DEVELOPMENT BANK OF ETHIOPIA Internal Memo To: Dessie District Date: August 08, 2022 From: Technical Team Manager SUBJECT: Correction for built up cost of Raya Valley Agro-Industry Project investment items Branch: -Dessie Based on project approval team comment dated August 03, 2022 for built up cost correction of drip irrigation system (10ha), germination room cell panel and equipment’s (80m2), and nursery greenhouse (9600m2), we have revised same and attached hereto. With regards, Wayiso K. (Agricultural Engineer) Encl: 3 page report 1. Introduction It’s to be recalled that the team was carried out technical evaluation and selection of drip irrigation system (10ha), germination room cell panel, and equipment (10m x 8m) and nursery house (1ha) for undertaking an 81.71ha irrigable and rain-fed fruit and vegetable production farm planned to be established in Amhara Regional State, North Wollo Zone, in the vicinity of Kobo Woreda, Addis Alem Kebele 043. Based on project approval team comment dated August 03, 2022 at head office here is attached cost built up same, by excluding contingency fee. 1.1 Drip Irrigation System (10ha) The quotation submitted from Rivulis Irrigation Ltd. with Ref. Inv.No:201223, date: April 12th, 2022 is revised and summarized in below table. Table 1: Revised drip irrigation system cost summary for Raya valley project S/N A Item description Drip irrigation system 10ha Qty 1 Unit FOB Price FOB Price CUR. 142,708.04 EUR Total FOB Price Sea freight (4%) Insurance (1%) Bank charge (3%) Total FOB Price, Euro 142,708.04 142,708.04 5,708.32 1,427.08 4,281.24 Installation cost:(pipe, fittings, drip, valves, filter, fertigation electro mechanical and trench work) Local costs (port handling, loading & unloading, clearing and forwarding, local transport etc.) (3%) Grand Total Total Price, ETB 7,742,467.73 7,742,467.73 309,698.71 77,424.68 232,274.03 491,050.00 4,281.24 158,405.92 232,274.03 9,085,189.18 Terms & condition of sale: Payment: 100% CAD, with a purchase order from an Ethiopian bank. Israel-Europe is the country of origin. Validity: 03/28/2022 The number of containers, port of lading, and destination are not stated. We have assumed 3*40ft HC, the Port of Ashdod as the port of lading, and Kombolcha as the destination port. Remark: The quoted price for pipe, fittings, drip, valves, filter, fertigation, electro-mechanical and trench work shall be submitted separately as cost for accessories, pipe, fittings, drip, valves, filter, fertigation, cost for electro-mechanical installation, and BOQ for installation work. Conclusion Therefore, the offer from Rivulis Irrigation Ltd. can be used for purposes of budgeting (or planning project costs). However, the above remark should be considered during the appraisal or purchase. 1|Page 1.2 Germination room cell panel and equipment’s (10m*8m*4m) The quotation submitted from CELTIC COOLING bv with project No.:2026-2, date April 12, 2022 is evaluated and is summarized in below table. Table 2: Revised germination room cell panel cost summary for Raya valley project Unit FOB Price FOB Price CUR. A EX Works delivery of the insulation construction 1 19,245.23 EUR B EX Works delivery of the refrigeration equipment 1 36,438.35 EUR C Procurement of the required local materials (liquids and gases) 1 19,245.23 ETB Total FOB Price Sea freight (4%) Insurance (1%) Bank charge (3%) Erection and installation Local costs (port handling, loading & unloading, clearing and forwarding, local transport etc.) (3%) Grand Total SN Item description Qty Total FOB Price, Euro 19,245.23 36,438.35 55,683.58 2,227.34 556.84 1,670.51 1,670.51 61,808.77 Total Price, ETB 1,044,128.78 1,976,922.60 27,169.99 3,021,051.38 120,842.06 30,210.51 90,631.54 187,510.26 90,631.54 3,568,047.28 Terms and conditions of sale: Payment: 100% CAD with an Ethiopian bank purchase order or 50 % Payment down at order 50 % Payment before handover shipment documents when payment comes from foreign account Transportation: by sea. 1 HC container (40 ft) Time to delivery: 12 to 14 weeks after receipt of signed order confirmation. Validity Period: 10 days after the date of the offer Warranty: 1 year Conclusion Therefore, the offer from Celtic Cooling bv can be used for purposes of budgeting (or planning project costs). 2|Page 1.3 Nursery greenhouse The quotation submitted from NOONTY GREENHOUSE Co., LTD with Inv.No.NT20220217Q, Date: April 12, 2022 is revised and summarized in below table. Table 3: Revised nursery greenhouse cost summary for Raya valley project A B EX Works delivery of the insulation construction EX Works delivery of the refrigeration equipment 1 1 Unit FOB Price FOB Price CUR. 19,245.23 EUR 36,438.35 EUR C Procurement of the required local materials (liquids and gases) 1 19,245.23 S/N Item description Qty Total FOB Price, Euro 19,245.23 36,438.35 Total Price, ETB 1,044,128.78 1,976,922.60 ETB Total FOB Price Sea freight (4%) Insurance (1%) Bank Charge (3%) Erection and installation Local costs (port handling, loading & unloading, clearing and forwarding, local transport etc.)(3%) Grand Total 27,169.99 55,683.58 2,227.34 556.84 1,670.51 1,670.51 61,808.77 3,021,051.38 120,842.06 30,210.51 90,631.54 187,510.26 90,631.54 3,568,047.28 Terms and conditions of sale: Payment: 50% TT in advance and the balance TT after the cargo is ready for shipment. Transportation: by sea. estimated by 3*40-ft containers Delivery Time: 45 days after down payment has been received. Validity Period: April 15th, 2022 Conclusion Therefore, the offer from Noonty Greenhouse Co.,Ltd (Xiamen Zhonghesheng Import&Export Co.,Ltd) can be used for purposes of budgeting (or planning project costs). Summary for cost built up revised for Raya valley project S/N 1 2 3 Item description Drip Irrigation System (10ha) Nursery Green House (9600m2) Germination Room cell panel and equipment’s 10mX8m Total cost USD Planned cost EURO 158,405.92 211,202.25 211,202.25 61,808.77 220,214.70 ETB 9,085,189.18 12,183,504.59 3,568,047.28 24,836,741.05 Remark: The aforementioned total cost is calculated based on 1 USD = 53.258 ETB and 1 EUR = 54.2539 (https://nbebank.com/commercial-banks-exchange-rate/). 5% contingency is excluded as per project approval comment. 3|Page