Document No. …………………….
TECHNICAL INFORMATION
PT. Saptaindra Sejati
Plant Department
Analysis Of Problem
.
V
DILAKSANAKAN SENDIRI
JOBSITE
REPORT NO.
REPORT DATE
ADMO
1/07/TI/0117088/2019
19/11/22
(No./Site Code/TI/NRP Mech/Year)
(dd-mm-yy)
CLAIM PROPOSAL NO.
CLAIM PROPOSAL DATE
HANYA SEBAGAI INFORMASI
WO NO. RELATED
1741155
(dd-mm-yy)
UNIT MODEL
UNIT CODE NO.
COMPONENT NAME
TROUBLE DATE (ddmmyy)
CHASSIS NO.
ENGINE MODEL
COMPONENT CODE
ACTION DATE (ddmmyy)
SMR (HM/KM)
ENGINE SERIAL NO.
COMPONENT LIFETIME
STANDARD LIFETIME
.
FINISH DATE (ddmmyy)
.
SYMPTOM
Timah tidak melekat dengan baik di cable hingga cable mengitam
MAIN PART CAUSING THE PROBLEM (PART NO.)
PART NAME
BRAND
Electrics Consumable goods (23271818-0004)
Timah/ Solder Wire
ATN/CF-008
FAILURE CODE **
Bent (Bengkok)
Blocked (Buntu)
V
Broken (Rusak)
Cracked (Retak)
Leaking (Kebocoran)
Shorted (Koresleting)
Worn Abnormal
(Keausan Abnormal)
Burnt (Terbakar)
Dirty (Kotor)
Low Power(Kurang Tenaga)
Twisted (Melintir)
Other :………..
.
ANALYSIS ( Uraikan detail kerusakan,data pendukung, Root Cause Analysis, LAMPIRKAN Foto & Gambar, Jika tidak mecukupi gunakan Continuation Sheet)
spesifikasi perbandingan timah dan perak 40/60 tidak cocok penggunaanya untuk elektronik (cable, pcb) karna membutuhkan suhu 238 Celcius untuk cair,
spesifikasi yang disarankan 60/40 dengan suhu mencair pada 190 C, Suhu yang tinggi mengakibatkan timah tidak dapat menempel di tembaga cable dikarenakan
tembaga menghitam dikarenakan over heat.
EXISTING PART : 40 / 60
Recomended PART : 60 / 40
CAUSE **
Mis Assembly (Salah Pemasangan)
Bad Material (Material Buruk)
Poor Torque (Torsi Lemah)
V
Mis Application (Kesalahan Aplikasi)
Bad Infrastructire (Infrastruktur Buruk)
Mis Maintenance (Salah Perawatan)
Mis Operation (Kesalahan Operasi)
Fatigue Fracture (Patah Lelah)
Bad Welding (Pengelasan Buruk)
Mis Adjustment (Salah Penyetelan)
Over Loaded (Kelebihan Beban)
Out Of Adjustment (Kurang Penyetelan)
Poor Durability (Daya Tahan Lemah)
Substandard (Kualitas dibawah standar)
Dirty Fuel (Bahan Bakar Kotor)
Other :………………………………..
.
CORRECTION MADE **
Repair (Perbaikan)
Adjust (Penyetelan)
V
Retorque (Pengencangan
Ulang)
Replace Comp Assy
Calibration (Kalibrasi)
Warranty Claim
Reinforce (Penambahan
Material)
Replace Part (Ganti Part)
Rebuild (Membangun
Ulang)
Out Site Repair (Perbaikan
External)
Site Modif (Modif Internal)
Other :……………………..
REMARK **
V
EFFECTIVE REPAIR DURATION
Finish
Not Finish , Due Date:…………………………….
Prepared By:
NRP
NAME:
0
1
1
5
1
hours
.
Checked By:
1
6
LEVEL
Pebri Punda S
CHECKED DATE:
Approved By:
APPROVED DATE:
19/11/2022
GROUP LEADER/SUPERVISOR NAME:
Verryanto
SECTION HEAD NAME:
19/11/2022
Herjuna
3E
SIGN:
SIGN:
SIGN:
.
Note :
* Diisi sampai level terendah sesuai ellipse.
** Diberi tanda V untuk option yang dipilih.
diisi oleh Group Leader/Supervisor/Planner.
Page 1 of 2