Uploaded by ahsan06

DETAILED CV AHSAN 2022

advertisement
AHSAN MAHMOOD
DESIGN ENGINEER POWER TRANSMISSION
Mobile No.: +44-7496-694866
Email: AHSAN06@YMAIL .COM
Glasgow, Scotland, United Kingdom
PROFESSIONAL PROFILE:
A professional electrical engineer having around 13 years of diversified global experience in the field of power transmission and
distribution. Enriched experience in successfully handling several feasibility studies, base & detailed execution design, electrical
studies for several Overhead Lines upto 765kV UHVAC and ±500kV HVDC high value mega projects at design consultancy and
EPC stages using advanced engineering tools and softwares like PLS-CADD, TOWER, SAG-10, ETAP, PSS/E, CDEGS.
Hands on experience in Overhead Line Design, Substation Primary Design, Underground Cable Network Design, Power System
Studies/ Grid Interconnection (load flow, short circuit and transient stability), Insulation Coordination Studies (temporary overvoltages, slow front transients for switching & faults, fast front transient over voltages for lightning), OHL Material Design, Line
modeling, Tower design, Induced Voltage Studies, Theoretical Line parameter Studies, Grounding Studies, Earthing/ Lightning,
Shielding studies, Arc-flash assessment, numerous FATs and Material Inspections in different regions of United Kingdom, Middle
East, South East Asia and Africa. Well versed with requirements of monetary/ sponsoring agencies WB, ADB, JICA and worked
on Standards of several electric utilities like SSE/ NG UK, Saudi Electricity-SEC, Dubai Electricity-DEWA, South Korean
Electricity KEPCO, NTDC-Pakistan and NAWEC-Africa.
QUALIFICATION:
Electrical Engineering
Passing
Year
2010
University of Central Punjab, Pakistan
MBA for Professionals
2014
Lahore School of Economics, Pakistan
Advanced Power Transmission Engineering
2015
KEPCO Academy, Seoul, South Korea
Description
Institute
PROFESSIONAL EXPERINCE:
From
To
Last Position
Employer
2022
date
Overhead Line Project Engineer
Scottish and Southern Electricity Networks –
Transmission (SSEN-Transmission)
2017
2022
Lead Design Engineer
Transmission Line
Dar Engineering (Alfanar Construction)
Saudi Arabia
2010
2017
Senior Design Engineer
EnMasse Pvt. Ltd.
Pakistan
COMPUTER SKILLS:
PLS-CADD, TOWER, ETAP, PSS/E, ASPEN, CDEGS, OPTIONEER, PRIMAVERA
TRAININGS DELIVERED:
Sr.
Topic
Trainees
Organization
1.
Design of Overhead Transmission Lines
using PLS-CADD
Analysis and Design of Overhead
Transmission Lines (PLS-CADD)
High Voltage Power Transmission Line
Design Optimization
24
Saudi Electricity
Company (SEC)
Power Grid Company
of Bangladesh (PGCB)
Private Consultants
2.
3.
10
10
Year
2020
2018
2017
Venue
SEC Head Quarter, Riyadh,
Saudi Arabia
Asian Institute of
Technology, Thailand
Softnitro Training Institute,
Pakistan
SUMMARY OF PROJECTS HANDLED (2010 - 2022)
*Key projects highlighted in Red
Year
Voltage
Category
2022ongoing
400kV
OHL
400kV
Length
Activities
Beauly-Blackhillock-Peterhead (New
Build)
200 km
OHL
Beauly-Loch Buidhe-Spittal (New Build)
200 km
275kV
OHL
109 km
275kV
OHL
Beauly-Blackhillock (HTLS
Reconductoring)
Beauly-Dounrey (Increase Opt. Temp.)
Corridor and Route
Selection Report.
Conductor selection and
Tower selection Reports.
Defining scope of work for
Contractors
Conductor selection Report,
Clearance check report
Clearance check report
132kV
OHL
0.5 km
132kV
OHL
Kintradwell Wind Farm Connection (Tapoff)
Loch Buidhe-Spittal (Reconductoring)
± 500kV
HVDC
OHL
Saudi-Egypt Interconnection
1000 km
380kV
OHTL
Wadi-Dawasir SS to Layla SS
293 km
33kV
OHL/ UG
Rehabilitation of Power Transmission
Network of Gambia
380kV
230kV
115kV
OHTL
Raising of Existing Overhead Transmission
Line over proposed Highway in Jubail City
20km
OHL
3 km
UGC
10
locations
20202021
380kV
OHTL
Khafji SS to Nariyah SS
113 km
2020
132kV
OHTL
Power evacuation of Dumat Al-Jandal
Wind farms.
