diversion paths - PROVISIONAL ITEM 300 m 21 Surface stabilisation for all exposed areas which are likely to be left without any erosion and/or dust controls for more than 5 days. Sprayed with suitable stabilising agent - PROVISIONAL ITEM 4,000 m2 22 Installation and removal of silt fencing as required (Refer Ecan ESC design guide for installation details) - PROVISIONAL ITEM 200 m EXCAVATION AND FILL 23 Trim and compact subgrade to CBR min 5 2,771 m2 24 AP7 Sand blinding, nominal thickness 2,448 m2 25 150 Thick AP65 sub base 2,448 m2 26 250 Thick AP65 sub base 324 m2 27 100 M/4 AP40 base-course 28 Excavate in hardfill for concrete edge thickening including battering 2,771 m2 25 m3 ASPHALT 29 Provide for testing as specified 30 50 Thick AC16 asphalt including seal coat item 324 m2 PAVING 31 Rates for paving shall include for construction joints, dowel bars, sawcuts, placing and finishing item 32 Rates shall include for curing compounds as required item 33 Concrete paving shall be laid to falls and crossfalls item 34 G500E-SE72 seismic mesh to paving 2,448 m2 35 D12 bar at pavement slab perimeter 4,353 kg 36 100 Thick 30 MPa utility concrete paving coloured with 4kg/m3 black oxide. P2 1,991 m2 37 100 Thick 30 MPa exposed aggregate "Canterbury Concrete Waimak". P3 38 100 Thick 30 MPa coloured concrete, Peter Fell #260. P4 394 m2 64 m2 KERBS 39 Concrete kerb and channel to CSS SD601-1 including excavation, backfill, forming, reinforcing etc 189 m 40 Form 1000 wide drop in kerb and channel for overflow 1 no 41 Concrete nib kerb to CSS SD602-2 including excavation, backfill, forming, reinforcing etc 5/16/2019 Page 105 207 m Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Exterior Elements Rate Total (Continued) STORMWATER BASIN Basin Fill 42 150 Deep sandy top soil (3 parts sand to 1 part top soil) 155 m2 43 200 Deep screened top soil 295 m2 44 250 Deep 19 premix sand 155 m2 45 300 Deep AP40 46 Geo-synthetic clay liner 257 m2 47 Reinstated pit run 310 m3 48 Uniformly graded 100-50 clean free draining boulders 84 m3 49 Bidm A29 geofabric 98 m2 50 200 Deep river boulders to overflow 77 m3 3 m2 Concrete Weir Wall 51 250 Deep TNZ M/4 AP40 basecourse 24 m2 52 20 MPa concrete foundation including placing and finishing 6 m3 53 260 High edge formwork 8 m2 54 20 MPa concrete wall including placing and finishing 4 m3 55 Formwork to sides of wall 56 HD12 Rod 57 200 Wide stormwater pipe outfall including Denso tape 38 m2 489 kg 1 no ROAD MARKING 58 Allow for applicator warranty as specified 59 Approved carpark delineation lines 60 Approved disabled carpark sign item 89 m 2 no GABION RETAINING WALL 61 Excavate for gabion wall 0-1.5m deep and remove from site 198 m3 62 CCC AP65 or similar granular backfill in compacted layers 63 Bidim A14 or similar between gabion and backfill 165 m2 64 1000 x 1000 x 1500 Gabion unit with basket and rockfill as per Specification 114 no 99 m3 FENCING 65 1800 High chain link fence set in to concrete kerb including posts 165 m 66 1800 High Boundaryline Durapanel 'Vecta' style steel panel fence including posts and footings 2 m IRRIGATION 67 Design and install irrigation system as specified 5/16/2019 item Page 106 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Exterior Elements Rate Total (Continued) TIMBER FENCE & SEATS 68 1800 High board and batten fence including excavation, foundations, posts and finish 17 m 69 Single leaf pedestrian gate including all hardware 1 no 70 3000 Long x 700 wide timber box seat including internal timber frame, all supports and fixings 2 no SOFT LANDSCAPING/PLANTING 71 100 Deep good quality screened soil, spread and prepared ready for lawn sowing 756 m2 72 Hydroseed standard mix lawn 756 m2 73 Good quality screened soil, spread and prepared ready for planting areas 545m2 164 m3 74 100 Deep good quality mulch spread over planting areas 545 m2 75 Alnus Cordata/Italian Alder tree 45 litre planted in tree pit, including excavation, carting away spoil, approved topsoil backfill, two timber stakes and hessian ties 1 no 76 Cordyline Australis/Grass Palm tree 30 litre planted in tree pit, including excavation, carting away spoil, approved topsoil backfill, two timber stakes and hessian ties 1 no 77 Fagus Sylvatica 'Dawyck Gold'/European Beech tree 45 litre planted in tree pit, including excavation, carting away spoil, approved topsoil backfill, two timber stakes and hessian ties 3 no 78 Platanus Orientalis/Oriental Plane Tree 45 litre planted in tree pit, including excavation, carting away spoil, approved topsoil backfill, two timber stakes and hessian ties 4 no 79 1500 x 1500 x 1000 High precast concrete tree frame 4 no 80 Coprosma Propinqua 'Red Rocks'/Coprosma 'Red Rocks' 3L 81 Apodasmia Similis/OiOi 3L 328 no 82 Chionochloa Flavicans/Minature Toetoe 3L 136 no 83 Coprosma Hawera/Hawera Coprosma 3L 210 no 84 Muehlenbeckia Astonii/Shrubby tororaro 3L 206 no 85 Provide 6 month maintenance period 19 no item MISCELLANEAOUS 86 Horizon SF3000 bollard, including concrete footing, excavation and backfill as required 87 7300 Wide commercial vehicle crossing to CCC