Comment on structure shop drawing station 29+831.626 30+358.99 Comment 1. Please correct the flow direction of the out let paved water way and main pipe 2. The out let needs channelization and please indicate the channelization limit 1. Based on the profile natural ground .5 percent slope is not sufficient to drain out the discharge flow and it needs to raise up in the inlet 2. The channel slope is reversed which is-1.89 3. The printed station is not the same as the soft copy