13 km
20192020
110kV
OHTL
16 km
230kV
UG
2019
115kV
OHTL/
UG
20182019
380kV
OHTL
20172018
69kV
OHL/ UG
Overhead Transmission Line for
110/13.8kV National Guard Compound
Substation TAIF
Underground Cable connections between
GIS SS-701 to MS1 (8 Ckts),
GIS SS-701 to MS2 (8 Ckts), GIS SS-701
to MS3 (10 Ckts), New Marjan GIS to
Tanajib Gas Plant(701SS) (3Ckts), Zuluf
Gantry to Tanajib Gas Plant (3 Ckts)
Overhead Transmission Line and
Underground cable connection from RIC
S/S #2 to Maritime Yard S/S
WASIT - RIC#3 & RIC#2 - RIC#3 and
One (1) D/C 380kV OHTL between RIC#1
- RIC#3
Shifting of six 69kV feeders from Old
Dhahran to New Dhahran Substation
2017
115kV
OHTL/
Overhead Transmission line and System
study for SPARK (King Salman Energy
Park) Project
6 km
20212022
System
Study
20172018
115kV
OHTL/
UG
115kV
UG
Project Description
Overhead Transmission Line for Safaniyah
NGL SFNY TL-14 STP-21 and Onshore
Cable for Electrical Distribution Platform
(EDP)
Power supply to Dhahran Residential
Development 115/13.8kv Substation U/G
Cable Project
100 km
91 km
12 km
total
10 km
8 km
50 km
30 km
6 km
OHL
0.8 km
UGC
16 km
Route sketch, electrical
clearance checks
Conductor selection Report,
Clearance check report
Review of Design /
Drawings, Plan and Profile.
Approval of Material design
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Feasibility, Route Selection,
Material Design, bidding
specification
Profiling, BOQ, technical
specification, bidding
document
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Route Map, Profiling, Cable
sheath bonding scheme,
metallic sheath grounding
and link box details
Owner/
Client
Scottish and
Southern
Electricity
Networks
(SSEN), UK
Saudi
Electricity Co.
(SEC),
Saudi Arabia
SEC,
Saudi Arabia
NAWEC,
Gambia
Royal
Commission,
(RC)
Saudi Arabia
SEC,
Saudi Arabia
TSK, Spain/
SEC,
Saudi Arabia
SEC,
Saudi Arabia
Hyundai/
ARAMCO
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Survey, Profiling, BOQ,
Construction Drawings/
Charts.
Load flow and Short circuit
study using ETAP Software
Survey, Profiling, BOQ,
Construction Drawings/
Charts
SEC,
Saudi Arabia
Route Map, Profiling, Cable
sheath bonding scheme,
metallic sheath grounding
and link box details
SEC,
Saudi Arabia
SEC and RC,
Saudi Arabia
SEC,
Saudi Arabia
SEC,
Saudi Arabia
ARAMCO,
Saudi Arabia
2017
115kV
UG
Power supply to Dhahran Home Ownership
115/13.8kV Substation #1A, 1B & 2 U/G
Cable Project
35 km
132kV
OHTL
East Qurayyat S/S up to Qurayyat BSP S/S
in Qurayyat area
35 km
500kV
OHTL
Transmission Line from HUBCO Plant to
Matiari Grid Station, Pakistan
200 km
220kV
OHTL
DI Khan to Zhob, Pakistan
220 km
Survey, Route Selection,
Profiling, BOQ
20152017
765kV
OHTL
Evacuation of 6000MW power from Dasu
Hydropower Plant, Pakistan
250 km
20152016
220kV
132kV
OHTL
-
2014
132kV
System
Study
132kV
System
Study
Designing of sixteen (16) Nos. 132kV and
220kV Transmission Lines Towers /Poles
for TP-1000 project, Pakistan
Grid Interconnection Study of 132/11kV
3.2MW Kathai HPP, 3.2MW Sharian HPP,
3.2MW Rehra HPP, 3.0MW Qadirabad
HPP
Grid Interconnection Study of 132/11kV
4.0MW Bagasse Plant, Pakistan
11kV
OHL
Rehabilitation of power distribution
network of Lahore Old City (Walled City)
300 Job
orders
Feasibility, Route Survey,
Voltage Selection, Material
Design, Tower modeling,
Conductor/ insulator
optimization, bidding specs.
