Borouge ITP ACTION Q. C. ACTIVITY EXTENT OF CHECK Pre-inspection Scope Meeting Documents/Procedures of ITP Compound Density Every Batch of Raw material used Every Batch of Raw material used Every Batch of Raw material used Every Batch of Raw material used 2.5 Melt Flow Rate Every Batch of Raw material used 2.6 Thermal Stability (OIT) Every Batch of Raw material used 2.1 Classification & Designation 2.2 Carbon Black Content (UV Protection) 2.4 Water/Moisture Content 3.2 PIM Agenda H ISO 4427-1 & Certificate of Analysis COM H H Borouge HE3490 LSH , Grade PE100 R R R 2.0 to 2.5% R R R Note: (≤300 mg/kg (Equivalent to <0.03 % by mass) R R R 940 to 965 Kg/m3 R R R R R R R R R As per Iso Code 4427-2 (pipes) and 4427-3 (fittings) section 5.1 Appearance P R S ISO 4427-2 ISO 4427-3 or as per approved drawings dimens. And tolerances. P W S P R R ISO 4427-I & ISO 6964 Certificate of Analysis ISO 4427-1, ISO 15512 Certificate of Analysis ≤300mg/kg ISO 4427-1 & ISO 1183 ISO 4427-1 & ISO 1133 0.15 to 0.3 g/10min @190 °C/5.0 kg Min. 20 Minutes @210 °C ISO 4427-1, ISO 11357-6 & EN 728 Appearance and Color Every Pipe and fitting Dimensional Measurements Every Pipe and fitting ISO 4427-2 & ISO 4427-3 (Every Run/each ISO 6259 & WI/QC/05 TURAN/SAHARA REMARKS NOTED IF BOROUGE/ BOREALIS RAW MATERICAL IS USED- ONLY RAW MATERIAL CERTIFICATE TO BE PROVIDED Elongation @Break batch of Raw (Work instruction for >350% Material Used) Tensile & Elongation) Tensile Stress @yield ISO 4427-2 & ISO 4427-3 comply & shall be included in MTC comply & shall be included in MTC PRODUCT TESTING 4 4.1 Agreed Minutes INVOLVEMENT Cif P PIPES AND FITTINGS 3 3.1 SC RAW MATERIAL (2.1, 2.2, 2.4, 2.5, 2.6 can be waived if Borouge/Borealis material used, upon perior Client Approval) 2 2.3 ACCEPTANCE CRITERIA PRELIMINARY DOCUMENTS INSPECTION 1 1.1 REF. STANDARDS/ DOCUMENT Tensile & Elongation comply & shall be performed 4.1 Tensile & Elongation comply & shall be performed P R R P W W (With respect to Raw material tested value) P R R > 20 Minutes @210 °C P R R comply & shall be performed IPS range for Borouge PE100 grades P R R AS PER ASTM D6247 THIS TEST IS NOT CONDUCTED ON THE POLYMERS, SO NOT INCLUDED P W R comply & shall be performed R machine calibration certificate shall be submitted R welders certificate shall be submitted as per product datasheet 4.1 4.1 Longitudinal Reversion (applicable to pipes only) (Every Run/each ISO 2505 & WI/QC/06 batch of Raw ISO 2505 & WI/QC/06 Material Used) Longitudinal Reversion (Every Run/each ISO 4427-1 , ISO 1133 & batch of Raw WI/QC/02 Material Used) (Work instruction for 3% not applicable for fittings Variation ± 20% Melt Flow Rate comply & shall be performed Melt Flow Rate Testing) 4.2 (Every Run/each ISO 4427-2 , ISO 11357-6 batch of Raw WI/QC/03 Material Used) (Work instruction for Thermal Stability OIT (Sample to be taken Thermal Stability) from inner/Outer/Middle wall surface) 4.3 X-ray fluorescence (XRF) One per patch 4.4 Decohesive Resistance Every Run/each batch of raw material used 5.2 ISO13954; ISO 4427-3 section 8 length on initiation rupture < L2/3 in Brittle Failure Welding 5 5.1 ASTM D6247 Every Machine Calibration Report Compliance to DVS 2208-1 Calibration not older than 1 Year and from an Authorized Service Center of the Machine Manufacturer Every Welding Technician Welder Qualification GW330 (DVGW) and DVS 2212-1 Valid Welder License, issued by a DVGW recognized training and certification body Welding Machine Welding Personnel R R R R Pressure Testing 6 ISO 4427-2 & ISO 4427-3 ISO 1167 & 6.1 Hydrostatic strength For pipes, Hydrostatic Tesing of (1) 80 degC, 5.4MPa, 165h & (2) 80 degC, 5.0MPa, 1000h for pipes up to OD630mm. Above OD630 pipes, plain strain grooved test (PSGT) tests can be accepted for the pipes. If fittings produced from Borouge/Borealis raw materials (it is mandatory as per BGS-LU017), then the 20C test can be waived. Remaining tests (1) 80 degC, 5.4MPa, 165h & (2) 80 degC, 5.0MPa, 1000h shall be done as per the below. With 2 differernt samples of each case. Tests to be carried per Size/ per Batch / Per Run. No failure or leakage for All three testing as per code P W R Test shall be performed for 165hour & 1000 hour hydrostatic strength test on one pc of branch saddle along with one pc of stub end & provide test reports R R R will be provided Hydrostatic strength RAW MATERIAL (All "R" points to change to "W" in case non-Borouge material used) 7 7.1 instruction for Quality Dossier 100% P 0 No. List of Deliverables Note 1: The calibration certificates shall be produced for all testing apparatus and for welding machine at the time of inspection. Legend: P = Perform; R = Review; S = Surveillance; W = Witness; H = Hold Shall meet the requirements of specification