Project Title: Package # 9: Rehabilitation of canal irrigation systems and River
bank protection schemes in Aybak District of Samangan province of Mazar
regional office of Afghanistan
Activity ID
Original Start
Duration
Activity Name
Finish
2022
Nov
2023
Mar
Feb
Jan
Dec
Apr
Jun
May
31-May-23, Project: OS
31-May-23Samangan
12-Nov-22in Aybak,
Project: OSRO/AFG/213/WBKEFSP Rehabilitation of canal irrigation systems and River bank protection201
schemes
17 12-Nov-22
28-Nov-22
1.2
Equipment, Team Mobilization and Site comp establishment
7 12-Nov-22
18-Nov-22
1.3
Prapartion of materials submittal plan
2 19-Nov-22
20-Nov-22
1.4
Revise actual Work Plan, mix design of concrete work with lab tests
8 21-Nov-22
28-Nov-22
WBS: OSRO/AFG/213/WBKEFSP.1 Project Primary Phase
28-Nov-22, WBS: OSRO/AFG/213/WBKEFSP.1 Project Primary Phase
Equipment, Team Mobilization and Site comp establishment
Prapartion of materials submittal plan
Revise actual Work Plan, mix design of concrete work with lab tests
27-May-23, WBS: OSRO/A
191 18-Nov-22
27-May-23
2.1
Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed
etc.
20 18-Nov-22
07-Dec-22
2.2
Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed etc
25 18-Nov-22
12-Dec-22
Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed etc
2.3
Supplying, placing, compacting and curing of PCC Class M15, including formworks all as per drawing and specfication
13 01-Dec-22
13-Dec-22
Supplying, placing, compacting and curing of PCC Class M15, including formworks all as per drawing and specfication
2.4
Stone Masonry Type B (1:4) with 40 % Mortar Content: Providing and laying random rubble stone masonry as per
drawing
75 05-Dec-22
17-Feb-23
2.5
Compaction & backfilling work as per drawing and specfication with all requirment
8 12-Feb-23
19-Feb-23
WBS: OSRO/AFG/213/WBKEFSP.2 Project Construction of Civil Works
Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed etc.
Stone Masonry Type B (1:4) with 40 % Mortar Content: Providing and laying random rubble stone ma
Compaction & backfilling work as per drawing and specfication with all requirment
Plain Cement Concrete (PCC-M20 including formworks all as per relevant drawings, specification
2.6
Plain Cement Concrete (PCC-M20 including formworks all as per relevant drawings, specification
75 05-Dec-22
17-Feb-23
2.7
Reinforced Cement Concrete (RCC-M20) including formworks all as per relevant drawings, specification
20 20-Nov-22
09-Dec-22
Reinforced Cement Concrete (RCC-M20) including formworks all as per relevant drawings, specification
Reinforced Cement Concrete (RCC-M25) including formworks all as per relevant drawings, specification
2.8
Reinforced Cement Concrete (RCC-M25) including formworks all as per relevant drawings, specification
20 20-Nov-22
09-Dec-22
2.9
Supply and fixing in position of Hand rails with 2 inch diameter galvanized iron pipe as per relevant drawings and spec
12 10-Dec-22
21-Dec-22
2.10
Joint preparation at each 15 to 20 m: Construction of expansion joint with PVC water stopper as per drawing and Specf
75 05-Dec-22
17-Feb-23
Joint preparation at each 15 to 20 m: Construction of expansion joint with PVC water stopper as per
2.11
Supplying, placing and compacting approved granular filter material under gabion basket or stone pitching
75 05-Dec-22
17-Feb-23
Supplying, placing and compacting approved granular filter material under gabion basket or stone pit
2.12
Supply and fixing in place 10 cm diameter PVC pipe weep holes of approved quality as per relevant
drawing/specification
75 05-Dec-22
17-Feb-23
Supply and fixing in place 10 cm diameter PVC pipe weep holes of approved quality as per relevant
2.13
Pointing (1:3): Surfacing and Pointing of Stone Masonry with 1: 3 Cement Sand Mortar as per specfication
70 10-Dec-22
17-Feb-23
Pointing (1:3): Surfacing and Pointing of Stone Masonry with 1: 3 Cement Sand Mortar as per specf
2.14
Provide, install and fill the gabion basket (2x1x0.5) m with stone in place as drawing/specification
84 25-Feb-23
19-May-23
Provide, install and fill the gabion
2.15
provide, install and fill the gabion basket (1x1x1) m with stone in place, having mesh size (80x100)mm as per drawing
84 25-Feb-23
19-May-23
provide, install and fill the gabion
2.16
Provide, install and fill the gabion basket (1x1x0.5) m with stone in place, having mesh size (80x100)mm as per drawing
10 05-Jan-23
14-Jan-23
Supply and fixing in position of Hand rails with 2 inch diameter galvanized iron pipe as per relevant drawings and spec
Provide, install and fill the gabion basket (1x1x0.5) m with stone in place, having mesh size (80x100)mm as per drawing
2.17
Provide, install and fill the gabion basket (1x1x2) m with stone in place, having mesh size (80x100)mm as per drawing
84 25-Feb-23
19-May-23
Provide, install and fill the gabion
2.18
Supply and installation of sign board as per standard drawing
5 15-May-23
19-May-23
Supply and installation of sign bo
2.19
Cleaning of Site after completion of all works in all respect including the dismantling of temporary structures
8 20-May-23
27-May-23
Cleaning of Site after comp
4 28-May-23
31-May-23
31-May-23, WBS: OSR
3.1
Project final Inspection and deficiencies correction
2 28-May-23
29-May-23
Project final Inspection a
3.2
Project hand over to cleint
1 30-May-23
30-May-23
Project hand over to clei
3.3
De-mobilization
1 31-May-23
31-May-23
WBS: OSRO/AFG/213/WBKEFSP.3 Project Closeout
Actual Work
Milestone
Remaining Work
Summary
Critical Remaining Work
Date
Revision
06-Nov-22 Parpered by: Eng. Wahidullah
De-mobilization
Checked Approved
Contractor: Idress Obaid Construction and Engineering
Group