Loading Trees, Modeling of
Towers/ Poles using
Powerline Software.
Load Flow Analysis, Short
Circuit Analysis and
Voltage Drop Calculations
by using ETAP Software
Load Flow Analysis, Short
Circuit Analysis and
Voltage Drop Calculations
by using ETAP Software
Augmentation/ replacement
of T/F and Cables, Bid
Documents
220kV
OHTL
3 km
20142015
132kV
SS /
OHTL
Overhead Transmission Line for tap-off
connection to 220 kV Okara, Bandala and
TT Singh Grid Station, Pakistan
Substation and allied Transmission Line for
Kamir & Miran Pur Grid Stations, Pakistan
20122014
132kV
SS /
OHTL
Substation and allied Transmission Line for
Ali Pur, Fateh Pur & Noor Sar Grid
Stations, Pakistan
-
2013/
2014
220kV
E & SIA
-
20122013
132kV
SS /
OHTL
Environmental and Social Impact
Assessment (E/SIA) Studies for 220kV
Uch-Sibbi Transmission Line Project,
Pakistan
220kV Dera Murad Jamali Substation, and
500kV Shikarpur Substation, Pakistan
Substation and allied Transmission Line for
WAPDA Town, Lar & Qasim Bagh Grid
Stations, Pakistan
20102012
11kV
OHL
Replacement of existing bare conductors at
2500+ 11/0.4kV job orders (HT/ LT
connections) with Aerial Bundled cables
and allied accessories, Pakistan
2500 Job
Orders
20162017
20132015
-
-
-
-
Route Map, Profiling, Cable
sheath bonding scheme,
metallic sheath grounding
and link box details
Survey, Profiling, BOQ,
Construction Drawings/
Charts
Survey, Route Selection,
Profiling, BOQ
Survey, Route Selection,
Profiling, BOQ
SLD for SS, material
drawings review, line
Profiling, BOQ
SLD for SS, material
drawings review for SS and
TL, line Profiling, BOQ
calculation
Carried out Environmental
Impact Assessment (EIA)
and Social Impact
Assessment (SIA) Studies
for the Lines and
Substation.
SLD for SS, material
drawings review for SS and
TL, line Profiling, BOQ
calculation
Computation of losses/
Preparation of Maps/
Technical Designs,
Analysis Reports, Survey
reports of H.T & L.T(11/
0.4kV), stacking sheets
SEC,
Saudi Arabia
SEC,
Saudi Arabia
National
Transmission
and Despatch
Company
(NTDC)
Pakistan
NTDC
K-Electric,
Pakistan.
AJK Hydro
Electric Board
KPK Energy
Board,
Pakistan
Distribution
Company
(LESCO),
Pakistan
NTDC,
Pakistan
Distribution
Company
(MEPCO),
Pakistan
NTDC,
Pakistan
MEPCO,
Pakistan
Distribution
Company
(HESCO/
SEPCO)
Pakistan
DETAILED DESCRIPTION OF PROJECTS AND RESPONSIBILITIES
1. From: February 2022 to date
Designation: Overhead Line Project Engineer
Employer: Scottish and Southern Electricity Networks (SSEN), Scotland, UK.
Projects:
Working as Lead Engineer / OHL Engineer on following large scale NOA Overhead Line projects:
• 400kV New Build OHL Beauly- Blackhillock (120 km)
• 400kV New Build OHL Blackhillock-Peterhead (80 km)
• 400kV New Build OHL Beauly-Loch Buidhe (110 km)
• 400kV New Build OHL Loch Buidhe-Spittal (90 km)
•
•
•
•
275kV HTLS Reconductoring Beauly-Blackhillock (120 km)
275kV (Increase in Opterating Temperature Beauly-Dounrey (100 km)
132kV Connection to Kintradwell Wind Farm Substation
132kV Reconductoring Loch Buidhe-Spittal (91 km)
Responsibilities:
• Selection of Corridor/ Route/ Alignment for Overhead Lines. Site selection for new Substations.
• Preparation of Conductor Selection / Tower Selection Reports
• PLSCADD modeling of Reconductoring lines to check clearance infringements and propose suitable
mitigations.
• Preparation of Scope of work for hiring of consultants for Tower modeling, LIDAR, Early Contractor
Engagement (ECE)
• Implementation of CDM regulations (maintaining Design Risk Register DRMI, Designers/ PD / Clients
duties checklists).
• Coordinate with all disciplines to meet gate requirements and achieve Programme timelines.