SD607 & SD611 with dished channel to align with existing 1 no 88 8200 Wide commercial vehicle crossing to CCC SD607 & SD611 with dished channel to align with existing 1 no 89 27200 Wide commercial vehicle crossing to CCC SD607 & SD611 with dished channel to align with existing 1 no 5/16/2019 Page 107 12 no Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Exterior Elements Rate Total (Continued) 90 2400 x 1200 Double sided free standing static sign including excavation and foundations 91 Hapuka Rock 1 no 15 no End of Section 5/16/2019 Page 108 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Fire Protection PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Quantities item 3 The rates shall include for all costs involved in carrying out the work in stages and at different times during the contract period to suit the construction programme and sequence of work item 4 Systems installed under this contract shall be installed and fixed in accordance with NZS 4219; allow for all earthquake protection/requirements in accordance with the Specification item 5 The Contractor shall take all necessary steps to ensure that all the obligations placed on the "Person Conducting a Business or Undertaking (PCBU)" pursuant to the Health and Safety at Work Act 2015 are complied with at all times item 6 Provide for fire sealant, penetrations and making good finishes around same and for all fire resisting elements as required by the specification item 7 Pay all fees and charges in connection with the Fire Protection Installation, comply with all regulations and by-laws, give all necessary notices and obtain permits item GENERAL 8 Provide all as-built, shop drawings, operation and maintenance manuals item 9 Provide for all service and maintenance logbooks item 10 Provide for a Certificate of Compliance for the sprinkler system item 11 Provide for a Certificate of Compliance for the fire alarm system item 12 Provide for all labelling and identification item 13 Provide all guarantees and warranties item 14 Provide all instruction/training to employer's staff item 15 Provide for all completion documentation, producer statements etc. item 16 Allow for all inspections, commissioning, acceptance testing and final completion item 17 Allow for the service and maintenance period as specified item FIRE PROTECTION 18 Design, supply, install, test, commission and maintain the fire sprinkler system in accordance with the Fire Protection Specification (section B) and NZS 4541 item 19 Provide hand held fire fighting equipment in accordance with the Fire Protection Specification (section B) and NZS 4503 item 5/16/2019 Page 109 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Fire Protection 20 Rate Total (Continued) Design, supply, install, test, commission and maintain the fire alarm systems in accordance with the Fire Protection Specification (section B) and NZS 4512 item BUILDERS WORK 21 Provide for co-operating with other trades and for cutting holes, chases, recesses, etc., supplying and building in all sleeves and fixings as required through concrete, blockwork, timber and other materials, making good finishes around same and for all sundry labours item SUPPLIED RATES 22 Fire alarm panel 1 no 23 Alarm acknowledgment unit (reset switch) 1 no 24 ASE device and connection 1 no 25 Manual call point 1 no 26 Sprinkler head (below ceiling) 1 no 27 Sprinkler head (concealed) 1 no 28 Sprinkler head (cover-plate) 1 no 29 Sprinkler head (external) 1 no 30 Portable hand held fire extinguisher 1 no 31 Evacuation sounder recessed 1 no 32 Evacuation sounder surface mounted 1 no 33 Fire rated wiring 1 m 34 Non fire rated wiring 1 m 35 Non PVC rated wiring 1 m Pipework insulation 1 m 36 Labour 37 Sprinkler Labour (ordinary time) 1 hr 38 Sprinkler Labour (overtime) 1 hr 39 Fire Alarm Labour (ordinary time) 1 hr 40 Fire Alarm Labour (overtime) 1 hr 41 Design Engineer 1 hr 42 Administration 1 hr 43 Mark up on materials % 44 Mark up on Subcontractors % 45 Main contractors margin % End of Section 5/16/2019 Page 110 Rawlinsons Ltd Schedule of Prices Details: Example Schedule in ANZSMM 2018 Project: ANZSMM Training Building: Item Description Quantity Unit Rate Total Included Sums PREAMBLES 1 Refer to the Drawings and Specification for full details and descriptions of materials and workmanship item 2 Refer to the General and Special Conditions of Contract and Tender and to the Preliminary and General section of the Specification and this Schedule of Prices item MONETARY ALLOWANCES 3 Allow the provisional sum of $1,000 (One Thousand Dollars) for internal door signage item 4 Allow the provisional sum of $7,500 (Seven Thousand Five Hundred Dollars) for the feature wall and footings item 5 Allow the provisional sum of $10,000 (Ten Thousand Dollars) for precast concrete walls and footings item 6 Allow the provisional sum of $1,000 (One Thousand Dollars) for wall access hatches item 7 Allow the provisional sum of $2,500 (Two Thousand Five Hundred Dollars) for concrete pad under exterior AC units item End of Section 5/16/2019 Page 111 Rawlinsons Ltd