AHSAN MAHMOOD DESIGN ENGINEER POWER TRANSMISSION Mobile No.: +44-7496-694866 Email: AHSAN06@YMAIL .COM Glasgow, Scotland, United Kingdom PROFESSIONAL PROFILE: A professional electrical engineer having around 13 years of diversified global experience in the field of power transmission and distribution. Enriched experience in successfully handling several feasibility studies, base & detailed execution design, electrical studies for several Overhead Lines upto 765kV UHVAC and ±500kV HVDC high value mega projects at design consultancy and EPC stages using advanced engineering tools and softwares like PLS-CADD, TOWER, SAG-10, ETAP, PSS/E, CDEGS. Hands on experience in Overhead Line Design, Substation Primary Design, Underground Cable Network Design, Power System Studies/ Grid Interconnection (load flow, short circuit and transient stability), Insulation Coordination Studies (temporary overvoltages, slow front transients for switching & faults, fast front transient over voltages for lightning), OHL Material Design, Line modeling, Tower design, Induced Voltage Studies, Theoretical Line parameter Studies, Grounding Studies, Earthing/ Lightning, Shielding studies, Arc-flash assessment, numerous FATs and Material Inspections in different regions of United Kingdom, Middle East, South East Asia and Africa. Well versed with requirements of monetary/ sponsoring agencies WB, ADB, JICA and worked on Standards of several electric utilities like SSE/ NG UK, Saudi Electricity-SEC, Dubai Electricity-DEWA, South Korean Electricity KEPCO, NTDC-Pakistan and NAWEC-Africa. QUALIFICATION: Electrical Engineering Passing Year 2010 University of Central Punjab, Pakistan MBA for Professionals 2014 Lahore School of Economics, Pakistan Advanced Power Transmission Engineering 2015 KEPCO Academy, Seoul, South Korea Description Institute PROFESSIONAL EXPERINCE: From To Last Position Employer 2022 date Overhead Line Project Engineer Scottish and Southern Electricity Networks – Transmission (SSEN-Transmission) 2017 2022 Lead Design Engineer Transmission Line Dar Engineering (Alfanar Construction) Saudi Arabia 2010 2017 Senior Design Engineer EnMasse Pvt. Ltd. Pakistan COMPUTER SKILLS: PLS-CADD, TOWER, ETAP, PSS/E, ASPEN, CDEGS, OPTIONEER, PRIMAVERA TRAININGS DELIVERED: Sr. Topic Trainees Organization 1. Design of Overhead Transmission Lines using PLS-CADD Analysis and Design of Overhead Transmission Lines (PLS-CADD) High Voltage Power Transmission Line Design Optimization 24 Saudi Electricity Company (SEC) Power Grid Company of Bangladesh (PGCB) Private Consultants 2. 3. 10 10 Year 2020 2018 2017 Venue SEC Head Quarter, Riyadh, Saudi Arabia Asian Institute of Technology, Thailand Softnitro Training Institute, Pakistan SUMMARY OF PROJECTS HANDLED (2010 - 2022) *Key projects highlighted in Red Year Voltage Category 2022ongoing 400kV OHL 400kV Length Activities Beauly-Blackhillock-Peterhead (New Build) 200 km OHL Beauly-Loch Buidhe-Spittal (New Build) 200 km 275kV OHL 109 km 275kV OHL Beauly-Blackhillock (HTLS Reconductoring) Beauly-Dounrey (Increase Opt. Temp.) Corridor and Route Selection Report. Conductor selection and Tower selection Reports. Defining scope of work for Contractors Conductor selection Report, Clearance check report Clearance check report 132kV OHL 0.5 km 132kV OHL Kintradwell Wind Farm Connection (Tapoff) Loch Buidhe-Spittal (Reconductoring) ± 500kV HVDC OHL Saudi-Egypt Interconnection 1000 km 380kV OHTL Wadi-Dawasir SS to Layla SS 293 km 33kV OHL/ UG Rehabilitation of Power Transmission Network of Gambia 380kV 230kV 115kV OHTL Raising of Existing Overhead Transmission Line over proposed Highway in Jubail City 20km OHL 3 km UGC 10 locations 20202021 380kV OHTL Khafji SS to Nariyah SS 113 km 2020 132kV OHTL Power evacuation of Dumat Al-Jandal Wind farms. 