ANALISA HARGA PASANG BATA RINGAN & BETON RINGAN – BANDUNG. 1M2 Pasang Dinding Bataringan 10 cm + space PMortar Bataringan 0.105 M3 x 700.000 = 73.500 Thin bed Pmortar 0.1 Sak x 80.000 = 8.000 Ongkos pasang 1 M2 x 25.000 = 25.000 Peralatan 1 Lot x 3,500 = 3,500 Jumlah =110.000 1M2 Pasang Dinding Bataringan 7,5 cm + space PMortar Block hebel 0.089 M3 x 700.000 = 63.300 Thin bed Pmortar 0.08 Sak x 80.000 = 6.545 Ongkos pasang 1 M2 x 25.000 = 25.000 Peralatan 1 Lot x 3,500 = 3,500 Jumlah =98.500.- 1 M2 Plesteran Ex Pmortar – 210 tebal 1 cm 1 sisi PMortar – 210 0.4 Zak x 64,500 = 25,600 Upah 1 M2 x 15.500 = 15.500 Peralatan 1 Lot x 1000 = 2.000 Jumlah = 39.200 1 M2 Acian Ex Pmortar – 310 tebal 2 – 3 mm 1 sisi Pm – 310 0.1 Zak x 75.000 =8.350 Upah + Alat 1 M2 x 11,500 =11,500 Jumlah= 19.850 1 M2 Pasang Panel Lantai Beton Ringan Panel Lantai 0.125 x 2.800.000 = Upah Pasang + Alat = 65.000,Upah Grouting nat = 20.000,Upah bongkar matrial = 5.000,Bahan Grouting Nat =………..? Variatif Jumlah = ….,- ( * ) 1 m2 Pasang Bata Merah 1 : 5 Bata merah 70bh x 820 = 57.400,Semen Pc 0.21 zak x 73.000 = 15.330,Pasir pasang 0.058 m3 x 200.000 = 11.600,Upah Pasang 1 M2 x 20.000 = 20.000,Peralatan 1 ls x 3.500 = 3.500,Jumlah = 107.830,- 1 m2 Plesteran semen pasir 1 : 5. Semen Pc 0.21 x 73.000 = 15.300,Pasir Pasang 0.027 x 255.000 = 6.850,Peralatan 1 x 5.000 = 3.500,Upah kerja 1 x 20.500 = 20.500,Jumlah = 46.150,- 1 m2 Acian semen Pc Semen Pc 0.08 sak x 73.000 = 5.850,Peralatan 1 x 2.500 = 2.500,Upah kerja 1 x 16.500 = 16.500,Jumlah = 24.850,-