Standard Operating Procedure: IT Instructions: Procedures has been documented in RACI format. The meaning of RACI is as below R - Responsible for : These are the activities, which the Role executes and completes, and is responsible for action and/or roll-out. A - Accountable for : These are the activities, which the Role has to get done and has the control to review the outcome of these activities C - Consulted for : These are the activities, for which the respondent may be consulted or asked to provide inputs, if needed I - Informed about: These are the activities, which when executed, the respondent will be informed off, so that that information may be of use to the respondent for some other activity > Process Chart Work sheet provides Summarry of list of Processes and Sub process for brief understanding > All these subprocesses are divided in to three categories viz Plan, Deliver and Monitor. > For each of the subprocesses, there are further actvities whcih are noted sequencially in checklist format in SOP worksheet. > Each actvity has been mapped with frequecy, System (if, to be done in system) > The table has different organisational roles mentioned in the columns. > Each role is mapped with R or A or C or I aganist activities for Role Clarity TABLE OF CONTENT 1 Process and Subprocess List 3 2 SOP in RACI 4 3 Job Aids 27 List Of Processes Process Subprocess ID Subprocess Information Technology IT - 01 Develop IT Strategy Information Technology IT - 02 Prepare Annual IT Budget Information Technology IT - 03 Evolve IT Architecture and Standards Information Technology IT - 04 Identification & Development of IT Products and Services Information Technology IT - 05 Deploy IT Products and Services Information Technology IT - 06 Manage IT Vendor Relationships Information Technology IT - 07 Manage New Employee Information Technology IT - 08 Manage Employee Exit Information Technology IT - 09 Manage Licenses Information Technology IT - 10 Manage System changes configuration Information Technology IT - 11 Manage System Changes error Information Technology IT - 12 Manage Enhancement/New Development - System Information Technology IT - 13 Manage Enhancement/New Development - Non System Information Technology IT - 14 Manage Incidents Information Technology IT - 15 Manage IT Procurement Information Technology IT - 16 Manage Routine Data Backup Information Technology IT - 17 Manage Service Request Information Technology IT - 18 Manage Authorization Information Technology IT - 19 User Account Creation - General Information Technology IT - 20 Disable User Accounts Information Technology IT - 21 Tag IT Asset Information Technology IT - 22 Manage Disposal of IT Assets Information Technology IT - 23 IT Disaster Recovery Information Technology IT - 24 Manage IT Audit 3 I I I IT - 01 Develop IT Strategy 2 Create Steering Committee for IT selection and monitoring. Y A R I I I IT - 01 Develop IT Strategy 3 Y A R C C IT - 01 Develop IT Strategy 4 Y I R C C IT - 01 Develop IT Strategy 5 Y R C C IT - 01 Develop IT Strategy 6 Assess Current Data Environment with respect to practices. Y R C C IT - 01 Develop IT Strategy 7 Forecast Outsourcing IT requirement Y A A R C C IT - 01 Develop IT Strategy 8 Determine future IT Projects based on the IT Strategic Plan. Consider future system strategy in light of enhance, replace, or retire options. Y A A R C C Develop IT Strategy 9 Identify and prioritize those systems solutions which are critical to the business and to the success of implementing the business’s strategy. Business-enabling system solutions assist and support the business. Y A A R I I I IT - 01 Develop IT Strategy An asset management strategy is established to move the business toward the target IT environment. The strategy is 10 used to establish IT inventories, manage IT asset life cycles, obtain economies from integrated procurement approaches and design decommissioning plans. Y A A R R R I IT - 01 Develop IT Strategy 11 Develop and Evolve Security Strategy and Plan. Y A A R C C C IT - 01 Develop IT Strategy 12 Consider Sourcing Strategies. Y A A R C C I IT - 01 Develop IT Strategy 13 Y A A R C C C IT - 01 Y Create Benchmark of future Needs and Prioritize as per the requirement. Assess Current Technology Environment with respect best practices. Assess Current Application Environment with respect to best practices. Develop and Evolve overall IT Strategy (Applications, Technology, Information, Data). 4 C C C R Manager Accounts R ManagerProcurement A Functional Department Head Y COO Consider Future Business Direction and forecast the IT requirement. Director 1 Managing Director Develop IT Strategy TAT IT - 01 Activity Frequency Develop IT Strategy System IT - 01 Sub process Activity No. CFO Information Technology Information Technology Information Technology Executive - Network Administrator Information Technology Executive - Help Desk Information Technology Manager - IT Information Technology Head Operations Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process C IT - 01 Develop IT Strategy 15 Align and communicate IT strategy with respect to overall business strategy. Y A R R I I Y A R C C Y A R R R Y C A R R A R R R A C C IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 IT - 02 Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget A Y 1 2 3 Establish Cost i.e. Personnel, Hardware, Software Review and analyze the actual expenditure incurred departments wise, category wise for the previous year Collect the IT requirement from departmental heads for the next financial year C 4 Consolidate and categorize the IT requirements Y 5 Review the IT requirements and refer the previous vendor price/take latest price from vendors Y 6 Develop and consolidate IT budget Y A R C C 7 Check the consolidated IT budget Y A R I I 8 Send the consolidated budget to Budgeting & MIS with specific format for consideration. Y A R I I I 9 Discussion on given budget and justification on same. Y A R I I C 10 After discussion, review and mutual agreement on budget send it for final approval to CFO. Y R R I I A R I I A R C C A R C C A R R R 11 Approval Status ? A Y If approved go to activity number 14 and if not approved go to activity number 13 If not approved check the where non approved point discuss 13 and rectify and get the final approval Track budget IT expenses against budgets IT expenses 14 (Month wise) 12 15 Discuss deviations any exceptional 16 C R Y A Y Y I Y Incase during the year a unplanned budget activity arise do the cost Vs benefits analysis for same. 5 I E C C Manager Accounts C ManagerProcurement Executive - Network Administrator R Functional Department Head Executive - Help Desk A CFO Manager - IT A COO Y Director Develop project plans that provide estimates for time required, resources required, and estimated project costs. Managing Director 14 TAT Develop IT Strategy Frequency IT - 01 System Activity Head Operations Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Activity No. Information Technology Sub process Sub process ID Process Y I Y C I I I I I I R I R C C C A C C Y Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Information Technology IT - 03 Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards Evolve IT Architecture and Standards I 1 Define and Enhance IT Development Methodology Y 2 Research and Pilot New Technologies Y C A C C 3 Design and Manage Data Architecture Y C A R R 4 Design and Manage Process/Application Architecture Y C R R R 5 Design and Manage Computing Platforms Architecture Y C R R R 6 Design and Manage Network Architecture Y C R 7 Design Standards for Information Repositories Y C A R R R C 8 Develop and Manage Information Repositories Y C A R C C C 9 Develop / evolve a comprehensive disaster recovery plan from existing interruption plans. Y C A R R R C Y 6 I R Manager Accounts R ManagerProcurement I Functional Department Head COO CFO A Director Managing Director TAT Frequency System Activity No. If approved the by MD, Refer the SOP for budgeting If not approved then go the activity no 19 If further clarification required by MD provide the same or 19 else document the rational and close the process 18 Y Executive - Network Administrator IT - 02 17 Submit the analysis to Managing Director for approval Executive - Help Desk IT - 02 Prepare Annual IT Budget Prepare Annual IT Budget Prepare Annual IT Budget Activity Manager - IT IT - 02 Sub process Head Operations Information Technology Information Technology Information Technology Sub process ID Process Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 IT Identification of final solutions E 5 Identification of different implementation partners E 6 Discussion of offerings. E 7 Define and validate technical scope. E 8 Seek the presentation and understand the entire process approach E C IT R C C IT A R C C IT A R C C IT IT IT IT 7 C C A R C C R I I R C C R C C A C Manager Accounts 4 C ManagerProcurement E R IT Functional Department Head Develop IT work plans / schedules and road map A CFO 3 COO E Director Assess Systems against Selection Criteria Managing Director 2 TAT Y Frequency Develop System Selection Criteria based on Cost Vs benefits. System 1 Executive - Network Administrator IT - 04 Executive - Help Desk Information Technology Manager - IT IT - 04 Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Activity Head Operations Information Technology Sub process Activity No. Sub process ID Process Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 IT IT IT IT IT IT IT IT R I I 11 Discussion on commercials E A R I I R 12 Discussion of terms an conditions. E A E I I R 13 Submit the proposal to MD E A R I I 14 Jointly Negotiation on commercial E A C I I R A R I I R System 15 After commercial discussion, preparation/validation of service agreement. E 16 Get the validation on service agreement from legal/contracts departments E 17 Preparation of PO & PR and approved E 8 I C I A A R I I R R A R Manager Accounts R ManagerProcurement E Functional Department Head 10 Pre