13 km 20192020 110kV OHTL 16 km 230kV UG 2019 115kV OHTL/ UG 20182019 380kV OHTL 20172018 69kV OHL/ UG Overhead Transmission Line for 110/13.8kV National Guard Compound Substation TAIF Underground Cable connections between GIS SS-701 to MS1 (8 Ckts), GIS SS-701 to MS2 (8 Ckts), GIS SS-701 to MS3 (10 Ckts), New Marjan GIS to Tanajib Gas Plant(701SS) (3Ckts), Zuluf Gantry to Tanajib Gas Plant (3 Ckts) Overhead Transmission Line and Underground cable connection from RIC S/S #2 to Maritime Yard S/S WASIT - RIC#3 & RIC#2 - RIC#3 and One (1) D/C 380kV OHTL between RIC#1 - RIC#3 Shifting of six 69kV feeders from Old Dhahran to New Dhahran Substation 2017 115kV OHTL/ Overhead Transmission line and System study for SPARK (King Salman Energy Park) Project 6 km 20212022 System Study 20172018 115kV OHTL/ UG 115kV UG Project Description Overhead Transmission Line for Safaniyah NGL SFNY TL-14 STP-21 and Onshore Cable for Electrical Distribution Platform (EDP) Power supply to Dhahran Residential Development 115/13.8kv Substation U/G Cable Project 100 km 91 km 12 km total 10 km 8 km 50 km 30 km 6 km OHL 0.8 km UGC 16 km Route sketch, electrical clearance checks Conductor selection Report, Clearance check report Review of Design / Drawings, Plan and Profile. Approval of Material design Survey, Profiling, BOQ, Construction Drawings/ Charts Feasibility, Route Selection, Material Design, bidding specification Profiling, BOQ, technical specification, bidding document Survey, Profiling, BOQ, Construction Drawings/ Charts Survey, Profiling, BOQ, Construction Drawings/ Charts Survey, Profiling, BOQ, Construction Drawings/ Charts Route Map, Profiling, Cable sheath bonding scheme, metallic sheath grounding and link box details Owner/ Client Scottish and Southern Electricity Networks (SSEN), UK Saudi Electricity Co. (SEC), Saudi Arabia SEC, Saudi Arabia NAWEC, Gambia Royal Commission, (RC) Saudi Arabia SEC, Saudi Arabia TSK, Spain/ SEC, Saudi Arabia SEC, Saudi Arabia Hyundai/ ARAMCO Survey, Profiling, BOQ, Construction Drawings/ Charts Survey, Profiling, BOQ, Construction Drawings/ Charts Survey, Profiling, BOQ, Construction Drawings/ Charts Survey, Profiling, BOQ, Construction Drawings/ Charts. Load flow and Short circuit study using ETAP Software Survey, Profiling, BOQ, Construction Drawings/ Charts SEC, Saudi Arabia Route Map, Profiling, Cable sheath bonding scheme, metallic sheath grounding and link box details SEC, Saudi Arabia SEC and RC, Saudi Arabia SEC, Saudi Arabia SEC, Saudi Arabia ARAMCO, Saudi Arabia 2017 115kV UG Power supply to Dhahran Home Ownership 115/13.8kV Substation #1A, 1B & 2 U/G Cable Project 35 km 132kV OHTL East Qurayyat S/S up to Qurayyat BSP S/S in Qurayyat area 35 km 500kV OHTL Transmission Line from HUBCO Plant to Matiari Grid Station, Pakistan 200 km 220kV OHTL DI Khan to Zhob, Pakistan 220 km Survey, Route Selection, Profiling, BOQ 20152017 765kV OHTL Evacuation of 6000MW power from Dasu Hydropower Plant, Pakistan 250 km 20152016 220kV 132kV OHTL - 2014 132kV System Study 132kV System Study Designing of sixteen (16) Nos. 132kV and 220kV Transmission Lines Towers /Poles for TP-1000 project, Pakistan Grid Interconnection Study of 132/11kV 3.2MW Kathai HPP, 3.2MW Sharian HPP, 3.2MW Rehra HPP, 3.0MW Qadirabad HPP Grid Interconnection Study of 132/11kV 4.0MW Bagasse Plant, Pakistan 11kV OHL Rehabilitation of power distribution network of Lahore Old City (Walled City) 300 Job orders Feasibility, Route Survey, Voltage Selection, Material Design, Tower modeling, Conductor/ insulator optimization, bidding specs. Loading Trees, Modeling of Towers/ Poles using Powerline Software. Load Flow Analysis, Short Circuit Analysis and Voltage Drop Calculations by using ETAP Software Load Flow Analysis, Short Circuit Analysis and Voltage Drop Calculations by using ETAP Software Augmentation/ replacement of T/F and Cables, Bid Documents 220kV OHTL 3 km 20142015 132kV SS / OHTL Overhead Transmission Line for tap-off connection to 220 kV Okara, Bandala and TT Singh Grid Station, Pakistan Substation and allied Transmission Line for Kamir & Miran Pur Grid Stations, Pakistan 20122014 132kV SS / OHTL Substation