Uploaded by TONY ZHONG

SUMMIT PDL 2020 - 2022

advertisement
PROFESSIONAL DEVELOPMENT LOG
NAME:
WEI SHENG
POSITION:
DIRECTOR
PSA NUMBER:
3322
EXPIRE DATE:
19-Aug-22
DATE
GOAL
ACTIVITY
OUTCOME
04.02.2020
Important update working under
COVID
All staff meeting for COVID affect windos and
glass industry.
new working requirement under
COVID.
12.03.2020
Site safe training
Site safe training, annual meeting to improve safe
thinking at work.
Work safe, think safe.
20.03.2020
Annual meeting with engineer.
Meet Mr Prakash and Hansen for recent
problems and cases, make solution and get new
ps1 updated.
New Ps1 updated with fixing old
issues since last few inspections.
28.04.2020
Requirement working under Level
3
Online meeting about new government
requirement working under level 3.
cut off half volmue of work
under level 3 to ensure all staff
safe under level 3
18.05.2020
Requirement working under Level
2
Staff meeting, working under level 2. Annual
installer training.
Learnt rules under level 2.
09.06.2020
Requirement working under Level
1
Staff meeting, working under level 1. Health &
safety training.
Learnt rules under level 1, all
staff health & safety
requirements
07.07.2020
Online meeting with Metro glass
service manager Sam
Online meeting with Sam
workflow under Covid, new
product introduction
15.07.2020
Online meeting with Viridian glass
custom manager Amy
Online meeting with Amy
New supplier rules under covid.
20.08.2020
New glass balustrades testing and
issue new PS1
Glass balustrade system test with Hansen and
issue new PS1
SS post infill glass system PS1
issued.
08.09.2020
SS post infill system installation
Site practice for new ss post infill system, new
system training
staff training new system
installation.
12.10.2020
New double disc standoff
upgrade.
New standoff upgrade with Mr prakash and Rob
campion
Better standoffs for further
works.
15.10.2020
Health & safety training
Work site health and safety training.
mind refresh health and safety
requirement
19.11.2020
Online meeting Hansen
Online meeting with Hansen for details on PS1
from council inspectors and architects.
Details updated on double disc
and mini post system.
PROFESSIONAL DEVELOPMENT LOG
NAME:
WEI SHENG
POSITION:
DIRECTOR
PSA NUMBER:
3322
EXPIRE DATE:
19-Aug-22
GOAL
DATE
ACTIVITY
OUTCOME
18.01.2021
New year meeting
Causal meeting with all staff for new year goals
and plans.
New year new start
02.02.2021
Site safe training.
All staff site safe training
Work safe, think safe.
23.02.2021
New installers training.
New installers training on and off site, for
standard, safety, requirements and quality.
New skilled gained for new
installers.
08.03.2021
Annual meeting with engineer。
Review the current ps1 design, new check point
from council inspections. Renew all ps1s.
Better understanding with
current council requirements.
22.04.2021
Annual meeting with Metroglass
Visit glass producting facility, review issues for
last financial year, new year plan and goal
18.05.2021
Site practice training.
Commercial building workflow and requirement
training.
25.05.2021
Catchup with Brett Francis
Online meeting with WGANZ CEO Brett Francis,
discuss glass industry in NZ
learn a lot from Brett Francis.
16.06.2021
Covid update
Learn work requirement under covid period.
work safe under covid
20.07.2021
Annual meeting with Viridian glass
Visit glass producting facility, sales team,
production manager Frank.
Improve glass leadtime and
quality.
02.08.2021
Read newsletter from WGANZ
Read newsletter from WGANZ
Glazing blocks and staples
update.
31.08.2021
Operating under level 3 and 4
Advises and suggestions from WGANZ Brett
Francis
follow the requirment for our
glass industry.
06.09.2021
Site safe training.
Site safe online training and test.
site safe license renewed.
08.11.2021
Health & safety audit findings
Advisewise shared by Kenneth Hannon, health &
safety is 1st at work and life.
safety audit findings in windows and glass
industry
Know glass processing and
production, work together
better.
Understand better for safety
and workflow for commercial
projects.
PROFESSIONAL DEVELOPMENT LOG
NAME:
WEI SHENG
POSITION:
DIRECTOR
PSA NUMBER:
3322
EXPIRE DATE:
19-Aug-22
GOAL
DATE
ACTIVITY
OUTCOME
20.01.2022 Training - Glass & Glazing Institute
3 days training in Wellington for glass
balustrades.
Get a certificate for glass
installer, registered installer.
15.02.2022 Site safe meeting
Site safe meeting with all staff
Work safe, think safe.
02.03.2022 Read newsletter from WGANZ
Read 1st issue for 2022, most about H1 and
glazing changes
Know more rules about glazing.
05.04.2022 Staff meeting
Installers meeting for workflow improvement,
reduce mistake, enhance site safe thinking
Skills improved.
15.04.2022 Visit Metroglass facility
Visit Metro glass production line with Sam
Know more about glass
processing.
29.05.2022 Read newsletter from WGANZ
Go over about the glass stamps and glazing
fracture
read and remember.
03.06.2022 Read newsletter from WGANZ
Read newsletter from WGANZ
New H1 about coming.
Discuss with structural engineer Hansen Yin for
glass balustrades installation in high wind zone.
Wind calculation to meet NZBC
requirement.
Working onsite with Tisini from Metroglass for
canopy installation
Learnt workflow in Metroglass.
11.06.2022
Review high wind zone for project
507 Remuera Road
11.07.2022 Canopy installation
22.07.2022
Read and go through Newsletter
from WGANZ
Read and learn new H1 regulations.
Understand the new H1
requirement.
02.08.2022
Read and go through Newsletter
from WGANZ
Read and learn new applications on glazing blocks
Better understanding usage on
glazing blocks.
Download