Finalization of implementation partners. CFO C COO C Director R Compression of different Implementation partners with respect to technical and commercial Managing Director R 9 TAT E Activity Frequency Executive - Network Administrator IT - 04 Executive - Help Desk Information Technology IT Manager - IT IT - 04 Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Head Operations Information Technology Sub process Activity No. Sub process ID Process Information Technology IT - 04 Information Technology IT - 04 Information Technology IT - 04 Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology IT - 05 IT - 05 IT - 05 IT - 05 IT - 05 IT - 05 IT IT I R R R IT 20 Perform System Integration Testing E I A R R IT 21 Perform User Acceptance and System Testing E I A R R IT 22 Document Systems Against Selection Criteria E I A R R IT 23 Develop User Procedures and Training Requirements E I A R R Deploy IT Products and Services Deploy IT Products and Services Deploy IT Products and Services Deploy IT Products and Services Deploy IT Products and Services Deploy IT Products and Services 1 Create a Cross-Functional Deployment Team M A R C C 2 Promote Application / Systems to Production Environment M I A R R 3 Decommission Legacy System M I R R R 4 Evaluate Applications/ Systems Usage M C A R R 5 Evaluate System Benefits Post-Implementation E A R R R 9 R Manager Accounts E 19 Perform Program / Unit Testing ManagerProcurement I COO I I Director R E Managing Director R 18 Kick off Project TAT R Activity Frequency C System Functional Department Head IT - 04 CFO Information Technology Executive - Network Administrator IT - 04 Executive - Help Desk Information Technology Manager - IT IT - 04 Sub process Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Identification & Development of Products and Services Head Operations Information Technology Activity No. Sub process ID Process IT - 06 IT - 06 IT - 06 IT - 06 Information Technology IT - 07 Manage New Employee Information Technology IT - 07 Manage New Employee Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology IT - 07 IT - 07 IT - 07 IT - 07 IT - 07 IT - 07 IT - 07 IT - 07 IT - 07 Manage New Employee Manage New Employee Manage New Employee Manage New Employee Manage New Employee Manage New Employee Manage New Employee Manage New Employee Manage New Employee Executive - Network Administrator CFO Functional Department Head C C A R R R C C E C A R R Evaluate and Assess Vendor Capabilities E C A R R 6 Measure Vendor Performance E C A R R 7 Establish Vendor Performance Metrics E C R R R 1 Receive the requisition for E mail through prescribed, desktop/laptop, data card allocation from via email from HR E E-7 E E-6 E 2 3 4 5 6 Get the approval from Director and departmental head for unbudgeted request Determine Desktop/laptop configuration based on request from HR check availability in IT stock Allocate required item and inform HR and departmental head through E mail Check type of E mail id as per HR request with suggested E mail id A R I I C I R A E-7 C I R E E-7 I A R E E1 I A R I E E1 I I R I A 7 Create new employee Mail ID E E1 I A R I 8 Inform the same to HR E E1 I I R I 9 Handover laptop, desktop and data card to employee E E1 I A R I E E1 I R I 10 Help Employee to get initiated 10 Manager Accounts Executive - Help Desk C ManagerProcurement Manager - IT 5 Head Operations Track and Manage IT Vendor Contracts COO 4 TAT E Frequency Define Needs and Service Level Requirements System 1 Director IT - 06 Manage IT Vendor Relationships Manage IT Vendor Relationships Manage IT Vendor Relationships Manage IT Vendor Relationships Manage IT Vendor Relationships Manage IT Vendor Relationships Activity Managing Director IT - 06 Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology IT - 08 IT - 08 IT - 08 IT - 08 IT - 08 E1 I I R A E E-1 C I R A I R E1 E System E 6 Update IT Asset inventory E E1 7 Format the Laptop/Desktop E E2 I I R 8 Retain the backup data and delete only when concerned department confirmation is received E E1 I I R I I I R I I R IT - 09 Manage Licenses IT - 09 Manage Licenses 1 Receive and assess request for licenses from user department E E1 IT - 09 Manage Licenses 2 Forward licenses requisition to IT by user department E E1 IT - 09 Manage Licenses 3 Receive licenses requisition from user department E E1 I I I IT - 09 Manage Licenses 4 Check availability of licenses E E2 I A R IT - 09 Manage Licenses 5 If Yes then go to activity 6 if No then go to activity no 10 E IT - 09 Manage Licenses 6 Seek approval from Head Operations for issue of licenses E E2 A R IT - 09 Manage Licenses 7 Receive request for issue of licenses E E2 I R IT - 09 Manage Licenses 8 Match licenses to user Ids and update allocation records E E2 I R IT - 09 Manage Licenses 9 Update and manage licenses inventory records E E2 I R 11 I Manager Accounts I E1 I ManagerProcurement R E 5 Functional Department Head A Take back up of all data of outgoing employee CFO C 2 4 Executive - Network Administrator R E-15 Process IT clearance, get clearance certificate signed from HOD Employee to handover Laptop/desktop, data card, pen drive etc (IT asset) to IT team Get guidance from HOD/Functional head on continuation/immediate stoppage of E mail id Executive - Help Desk A E COO R Receiving information for about exiting employee Director I 1 3 Managing Director Manager - IT IT - 08 Head Operations IT - 08 I TAT IT - 08 Manage Employee Exit Manage Employee Exit Manage Employee Exit Manage Employee Exit Manage Employee Exit Manage Employee Exit Manage Employee Exit Manage Employee Exit Manage Employee Exit Activity Frequency IT - 08 Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process I E3 A R I E E4 C R C R 16 Create the PO & PR E E5 C A R R Manage Licenses 17 Conduct purchase of licenses E E6 A R R R IT - 09 Manage Licenses 18 Update and manage licenses inventory records E E I R IT - 09 Manage Licenses 19 Match licenses to user Ids and update allocation records E E1 I R IT - 09 Manage Licenses 20 Incase of employee severance, hold licenses in inventory and assign to new joinee E I R 1 Receive request from users for new business requirement through Email/online tool/ Ticketing tool E E1 2 Assess the requirement E E2 3 Check Is this a configuration issue E E2 4 If Yes then go to activity 6 if No then go to activity no 5 E E2 IT - 09 Manage Licenses 11 Receive request for new licenses by Head Operations E E2 IT - 09 Manage Licenses 12 Check if budgeted E E2 IT - 09 Manage Licenses 13 If Yes then go to activity 15 if No then go to activity no 14 E IT - 09 Manage Licenses 14 Discuss with Head Operations and CFO on licenses procurement approval E IT - 09 Manage Licenses 15 Conduct rate negotiation with vendors for new licenses IT - 09 Manage Licenses IT - 09 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration System E 12 I A I A I I I I C A R I R ManagerProcurement R Seek approval from Head Operations for new licenses procurement CFO C 10 A R Manager Accounts Functional Department Head Executive - Network Administrator Executive - Help Desk Manager - IT R Manage Licenses COO I IT - 09 Director Head Operations Managing Director R TAT I Activity Frequency A Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology IT - 10 Information Technology Information Technology IT - 11 IT -11 Manage System Changes error Manage System Changes error E4 A R Get approval from impacted System module leaders of Implementation team, Head Operations E E4 8 Can it be resolved by Implementation E 9 If Yes then go to activity 10 if No then go to activity no 11 E System 7 Manager Accounts R E2 ManagerProcurement A E Functional Department Head A Prepare PCR (Process Change Request) CFO R 6 Executive - Network Administrator R E2 Head Operations A E COO R Manage enhancement/new development - System Director R 5 Managing Director Executive - Help Desk IT - 10 Manager - IT Information Technology Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration Manage System changes configuration TAT IT - 10 Activity Frequency Information Technology Sub process Activity No. Sub process ID Process 10 Make necessary configurations E E5 I R R 11 Receive and E mail about configuration issue E E6 I R R 12 Discuss with IT team and ascertain configuration requirements E E6 I I R 13 Log configuration details with System vendor and understand the effort involved E E6 R R R 14 Make necessary configuration changes through System vendor E E7 A R 15 Document the changes wrt FS,TS and request number with issue log id. E E7 A R 1 Receive request from users for error resolution by Implementation team E E1 I I 13 IT -11 IT -11 IT -11 IT -11 E1 A R 4 Can it be resolved by internal IT team E E1 5 If Yes then go to activity 6 if No then go to activity no 7 E 6 Resolve the same by internal IT team E E2 A R 7 Make necessary correction by System vendor E E2 A R 8 Inform about changes by System vendor to IT team E E2 I I 9 Receive correction details by IT team checked at their end and inform to user E E2 A R Manager Accounts E ManagerProcurement Receive the mail and assess the error by IT team Functional Department Head 3 CFO I Executive - Network Administrator I Head Operations E1 COO E Director Assess the error, create PCR, document and mail the details to IT team by Implementation team Managing Director 2 System Executive - Help Desk IT -11 Manager - IT IT -11 TAT IT -11 Manage System Changes error Manage System Changes error Manage System Changes error Manage System Changes error Manage System Changes error Manage System Changes error Manage System Changes error Manage System Changes error Activity Frequency IT -11 Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process R R R Information Technology IT -12 Information Technology IT -12 Information Technology IT -12 IT -12 Information Technology IT -12 Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System R 1 Initiate new development and enhancement E E1 2 Take the approval new development from Head Operations and CFO for budgeted