GENERAL NOTES: 7.00 7.00 4.00 1. 3.00 3.20 POURED CONCRETE COVER 3.80 ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING CODE, AND THE RULES AND REGULATIONS OF LOCAL GOVERNMENT AUTHORITIES CONCERNED. 2. 0.50 FCO ALL WORKS SHALL BE DONE UNDER DIRECT SUPERVISION OF A LICENSED AND REGISTERED MASTER PLUMBER OR A PLUMBING ENGINEER. 0.50 4. ALL WORKS SHALL CONFORM TO THE BUILDING OWNER'S REQUIREMENTS OR GUIDELINES AND SITE CONDITIONS AND INCLUDE ALL SINK 3.50 ALL PIPE SIZES ARE IN MILLIMETER AND ALL DIMENSIONS ARE IN METERS UNLESS SPECIFIED. 3.00 3. 0.05 CONCRETE COVER WITH HANDLE BAR FCO 0.40 BAR 0.05 0.10M THK CHB WALL COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, THE DESIGN ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND HEREIN. ALL SLOPE FOR HORIZONTAL DRAINAGE SHALL MAINTAIN A 2% UNLESS OTHERWISE SPECIFIED. ALL SLOPES FOR HORIZONTAL SEWER LAV SHALL MAINTAIN 1% UNLESS SPECIFIED. 0.10 WC 10. THE CONTRACTOR SHALL VERIFY ALL THE EXISTING UTILITIES AT THE SITE AND COORDINATES THE WORK WITH THE SEWER LINE 3.50 SIZES OF SEWER AND WATER SUPPLY PIPE TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 3.50 9. 11.50 11.50 1.00 WC PVC PPE 2%SLOPE VERIFY 0.50 1.00 9.00 9.00 PROPER PLUMBING / SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. 8. LAV FD TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR DESIGNER. 7. 1.50 FCO ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATION REQUIRED FOR THE PROPER EXECUTION OF OTHER 1.00 6. 5.50 5. 5.50 COST EXPENSES NECESSARY TO COMPLETE THE SYSTEMS. FCO FD EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT. 0.10M THK CHB WALL PLAN 6.00 6.00 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ON SITE COORDINATION, PREPARE CONSTRUCTION SHOP DRAWINGS, FIXTURES AND EQUIPMENT DIMENSIONS. INFORM OR ADVICE THE OWNER / ARCHITECT / ENGINEER OF ANY TECHNICAL / MAINTENANCE PROBLEM POURED CONCRETE BOTTOM SECTION FOUND HEREIN OR ON THE SITE. 2.50 4.00 REQUIREMENT BY THE BUILDING OWNER. EXCEEDING 135'. 2.50 SEPTIC TANK 13. CLEAN OUT SHALL BE INSTALLED NOT TO EXCEED 15 METERS ON STRAIGHT RUN AND FOR EACH AGGREGATE CHANGE IN DIRECTION 2.50 4.00 12. THE CONTRACTOR SHALL INCLUDE ALL THE COST OR EXPENSES NECESSARY TO COMPLETE THE SYSTEM AND TESTING 6 P-1 SCALE: 1:10M. 14. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR, DE-CLOGGING, RESEALING OF EXISTING SEWER, VENT AND WATER LINES UP TO 3.00 1.00 3.00 BUILDING MAIN LINE. ALL EXPENSES IN ACCOUNT OF CONTRACTOR'S. 8.00 15. ALL PLUMBING PIPES AND EQUIPMENTS SHALL BE INSTALLED IN ACCORDANCE WITH THE PLUMBING CODE AND HAVE SUFFICIENT VARIES 7.00 0.10 0.90 L WORKING CLEARANCE OR SPACE FOR MAINTENANCE OR REPAIR. NO DOUBLE TRAP SHALL BE USED. TAP TO NEAREST STREET SEWERLINE TAP