Project Doc No. Notice for Inspection (NFI) Basrah Refinery Upgrading Project VS3114-PL1-APLN-0001 Notice for Inspection (NFI) NFI Date: 24-NOV-2021 NFI No.: VS3114-PL1-NFI-0001 Inspection for Formwork Steel Reinforcement Cage & Mechanical Joint Prior To Pouring PC Test Pile Description: A000-PC400-TP01 A000-PC400-TP02 B000-PC400-TP03 C000-PC400-TP04 E000-PC400-TP05 E000-PC400-TP06 Al Yamama Patch Plant Location: Inspection Date: 25-NOV-2021 10:30 Am Time: Applicable ITP No Inspected Items N/A Formwork dimension N/A Steel Reinforcement Cage N/A Mechanical Joint Prior Contact Number Subcontractor: JGC / HDEC 5360/B/2020 Al Yamama Engineering Co. Remarks (if any): Subcontractor SIGNATURE NAME DATE Al Yamama Engineering for General Contracting, Trading and Transportation JGC / HDEC Employer