items E E2 3 If not budgeted go to (Sub Process 02 and activity No. 16,17,18) E 4 If approved then go to activity 5 if not approved 19 E 14 A R R R R R A R R IT -12 Information Technology IT -12 Information Technology IT -12 Information Technology IT -12 Information Technology IT -12 Information Technology IT -12 Information Technology IT -12 Initiate the discussion with the implementation team and user to ascertain exact requirement through online portal/ email E E3 C R R 7 Preparation of details functional specification by Implementation team E E3 I I 8 Obtain sign off by from user by Implementation team E E5 A I 9 Preparation of technical specification by IT team E E6 A R E E R R E E1 A R 12 Perform unit testing by Implementation team E E2 I I 13 If successful E 10 Begin development 11 Inform Implementation team about completion of project plan by IT team 15 I A Manager Accounts 6 ManagerProcurement R Functional Department Head A CFO C Executive - Network Administrator E2 COO E Director Work on Feasibility Managing Director 5 System Executive - Help Desk Information Technology Manager - IT IT -12 Head Operations Information Technology TAT IT -12 Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Activity Frequency Information Technology Sub process Activity No. Sub process ID Process Information Technology IT -12 Information Technology IT -12 Information Technology IT -12 Information Technology IT -12 Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System R 18 Receive test results by IT team E E3 I I 19 Inform Implementation team about non approval E E3 R R C I 1 Send request for enhancement/new development to IT through online portal/ email by user department/person E E1 I I 2 Receive online request by Head Operations by user department/person E E1 I I 3 Discuss with IT team and ascertain whether new development/enhancement is essential E E2 R R 16 C Manager Accounts R ManagerProcurement E3 Functional Department Head E CFO 17 Reengineering of test failures Executive - Network Administrator I Head Operations I COO E2 Director E Managing Director 15 Inform IT team TAT E Activity Frequency 14 If Yes then go to activity 15 if No then go to activity no 16 System Executive - Help Desk IT -12 Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manage Enhancement/New Development System Manager - IT Information Technology Sub process Activity No. Sub process ID Process Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 6 Inform to user for non approval E E3 R R 7 Prepare detailed functional specification & technical specification by IT team E E4 A R 8 Obtain sign off from user department by IT team E E A R 9 Begin development E E A R 10 Keep user department informed on progress through regular updates E E1 A R 11 Perform unit testing E E A R 12 log results E A R 17 Manager Accounts E ManagerProcurement If Yes then go to activity 7 if No then go to activity no 6 A Functional Department Head 5 Manager - IT E3 COO E Director Approval Process CFO Executive - Network Administrator Executive - Help Desk Head Operations Managing Director 4 System TAT IT - 13 Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Activity Frequency Information Technology Sub process Activity No. Sub process ID Process Information Technology IT - 13 Information Technology IT - 13 Information Technology IT - 13 Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology E2 16 Obtain final approval from user and upload to live environment E E3 Log the incident in System solution manager by users E E1 I I E E1 I R E E1 A R E1 A R C A R A R IT - 14 Manage Incidents IT - 14 Manage Incidents 1 IT - 14 Manage Incidents 2 IT - 14 Manage Incidents 3 IT - 14 Manage Incidents 4 Incident Resolved E IT - 14 Manage Incidents 5 If Yes then go to activity 6 if No then go to activity no 7 E IT - 14 Manage Incidents 6 Discuss the resolution with user and close the incident E E2 I R IT - 14 Manage Incidents 7 Assign basis/it team according to the nature of the incident E E2 A R IT - 14 Manage Incidents 8 Receive incident notification through System solution manager generated E mail by technical team E E2 I R IT - 14 Manage Incidents 9 External assistance required ? E E3 Receive incident notification through System solution manager generated E mail Investigate incident and attempt to solve in test environment 18 C R Manager Accounts E ManagerProcurement 15 Obtain test results and modify solution iteratively Functional Department Head E CFO 14 If Yes then go to activity 16 if No then go to activity no 15 COO E1 Director E Activity Executive - Network Administrator Executive - Help Desk Manager - IT Head Operations Managing Director 13 Testing successful System TAT IT - 13 Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Manage Enhancement/New Development - Non System Frequency Information Technology Sub process Activity No. Sub process ID Process Manage Incidents IT - 14 Manage Incidents IT - 14 R I R I R Manager Accounts IT - 14 Resolve incident with external assistance and upload detailed solution note on service management tool. Update status of incident and inform core user team to 14 check resolution I ManagerProcurement 13 I Functional Department Head Manage Incidents R CFO IT - 14 A Executive - Network Administrator 12 Log call to System for technical consultant Executive - Help Desk Manage Incidents Manager - IT IT - 14 Discuss with Head Operations and seek approval to engage external consultant Head Operations 11 COO Manage Incidents Director IT - 14 Managing Director 10 If Yes then go to activity 11 if No then go to activity no 21 TAT Manage Incidents Activity Frequency IT - 14 System Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process E E E3 E E3 E I E E 15 Resolution Approved E E2 Manage Incidents 16 If Yes then go to activity 17 if No then go to activity no 18 E IT - 14 Manage Incidents 17 Discuss resolution with users and close incident E E1 I R IT - 14 Manage Incidents 18 Update status of incident E E1 I R IT - 14 Manage Incidents 19 Discuss resolution with users and close incident E E2 I R IT - 14 Manage Incidents 20 Monitoring the resolution and reopen if it reoccurs E E2 I R IT - 14 Manage Incidents 21 E E1 I R R IT - 14 Manage Incidents E E1 I R R Resolve incident and upload detailed solution notes on System solution manager Update status of incident and inform core user team to 22 check resolution R R R R R Information Technology Information Technology Information Technology Information Technology Information Technology IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement 1 R 1 Identify requirement by IT team or by end user (in case of end user refer the Sub Process -21) E E2 I R 2 Can requirement filled up with the current inventory E E2 A R 3 If Yes then go to activity 19 if No then go to activity no 4 E E1 4 Is this Planned expenditure E E1 19 R A R IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 IT - 15 E1 7A Approval status ? E E1 8 If Yes then go to activity 9 if No then go to activity no 10 E E2 9 Generate asset code for new asset and initiate for indent E E2 E 10 Provide further details as required 11 12 13 14 15 16 17 Information Technology IT - 15 Manage IT Procurement 18 Information Technology IT - 15 Manage IT Procurement 19 Information Technology Information Technology IT - 16 IT - 16 Manage Routine Data Backup Manage Routine Data Backup Invite 2or 3 vendor for quotes and further negotiation by Procurement department. Prepare comparative analysis and send it to Head Operations Evaluate comparative quotes and give final call for technical preference by Head Operations Complete the vendor selection by Head Operations and take the approval from Head Operations and CFO. Finalize delivery terms and other conditions through discussion with the chosen vendor. Receive delivery of asset and update the IT asset register with tagging to user department/Primary user Prepare handover letter and complete handover to user department Follow delegation of power for approval of unplanned purchase (Refer the Sub Process 02 and activity no 16,17,18,19) Service request from existing stock in inventory and update asset register I I R R I R E2 I R E E2 C C R E E2 I I R E E2 C C I E E2 R R E E2 C I E E2 I R E E2 I R E E2 R R E E2 I R R R A 1 1 Develop/Review data back up strategy and frequency every quarter 20 Q Q2 Manager Accounts E R ManagerProcurement Obtain accounts clearances and seek the approval as per DOP R Functional Department Head 7 A CFO E2 Executive - Network Administrator E Executive - Help Desk Fill out capex approval form Manager - IT 6 Head Operations E2 COO E Director If Yes then go to activity 6 if No then go to activity no 18 Managing Director 5 System TAT IT - 15 Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Manage IT Procurement Activity Frequency IT - 15 Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process A R IT - 16 IT - 16 IT - 16 IT - 16 IT - 16 Stored at outsourced back end Vendor D D2 A R 4 After every seven days saved to tape library/ back-up store W W2 A R E E2 A R D D2 A R R W W2 A R R 5 6 7 Allocate tapes for online data back up for System on working days/regular basis Schedule and run jobs during non working hours for back ups take offline tapes for storage every week and re use the online tapes 8 Take E mail data back up on desktop Server W W2 A R Information Technology IT - 16 Manage Routine Data Backup 9 Take Farvision/Others application data back up on external hard drive and store with Head Operations under lock & key M M2 R R Information Technology IT - 16 Manage Routine Data Backup 10 Transfer Farvision/other application data back up to cross locations (DR site) M M2 R R Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology IT - 17 IT - 17 IT - 17 IT - 17 IT - 17 IT - 17 IT - 17 IT - 17 IT - 17 Manage Service Request Manage Service Request Manage Service Request Manage Service Request Manage Service Request Manage Service Request Manage Service Request Manage Service Request Manage Service