Uploaded by skyspsaw

Earthwork

advertisement
ID
Task
Mode
Task Name
Duration
Start
Finish
124 days
Thu 20/10/22
Tue 11/04/23
60 days
60 days
14 days
20 days
60 days
30 days
124 days
74 days
14 days
30 days
30 days
60 days
65 days
30 days
14 days
7 days
7 days
7 days
0 days
Thu 20/10/22
Thu 20/10/22
Thu 20/10/22
Thu 20/10/22
Thu 20/10/22
Fri 18/11/22
Thu 20/10/22
Thu 17/11/22
Thu 17/11/22
Wed 7/12/22
Wed 18/01/23
Wed 18/01/23
Wed 7/12/22
Wed 7/12/22
Wed 18/01/23
Tue 7/02/23
Thu 16/02/23
Mon 27/02/23
Tue 6/12/22
Wed 11/01/23
Wed 11/01/23
Tue 8/11/22
Wed 16/11/22
Wed 11/01/23
Thu 29/12/22
Tue 11/04/23
Tue 28/02/23
Tue 6/12/22
Tue 17/01/23
Tue 28/02/23
Tue 11/04/23
Tue 7/03/23
Tue 17/01/23
Mon 6/02/23
Wed 15/02/23
Fri 24/02/23
Tue 7/03/23
Tue 6/12/22
60 days
14 days
0 days
Thu 20/10/22
Wed 11/01/23
Thu 20/10/22
Thu 20/10/22
30 days
Thu 20/10/22
Wed 30/11/22
60 days
Thu 20/10/22
Wed 11/01/23
14 days
Thu 20/10/22
Tue 8/11/22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Project: Project1
Date: Fri 21/10/22
Cadangan Kerja-Kerja Tanah dan
Infrastruktur
Preliminary and Initial Work
Hoarding
Project Signage
Wash trough
Dilapilation survey
Site Office and Related Facilities
Earthworks
Site Clearace
Zone A
Zone B
Zone C
Setting Out and Survey
Silt Trap No. 1 & 2
Excavation & Forming Slope
Pipe Culvert
Riser Pipe & trash Rack
Collection Sump
Close Turfing
Sub soil Pipe
Excavation
PVC pipe wrapped
Zone A
Sediment Fence
Excavation unsuitable material
Excavation and Dispose
Cut & Fill
Excavation
Compact
Level to platform level
Import Earth
Import
Compact
Level to platform level
Temporary Earth Drain
Task
Manual Summary Rollup
Split
Manual Summary
Milestone
Start-only
Summary
Finish-only
Project Summary
External Tasks
Inactive Task
External Milestone
Inactive Milestone
Deadline
Inactive Summary
Progress
Manual Task
Manual Progress
Duration-only
Page 1
Oct '22
3
10
ID
Task
Mode
Task Name
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Project: Project1
Date: Fri 21/10/22
Excavation
Concrete lining
Spot Turfing
Check dam
Excavation
forming slope
installation
Pipe Culvert
Excavation
Concrete lining
900mm diameter pipe culvert
Zone B
Sediment Fence
Excavation unsuitable material
Excavation and Dispose
Cut & Fill
Excavation
Compact
Level to platform level
Control Blasting
Permit
Blasting
Break to smaller pieces
Dispose
Import and compact
Import
Compact
Level to platform level
Temporary Earth Drain
Excavation
Concrete lining
Spot Turfing
Check dam
Excavation
forming slope
installation
Duration
Start
Finish
14 days
Thu 20/10/22
Tue 8/11/22
14 days
Thu 20/10/22
Tue 8/11/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
Task
Manual Summary Rollup
Split
Manual Summary
Milestone
Start-only
Summary
Finish-only
Project Summary
External Tasks
Inactive Task
External Milestone
Inactive Milestone
Deadline
Inactive Summary
Progress
Manual Task
Manual Progress
Duration-only
Page 2
Oct '22
3
10
ID
Task
Mode
Task Name
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
Project: Project1
Date: Fri 21/10/22
Zone C
Sediment Fence
Excavation unsuitable material
Excavation and Dispose
Cut & Fill
Excavation
Compact
Level to platform level
Control Blasting
Permit
Blasting
Break to smaller pieces
Dispose
Soil Nail
Mobilisation
Survey setting out
Drilling
Erection of Temporary platform
and staging for the works
Grouting Grade 30
Installation for soil nail head
20mm thick galvanised mild
steel faceplate
inclusive grouting and to form
nail pad concrete
Testing
INTERCEPTOR DRAIN
Excavation
Concrete lining
BRC and concrete
Spot Turfing
BENCH DRAIN
Excavation
Concrete lining
BRC and concrete
Spot Turfing
CASCADE DRAIN
Duration
Start
Finish
1 day
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
Task
Manual Summary Rollup
Split
Manual Summary
Milestone
Start-only
Summary
Finish-only
Project Summary
External Tasks
Inactive Task
External Milestone
Inactive Milestone
Deadline
Inactive Summary
Progress
Manual Task
Manual Progress
Duration-only
Page 3
Oct '22
3
10
ID
Task
Mode
Task Name
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
Project: Project1
Date: Fri 21/10/22
Excavation
Concrete lining
Formwork
BRC
concrete
Import and compact
Import
Compact
Level to platform level
Temporary Earth Drain
Excavation
Concrete lining
Spot Turfing
Check dam
Excavation
forming slope
installation
INTERCEPTOR DRAIN
Excavation
Concrete lining
BRC and concrete
Spot Turfing
BENCH DRAIN
Excavation
Concrete lining
BRC and concrete
Spot Turfing
CASCADE DRAIN
Excavation
Concrete lining
Formwork
BRC
concrete
Zone D
Sediment Fence
Excavation unsuitable material
Duration
Start
Finish
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
1 day
Thu 20/10/22
Thu 20/10/22
1 day
0 days
Thu 20/10/22
Thu 20/10/22
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
Task
Manual Summary Rollup
Split
Manual Summary
Milestone
Start-only
Summary
Finish-only
Project Summary
External Tasks
Inactive Task
External Milestone
Inactive Milestone
Deadline
Inactive Summary
Progress
Manual Task
Manual Progress
Duration-only
Page 4
Oct '22
3
10
ID
Task
Mode
Task Name
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
Project: Project1
Date: Fri 21/10/22
Excavation and Dispose
Cut & Fill
Excavation
Compact
Level to platform level
RC RETAINING WALL
Excavation
50mm thick in situ concrete
150 thick crusher run
retaining wall base
sawn formwork
steel bar reinforcement
retaining wall wall
sawn formwork
steel bar reinforcement
Sand
backfill
weephole pipe & subsoil pipe
Import and compact
Import
Compact
Level to platform level
Temporary Earth Drain
Excavation
Concrete lining
Spot Turfing
Check dam
Excavation
forming slope
installation
Sewerage Work
Water Reticulation
Duration
Start
Finish
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
0 days
Thu 20/10/22
Thu 20/10/22
Task
Manual Summary Rollup
Split
Manual Summary
Milestone
Start-only
Summary
Finish-only
Project Summary
External Tasks
Inactive Task
External Milestone
Inactive Milestone
Deadline
Inactive Summary
Progress
Manual Task
Manual Progress
Duration-only
Page 5
Oct '22
3
10
Download