and allied Transmission Line for Ali Pur, Fateh Pur & Noor Sar Grid Stations, Pakistan - 2013/ 2014 220kV E & SIA - 20122013 132kV SS / OHTL Environmental and Social Impact Assessment (E/SIA) Studies for 220kV Uch-Sibbi Transmission Line Project, Pakistan 220kV Dera Murad Jamali Substation, and 500kV Shikarpur Substation, Pakistan Substation and allied Transmission Line for WAPDA Town, Lar & Qasim Bagh Grid Stations, Pakistan 20102012 11kV OHL Replacement of existing bare conductors at 2500+ 11/0.4kV job orders (HT/ LT connections) with Aerial Bundled cables and allied accessories, Pakistan 2500 Job Orders 20162017 20132015 - - - - Route Map, Profiling, Cable sheath bonding scheme, metallic sheath grounding and link box details Survey, Profiling, BOQ, Construction Drawings/ Charts Survey, Route Selection, Profiling, BOQ Survey, Route Selection, Profiling, BOQ SLD for SS, material drawings review, line Profiling, BOQ SLD for SS, material drawings review for SS and TL, line Profiling, BOQ calculation Carried out Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) Studies for the Lines and Substation. SLD for SS, material drawings review for SS and TL, line Profiling, BOQ calculation Computation of losses/ Preparation of Maps/ Technical Designs, Analysis Reports, Survey reports of H.T & L.T(11/ 0.4kV), stacking sheets SEC, Saudi Arabia SEC, Saudi Arabia National Transmission and Despatch Company (NTDC) Pakistan NTDC K-Electric, Pakistan. AJK Hydro Electric Board KPK Energy Board, Pakistan Distribution Company (LESCO), Pakistan NTDC, Pakistan Distribution Company (MEPCO), Pakistan NTDC, Pakistan MEPCO, Pakistan Distribution Company (HESCO/ SEPCO) Pakistan DETAILED DESCRIPTION OF PROJECTS AND RESPONSIBILITIES 1. From: February 2022 to date Designation: Overhead Line Project Engineer Employer: Scottish and Southern Electricity Networks (SSEN), Scotland, UK. Projects: Working as Lead Engineer / OHL Engineer on following large scale NOA Overhead Line projects: • 400kV New Build OHL Beauly- Blackhillock (120 km) • 400kV New Build OHL Blackhillock-Peterhead (80 km) • 400kV New Build OHL Beauly-Loch Buidhe (110 km) • 400kV New Build OHL Loch Buidhe-Spittal (90 km) • • • • 275kV HTLS Reconductoring Beauly-Blackhillock (120 km) 275kV (Increase in Opterating Temperature Beauly-Dounrey (100 km) 132kV Connection to Kintradwell Wind Farm Substation 132kV Reconductoring Loch Buidhe-Spittal (91 km) Responsibilities: • Selection of Corridor/ Route/ Alignment for Overhead Lines. Site selection for new Substations. • Preparation of Conductor Selection / Tower Selection Reports • PLSCADD modeling of Reconductoring lines to check clearance infringements and propose suitable mitigations. • Preparation of Scope of work for hiring of consultants for Tower modeling, LIDAR, Early Contractor Engagement (ECE) • Implementation of CDM regulations (maintaining Design Risk Register DRMI, Designers/ PD / Clients duties checklists). • Coordinate with all disciplines to meet gate requirements and achieve Programme timelines. 2. From: May 2017 to February 2022 Designation: Lead Design Engineer, Transmission Lines Employer: Alfanar Co. (Dar Engineering), Saudi Arabia. Projects: • • • • • • • • • • • • • • • Design & Engg. for Construction of 380kV Overhead Transmission Line from Wadi-Dawasir BSP to Layla BSP (293 km) Rehabilitation of 33kV / 11kV Power Transmission Network of Gambia (20km OHL 3 km UGC) Design & Engg. for Raising of Existing Overhead Transmission Line (380kV 230kV and 115kV) at 10 different locations over proposed Highway in Jubail City. Design & Engg. for Construction of 380kV Overhead Transmission Line from Khafji BSP to Nariyah BSP (113 km) Design & Engg. for Construction of 132kV Overhead Transmission Line for power evacuation of Dumat Al-Jandal Wind farms (13 km) Design & Engg. for Construction of 110kV Overhead Transmission Line for 110/13.8kV National Guard Compound Substation TAIF (16 km) Design & Engg. for Construction of 