Request 1 1 2 3 4 Receive service request from via mail, phone from user Acknowledge request and send user call reference no. through online tool Obtain key information required to understand and deliver solution Establish with user expectations for resolution of service request E E2 I R E E2 I R E E2 I R E E2 A R 5 Identify the root cause of issue and fix up the problem E E2 I R 6 Communicate solution to user E E1 I R 7 Close call logs E E1 I R 8 Initiate monthly user feedback process M M2 A R 21 I Manager Accounts 3 ManagerProcurement R Functional Department Head A Manager - IT D1 COO D Director Take the application data back up CFO Executive - Network Administrator Executive - Help Desk Head Operations Managing Director 2 System TAT IT - 16 Manage Routine Data Backup Manage Routine Data Backup Manage Routine Data Backup Manage Routine Data Backup Manage Routine Data Backup Manage Routine Data Backup Manage Routine Data Backup Activity Frequency IT - 16 Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology IT - 18 IT - 18 IT - 18 IT - 18 IT - 18 IT - 18 IT - 18 IT - 18 IT - 18 IT - 19 IT - 19 IT - 19 IT - 19 IT - 19 IT - 19 IT - 19 IT - 19 Manage Authorization Manage Authorization Manage Authorization Manage Authorization Manage Authorization Manage Authorization Manage Authorization Manage Authorization Manage Authorization User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General R 10 Monitor and review user feedback results through online tool. M M2 I A R 1 1 Receiving authorization error notification from user department E E2 A R 2 Check and determine if authorization is needed E E2 A C 3 If Yes then go to activity 4 if No then go to activity no 5 E E2 4 Fill authorization request form and send it to Head Operations E E2 I R 5 Assign to appropriate group to service and issue E E2 A R E E2 A R E E2 A R E E1 I R 6 7 8 Receive confirmation and forward to basis team for execution Complete authorization request and inform Implementation team Update the authorization matrix A 1 1 Request through online portal/ email for access to software E E2 I I 2 Receive application access request via online portal/ email by user E E2 I I 3 Approval of access E E1 I R 4 If Yes then go to activity 5 if No then go to activity no 6 E E2 E E2 I R E E2 A R E E2 I R 5 6 7 Receive & Forward the approved request for user access to designated application administrator. Inform the user via E mail about rejection of application access and keep log of rejection in online portal/ email Receive the approved request for user access 22 A I Manager Accounts A ManagerProcurement I Functional Department Head M1 CFO Executive - Network Administrator Executive - Help Desk Manager - IT M COO Obtain consolidated user feedback Director Head Operations Managing Director 9 System TAT IT - 17 Manage Service Request Manage Service Request Activity Frequency IT - 17 Sub process Activity No. Information Technology Information Technology Sub process ID Process IT - 19 IT - 19 IT - 19 IT - 19 IT - 20 IT - 20 IT - 20 IT - 20 IT - 20 IT - 20 IT - 20 Disable User Accounts Disable User Accounts Disable User Accounts Disable User Accounts Disable User Accounts Disable User Accounts Disable User Accounts Refer the standard user Profile/Role E E2 I R 10 Enable relevant rights E E1 I A R 11 Map user accounts name with Role E E2 I A R 12 Issue the UID default password to user E E2 I A R 13 Mail the UID and default password and user guide to user E E2 A R I I Manager Accounts 9 ManagerProcurement R Functional Department Head I Manager - IT E2 COO E Director Refer user account naming convention CFO Executive - Network Administrator Executive - Help Desk Head Operations Managing Director 8 System TAT IT - 19 User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General User Account Creation - General Activity Frequency Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology IT - 19 Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process 2 1 2 Inform the Head Operations to disable application access to the user online portal/ email via HR. Receive and forward the request to disable access to designated application administrator. E E2 A E E2 I R I R 3 Receive the request to disable user access E E2 4 Disable user accounts for the application E E2 C A R 5 Inform Head Operations E E2 I R R 6 Preserve the Log of disablement. E E2 I R R R IT - 21 Tag IT Asset IT - 21 Tag IT Asset 1 IT - 21 Tag IT Asset 2 IT - 21 Tag IT Asset 3 IT - 21 Tag IT Asset 4 IT - 21 Tag IT Asset 5 I 2 Coordinate with Accounts to prepare a list of IT assets and code IT assets (Asset Tagging) Verify the technical specifications and location of IT assets listed Check the IT asset tags for each desktop, printer, server, laptop and software license Develop and maintain the IT asset register by location and code Check the IT asset register 23 HY HY2 A HY HY2 R HY HY2 R Y Y2 HY HY2 A R R R R R Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology IT - 22 IT - 22 IT - 22 IT - 22 IT - 22 IT - 22 IT - 22 IT - 22 Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manage Disposal of IT Assets Manager Accounts ManagerProcurement R Functional Department Head A CFO R Executive - Network Administrator A Executive - Help Desk COO Y2 Director Y Managing Director TAT Monitor renewal and termination of Annual Maintenance Contracts (AMC) on periodic basis System 6 Manager - IT IT - 22 Tag IT Asset Head Operations IT - 22 Activity Frequency IT - 21 Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process 2 1 2 3 4 Review the current IT asset inventory and identify IT assets to be disposed Prepare a consolidated list of IT assets to be disposed and obtain approval Ensure format of memory is done for the IT assets to be dispose off Ensure IT Asset has been inventoried and labeled for destruction/sale HY HY2 HY HY2 R R E E2 R R E E2 R R R R R 5 Forward IT asset disposal list to Accounts for valuation E E2 6 Receive the synopsis mentioning asset details like description, date of capitalization, value of asset etc. from Accounts E E2 I R 7 Remove IT assets for sale and update IT inventory E E2 A R E E2 C I R E E2 A R R A R A R A R 8 9 Receive information about sale of IT assets from Procurement Team Obtain approval for the IT asset sale voucher from Head Operations IT - 23 IT Disaster Recovery 2 IT - 23 IT Disaster Recovery 1 Formulate IT disaster recovery and business continuity plan Y Y2 IT - 23 IT Disaster Recovery 2 Approve business continuity and disaster recovery plan from MD, Head Operations Y Y2 IT - 23 IT Disaster Recovery 3 Develop responsibility matrix to manage eventualities Y Y2 IT - 23 IT Disaster Recovery 4 Plan and schedule regular business continuity & disaster recovery training to the IT team Y Y2 IT - 23 IT Disaster Recovery 5 Define data backup rules and server redundancy rules Y Y2 IT - 23 IT Disaster Recovery 6 Classify data based on business criticality by department and location in coordination with respective departmental heads Y Y2 24 A R R C R R C R R IT - 23 IT Disaster Recovery 8 Establish testing standards and guidelines Y Y2 IT - 23 IT Disaster Recovery 9 Perform periodic IT recovery testing M M2 IT - 23 IT Disaster Recovery 10 Monthly check data backup M M2 IT - 23 IT Disaster Recovery 11 M M2 IT - 24 Manage IT Audit IT - 24 Manage IT Audit 1 Prepare and approve audit checklist HY HY2 IT - 24 Manage IT Audit 2 Run audit utility tool on the users system Q Q2 Q Q2 C A R Q Q2 C A R Monitor program effectiveness and identify developmental opportunities A R C A R I A R A R I A R C R 2 Check desktops/ laptops security patch updates - service patch updates - application program updates - delete all unwanted files and applications Check servers- security patch updates- service patch updates- server maintenance/ performance reports to the IT team R Information Technology IT - 24 Manage IT Audit 3 Information Technology IT - 24 Manage IT Audit 4 IT - 24 Manage IT Audit 5 Check network- network maintenance/ performance reports Q Q2 I A R IT - 24 Manage IT Audit 6 Check backup maintenance and security Q Q2 I A R IT - 24 Manage IT Audit 7 Check IT stock against IT inventory Q Q2 I A R IT - 24 Manage IT Audit 8 Q Q2 C A R IT - 24 Manage IT Audit 9 Q Q2 I A R IT - 24 Manage IT Audit 10 Submit and discuss the Audit Report with Head Operations Q Q2 C A R IT - 24 Manage IT Audit 11 Escalate the exceptions to MD Q Q2 A R Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Review previous Audit and MIS reports and check non compliance issues previously Develop audit report highlighting non compliance issues identified with set time frames for issue resolution 25 I Manager Accounts M2 ManagerProcurement M Functional Department Head Ensure conduct of regular backup of business critical data Manager - IT 7 CFO Executive - Network Administrator Executive - Help Desk Head Operations IT Disaster Recovery COO TAT IT - 23 Director Frequency Managing Director Activity System Sub process Activity No. Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Information Technology Sub process ID Process Job Aids 26 Manager- IT Process Develop IT Strategy 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Frequen Manager cy - IT Consider Future Business Direction and forecast the IT requirement. Y R Create Steering Committee for IT selection and monitoring. Y R Create Benchmark of future Needs and Prioritize as per the requirement. Y R Assess Current Technology Environment with respect best practices. Y R Assess Current Application Environment with respect to best practices. Y R Assess Current Data Environment with respect to practices. Y R Forecast Outsourcing IT requirement Y R Determine future IT Projects based on the IT Strategic Plan. Consider future system strategy in light Y R of enhance, rep Identify and prioritize those systems solutions which are critical to the business and to Ythe success R of implementing An asset management strategy is established to move the business toward the target ITY environment. The strategy R Develop and Evolve Security Strategy and Plan. Y R Consider Sourcing Strategies. Y R Develop and Evolve overall IT Strategy (Applications, Technology, Information, Data). Y R Develop project plans that provide estimates for time required, resources required, andY estimated R project costs. Align and communicate IT strategy with respect to overall business strategy. Y R Prepare Annual IT Budget 1 Establish Cost i.e. Personnel, Hardware, Software 2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 Review and analyze the actual expenditure incurred departments wise, category wise for year Y the previous R Collect the IT requirement from departmental heads for the next financial year Y A Consolidate and categorize the IT requirements Y R Review the IT requirements and refer the previous vendor price/take latest price from vendors Y A Develop and consolidate IT budget Y R Check the consolidated IT budget Y R Send the consolidated budget to Budgeting & MIS with specific format for consideration. Y R Discussion on given budget and justification on same. Y R After discussion, review and mutual agreement on budget send it for final approval to CFO. Y R If not approved check the where non approved point discuss and rectify and get the final Y approvalR Track budget IT expenses against budgets IT expenses (Month wise) Y R Discuss deviations any exceptional Y R Incase during the year a unplanned budget activity arise do the cost Vs benefits analysisE for same.R Submit the analysis to Managing Director for approval Y R If approved the by MD, Refer the SOP for budgeting If not approved then go the activity Y no 19 I If further clarification required by MD provide the same or else document the rational and Y close the R process 1 Define and Enhance IT Development Methodology 2 3 4 5 6 7 8 9 Research and Pilot New Technologies Y Design and Manage Data Architecture Y Design and Manage Process/Application Architecture Y Design and Manage Computing Platforms Architecture Y Design and Manage Network Architecture Y Design Standards for Information Repositories Y Develop and Manage Information Repositories Y Develop / evolve a comprehensive disaster recovery plan from existing interruption plans. Y A A R R R R R R 1 Develop System Selection Criteria based on Cost Vs benefits. R 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Assess Systems against Selection Criteria E Develop IT work plans / schedules and road map E Identification of final solutions E Identification of different implementation partners E Discussion of offerings. E Define and validate technical scope. E Seek the presentation and understand the entire process approach E Compression of different Implementation partners with respect to technical and commercial E Pre Finalization of implementation partners. E Discussion on commercials E Discussion of terms an conditions. E Submit the proposal to MD E Jointly Negotiation on commercial E After commercial discussion, preparation/validation of service agreement. E Get the validation on service agreement from legal/contracts departments E Preparation of PO & PR and approved E Kick off Project E Perform Program / Unit Testing E Perform System Integration Testing E Perform User Acceptance and System Testing E Document Systems Against Selection Criteria E Develop User Procedures and Training Requirements E R R R R R R R R R R E R C R I A R R A A A A 1 Create a Cross-Functional Deployment Team M R 2 3 4 5 Promote Application / Systems to Production Environment Decommission Legacy System Evaluate Applications/ Systems Usage Evaluate System Benefits Post-Implementation M M M E A R A R Sub processSub ID process Information Technology IT - 01 IT - 02 IT - 03 IT - 04 IT - 05 Evolve IT Architecture and Standards Identification & Development of IT Products and Services Deploy IT Products and Services Activity No.Activity 27 Y Y Y R A IT - 06 Manage IT Vendor Relationships IT - 07 Manage New Employee IT - 08 Manage Employee Exit IT - 09 Manage Licenses IT - 10 Manage System changes configuration IT -11 IT -12 Manage System Changes error Manage Enhancement/New Development - System 1 Define Needs and Service Level Requirements 4 5 6 7 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 1 2 3 4 6 7 8 9 10 11 12 14 15 16 17 18 19 20 Track and Manage IT Vendor Contracts E A Evaluate and Assess Vendor Capabilities E A Measure Vendor Performance E A Establish Vendor Performance Metrics E R Receive the requisition for E mail through prescribed, desktop/laptop, data card allocation E from via R email from HR Get the approval from Director and departmental head for unbudgeted request E I Determine Desktop/laptop configuration based on request from HR E I check availability in IT stock E A Allocate required item and inform HR and departmental head through E mail E A Check type of E mail id as per HR request with suggested E mail id E I Create new employee Mail ID E A Inform the same to HR E I Handover laptop, desktop and data card to employee E A Help Employee to get initiated E I Receiving information for about exiting employee E I Take back up of all data of outgoing employee E A Process IT clearance, get clearance certificate signed from HOD E A Employee to handover Laptop/desktop, data card, pen drive etc (IT asset) to IT team E I Get guidance from HOD/Functional head on continuation/immediate stoppage of E mail E id I Update IT Asset inventory E I Format the Laptop/Desktop E I Retain the backup data and delete only when concerned department confirmation is received E I Receive and assess request for licenses from user department E I Forward licenses requisition to IT by user department E I Receive licenses requisition from user department E I Check availability of licenses E A Seek approval from Head Operations for issue of licenses E A Receive request for issue of licenses E I Match licenses to user Ids and update allocation records E I Update and manage licenses inventory records E I Seek approval from Head Operations for new licenses procurement E I Receive request for new licenses by Head Operations E I Check if budgeted E R Discuss with Head Operations and CFO on licenses procurement approval E R Conduct rate negotiation with vendors for new licenses E R Create the PO & PR E A Conduct purchase of licenses E R Update and manage licenses inventory records E I Match licenses to user Ids and update allocation records E I Incase of employee severance, hold licenses in inventory and assign to new joinee E I 1 Receive request from users for new business requirement through online tool 2 3 5 6 7 8 10 11 12 13 14 15 Assess the requirement E Check Is this a configuration issue E Manage enhancement/new development - System E Prepare PCR (Process Change Request) E Get approval from impacted System module leaders of Implementation team, Head Operations E Can it be resolved by Implementation E Make necessary configurations E Receive and E mail about configuration issue E Discuss with IT team and ascertain configuration requirements E Log configuration details with System vendor and understand the effort involved E Make necessary configuration changes through System vendor E Document the changes wrt FS,TS and request number with issue log id. E A I R R A A I I I R A A 1 Receive request from users for error resolution by Implementation team I 2 3 6 7 8 9 Assess the error, create PCR, document and mail the details to IT team by Implementation E team Receive the mail and assess the error by IT team E Resolve the same by internal IT team E Make necessary correction by System vendor E Inform about changes by System vendor to IT team E Receive correction details by IT team checked at their end and inform to user E I A A A I A 1 Initiate new development and enhancement R 2 5 6 7 8 9 10 11 12 15 17 18 19 Take the approval new development from Head Operations and CFO for budgeted items E R Work on Feasibility E A Initiate the discussion with the implementation team and user to ascertain exact requirement through online porta E R Preparation of details functional specification by Implementation team E I Obtain sign off by from user by Implementation team E A Preparation of technical specification by IT team E A Begin development E R Inform Implementation team about completion of project plan by IT team E A Perform unit testing by Implementation team E I Inform IT team E I Reengineering of test failures E R Receive test results by IT team E I Inform Implementation team about non approval E R 28 E E E E R I IT - 13 Manage Enhancement/New Development - Non System IT - 14 Manage Incidents IT -15 Manage IT Procurement IT - 16 Manage Routine Data Backup IT - 17 Manage Service Request IT - 18 Manage Authorization IT - 19 User Account Creation General 1 Send request for enhancement/new development to IT through online portal/ email byEuser department/person I 2 3 6 7 8 9 10 11 12 15 16 1 2 3 4 6 7 8 9 11 12 13 14 17 18 19 20 21 22 1 2 4 6 7 8 10 11 12 13 14 15 16 17 18 19 Receive online request by Head Operations by user department/person E I Discuss with IT team and ascertain whether new development/enhancement is essential E R Inform to user for non approval E R Prepare detailed functional specification & technical specification by IT team E A Obtain sign off from user department by IT team E A Begin development E A Keep user department informed on progress through regular updates E A Perform unit testing E A log results E A Obtain test results and modify solution iteratively E A Obtain final approval from user and upload to live environment E A Log the incident in System solution manager by users E I Receive incident notification through System solution manager generated E mail E I Investigate incident and attempt to solve in test environment E A Incident Resolved E A Discuss the resolution with user and close the incident E I Assign basis/ABAP team according to the nature of the incident E A Receive incident notification through System solution manager generated E mail by technical team