TO NEAREST STREET SEWERLINE MANHOLE 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHIPPING WORKS, EXCAVATION, AND INSTALLATION OF PLUMBING PIPES AND EQUAL 0.60 0.10 0.10 0.60 MANHOLE MANHOLE PROVIDE BEVEL CUT MARKER FOR EACH COVER NOTE: ADDITIONAL REBARS IS A MUST IF LOCATED AT DRIVEWAY FIXTURES, UNLESS OTHERWISE SPECIFIED IN THE CONTRACT P-1 1:100M. SCALE: 1:100M. 19. WATER PIPE / LINE SHALL BE 300mm ABOVE THE TOPE OF THE SEWER OR DRAINAGE PIPE / LINE. DISTANCE OF 300mm BETWEEN WATER PIPE AND SEWER OR DRAINAGE PIPE, IF PLACE IN THE SAME TRENCH. 7.00 LIQUID FLOW PRIOR TO START OF THE PIPE INSTALLATION. TO SEWER LINE 7.00 4.00 AT 600MM ON CENTER 3.00 3.20 AT 600MM ON CENTER 3.80 0.10 20. PLUMBING CONTRACTOR SHALL VERIFY AND INVESTIGATE THE ACTUAL EXISTING PIPE, SLOPES AND DIRECTION OF WATER / SEWER 3.00 2 SCALE: W P-1 WITH SANITARY AND SAFE OPERATING CONDITION. VARIES 1 18. THE BUILDING OWNER / CONTRACTOR SHALL MAINTAIN THE PLUMBING AND DRAINAGE SYSTEM OF HIS PREMISES IN ACCORDANCE PLAN NON-SKID COVER FINISH FLOOR LINE G.I. FERRULE 3MM C.I. BEND 3.50 3.00 PLUG 0.10 0.60 MANHOLE (AEROFLEX) FOR FCU DRAIN PIPE INSTALLED ABOVE CEILING AND PROVIDE P-TRAP ON DRAIN LINE FOR FCU ON APPROVED LOCATION. EQUAL TAP TO NEAREST STREET SEWERLINE 0.10 16. ALL SEWER, WASTELINES, FCU DRAINS SHALL BE PROVIDED WITH 12mm (21") THICK CLOSE CELL ELASTOMERIC THERMAL INSULATION 1.00 PIPE CHANNEL REMOVABLE BRASS COVER 0.15 2.50 2.50 1:100M. 2.50 REG. NO.: 3.00 PVC LENGTH AS REQUIRED 1.00 ISSUED ON: 0.06 AIR SPACE SCUM SCUM DIGESTION CHAMBER # 1 EQUAL DIGESTION CHAMBER # 2 LEACHING CHAMBER EQUAL TO SEWER LINE 10% SLOPE 10% SLOPE 10% SLOPE AT 300MM ON CENTER 8.00 7.00 WATER-PROOF INTERIOR SURFACE SECTION 3 7 4 SCALE: P-1 1:100M. PROJECT TITLE/ LOCATION: P-1 SCALE: OPWNER: TWO-STOREY RESIDENTIAL SCALE: 1:25M. 1:100M. DESIGNED BY: CHECKED BY: MR. NOEL F. ANG APPROVED BY: PUROK 3, SAN ROQUE, SAN RAFAEL, BULACAN ISSUED AT: AIR SPACE SCUM 3.00 DRAWN BY: ENGINEER AIR SPACE M TIN NO.: P.T.R.: 0.6 GV CV P-1 ENGINEER: 0.6 4.00 PVC P-TRAP SCALE: PIPE 0.6 "D" 6.00 3.50 F/SHO 1.50 1.05 0.15 0.30 LAV 6.00 3.50 LIFTING EYE 11.50 11.50 GV TAP TO MAIN DISTRIBUTION WATERLINE 6 AT 300MM ON CENTER RISER 4.00 P-1 FOR EACH COVER 9.00 1.00 9.00 RISER LAV RUBBER COMPRESSION GASKET JOINT 0.06 PROVIDE BEVEL CUT MARKER 1.00 F/SHO WC LAV WC FINISH FLOOR LINE 0.60 0.15 1.50 GV 5.50 C.I. LENGTH AS REQUIRED 5.50 NOTE: DATE PRINTED: SHEET CONTENTS GROUND FLOOR SANITARY & STORM DRAINAGE LAYOUT SECOND FLOOR SANITARY & STORM DRAINAGE LAYOUT GROUND FLOOR COLD WATERLINE SECOND FLOOR COLD WATERLINE GENERAL NOTES ISOMETRIC PIPE SIZES SEPTIC TANK DETAIL CATCH BASIN DETAIL LEGEND PIPE FIXTURE DETAIL WATER METER CONNECTION DETAIL SHEET NO.: P-1 1