230kV Underground Cable connections between GIS SS-701 TO MS-1 (8 Ckts), GIS SS701 to MS2 (8 Ckts), GIS SS-701 to MS3 (10 Ckts), New Marjan GIS to Tanajib Gas Plant(701SS) (3Ckts), Zuluf Gantry Tower to Tanajib Gas Plant (3 Ckts) total route length of 12kms. Design & Engg. for Construction of 115kV Overhead Transmission Line and Underground cable connection from RIC S/S #2 to MARITIME YARD S/S (10 km OHTL and 8 km UG) Design & Engg. for Construction of 380kV Overhead Transmission Line between WASIT - RIC#3 & RIC#2 - RIC#3 and One (1) D/C 380kV OHTL between RIC#1 - RIC#3 (50 km) Design & Engg. for Shifting of six 69kV feeders from Old Dhahran to New Dhahran Substation (30 km) Design & Engg. for Construction of 115KV Overhead Transmission line and Power System study for SPARK (King Salman Energy Park) Project (6 kms) Design & Engg. for Construction of 115kV Overhead Transmission Line for Safaniyah NGL SFNY TL-14 STP-21 and Onshore Cable for Electrical Distribution Platform (EDP) (6 km OHL & 0.8 km UGC) Design & Engg. for Construction of Power supply to Dhahran Residential Development 115/13.8kv Substation U/G Cable Project (16 km) Design & Engg. for Construction of Power supply to Dhahran Home Ownership 115/13.8kV Substation #1A, 1B & 2 U/G Cable Project (35 km) Design & Engg. for Construction of 132kV Overhead Transmission Line from proposed East Qurayyat S/S up to Qurayyat BSP S/S in Qurayyat area. (35 km) Responsibilities: • • • • • • • • • • • • • Preparation of Complete Construction Design for different renowned Contractors of KSA. Generation of Plan and Profile Drawings using latest PLS CADD software & Structure List Conductor Selection, Insulator and Hardware Design, Review of Tower Fabrication Drawings of Manufacturer Generation of Sag Tension Calculations & Stringing Charts of OHTL projects for construction Estimation of Complete Bill of Quantities (BOQ) of Transmission Line Components Route Map, Profiling, Cable sheath bonding scheme, metallic sheath grounding and link box details for Underground Cable Projects Load Flow, Short Circuit and Transient Stability studies for interconnectivity projects. Resolving Day-to-day construction problems at Site and provision of technical solutions and Compliance to Comments of Client (Saudi Electricity Co. / Royal Commission, ARAMCO) Prepare, maintain and update the Engineering deliverables Progress Reports (Weekly, Monthly, Quarterly and Yearly) Implement the Project Management Plan by EPPR (Engineering Progress Performance Report) and PEP (Projects Execution Plan). Preparation of Tender Documents, Tender Specifications and Working Documents for the Construction projects. Primavera P6 - Planning & Scheduling Modernization Program Activities, Project Reporting, Scheduling Construction Activities & Milestones, Planning sequence of Works, Resource and Material Loading, Critical Path Analysis & Man-hours Histograms. Support Tendering/ Contracts Department of the company in Preparation of Technical Proposals and Methodologies for Power Transmission bids. 3. From: July 2010 to April 2017 Designation: Senior Design Engineer / Electrical Engineer Employer: EnMasse Pvt. Ltd. Pakistan. Projects: Project: 220kV / 132kV Transmission Lines Design (TP-1000 Project) Year: 2017 Client: K-Electric, Karachi, Pakistan. Responsibilities: • • • Checking of basic design parameters like wind speed/ pressure and clearances, safety factors etc. required for the designing of sixteen (16) Nos. 132kV and 220kV Transmission Lines Towers /Poles for TP-1000 project Checking of Loading Calculations / Loading Trees of 132kV and 220kV Transmission Line Tension / Suspension Towers & Poles prepared by the Chinese Contractor (Shanghai Electric Company). Checking of detailed Design of Transmission Line Tower/ Poles submitted by the Contractors using PLS-POLE and PLSTOWER. Project: 500kV and 220kV Transmission Line Survey and Profiling Year: 2017 Client: National Transmission and Despatch Company (NTDC), Lahore, Pakistan. Responsibilities: Performed detailed Site Survey, identification of potential corridors, preparation of Route Plan wrt. to different ground features at site, detailed mapping and generation of Plan and Profile Drawings for 500kV HUBCO-Matiari Transmission Line (Lot-I) and 220kV DI Khan to Zhob Transmission Line project of National Transmission and Despatch Company, (NTDC), Pakistan. Project: 765kV (Ultra High Voltage) Dasu Transmission Lines Design Project Year: 2015-2017 Client: National Transmission and Despatch Company (NTDC), Lahore, Pakistan. Responsibilities: Designing of Pakistan's first Ultra High Voltage (UHV) i.e. 765kV Transmission Line from Dasu to Islamabad (250 kms) in association with KEPCO (Korea Electric Power Corporation); and performed following key activities: • • • • • Comprehensive Techno-Economic Analysis Report for assisting the client in the Selection of Voltage Level for power dispersal (i.e. 500kV or 765kV) Loading Zone Report & Design wind speed calculation as per IEC 60826 and ASCE 74. Generation of Plan and Profile Drawings using PLS-CADD based on the detailed survey data collected through GPS coordinates. Techno-economic Study for selection of most appropriate size/ type of ACSR vs ACSR/TW Conductors as per World Bank’s Consultants request which includes evaluation of differences between Electrical parameters like thermal ampacity, surface gradient, electromagnetic effects: Corona, Radio Interferences and TV interferences, and Mechanical strength. Techno-economic Study for selection of most appropriate size/ type of Insulators as per World Bank’s Consultants request. • • • • • • • • • Prepared basic Design Criteria for 765kV Dasu Transmission Line as per International Standard IEC-60826. A detailed Insulation Coordination Study for assessment of Switching Surge Over-voltage, Lightening Impulse withstand Voltage (Power Frequency, Short-front and Fast-front Voltages) for the calculation of minimum required clearances as per International Standards IEC 60071-1 and 60071-2. Prepared Detailed Design Report for 765kV Dasu Transmission Line Project covering detailed design of Conductor, Shield Wire, OPGW, Insulator and Hardware, Tender level Tower Design and Tower weights, Review of Clearances, and insulator string swings, Review of Tensions and Conductor Safe Design Calculations as per CIGRE guidelines, Tender level Foundation Design and calculations of moments. Loading Calculation of Towers and generation of Loading Trees with respect to the initial tower skeleton drawing and wind speed as per International Standard ASCE Manual 74. In this project, a comparison was also made between three concepts of Loadings i.e. older version and latest version of ASCE Manual 74 and IEC 60826 for better understanding of Loads on 765kV Double Circuit Lattice Steel Towers. Calculation of Estimated Tower weights of all types of towers using Moment Formula based on the final Loadings of the towers. Prepared Bidding Document for hiring of Contractor for Construction of 765kV Double Circuit Transmission Line from Mansehra to Islamabad - Volume I (Turnkey Project) as per World Bank Format. Prepared Technical Tender Specification for Bidding Document - Volume II (Turnkey Project) as per World Bank Format, calculation of Bill of Quantities (BOQ) based on the Design Report. Technical Tender Specification includes manufacturing guidelines for all components of the line including raw material detail and testing protocols. Project: 220kV & 132kV S/S & T/Lines Projects) Year: 2011-2015 Client: NTDC / Distribution Companies of Pakistan Projects: o o o o Design and Construction Supervision of Transmission Lines for 220 kV AIS Okara Grid Station, 220kV GIS Bandala Grid Station & 220kV AIS Toba Tek Singh Grid Station under EHV, NTDC, Pakistan. 132kV WAPDA Town, Lar & Qasim Bagh Grid Stations (Multan) along with their allied Transmission Lines (New) under MEPCO, Pakistan. 