E I External assistance required ? E R Discuss with Head Operations and seek approval to engage external consultant E R Log call to System for technical consultant E I Resolve incident with external assistance and upload detailed solution note on service management E I tool. Update status of incident and inform core user team to check resolution E I Discuss resolution with users and close incident E I Update status of incident E I Discuss resolution with users and close incident E I Monitoring the resolution and reopen if it reoccurs E I Resolve incident and upload detailed solution notes on System solution manager E I Update status of incident and inform core user team to check resolution E I Identify requirement by IT team or by end user (in case of end user refer the Sub Process E -21) I Can requirement filled up with the current inventory E A Is this Planned expenditure E A Fill out capex approval form E R Obtain accounts clearances and seek the approval as per DOP E I If Yes then go to activity 9 if No then go to activity no 10 E I Provide further details as required E I Invite 2or 3 vendor for quotes and further negotiation by purchase department. E C Prepare comparative analysis and send it to Head Operations E I Evaluate comparative quotes and give final call for technical preference by Head Operations E C Complete the vendor selection by Head Operations and take the approval from Head Operations E Rand CFO. Finalize delivery terms and other conditions through discussion with the chosen vendor. E C Receive delivery of asset and update the IT asset register with tagging to user department/Primary E I user Prepare handover letter and complete handover to user department E I Follow delegation of power for approval of unplanned purchase (Refer the Sub ProcessE02 and activity no 16,17,18, R Service request from existing stock in inventory and update asset register E I 1 Develop/Review data back up strategy and frequency every quarter 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 4 5 6 7 8 Take the application data back up D A Stored at outsourced back end Vendor D A After every seven days saved to tape library/ back-up store W A Allocate tapes for online data back up for System on working days/regular basis E A Schedule and run jobs during non working hours for back ups D A take offline tapes for storage every week and re use the online tapes W A Take E mail data back up on desktop Server W A Take HRMS/Others application data back up on external hard drive and store with HeadMOperations R under lock & ke Transfer HRMS/other application data back up to cross locations (DR site) M R Receive service request from via mail, phone from user E I Acknowledge request and send user call reference no. through online tool E I Obtain key information required to understand and deliver solution E I Establish with user expectations for resolution of service request E A Identify the root cause of issue and fix up the problem E I Communicate solution to user E I Close call logs E I Initiate monthly user feedback process M A Obtain consolidated user feedback M A Monitor and review user feedback results through online tool. M A Receiving authorization error notification from user department E A Check and determine if authorization is needed E A Fill authorization request form and send it to Head Operations E I Assign to appropriate group to service and issue E A Receive confirmation and forward to basis team for execution E A Complete authorization request and inform Implementation team E A Update the authorization matrix E I 1 Request through online portal/ email for access to software E I 2 Receive application access request via online portal/ email by user E I 29 Q R IT - 20 Disable User Accounts IT - 21 Tag IT Asset IT - 22 Manage Disposal of IT Assets IT - 23 IT Disaster Recovery IT - 24 Manage IT Audit 3 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 1 2 3 4 5 6 Approval of access E I Receive & Forward the approved request for user access to designated application administrator. E I Inform the user via E mail about rejection of application access and keep log of rejection E in onlineAportal/ email Receive the approved request for user access E I Refer user account naming convention E I Refer the standard user Profile/Role E I Enable relevant rights E A Map user accounts name with Role E A Issue the UID default password to user E A Mail the UID and default password and user guide to user E A Inform the Head Operations to disable application access to the user online portal/ email E via HR. I Receive and forward the request to disable access to designated application administrator. E I Receive the request to disable user access E I Disable user accounts for the application E A Inform Head Operations E R Preserve the Log of disablement. E I Coordinate with Accounts to prepare a list of IT assets and code IT assets (Asset Tagging) HY R Verify the technical specifications and location of IT assets listed HY R Check the IT asset tags for each desktop, printer, server, laptop and software license HY R Develop and maintain the IT asset register by location and code Y R Check the IT asset register HY R Monitor renewal and termination of Annual Maintenance Contracts (AMC) on periodicYbasis R 1 Review the current IT asset inventory and identify IT assets to be disposed 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 Prepare a consolidated list of IT assets to be disposed and obtain approval HY R Ensure format of memory is done for the IT assets to be dispose off E R Ensure IT Asset has been inventoried and labeled for destruction/sale E R Forward IT asset disposal list to Accounts for valuation E R Receive the synopsis mentioning asset details like description, date of capitalization, value E of asset R etc. from Accoun Remove IT assets for sale and update IT inventory E R Receive information about sale of IT assets from Procurement Team E I Obtain approval for the IT asset sale voucher from Head Operations E R Formulate IT disaster recovery and business continuity plan Y R Approve business continuity and disaster recovery plan from MD, Head Operations Y R Develop responsibility matrix to manage eventualities Y R Plan and schedule regular business continuity & disaster recovery training to the IT team Y R Define data backup rules and server redundancy rules Y R Classify data based on business criticality by department and location in coordination with Y respective R departmental Ensure conduct of regular backup of business critical data M A Establish testing standards and guidelines Y A Perform periodic IT recovery testing M A Monthly check data backup M A Monitor program effectiveness and identify developmental opportunities M A Prepare and approve audit checklist HY R Run audit utility tool on the users system Q R Check desktops/ laptops security patch updates- service patch updates- application program updates Q A - delete all unw Check servers- security patch updates- service patch updates- server maintenance/ performance Q Areports to the IT t Check network- network maintenance/ performance reports Q A Check backup maintenance and security Q A Check IT stock against IT inventory Q A Review previous Audit and MIS reports and check non compliance issues previously Q A Develop audit report highlighting non compliance issues identified with set time framesQfor issue A resolution Submit and discuss the Audit Report with Head Operations Q A Escalate the exceptions to MD Q R 30 HY R Executive - Help Desk Process Develop IT Strategy 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Executiv Frequen e - Help cy Desk Consider Future Business Direction and forecast the IT requirement. Y I Create Steering Committee for IT selection and monitoring. Y I Create Benchmark of future Needs and Prioritize as per the requirement. Y C Assess Current Technology Environment with respect best practices. Y C Assess Current Application Environment with respect to best practices. Y C Assess Current Data Environment with respect to practices. Y C Forecast Outsourcing IT requirement Y C Determine future IT Projects based on the IT Strategic Plan. Consider future system strategy in light Y C of enhance, rep Identify and prioritize those systems solutions which are critical to the business and to Ythe success I of implementing An asset management strategy is established to move the business toward the target ITY environment. The strategy R Develop and Evolve Security Strategy and Plan. Y C Consider Sourcing Strategies. Y C Develop and Evolve overall IT Strategy (Applications, Technology, Information, Data). Y C Develop project plans that provide estimates for time required, resources required, andY estimated C project costs. Align and communicate IT strategy with respect to overall business strategy. Y I Prepare Annual IT Budget 1 Establish Cost i.e. Personnel, Hardware, Software 2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 Review and analyze the actual expenditure incurred departments wise, category wise for year Y the previous R Collect the IT requirement from departmental heads for the next financial year Y R Consolidate and categorize the IT requirements Y R Review the IT requirements and refer the previous vendor price/take latest price from vendors Y C Develop and consolidate IT budget Y C Check the consolidated IT budget Y I Send the consolidated budget to Budgeting & MIS with specific format for consideration. Y I Discussion on given budget and justification on same. Y I After discussion, review and mutual agreement on budget send it for final approval to CFO. Y I If not approved check the where non approved point discuss and rectify and get the final Y approvalI Track budget IT expenses against budgets IT expenses (Month wise) Y C Discuss deviations any exceptional Y C Incase during the year a unplanned budget activity arise do the cost Vs benefits analysisE for same.R Submit the analysis to Managing Director for approval Y I If approved the by