DEFENCE FORCES CANTEEN ORGANIZATION EDRMS Business Requirements Document (BRD) EDRMS Project Version 1.00 P a g e 0 | 16 DEFENCE FORCES CANTEEN ORGANIZATION Table of Contents 1 Document Revisions _____________________________________________________________ 2 2 Approvals _____________________________________________________________________ 2 3 Introduction ____________________________________________________________________ 3 3.1 3.1.1 3.1.2 3.2 4 5 Project Summary____________________________________________________________________3 Objectives _________________________________________________________________________________ 3 Background ________________________________________________________________________________ 3 Project Scope_______________________________________________________________________3 Business Process Overview ________________________________________________________ 5 4.1 Current Business Process (As-Is)________________________________________________________5 4.2 Proposed Business Process (To-Be) _____________________________________________________7 Business Requirements ___________________________________________________________ 7 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 Business Requirements_______________________________________________________________8 Accounts section ___________________________________________________________________________ 8 Budgetary _________________________________________________________________________________ 8 Debtors/receivables _________________________________________________________________________ 9 Cash Office _______________________________________________________________________________ 11 Pricing Department ________________________________________________________________________ 11 Branch Accounts___________________________________________________________________________ 16 P a g e 1 | 16 DEFENCE FORCES CANTEEN ORGANIZATION 1 Document Revisions Date Version Document Changes 12/08/2022 1.0 Draft 23/08/2022 1.1 Added Accounts Section requirements 24/08/2022 1.2 Added Personnel requirements 2 Approvals Role Name Title Signature Date Business Owner Project Manager System Architect Software Development Lead P a g e 2 | 16 DEFENCE FORCES CANTEEN ORGANIZATION 3 Introduction 3.1 3.1.1 Project Summary Objectives To establish an ELECTRONIC DOCUMENT & Records MANAGEMENT SYSTEM (EDRMS) that will be used across Defence Force Canteen Organization including but not limited to: integration with existing systems, set up of all hardware and software components and interface with server platforms such as operating systems and databases. The goals of this project include: 3.1.2 To build an Image Repository for the current Paper-based file system & integrate the same with the existing line of systems as well as manual processes. To make electronic files available across offices/users in all branches / Departments. To store and route documents electronically and to avoid courier of documents across offices and manual registers. Provide a repository of sensitive documents in a secure manner. To make the image of the paper documents available in the electronic form on their receipt/creation/filing. Improve efficiency, better utilization of resources, improve productivity & reduce Turn Around Time (TAT) for each process. Provide business continuity by making available important documents through ECM. To allow access on the need-based / role-based with user privileges set. To make documents and files accessible to all users To create a backup to the Paper Based Documents to serve as a reference system. Background 3.2 Project Scope The scope of implementation for this project is as follows: 1. Understanding customer organization structure & different entities. Understanding AS-IS processes and demonstration of prototyping and GAP fixing to arrive at actual to-be process. 2. Understanding the document types and their importance in the overall process and the business rules, mandatory activities to be performed and exceptions in processing. 3. Collecting information about the functional specifications. 4. Preparation of FRS (Functional Requirement Specification) document. 5. Finalization of the SRS (System Requirement Specification) Document. 6. Installation a. Setup of Production Environment P a g e 3 | 16 DEFENCE FORCES CANTEEN ORGANIZATION i. Installation of Components of ECM suite and RMS at Production Environment i.e. Installation of OmniDocs and RMS at the server provided by a client. ii. Installation of Add-on components. b. Setup of Additional environments (as required) i. Development/test Environment 7. Configuration of the System a. OmniScan Required configuration in Scanning Solution in terms of Template Creation with Index Parameters, Document Type Creation, Folder Hierarchy Definition, and Data Class Definition. It is assumed that Unimax’s delivery team will create maximum of 5 Scanning templates in OmniScan with 10 Indexing parameters per template will be designed. A total of 10 search templates (data class) will be created to enable the search these documents from Newgen ECM web interface. For further template requirements, Unimax Team will train the client’s admin users for any such scanning template designing will be trained through our training scope. b. OmniDocs Configuration Required configuration in the DMS application will be done in terms of Folder Hierarchy, User Creation, Privilege Management, Data Class creation etc. Unimax will provide folder structure as per the organization’s requirement. Environments considered for implementation – Production, and Testing environment only. Unimax will configure 5 OmniProcess (simple linear approval) workflows. Unimax will define the Folder Structure for the storage of documents within the system as follows, DEFCO Department Department Type Application # Document #1 Document #2 P a g e 4 | 16 DEFENCE FORCES CANTEEN ORGANIZATION The folder structure, document types and indices associated with the documents or at folder level can be mapped and finalized at the time of SRS. Unimax will define the Users/Group of Users along with their access rights/privileges in order to ensure that there is no unauthorized access to the system. In DMS Application, support of standard image formats viewing will be done through in-built viewer such as PDF, PDF/A, TIFF and JPEG. Any additional file format will be supported through native application. For any unconventional file format, needful native application needs to be installed into the workstation. Any other business process that will be identified by the client during system study, efforts for automating the business process by Unimax will be provided post system study and on agreement with the client. Unimax will automate those processes based on the change request approval process. c. Records Management Configuration Required configuration on OmniDocs Record Management System (10 Retention Policies, 10 Storage Policies & 10 Cut-off Rollover Policies for RMS). 