2. From: May 2017 to February 2022
Designation: Lead Design Engineer, Transmission Lines
Employer: Alfanar Co. (Dar Engineering), Saudi Arabia.
Projects:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Design & Engg. for Construction of 380kV Overhead Transmission Line from Wadi-Dawasir BSP to Layla BSP (293 km)
Rehabilitation of 33kV / 11kV Power Transmission Network of Gambia (20km OHL 3 km UGC)
Design & Engg. for Raising of Existing Overhead Transmission Line (380kV 230kV and 115kV) at 10 different locations over
proposed Highway in Jubail City.
Design & Engg. for Construction of 380kV Overhead Transmission Line from Khafji BSP to Nariyah BSP (113 km)
Design & Engg. for Construction of 132kV Overhead Transmission Line for power evacuation of Dumat Al-Jandal Wind
farms (13 km)
Design & Engg. for Construction of 110kV Overhead Transmission Line for 110/13.8kV National Guard Compound
Substation TAIF (16 km)
Design & Engg. for Construction of 230kV Underground Cable connections between GIS SS-701 TO MS-1 (8 Ckts), GIS SS701 to MS2 (8 Ckts), GIS SS-701 to MS3 (10 Ckts), New Marjan GIS to Tanajib Gas Plant(701SS) (3Ckts), Zuluf Gantry
Tower to Tanajib Gas Plant (3 Ckts) total route length of 12kms.
Design & Engg. for Construction of 115kV Overhead Transmission Line and Underground cable connection from RIC S/S #2
to MARITIME YARD S/S (10 km OHTL and 8 km UG)
Design & Engg. for Construction of 380kV Overhead Transmission Line between WASIT - RIC#3 & RIC#2 - RIC#3 and One
(1) D/C 380kV OHTL between RIC#1 - RIC#3 (50 km)
Design & Engg. for Shifting of six 69kV feeders from Old Dhahran to New Dhahran Substation (30 km)
Design & Engg. for Construction of 115KV Overhead Transmission line and Power System study for SPARK (King Salman
Energy Park) Project (6 kms)
Design & Engg. for Construction of 115kV Overhead Transmission Line for Safaniyah NGL SFNY TL-14 STP-21 and
Onshore Cable for Electrical Distribution Platform (EDP) (6 km OHL & 0.8 km UGC)
Design & Engg. for Construction of Power supply to Dhahran Residential Development 115/13.8kv Substation U/G Cable
Project (16 km)
Design & Engg. for Construction of Power supply to Dhahran Home Ownership 115/13.8kV Substation #1A, 1B & 2 U/G
Cable Project (35 km)
Design & Engg. for Construction of 132kV Overhead Transmission Line from proposed East Qurayyat S/S up to Qurayyat
BSP S/S in Qurayyat area. (35 km)
Responsibilities:
•
•
•
•
•
•
•
•
•
•
•
•
•
Preparation of Complete Construction Design for different renowned Contractors of KSA.
Generation of Plan and Profile Drawings using latest PLS CADD software & Structure List
Conductor Selection, Insulator and Hardware Design, Review of Tower Fabrication Drawings of Manufacturer
Generation of Sag Tension Calculations & Stringing Charts of OHTL projects for construction
Estimation of Complete Bill of Quantities (BOQ) of Transmission Line Components
Route Map, Profiling, Cable sheath bonding scheme, metallic sheath grounding and link box details for Underground Cable
Projects
Load Flow, Short Circuit and Transient Stability studies for interconnectivity projects.
Resolving Day-to-day construction problems at Site and provision of technical solutions and Compliance to Comments of
Client (Saudi Electricity Co. / Royal Commission, ARAMCO)
Prepare, maintain and update the Engineering deliverables Progress Reports (Weekly, Monthly, Quarterly and Yearly)
Implement the Project Management Plan by EPPR (Engineering Progress Performance Report) and PEP (Projects Execution
Plan).
Preparation of Tender Documents, Tender Specifications and Working Documents for the Construction projects.
Primavera P6 - Planning & Scheduling Modernization Program Activities, Project Reporting, Scheduling Construction
Activities & Milestones, Planning sequence of Works, Resource and Material Loading, Critical Path Analysis & Man-hours
Histograms.
Support Tendering/ Contracts Department of the company in Preparation of Technical Proposals and Methodologies for Power
Transmission bids.
3. From: July 2010 to April 2017
Designation: Senior Design Engineer / Electrical Engineer
Employer: EnMasse Pvt. Ltd. Pakistan.
