Scheduled
Sl.
No
1.
1.1
1.2
:
E.H.S Committee Meeting
Venue :
At Main Office Conference room.
Time :
03:00 PM
Date :
11.Dec.21.
Description
Responsibility
Status of previous
meeting point
-
Wooden panel minimize
but still used.
Mr.Sushil & Area in
charge.
SWL, TPI, Driver licence
not displayed
Mr.Sushil & team.
Root Cause
Remarks / Date
Only 2 point is open.
----------
Lackness of
supervision
Partly Done & rest will
be complied by 30-Dec21.
It will be complied by
15-Dec-21.
2.
Complaints/Appreci
ation received from
clients and their
corrective
/Preventive action.
3.
Observation from
third party.
----------
NIL
4.
Future job /specific
requirement.
----------
NIL
5.
Sub-contractors
performance in
S.H.E.
6.
SHE Statistics.
6.1
First Aid Case.
NIL
NIL
----------
05 nos.
6.2
Safe man Hours
7.
NCN Status in this
month.
8.
Internal observation.
8.1.
8.2.
8.3.
84.
8.5.
8.6
8.7
8.8
8.9
81119665 till 10-Dec21.)
NIL
Water tank cleaning
required (at labor camp &
staff quarte,site with
display of chart)
Assure PPE’s must be
used by workers.
Due to filling
earthing not
done proper.
It will be complied by
16-Oct-2021.
Lackness of
supervision.
It will be complied by
12-Oct-2021.
Electrical cable need to
be height where are
going to filling.
Assure proper access
required in form work for
slab checking.
Lackness of
supervision.
It will be complied by
today 10-Oct-21.
---------
It will be assured from
today.
---------
It will be complied by
12-Oct-2021.
Assure nose mask must
be used by workers.
Need to make
housekeeping on deshuttering floor.
SWL need to be display
at all machine and
buckets.
It will be complied soon.
---------
Bushes need to be
removed back & front
side of block D,C.
Lackness of
supervision
Light required in labor
camp.
---------
It will be complied
today.
Compliance done and
assure from next time..
It will be complied by
11-Oct-2021.
Covid-19 guidelines
must be followed.
9.1
1. Assure all new
worker’s staff must be
have covid-19 negative
report when enter at
project gate
--------All Staff.
10.
Chairman’s review.
1. Worker’s child must be
prohibited at site.
10.1
2. Assure floor opening
must be covered
All Staff.
It will be assured.