Electrical Permit Application Plans
1807 Sterling Drive, Lakeland FL, 33813
Project Description:
An 80-Amp, 2-pole breaker will be installed in the main breaker box.
50 feet of Aluminum 2-2-2-4 Service Entrance Cable will be run through an attic space to the
subpanel, stapled every 4.5 ft.
Subpanel is a 100-Amp 8-Spaces Main Lug Load Center
Within the subpanel will be the following circuits:
- 20-Amp, 2-pole breaker powering a 6-20r receptacle via approximately 30 feet of 12/2 NM wire
- 20-Amp, 2-pole breaker powering a 6-20r receptacle via approximately 25 feet of 12/2 NM wire
- 20-Amp, 1-pole breaker powering LED light fixtures via approximately 20 feet of 16t/2 NM wire
Current Setup:
Legend:
1: Existing 150A Main Breaker Panel
2: LED Shop Lights
3: NM Wiring from Main Breaker Panel through Attic and Covered Carport
New Setup:
Legend:
1: 150 Amp Main Breaker Panel
2: 100 Amp Sub Panel (Connected to 80-Amp Breaker)
3: Aluminum 2-2-2-4 Service Entrance Cable run through Attic and Covered Carport
4: 6-20r Receptacle connected to 20-Amp Breaker (will run Dust Collector that pulls 7-Amps)
5: 6-20r Receptacle connected to 20-Amp Breaker (will run Woodworking Jointer that pulls
7-Amps)
6: LED Shop Lights
7: 12/2 Wiring to sub-panel
8: 12/2 Wiring to sub-panel
Note, where wires will be run along rafters/attic space, they will be stapled every 4.5ft. Where
wires are run down walls to outlets, they will be protected with metal conduit.
Current Service Load Calculation
Item
Wattage
Lighting (3W / sq ft) (2700 sqft)
8100
Small Appliances (2)
3000
Lighting/Small Appliances Adjusted (3000 + 35% * 8100)
5835
Oven
3000
Stove
6600
Oven/Stove Adjusted (65%)
6240
Dishwasher
1500
Water Heater
4500
Laundry
1500
Dryer
5000
A/C
1058
Total Sum
25633
25633 W / 230 V = 111 Amps
Proposed Service Load Calculation
Item
Wattage
Lighting (3W / sq ft) (2700 sqft)
8100
Small Appliances (2)
3000
Lighting/Small Appliances Adjusted (3000 + 35% * 8100)
5835
Oven
3000
Stove
6600
Oven/Stove Adjusted (65%)
6240
Dishwasher
1500
Water Heater
4500
Laundry
1500
Dryer
5000
A/C
1058
Jointer (NEW)
1610
Dust Collector (NEW)
1610
Total Sum
28853
28853 W / 230 V = 125 Amps