Projects:
Project: 220kV / 132kV Transmission Lines Design (TP-1000 Project)
Year: 2017
Client: K-Electric, Karachi, Pakistan.
Responsibilities:
•
•
•
Checking of basic design parameters like wind speed/ pressure and clearances, safety factors etc. required for the designing of
sixteen (16) Nos. 132kV and 220kV Transmission Lines Towers /Poles for TP-1000 project
Checking of Loading Calculations / Loading Trees of 132kV and 220kV Transmission Line Tension / Suspension Towers &
Poles prepared by the Chinese Contractor (Shanghai Electric Company).
Checking of detailed Design of Transmission Line Tower/ Poles submitted by the Contractors using PLS-POLE and PLSTOWER.
Project: 500kV and 220kV Transmission Line Survey and Profiling
Year: 2017
Client: National Transmission and Despatch Company
(NTDC), Lahore, Pakistan.
Responsibilities:
Performed detailed Site Survey, identification of potential corridors, preparation of Route Plan wrt. to different ground features at
site, detailed mapping and generation of Plan and Profile Drawings for 500kV HUBCO-Matiari Transmission Line (Lot-I) and
220kV DI Khan to Zhob Transmission Line project of National Transmission and Despatch Company, (NTDC), Pakistan.
Project: 765kV (Ultra High Voltage) Dasu Transmission Lines Design Project
Year: 2015-2017
Client: National Transmission and Despatch Company
(NTDC), Lahore, Pakistan.
Responsibilities:
Designing of Pakistan's first Ultra High Voltage (UHV) i.e. 765kV Transmission Line from Dasu to Islamabad (250
kms) in association with KEPCO (Korea Electric Power Corporation); and performed following key activities:
•
•
•
•
•
Comprehensive Techno-Economic Analysis Report for assisting the client in the Selection of Voltage Level for power
dispersal (i.e. 500kV or 765kV)
Loading Zone Report & Design wind speed calculation as per IEC 60826 and ASCE 74.
Generation of Plan and Profile Drawings using PLS-CADD based on the detailed survey data collected through GPS
coordinates.
Techno-economic Study for selection of most appropriate size/ type of ACSR vs ACSR/TW Conductors as per World Bank’s
Consultants request which includes evaluation of differences between Electrical parameters like thermal ampacity, surface
gradient, electromagnetic effects: Corona, Radio Interferences and TV interferences, and Mechanical strength.
Techno-economic Study for selection of most appropriate size/ type of Insulators as per World Bank’s Consultants request.
•
•
•
•
•
•
•
•
•
Prepared basic Design Criteria for 765kV Dasu Transmission Line as per International Standard IEC-60826.
A detailed Insulation Coordination Study for assessment of Switching Surge Over-voltage, Lightening Impulse withstand
Voltage (Power Frequency, Short-front and Fast-front Voltages) for the calculation of minimum required clearances as per
International Standards IEC 60071-1 and 60071-2.
Prepared Detailed Design Report for 765kV Dasu Transmission Line Project covering detailed design of Conductor, Shield
Wire, OPGW, Insulator and Hardware, Tender level Tower Design and Tower weights, Review of Clearances, and insulator
string swings, Review of Tensions and Conductor Safe Design Calculations as per CIGRE guidelines, Tender level Foundation
Design and calculations of moments.
Loading Calculation of Towers and generation of Loading Trees with respect to the initial tower skeleton drawing and wind
speed as per International Standard ASCE Manual 74. In this project, a comparison was also made between three concepts of
Loadings i.e. older version and latest version of ASCE Manual 74 and IEC 60826 for better understanding of Loads on 765kV
Double Circuit Lattice Steel Towers.
Calculation of Estimated Tower weights of all types of towers using Moment Formula based on the final Loadings of the
towers.
Prepared Bidding Document for hiring of Contractor for Construction of 765kV Double Circuit Transmission Line from
Mansehra to Islamabad - Volume I (Turnkey Project) as per World Bank Format.
Prepared Technical Tender Specification for Bidding Document - Volume II (Turnkey Project) as per World Bank Format,
calculation of Bill of Quantities (BOQ) based on the Design Report.
Technical Tender Specification includes manufacturing guidelines for all components of the line including raw material detail
and testing protocols.
Project: 220kV & 132kV S/S & T/Lines Projects)
Year: 2011-2015
Client: NTDC / Distribution Companies of Pakistan
Projects:
o
o
o
o
Design and Construction Supervision of Transmission Lines for 220 kV AIS Okara Grid Station, 220kV GIS Bandala
Grid Station & 220kV AIS Toba Tek Singh Grid Station under EHV, NTDC, Pakistan.
