Project Title: Package # 9: Rehabilitation of canal irrigation systems and River bank protection schemes in Aybak District of Samangan province of Mazar regional office of Afghanistan Activity ID Original Start Duration Activity Name Finish 2022 Nov 2023 Mar Feb Jan Dec Apr Jun May 31-May-23, Project: OS 31-May-23Samangan 12-Nov-22in Aybak, Project: OSRO/AFG/213/WBKEFSP Rehabilitation of canal irrigation systems and River bank protection201 schemes 17 12-Nov-22 28-Nov-22 1.2 Equipment, Team Mobilization and Site comp establishment 7 12-Nov-22 18-Nov-22 1.3 Prapartion of materials submittal plan 2 19-Nov-22 20-Nov-22 1.4 Revise actual Work Plan, mix design of concrete work with lab tests 8 21-Nov-22 28-Nov-22 WBS: OSRO/AFG/213/WBKEFSP.1 Project Primary Phase 28-Nov-22, WBS: OSRO/AFG/213/WBKEFSP.1 Project Primary Phase Equipment, Team Mobilization and Site comp establishment Prapartion of materials submittal plan Revise actual Work Plan, mix design of concrete work with lab tests 27-May-23, WBS: OSRO/A 191 18-Nov-22 27-May-23 2.1 Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed etc. 20 18-Nov-22 07-Dec-22 2.2 Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed etc 25 18-Nov-22 12-Dec-22 Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed etc 2.3 Supplying, placing, compacting and curing of PCC Class M15, including formworks all as per drawing and specfication 13 01-Dec-22 13-Dec-22 Supplying, placing, compacting and curing of PCC Class M15, including formworks all as per drawing and specfication 2.4 Stone Masonry Type B (1:4) with 40 % Mortar Content: Providing and laying random rubble stone masonry as per drawing 75 05-Dec-22 17-Feb-23 2.5 Compaction & backfilling work as per drawing and specfication with all requirment 8 12-Feb-23 19-Feb-23 WBS: OSRO/AFG/213/WBKEFSP.2 Project Construction of Civil Works Excavation of channelization, trenches, Gabion Groynes, Gabion Guide walls, Structure Foundation, Canal/Riverbed etc. Stone Masonry Type B (1:4) with 40 % Mortar Content: Providing and laying random rubble stone ma Compaction & backfilling work as per drawing and specfication with all requirment Plain Cement Concrete (PCC-M20 including formworks all as per relevant drawings, specification 2.6 Plain Cement Concrete (PCC-M20 including formworks all as per relevant drawings, specification 75 05-Dec-22 17-Feb-23 2.7 Reinforced Cement Concrete (RCC-M20) including formworks all as per relevant drawings, specification 20 20-Nov-22 09-Dec-22 Reinforced Cement Concrete (RCC-M20) including formworks all as per relevant drawings, specification Reinforced Cement Concrete (RCC-M25) including formworks all as per relevant drawings, specification 2.8 Reinforced Cement Concrete (RCC-M25) including formworks all as per relevant drawings, specification 20 20-Nov-22 09-Dec-22 2.9 Supply and fixing in position of Hand rails with 2 inch diameter galvanized iron pipe as per relevant drawings and spec 12 10-Dec-22 21-Dec-22 2.10 Joint preparation at each 15 to 20 m: Construction of expansion joint with PVC water stopper as per drawing and Specf 75 05-Dec-22 17-Feb-23 Joint preparation at each 15 to 20 m: Construction of expansion joint with PVC water stopper as per 2.11 Supplying, placing and compacting approved granular filter material under gabion basket or stone pitching 75 05-Dec-22 17-Feb-23 Supplying, placing and compacting approved granular filter material under gabion basket or stone pit 2.12 Supply and fixing in place 10 cm diameter PVC pipe weep holes of approved quality as per relevant drawing/specification 75 05-Dec-22 17-Feb-23 Supply and fixing in place 10 cm diameter PVC pipe weep holes of approved quality as per relevant 2.13 Pointing (1:3): Surfacing and Pointing of Stone Masonry with 1: 3 Cement Sand Mortar as per specfication 70 10-Dec-22 17-Feb-23 Pointing (1:3): Surfacing and Pointing of Stone Masonry with 1: 3 Cement Sand Mortar as per specf 2.14 Provide, install and fill the gabion basket (2x1x0.5) m with stone in place as drawing/specification 84 25-Feb-23 19-May-23 Provide, install and fill the gabion 2.15 provide, install and fill the gabion basket (1x1x1) m with stone in place, having mesh size (80x100)mm as per drawing 84 25-Feb-23 19-May-23 provide, install and fill the gabion 2.16 Provide, install and fill the gabion basket (1x1x0.5) m with stone in place, having mesh size (80x100)mm as per drawing 10 05-Jan-23 14-Jan-23 Supply and fixing in position of Hand rails with 2 inch diameter galvanized iron pipe as per relevant drawings and spec Provide, install and fill the gabion basket (1x1x0.5) m with stone in place, having mesh size (80x100)mm as per drawing 2.17 Provide, install and fill the gabion basket (1x1x2) m with stone in place, having mesh size (80x100)mm as per drawing 84 25-Feb-23 19-May-23 Provide, install and fill the gabion 2.18 Supply and installation of sign board as per standard drawing 5 15-May-23 19-May-23 Supply and installation of sign bo 2.19 Cleaning of Site after completion of all works in all respect including the dismantling of temporary structures 8 20-May-23 27-May-23 Cleaning of Site after comp 4 28-May-23 31-May-23 31-May-23, WBS: OSR 3.1 Project final Inspection and deficiencies correction 2 28-May-23 29-May-23 Project final Inspection a 3.2 Project hand over to cleint 1 30-May-23 30-May-23 Project hand over to clei 3.3 De-mobilization 1 31-May-23 31-May-23 WBS: OSRO/AFG/213/WBKEFSP.3 Project Closeout Actual Work Milestone Remaining Work Summary Critical Remaining Work Date Revision 06-Nov-22 Parpered by: Eng. Wahidullah De-mobilization Checked Approved Contractor: Idress Obaid Construction and Engineering Group