MD, Refer the SOP for budgeting If not approved then go the activity Y no 19 I If further clarification required by MD provide the same or else document the rational and Y close the C process 1 Define and Enhance IT Development Methodology 2 3 4 5 7 8 9 Research and Pilot New Technologies Y Design and Manage Data Architecture Y Design and Manage Process/Application Architecture Y Design and Manage Computing Platforms Architecture Y Design Standards for Information Repositories Y Develop and Manage Information Repositories Y Develop / evolve a comprehensive disaster recovery plan from existing interruption plans. Y C R R R R C R 1 Develop System Selection Criteria based on Cost Vs benefits. C 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 19 20 21 22 23 Assess Systems against Selection Criteria E Develop IT work plans / schedules and road map E Identification of final solutions E Identification of different implementation partners E Discussion of offerings. E Define and validate technical scope. E Seek the presentation and understand the entire process approach E Compression of different Implementation partners with respect to technical and commercial E Pre Finalization of implementation partners. E Discussion on commercials E Discussion of terms an conditions. E Submit the proposal to MD E Jointly Negotiation on commercial E After commercial discussion, preparation/validation of service agreement. E Preparation of PO & PR and approved E Kick off Project E Perform Program / Unit Testing E Perform System Integration Testing E Perform User Acceptance and System Testing E Document Systems Against Selection Criteria E Develop User Procedures and Training Requirements E C C C C I C C C I I I I I I R R R R R R R 1 Create a Cross-Functional Deployment Team M C 2 3 4 5 Promote Application / Systems to Production Environment Decommission Legacy System Evaluate Applications/ Systems Usage Evaluate System Benefits Post-Implementation M M M E R R R R 1 Define Needs and Service Level Requirements E R Sub processSub ID process Information Technology IT - 01 IT - 02 IT - 03 IT - 04 IT - 05 IT - 06 Evolve IT Architecture and Standards Identification & Development of IT Products and Services Deploy IT Products and Services Manage IT Vendor Relationships Activity No.Activity 31 Y Y Y C C Manage IT Vendor Relationships IT - 10 IT -11 IT -12 Manage System changes configuration Manage System Changes error Manage Enhancement/New Development - System IT - 14 Manage Incidents IT - 16 Manage Routine Data Backup IT - 18 Manage Authorization 4 Track and Manage IT Vendor Contracts E R 5 6 7 Evaluate and Assess Vendor Capabilities Measure Vendor Performance Establish Vendor Performance Metrics E E E R R R 1 Receive request from users for new business requirement through online tool E I 2 3 5 6 7 8 10 11 12 13 14 15 Assess the requirement E Check Is this a configuration issue E Manage enhancement/new development - System E Prepare PCR (Process Change Request) E Get approval from impacted System module leaders of Implementation team, Head Operations E Can it be resolved by Implementation E Make necessary configurations E Receive and E mail about configuration issue E Discuss with IT team and ascertain configuration requirements E Log configuration details with System vendor and understand the effort involved E Make necessary configuration changes through System vendor E Document the changes wrt FS,TS and request number with issue log id. E R R R R R R R R I R R R 1 Receive request from users for error resolution by Implementation team I 2 3 6 7 8 9 Assess the error, create PCR, document and mail the details to IT team by Implementation E team Receive the mail and assess the error by IT team E Resolve the same by internal IT team E Make necessary correction by System vendor E Inform about changes by System vendor to IT team E Receive correction details by IT team checked at their end and inform to user E I R R R I R 1 Initiate new development and enhancement R 2 5 6 7 8 9 10 11 12 15 17 18 19 1 2 3 4 6 7 8 11 12 13 14 17 18 19 20 21 22 Take the approval new development from Head Operations and CFO for budgeted items E R Work on Feasibility E R Initiate the discussion with the implementation team and user to ascertain exact requirement through online porta E R Preparation of details functional specification by Implementation team E I Obtain sign off by from user by Implementation team E I Preparation of technical specification by IT team E R Begin development E R Inform Implementation team about completion of project plan by IT team E R Perform unit testing by Implementation team E I Inform IT team E I Reengineering of test failures E R Receive test results by IT team E I Inform Implementation team about non approval E R Log the incident in System solution manager by users E I Receive incident notification through System solution manager generated E mail E R Investigate incident and attempt to solve in test environment E R Incident Resolved E R Discuss the resolution with user and close the incident E R Assign basis/ABAP team according to the nature of the incident E R Receive incident notification through System solution manager generated E mail by technical team E R Discuss with Head Operations and seek approval to engage external consultant E I Log call to System for technical consultant E R Resolve incident with external assistance and upload detailed solution note on service management E R tool. Update status of incident and inform core user team to check resolution E R Discuss resolution with users and close incident E R Update status of incident E R Discuss resolution with users and close incident E R Monitoring the resolution and reopen if it reoccurs E R Resolve incident and upload detailed solution notes on System solution manager E R Update status of incident and inform core user team to check resolution E R 5 Allocate tapes for online data back up for System on working days/regular basis E R 6 7 1 2 4 5 6 7 8 Schedule and run jobs during non working hours for back ups take offline tapes for storage every week and re use the online tapes Receiving authorization error notification from user department Check and determine if authorization is needed Fill authorization request form and send it to Head Operations Assign to appropriate group to service and issue Receive confirmation and forward to basis team for execution Complete authorization request and inform Implementation team Update the authorization matrix D W E E E E E E E R R R C R R R R R 32 E E Executive - Network Administrator Process Sub processSub ID process Information Technology IT - 01 IT - 02 IT - 03 IT - 04 IT - 05 Develop IT Strategy Prepare Annual IT Budget Evolve IT Architecture and Standards Identification & Development of IT Products and Services Deploy IT Products and Services Executiv eFrequen Activity No.Activity Network cy Administ rator 1 Consider Future Business Direction and forecast the IT requirement. Y I 2 Create Steering Committee for IT selection and monitoring. Y I 3 Create Benchmark of future Needs and Prioritize as per the requirement. Y C 4 Assess Current Technology Environment with respect best practices. Y C 5 Assess Current Application Environment with respect to best practices. Y C 6 Assess Current Data Environment with respect to practices. Y C 7 Forecast Outsourcing IT requirement Y C 8 Determine future IT Projects based on the IT Strategic Plan. Consider future system strategy in light Y C of enhance, rep 9 Identify and prioritize those systems solutions which are critical to the business and to Ythe success I of implementing 10 An asset management strategy is established to move the business toward the target ITY environment. The strategy R 11 Develop and Evolve Security Strategy and Plan. Y C 12 Consider Sourcing Strategies. Y C 13 Develop and Evolve overall IT Strategy (Applications, Technology, Information, Data). Y C 14 Develop project plans that provide estimates for time required, resources required, andY estimated C project costs. 15 Align and communicate IT strategy with respect to overall business strategy. Y I 1 Establish Cost i.e. Personnel, Hardware, Software 2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 Review and analyze the actual expenditure incurred departments wise, category wise for year Y the previous R Collect the IT requirement from departmental heads for the next financial year Y R Consolidate and categorize the IT requirements Y R Review the IT requirements and refer the previous vendor price/take latest price from vendors Y C Develop and consolidate IT budget Y C Check the consolidated IT budget Y I Send the consolidated budget to Budgeting & MIS with specific format for consideration. Y I Discussion on given budget and justification on same. Y I After discussion, review and mutual agreement on budget send it for final approval to CFO. Y I If not approved check the where non approved point discuss and rectify and get the final Y approvalI Track budget IT expenses against budgets IT expenses (Month wise) Y C Discuss deviations any exceptional Y C Incase during the year a unplanned budget activity arise do the cost Vs benefits analysisE for same.R Submit the analysis to Managing Director for approval Y I If approved the by MD, Refer the SOP for budgeting If not approved then go the activity Y no 19 I If further clarification required by MD provide the same or else document the rational and Y close the C process 1 Define and Enhance IT Development Methodology 2 3 4 5 6 7 8 9 Research and Pilot New Technologies Y Design and Manage Data Architecture Y Design and Manage Process/Application Architecture Y Design and Manage Computing Platforms Architecture Y Design and Manage Network Architecture Y Design Standards for Information Repositories Y Develop and Manage Information Repositories Y Develop / evolve a comprehensive disaster recovery plan from existing interruption plans. Y C R R R R R C R 1 Develop System Selection Criteria based on