ID Task Mode Task Name Duration Start Finish 124 days Thu 20/10/22 Tue 11/04/23 60 days 60 days 14 days 20 days 60 days 30 days 124 days 74 days 14 days 30 days 30 days 60 days 65 days 30 days 14 days 7 days 7 days 7 days 0 days Thu 20/10/22 Thu 20/10/22 Thu 20/10/22 Thu 20/10/22 Thu 20/10/22 Fri 18/11/22 Thu 20/10/22 Thu 17/11/22 Thu 17/11/22 Wed 7/12/22 Wed 18/01/23 Wed 18/01/23 Wed 7/12/22 Wed 7/12/22 Wed 18/01/23 Tue 7/02/23 Thu 16/02/23 Mon 27/02/23 Tue 6/12/22 Wed 11/01/23 Wed 11/01/23 Tue 8/11/22 Wed 16/11/22 Wed 11/01/23 Thu 29/12/22 Tue 11/04/23 Tue 28/02/23 Tue 6/12/22 Tue 17/01/23 Tue 28/02/23 Tue 11/04/23 Tue 7/03/23 Tue 17/01/23 Mon 6/02/23 Wed 15/02/23 Fri 24/02/23 Tue 7/03/23 Tue 6/12/22 60 days 14 days 0 days Thu 20/10/22 Wed 11/01/23 Thu 20/10/22 Thu 20/10/22 30 days Thu 20/10/22 Wed 30/11/22 60 days Thu 20/10/22 Wed 11/01/23 14 days Thu 20/10/22 Tue 8/11/22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Project: Project1 Date: Fri 21/10/22 Cadangan Kerja-Kerja Tanah dan Infrastruktur Preliminary and Initial Work Hoarding Project Signage Wash trough Dilapilation survey Site Office and Related Facilities Earthworks Site Clearace Zone A Zone B Zone C Setting Out and Survey Silt Trap No. 1 & 2 Excavation & Forming Slope Pipe Culvert Riser Pipe & trash Rack Collection Sump Close Turfing Sub soil Pipe Excavation PVC pipe wrapped Zone A Sediment Fence Excavation unsuitable material Excavation and Dispose Cut & Fill Excavation Compact Level to platform level Import Earth Import Compact Level to platform level Temporary Earth Drain Task Manual Summary Rollup Split Manual Summary Milestone Start-only Summary Finish-only Project Summary External Tasks Inactive Task External Milestone Inactive Milestone Deadline Inactive Summary Progress Manual Task Manual Progress Duration-only Page 1 Oct '22 3 10 ID Task Mode Task Name 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 Project: Project1 Date: Fri 21/10/22 Excavation Concrete lining Spot Turfing Check dam Excavation forming slope installation Pipe Culvert Excavation Concrete lining 900mm diameter pipe culvert Zone B Sediment Fence Excavation unsuitable material Excavation and Dispose Cut & Fill Excavation Compact Level to platform level Control Blasting Permit Blasting Break to smaller pieces Dispose Import and compact Import Compact Level to platform level Temporary Earth Drain Excavation Concrete lining Spot Turfing Check dam Excavation forming slope installation Duration Start Finish 14 days Thu 20/10/22 Tue 8/11/22 14 days Thu 20/10/22 Tue 8/11/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 Task Manual Summary Rollup Split Manual Summary Milestone Start-only Summary Finish-only Project Summary External Tasks Inactive Task External Milestone Inactive Milestone Deadline Inactive Summary Progress Manual Task Manual Progress Duration-only Page 2 Oct '22 3 10 ID Task Mode Task Name 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 Project: Project1 Date: Fri 21/10/22 Zone C Sediment Fence Excavation unsuitable material Excavation and Dispose Cut & Fill Excavation Compact Level to platform level Control Blasting Permit Blasting Break to smaller pieces Dispose Soil Nail Mobilisation Survey setting out Drilling Erection of Temporary platform and staging for the works Grouting Grade 30 Installation for soil nail head 20mm thick galvanised mild steel faceplate inclusive grouting and to form nail pad concrete Testing INTERCEPTOR DRAIN Excavation Concrete lining BRC and concrete Spot Turfing BENCH DRAIN Excavation Concrete lining BRC and concrete Spot Turfing CASCADE DRAIN Duration Start Finish 1 day Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 Task Manual Summary Rollup Split Manual Summary Milestone Start-only Summary Finish-only Project Summary External Tasks Inactive Task External Milestone Inactive Milestone Deadline Inactive Summary Progress Manual Task Manual Progress Duration-only Page 3 Oct '22 3 10 ID Task Mode Task Name 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 Project: Project1 Date: Fri 21/10/22 Excavation Concrete lining Formwork BRC concrete Import and compact Import Compact Level to platform level Temporary Earth Drain Excavation Concrete lining Spot Turfing Check dam Excavation forming slope installation INTERCEPTOR DRAIN Excavation Concrete lining BRC and concrete Spot Turfing BENCH DRAIN Excavation Concrete lining BRC and concrete Spot Turfing CASCADE DRAIN Excavation Concrete lining Formwork BRC concrete Zone D Sediment Fence Excavation unsuitable material Duration Start Finish 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 1 day Thu 20/10/22 Thu 20/10/22 1 day 0 days Thu 20/10/22 Thu 20/10/22 Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 Task Manual Summary Rollup Split Manual Summary Milestone Start-only Summary Finish-only Project Summary External Tasks Inactive Task External Milestone Inactive Milestone Deadline Inactive Summary Progress Manual Task Manual Progress Duration-only Page 4 Oct '22 3 10 ID Task Mode Task Name 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 Project: Project1 Date: Fri 21/10/22 Excavation and Dispose Cut & Fill Excavation Compact Level to platform level RC RETAINING WALL Excavation 50mm thick in situ concrete 150 thick crusher run retaining wall base sawn formwork steel bar reinforcement retaining wall wall sawn formwork steel bar reinforcement Sand backfill weephole pipe & subsoil pipe Import and compact Import Compact Level to platform level Temporary Earth Drain Excavation Concrete lining Spot Turfing Check dam Excavation forming slope installation Sewerage Work Water Reticulation Duration Start Finish 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 0 days Thu 20/10/22 Thu 20/10/22 Task Manual Summary Rollup Split Manual Summary Milestone Start-only Summary Finish-only Project Summary External Tasks Inactive Task External Milestone Inactive Milestone Deadline Inactive Summary Progress Manual Task Manual Progress Duration-only Page 5 Oct '22 3 10