Owner: IOCL PMC: TOYO Contractor : Tecnimont Project Name: IOCL-PX EPCC2 Project No. 9989 SAFETY INSPECTION CHECKLIST FOR BAR BENDING MACHINE Document No-HSE-RB-CHK-12 Name of Sub-Contractor: Location: Equipment No. Inspection Date: Description Sl. No. 1 2 Ok 4 D.B. Box connected with the machine is equipped with MCB & ELCB (30ma Senstivity. 5 Emergency switch is available in working condition (front side & back side of the machine 7 Power on & Oil wsitch with indicator light are available in working condition Belt & other moving parts are covered/guarded 8 No oil leakage 9 Both side hand guard is available 11 Remarks Machine is grouted properly / Base Wheel Stopper Provided Body earthing is provided 10 NA Erected in a firm base concrete platform 3 6 Not Ok Limit switch (both side below & job plate) are in working condition Availability of standard limit switch pin (Usage of nail & other material is not good to instead of) Name Signature Date Name Signature Date Name Signature Date Checked by Sub-Contractor HSE Personnel Checked by Sub-Contractor Electrician Verified by Tecnimont HSE Personnel