132kV Kamir & Miran Pur Grid Stations along with their allied Transmission Lines (New) under MEPCO, Pakistan. 132kV Ali Pur, Fateh Pur & Noor Sar Grid Stations along with their allied Transmission Lines (Conversion) under MEPCO, Pakistan. Responsibilities: • • • • • • • • • To prepare and verify basic design parameters for detailed designing of 132kV and 220kV Transmission Lines and generation of Outline skeleton drawing as per the calculated clearances. Preparation of Loading Calculations and Loading Trees of 132kV and 220kV Transmission Line Tower / Poles. Carried out Conductor selection, Insulator and Hardware Design To review the Drawings and detailed Design of Transmission Line Tower/ Poles submitted by the Contractors using PLS POLE and TOWERS. Checking Plan and Profile drawings of 132kV and 220kV Transmission Lines traversing through Hilly, semi-hilly, flat, rural and urban areas of Pakistan. Reviewing and monitoring Contractor’s Progress of Works. To review Electrical Drawings of 132kV Grid Stations. Preparation of Construction Schedules using Primavera. Inspection/ Testing and Commissioning of a number of Conductors, Towers, poles and other allied hardware of Transmission Line and Substations including Power Transformer (20/26MVA), CB, CT, PT, Steel Structures, Power Cables, Control Cables, Gantries, SPA/SPD/SPG Poles and Control/ Relay Panels, Insulators, Conductors Earth Wire etc. Project: System Study Projects Project Year: 2014 Client: AJK Hydro Electric Board Projects: o o o o o Grid Interconnection Study of 132/11kV 3.2MW Kathai Hydropower Plant by using ETAP Grid Interconnection Study of 132/11kV 3.2MW Sharian Hydropower Plant by using ETAP Grid Interconnection Study of 132/11kV 3.2MW Rehra Hydropower Plant by using ETAP Grid Interconnection Study of 132/11kV 3.0MW Qadirabad Hydropower Plant Grid Interconnection Study of 132/11kV 4.0MW Bagasse Plant by using ETAP Responsibilities: Load Flow Analysis, Short Circuit Analysis and Voltage Drop Calculations by using ETAP Software. Project: 11kV Distribution Project Year: 2010-2011 Client: National Power Distribution Companies Responsibilities: • • • Computation of losses/ Preparation of Maps/ Technical Designs, Analysis Reports, Survey reports of H.T & L.T(11kv/ 0.4kV), stacking sheets of the Feeders for ‘Replacement of bare overhead Conductor with Aerial Bundled Cables (ABC) and Old Energy Meters with New Static Energy Meters’ in various Distribution Companies of Sindh, Pakistan. Prepared Single Line Diagram (SLDs) as well as complete study (Analysis) which including Load Flow Study (Line Losses, Transformation Losses, Voltage Drop, etc.), Optimal Capacitor Placement of 11 kV feeders and also Performed Load Flow Analysis, voltage drop calculation on ETAP 11.0 Prepared Map of 11 kV feeder in GIS (Geographical Information System) using Coordinates of Accessories (Poles, Transformer etc.) through GPS Device (Garmin). Environmental Impact Assessment (EIA/ SIA) Studies of Transmission Lines: • • • Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) Studies for 220kV Uch-Sibbi Transmission Line Project, Baluchistan, Pakistan. Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) Studies for 220/132 kV Dera Murad Jamali Substation, Baluchistan, Pakistan. Environmental Reports for 500kV Shikarpur Substation Tendering/ Contract Experience: • • • Prepared Bidding Documents, Technical & Financial Proposals for International tendering, prepared Engineers Estimates and Contract Agreements for Power Project. Prepared Expression of Interest (EOI), Technical Proposals for Design & Construction of Civil/ Elect. Works, Erection of Equipment, Testing and Commissioning of Transmission Line & Grid Station Projects (220kV and 132kV) of Pakistan. Prepared several Bid Evaluation Reports on behalf of Client for National / International Projects for the procurement of Goods and Works related to Transmission Line Projects funded by different donor agencies, ADB, World Bank, JICA, Chinese investment etc.