DESIGN SERVICES SCOPE OF WORK – EXHIBIT A
PROJECT: ___________________________
Date: _________________
PROJECT LOCATION: ___________________
CLIENT: ______________
PROJECT NUMBER:
____________________
Scope Items: The services provided to the Design-Builder are those below designated by an “X” on the line preceding the listed
service. Any item that is unchecked has not been included in the fee proposal.
Basic Design Services
Architectural Design
☐
☐
☐
☐
☐
☐
☐
☐
☒
☐
☐
☐
☐
☐
☐
☐
☐
Civil Engineering Design
Architectural Site Plan (Includes minor modifications to landscaping, grading, site utilities, and hardscape surfaces)
Construction Administration
Electrical Engineering Design
Fire Alarm/Mass Notification
Fire Protection (Full Design)
Interior Design (SID)
Interior Design (CID) –Document basis of design and provide recommendations for materials
Landscape Design
Life Safety/Code Analysis
Low Voltage Design (CAT A/RPIE)
Low Voltage Design (CAT C/PP)
Mechanical/Plumbing Engineering Design
Specifications (Excluding Division 1)
Structural Engineering Design
Kitchen/Food Service Design
Design Submittals
Site Investigation (Concurrent with Design Charrette)
☒
☒
☐
☐
☐
☐
☐
Design Charrette
Submittal #1 (65%) Resolution conference On-Site
Submittal #2 (95%) Resolution conference Teleconference
Submittal #3 (100%) Resolution conference Teleconference
Submittal #4 (100% Corrected Final) Resolution conference Teleconference
As-Built Record Drawings
Travel & Reimbursable
Travel costs are included in fee
☒
☐
Printing, Delivery & Miscellaneous Project Expenses are included in fee. (Submittal printing and shipping expenses are not
included)
LEED
☐
☐
☒
Register, document and submit project to the USGBC for LEED certification using [LEED HC version 4] to achieve [Silver]
certification.
Document project to a Silver certification level using LEED HC version 4 and provide documentation to the owner without
submission to USGBC
LEED certification and documentation is not required.
1 of 3
Initial
/
DESIGN SERVICES SCOPE OF WORK – EXHIBIT A
☐
LEED Registration & Certification Fees included in design fee
AT/FP
☐
☐
☐
☐
☐
Site Investigation of existing conditions
Design recommendations for compliance with UFC 4-010-01
Construction documents related to AT/FP Design
Progressive collapse evaluation
Progressive collapse design
Commissioning
Provide commissioning as required by the scope of work
☐
☐
Coordination with Commissioning agent (Commissioning agent provided by UEC)
Temporary Phasing Facilities
Conceptual Design (Floor Plan Diagrams)
☐
☐
☐
☐
☐
☐
☐
☐
☐
Quality control reviews of each submission compared to codes, criteria, and standards.
Equipment Plans
Equipment Cutsheet Selection (New and Reuse)
Room by Room Updates
Space planning functional review
Site utility drawings
Lightning Protection Analysis/Design
Civil Engineering (Grading, stormwater management, and parking modifications)
Swing Space Design
Conceptual floor plans
☐
☐
☐
☐
Equipment Plans
Room by Room Updates
Construction documents for temporary conditions.
Furniture Fixtures & Equipment
Cat A equipment drawings
☐
☐
☐
☒
☒
☐
☒
☐
Cat A cutsheet selection (Non-medical equipment)
CAT A Medical equipment selection (Surgical Lights, Audio Booths, etc.)
Cat C/R (RPIE) equipment drawings
Cat C/R (PP) cutsheet selection
Inventory of existing equipment and furniture
Room by Room Updates
Space planning functional review
Signage
Interior Sign Type design (Wayfinding, Room ID’s, Door tags, Department ID’s, Dimensional Letters and Regulatory
☐
Signage)
Exterior Sign Type design (Building ID’s, Site signage, Monument signs)
☐
☐
☐
Produce message schedules
Temporary signage design (Easel Signs, Handouts, and Updates to existing wayfinding signage)
Miscellaneous Additional Services
Geotechnical Report
☐
2 of 3
Initial
/
DESIGN SERVICES SCOPE OF WORK – EXHIBIT A
☐
☐
☐
☐
☐
Hazardous Material Report
Presentation Renderings
Radiation Shielding Report
Seismic Evaluation
Surveys (Boundary, Topographic, and Utilities Surveys)
Scope Clarifications:


End of Document