VS3114-PL1-NFI-0001

advertisement
Project Doc No.
Notice for Inspection (NFI)
Basrah Refinery Upgrading
Project
VS3114-PL1-APLN-0001
Notice for Inspection
(NFI)
NFI Date:
24-NOV-2021
NFI No.:
VS3114-PL1-NFI-0001
Inspection for Formwork Steel Reinforcement Cage & Mechanical Joint Prior To Pouring PC Test Pile
Description:

A000-PC400-TP01

A000-PC400-TP02

B000-PC400-TP03

C000-PC400-TP04

E000-PC400-TP05

E000-PC400-TP06
Al Yamama Patch Plant
Location:
Inspection Date: 25-NOV-2021
10:30 Am
Time:
Applicable ITP No
Inspected Items
N/A
Formwork dimension
N/A
Steel Reinforcement Cage
N/A
Mechanical Joint Prior
Contact Number
Subcontractor:
JGC / HDEC
5360/B/2020
Al Yamama Engineering Co.
Remarks (if any):
Subcontractor
SIGNATURE
NAME
DATE
Al Yamama Engineering for General
Contracting, Trading and Transportation
JGC / HDEC
Employer