Operation Control Procedure for Monitoring and Controlling of Spillages and Leakages of All Type of Oil, Coolant, And Water Section: OCP002 Sheet 1 of 2 Version 1.0 AIM: This document will explain the procedure to control the effects of control spillages and leakages of all types of oil, water, and coolant. SCOPE: This work instruction is applicable to all departments. RESPONSIBILITY: Departmental HOD. Leakages of all types of oil, water, and coolant INSTRUCTIONS: 1. Ensure the effective preventive maintenance of pipelines, Drainage, and Taps. 2. If the leakage of oil informs about leakage to the maintenance supervisor. 3. Check gravity of leak physically. 4. If the gravity of the leak found more, immediately close the valve and inform the charge of maintenance immediately. 5. If necessary, stop processing. 6. Start work after arresting leakage completely. 7. Collect leaked oils in containers and clean the area. 8. Avoid parking in the leakage area. Prepared By Renuka K Signature Date Approved By Shashank Srivaths Signature 01-06-2021 Date 01-06-2021 Operation Control Procedure for Monitoring and Controlling of Spillages and Leakages of All Type of Oil, Coolant, And Water Section: OCP002 Sheet 2 of 2 Version 1.0 9. Do not allow employees to pass on through leaked areas to avoid slippage. 10. If leakage from the waterline, carry out a survey to identify water leakages from Pipelines. 11. Take corrective measures considering survey reports and arrest leakages. 12. If small quantity leakage occurs arrest, it immediately. 13. If the gravity of the leak found more, immediately close the valve and inform to maintenance in charge. 14. If necessary, stop processing. 15. Start work after arresting leakage completely. ***END OF THE DOCUMENT*** Prepared By Renuka K Signature Date Approved By Shashank Srivaths Signature 01-06-2021 Date 01-06-2021