4 Business Process Overview [Describe how the current process(es) work, including the interactions between systems and various business units. Include visual process flow diagrams to further illustrate the processes the new product will replace or enhance. Use case documentation and accompanying activity or process flow diagrams can be used to create the description(s) of the proposed or “To-Be” processes.] 4.1 Current Business Process (As-Is) [Describe how the current process(es) work, including the interactions between systems and various business units. Include visual process flow diagrams to further illustrate the processes the new product will replace or enhance. Use case documentation and accompanying activity or process flow diagrams can be used to create the description(s) of the proposed or “To-Be” processes.] P a g e 5 | 16 DEFENCE FORCES CANTEEN ORGANIZATION P a g e 6 | 16 DEFENCE FORCES CANTEEN ORGANIZATION 4.2 Proposed Business Process (To-Be) [Describe how the current process(es) work, including the interactions between systems and various business units. Include visual process flow diagrams to further illustrate the processes the new product will replace or enhance. Use case documentation and accompanying activity or process flow diagrams can be used to create the description(s) of the proposed or “To-Be” processes.] 5 Business Requirements [The specific business requirements elicited from stakeholders should be listed, categorized by both priority and area of functionality to smooth the process of reading and tracking them. Include links to use case documentation, and other key reference material as needed to make the requirements as complete and understandable as possible. You may wish to incorporate the functional and non-functional requirements into a traceability matrix that can be followed throughout the project.] Value Rating Description 1 Critical This requirement is critical to the success of the project. The project will not be possible without this requirement. 2 High This requirement is high priority, but the project can be implemented at a bare minimum without this requirement. 3 Medium This requirement is somewhat important, as it provides some value but the project can proceed without it. 4 Low This is a low priority requirement, or a “nice to have” feature, if time and cost allow it. P a g e 7 | 16 DEFENCE FORCES CANTEEN ORGANIZATION 5 Future This requirement is out of scope for this project, and has been included here for a possible future release. 5.1 Business Requirements 5.1.1 Accounts section 5.1.2 Budgetary They handle payment documents referred to staffs: 1. 2. 3. 4. Expense Claims Examination of invoices – Bills scan and upload to EBS Processing of imprest request forms Shop expenses (Annex) – scanning of documents already done (Uploading of documents from Zimbra mail) 5. Customer refunds (missing workstep for CA & AIE Holder in EBS to be discussed with Samwel Kiprono) A need for a linear process will be in scope with expense of claims Metadata fields: Staff Name, DP Number, Amount, Nature of expense & Claim serial No P a g e 8 | 16 DEFENCE FORCES CANTEEN ORGANIZATION 5.1.3 Debtors/receivables Backlog scanning might be considered. There will be two types of documents in which only one might be considered for scanning. 1. Proforma invoices 2. Manual Invoice (won’t be scanned) 3. Customer Invoices They would require 3 linear workflows to cater for PCAs. a) From Personnel Department (PCA - debtors) P a g e 9 | 16 DEFENCE FORCES CANTEEN ORGANIZATION b) From Salary Department (Deduction by product) c) Inter-Shop transfers to be scanned and retrieved from DMS through the EBS according to relevant shops. This will require a 3-step linear workflow. P a g e 10 | 16 DEFENCE FORCES CANTEEN ORGANIZATION 5.1.4 Cash Office 5.1.5 Pricing Department In Pricing department, we will establish several linear processes that will help with efficiency in the department. The Department contain two sections: 1. Pricing 2. Stock adjustments Pricing Pricing Department receives price list that are initiated form Registry department and pushed to the MD/CA after which the MD will send it to Fields office for market survey. Market Survey will be conducted and once completed it is sent to the supplies department actioned and pushed to pricing for action. Once actioned pricing will send it back to supplies in order to coordinate with respective vendors and then archive it. Metadata fields: Supplier Name & Price List Date P a g e 11 | 16 DEFENCE FORCES CANTEEN ORGANIZATION P a g e 12 | 16 DEFENCE FORCES CANTEEN ORGANIZATION Price listing workflow NB Reject documents to be done at each step and sent back to the previous workstep Offer letters Initiation is done from the registry department and pushed to the supplies department after an action is done it is now pushed to pricing. Metadata fields: Supplier Name & Offer Letter Date Offer letter workflow NB Reject documents to be done at each step and sent back to the previous workstep Warehouse invoices P a g e 13 | 16 DEFENCE FORCES CANTEEN ORGANIZATION This will contain two actions depending on the invoice shared. i. Initiation from the warehouse with the existing price list will not change or require authorization. ii. Initiation from the warehouse with no existing price list will require authorization from the supplies department Metadata fields: Invoice Number & Invoice Date Warehouse invoices no authorization workflow NB Reject documents to be done at each step and sent back to the previous workstep b) Stock Adjustment They contain 3 forms: 1. Write offs generated from Shops (D/3) and lands to the fields office after which it is actioned and sent to Pricing department and archived. i. Metadata field: Invoice number P a g e 14 | 16 DEFENCE FORCES CANTEEN ORGANIZATION D/3 Write-offs workflow NB Reject documents to be done at each step and sent back to the previous workstep 2. After stock adjustments – initiated from the shop then sent to audit department after action it is pushed to MD/CA and sent back to audit department after actioning and finally pushed to pricing department for action and archival. i. Metadata field: Originating Shop & Date After stocks adjustments workflow P a g e 15 | 16 DEFENCE FORCES CANTEEN ORGANIZATION NB Reject documents to be done at each step and sent back to the previous workstep 3. Board Of Survey (BOS) – Initiation is done from shop to Fields department then actioned to MD/CA and finally actioned to pricing department and archived. i. Metadata field: Originating Shop & Date Board Of Survey (BOS) workflow NB Reject documents to be done at each step and sent back to the previous workstep 5.1.6 Branch Accounts P a g e 16 | 16