132kV WAPDA Town, Lar & Qasim Bagh Grid Stations (Multan) along with their allied Transmission Lines (New)
under MEPCO, Pakistan.
132kV Kamir & Miran Pur Grid Stations along with their allied Transmission Lines (New) under MEPCO, Pakistan.
132kV Ali Pur, Fateh Pur & Noor Sar Grid Stations along with their allied Transmission Lines (Conversion) under
MEPCO, Pakistan.
Responsibilities:
•
•
•
•
•
•
•
•
•
To prepare and verify basic design parameters for detailed designing of 132kV and 220kV Transmission Lines and generation
of Outline skeleton drawing as per the calculated clearances.
Preparation of Loading Calculations and Loading Trees of 132kV and 220kV Transmission Line Tower / Poles.
Carried out Conductor selection, Insulator and Hardware Design
To review the Drawings and detailed Design of Transmission Line Tower/ Poles submitted by the Contractors using PLS
POLE and TOWERS.
Checking Plan and Profile drawings of 132kV and 220kV Transmission Lines traversing through Hilly, semi-hilly, flat, rural
and urban areas of Pakistan.
Reviewing and monitoring Contractor’s Progress of Works.
To review Electrical Drawings of 132kV Grid Stations.
Preparation of Construction Schedules using Primavera.
Inspection/ Testing and Commissioning of a number of Conductors, Towers, poles and other allied hardware of Transmission
Line and Substations including Power Transformer (20/26MVA), CB, CT, PT, Steel Structures, Power Cables, Control Cables,
Gantries, SPA/SPD/SPG Poles and Control/ Relay Panels, Insulators, Conductors Earth Wire etc.
Project: System Study Projects Project
Year: 2014
Client: AJK Hydro Electric Board
Projects:
o
o
o
o
o


Grid Interconnection Study of 132/11kV 3.2MW Kathai Hydropower Plant by using ETAP
Grid Interconnection Study of 132/11kV 3.2MW Sharian Hydropower Plant by using ETAP
Grid Interconnection Study of 132/11kV 3.2MW Rehra Hydropower Plant by using ETAP
Grid Interconnection Study of 132/11kV 3.0MW Qadirabad Hydropower Plant
Grid Interconnection Study of 132/11kV 4.0MW Bagasse Plant by using ETAP
Responsibilities:
Load Flow Analysis, Short Circuit Analysis and Voltage Drop Calculations by using ETAP Software.
Project: 11kV Distribution Project
Year: 2010-2011
Client: National Power Distribution Companies
Responsibilities:
•
•
•
Computation of losses/ Preparation of Maps/ Technical Designs, Analysis Reports, Survey reports of H.T & L.T(11kv/ 0.4kV),
stacking sheets of the Feeders for ‘Replacement of bare overhead Conductor with Aerial Bundled Cables (ABC) and Old
Energy Meters with New Static Energy Meters’ in various Distribution Companies of Sindh, Pakistan.
Prepared Single Line Diagram (SLDs) as well as complete study (Analysis) which including Load Flow Study (Line Losses,
Transformation Losses, Voltage Drop, etc.), Optimal Capacitor Placement of 11 kV feeders and also Performed Load Flow
Analysis, voltage drop calculation on ETAP 11.0
Prepared Map of 11 kV feeder in GIS (Geographical Information System) using Coordinates of Accessories (Poles,
Transformer etc.) through GPS Device (Garmin).
Environmental Impact Assessment (EIA/ SIA) Studies of Transmission Lines:
•
•
•
Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) Studies for 220kV Uch-Sibbi Transmission
Line Project, Baluchistan, Pakistan.
Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) Studies for 220/132 kV Dera Murad Jamali
Substation, Baluchistan, Pakistan.
Environmental Reports for 500kV Shikarpur Substation
Tendering/ Contract Experience:
•
•
•
Prepared Bidding Documents, Technical & Financial Proposals for International tendering, prepared Engineers Estimates and
Contract Agreements for Power Project.
Prepared Expression of Interest (EOI), Technical Proposals for Design & Construction of Civil/ Elect. Works, Erection of
Equipment, Testing and Commissioning of Transmission Line & Grid Station Projects (220kV and 132kV) of Pakistan.
Prepared several Bid Evaluation Reports on behalf of Client for National / International Projects for the procurement of Goods
and Works related to Transmission Line Projects funded by different donor agencies, ADB, World Bank, JICA, Chinese
investment etc.
Download