Document No. ……………………. TECHNICAL INFORMATION PT. Saptaindra Sejati Plant Department Analysis Of Problem . V DILAKSANAKAN SENDIRI JOBSITE REPORT NO. REPORT DATE ADMO 1/07/TI/0117088/2019 19/11/22 (No./Site Code/TI/NRP Mech/Year) (dd-mm-yy) CLAIM PROPOSAL NO. CLAIM PROPOSAL DATE HANYA SEBAGAI INFORMASI WO NO. RELATED 1741155 (dd-mm-yy) UNIT MODEL UNIT CODE NO. COMPONENT NAME TROUBLE DATE (ddmmyy) CHASSIS NO. ENGINE MODEL COMPONENT CODE ACTION DATE (ddmmyy) SMR (HM/KM) ENGINE SERIAL NO. COMPONENT LIFETIME STANDARD LIFETIME . FINISH DATE (ddmmyy) . SYMPTOM Timah tidak melekat dengan baik di cable hingga cable mengitam MAIN PART CAUSING THE PROBLEM (PART NO.) PART NAME BRAND Electrics Consumable goods (23271818-0004) Timah/ Solder Wire ATN/CF-008 FAILURE CODE ** Bent (Bengkok) Blocked (Buntu) V Broken (Rusak) Cracked (Retak) Leaking (Kebocoran) Shorted (Koresleting) Worn Abnormal (Keausan Abnormal) Burnt (Terbakar) Dirty (Kotor) Low Power(Kurang Tenaga) Twisted (Melintir) Other :……….. . ANALYSIS ( Uraikan detail kerusakan,data pendukung, Root Cause Analysis, LAMPIRKAN Foto & Gambar, Jika tidak mecukupi gunakan Continuation Sheet) spesifikasi perbandingan timah dan perak 40/60 tidak cocok penggunaanya untuk elektronik (cable, pcb) karna membutuhkan suhu 238 Celcius untuk cair, spesifikasi yang disarankan 60/40 dengan suhu mencair pada 190 C, Suhu yang tinggi mengakibatkan timah tidak dapat menempel di tembaga cable dikarenakan tembaga menghitam dikarenakan over heat. EXISTING PART : 40 / 60 Recomended PART : 60 / 40 CAUSE ** Mis Assembly (Salah Pemasangan) Bad Material (Material Buruk) Poor Torque (Torsi Lemah) V Mis Application (Kesalahan Aplikasi) Bad Infrastructire (Infrastruktur Buruk) Mis Maintenance (Salah Perawatan) Mis Operation (Kesalahan Operasi) Fatigue Fracture (Patah Lelah) Bad Welding (Pengelasan Buruk) Mis Adjustment (Salah Penyetelan) Over Loaded (Kelebihan Beban) Out Of Adjustment (Kurang Penyetelan) Poor Durability (Daya Tahan Lemah) Substandard (Kualitas dibawah standar) Dirty Fuel (Bahan Bakar Kotor) Other :……………………………….. . CORRECTION MADE ** Repair (Perbaikan) Adjust (Penyetelan) V Retorque (Pengencangan Ulang) Replace Comp Assy Calibration (Kalibrasi) Warranty Claim Reinforce (Penambahan Material) Replace Part (Ganti Part) Rebuild (Membangun Ulang) Out Site Repair (Perbaikan External) Site Modif (Modif Internal) Other :…………………….. REMARK ** V EFFECTIVE REPAIR DURATION Finish Not Finish , Due Date:……………………………. Prepared By: NRP NAME: 0 1 1 5 1 hours . Checked By: 1 6 LEVEL Pebri Punda S CHECKED DATE: Approved By: APPROVED DATE: 19/11/2022 GROUP LEADER/SUPERVISOR NAME: Verryanto SECTION HEAD NAME: 19/11/2022 Herjuna 3E SIGN: SIGN: SIGN: . Note : * Diisi sampai level terendah sesuai ellipse. ** Diberi tanda V untuk option yang dipilih. diisi oleh Group Leader/Supervisor/Planner. Page 1 of 2