Cost Vs benefits. C 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Assess Systems against Selection Criteria E Develop IT work plans / schedules and road map E Identification of final solutions E Identification of different implementation partners E Discussion of offerings. E Define and validate technical scope. E Seek the presentation and understand the entire process approach E Compression of different Implementation partners with respect to technical and commercial E Pre Finalization of implementation partners. E Discussion on commercials E Discussion of terms an conditions. E Submit the proposal to MD E Jointly Negotiation on commercial E After commercial discussion, preparation/validation of service agreement. E Get the validation on service agreement from legal/contracts departments E Preparation of PO & PR and approved E Kick off Project E Perform Program / Unit Testing E Perform System Integration Testing E Perform User Acceptance and System Testing E Document Systems Against Selection Criteria E Develop User Procedures and Training Requirements E C C C C I C C C I I I I I I I R R R R R R R 1 Create a Cross-Functional Deployment Team M C 2 3 4 Promote Application / Systems to Production Environment Decommission Legacy System Evaluate Applications/ Systems Usage M M M R R R 33 Y Y Y C C IT - 06 Manage IT Vendor Relationships Manage IT Vendor Relationships IT - 07 Manage New Employee IT - 08 Manage Employee Exit IT - 09 Manage Licenses IT - 13 Manage Enhancement/New Development - Non System IT - 16 IT - 17 Manage Routine Data Backup Manage Service Request 5 Evaluate System Benefits Post-Implementation E R 1 Define Needs and Service Level Requirements E R 4 Track and Manage IT Vendor Contracts E R 5 6 7 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 1 2 3 4 6 7 8 9 10 11 12 14 15 16 17 18 19 20 Evaluate and Assess Vendor Capabilities E R Measure Vendor Performance E R Establish Vendor Performance Metrics E R Receive the requisition for E mail through prescribed, desktop/laptop, data card allocation E from via I email from HR Get the approval from Director and departmental head for unbudgeted request E R Determine Desktop/laptop configuration based on request from HR E R check availability in IT stock E R Allocate required item and inform HR and departmental head through E mail E R Check type of E mail id as per HR request with suggested E mail id E R Create new employee Mail ID E R Inform the same to HR E R Handover laptop, desktop and data card to employee E R Help Employee to get initiated E R Receiving information for about exiting employee E R Take back up of all data of outgoing employee E R Process IT clearance, get clearance certificate signed from HOD E R Employee to handover Laptop/desktop, data card, pen drive etc (IT asset) to IT team E R Get guidance from HOD/Functional head on continuation/immediate stoppage of E mail E id R Update IT Asset inventory E R Format the Laptop/Desktop E R Retain the backup data and delete only when concerned department confirmation is received E R Receive and assess request for licenses from user department E I Forward licenses requisition to IT by user department E I Receive licenses requisition from user department E I Check availability of licenses E R Seek approval from Head Operations for issue of licenses E R Receive request for issue of licenses E R Match licenses to user Ids and update allocation records E R Update and manage licenses inventory records E R Seek approval from Head Operations for new licenses procurement E R Receive request for new licenses by Head Operations E R Check if budgeted E I Discuss with Head Operations and CFO on licenses procurement approval E I Conduct rate negotiation with vendors for new licenses E C Create the PO & PR E R Conduct purchase of licenses E R Update and manage licenses inventory records E R Match licenses to user Ids and update allocation records E R Incase of employee severance, hold licenses in inventory and assign to new joinee E R 1 Send request for enhancement/new development to IT through online portal/ email byEuser department/person I 2 3 6 7 8 9 10 11 12 15 16 Receive online request by Head Operations by user department/person E Discuss with IT team and ascertain whether new development/enhancement is essential E Inform to user for non approval E Prepare detailed functional specification & technical specification by IT team E Obtain sign off from user department by IT team E Begin development E Keep user department informed on progress through regular updates E Perform unit testing E log results E Obtain test results and modify solution iteratively E Obtain final approval from user and upload to live environment E I R R R R R R R R R R 1 Develop/Review data back up strategy and frequency every quarter R 2 3 4 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Take the application data back up D R Stored at outsourced back end Vendor D R After every seven days saved to tape library/ back-up store W R Schedule and run jobs during non working hours for back ups D R take offline tapes for storage every week and re use the online tapes W R Take E mail data back up on desktop Server W R Take HRMS/Others application data back up on external hard drive and store with HeadMOperations R under lock & ke Transfer HRMS/other application data back up to cross locations (DR site) M R Receive service request from via mail, phone from user E R Acknowledge request and send user call reference no. through online tool E R Obtain key information required to understand and deliver solution E R Establish with user expectations for resolution of service request E R Identify the root cause of issue and fix up the problem E R Communicate solution to user E R Close call logs E R Initiate monthly user feedback process M R Obtain consolidated user feedback M R Monitor and review user feedback results through online tool. M R 34 Q IT - 19 User Account Creation General IT - 20 Disable User Accounts IT - 21 Tag IT Asset IT - 22 Manage Disposal of IT Assets IT - 23 IT Disaster Recovery IT - 24 Manage IT Audit IT - 15 Manage IT Procurement 1 Request through online portal/ email for access to software 2 3 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 1 3 Receive application access request via online portal/ email by user E I Approval of access E R Receive & Forward the approved request for user access to designated application administrator. E R Inform the user via E mail about rejection of application access and keep log of rejection E in onlineRportal/ email Receive the approved request for user access E R Refer user account naming convention E R Refer the standard user Profile/Role E R Enable relevant rights E R Map user accounts name with Role E R Issue the UID default password to user E R Mail the UID and default password and user guide to user E R Inform the Head Operations to disable application access to the user online portal/ email E via HR. I Receive and forward the request to disable access to designated application administrator. E R Receive the request to disable user access E R Disable user accounts for the application E R Inform Head Operations E R Preserve the Log of disablement. E R Coordinate with Accounts to prepare a list of IT assets and code IT assets (Asset Tagging) HY R Check the IT asset tags for each desktop, printer, server, laptop and software license HY R 2 Prepare a consolidated list of IT assets to be disposed and obtain approval 3 4 4 5 6 7 8 9 10 11 3 4 5 6 7 8 9 10 1 2 4 6 8 10 11 12 13 14 15 16 17 18 19 Ensure format of memory is done for the IT assets to be dispose off E R Ensure IT Asset has been inventoried and labeled for destruction/sale E R Plan and schedule regular business continuity & disaster recovery training to the IT team Y R Define data backup rules and server redundancy rules Y R Classify data based on business criticality by department and location in coordination with Y respective R departmental Ensure conduct of regular backup of business critical data M R Establish testing standards and guidelines Y R Perform periodic IT recovery testing M R Monthly check data backup M R Monitor program effectiveness and identify developmental opportunities M R Check desktops/ laptops security patch updates- service patch updates- application program updates Q R - delete all unw Check servers- security patch updates- service patch updates- server maintenance/ performance Q Rreports to the IT t Check network- network maintenance/ performance reports Q R Check backup maintenance and security Q R Check IT stock against IT inventory Q R Review previous Audit and MIS reports and check non compliance issues previously Q R Develop audit report highlighting non compliance issues identified with set time framesQfor issue Rresolution Submit and discuss the Audit Report with Head Operations Q R Identify requirement by IT team or by end user (in case of end user refer the Sub Process E -21) R Can requirement filled up with the current inventory E R Is this Planned expenditure E R Fill out capex approval form E R If Yes then go to activity 9 if No then go to activity no 10 E R Provide further details as required E R Invite 2or 3 vendor for quotes and further negotiation by purchase department. E C Prepare comparative analysis and send it to Head Operations E I Evaluate comparative quotes and give final call for technical preference by Head Operations E C Complete the vendor selection by Head Operations and take the approval from Head Operations E Rand CFO. Finalize delivery terms and other conditions through discussion with the chosen vendor. E I Receive delivery of asset and update the IT asset register with tagging to user department/Primary E R user Prepare handover letter and complete handover to user department E R Follow delegation of power for approval of unplanned purchase (Refer the Sub ProcessE02 and activity no 16,17,18, R Service request from existing stock in inventory and update asset register E R 35 E HY I R