Risk Assessment Location/Facility: All Doc No: SG-PR-QHSE-0016 Revision: 0 Date 11-Sep-2021 Sirius Gemstone-es Drilling Fluids Title: Activities Risk Assessment Ref # SG/HSE/RA/Act-01 Name of Department Name of Section ACTIVITY CONDITION OF ACTIVITY ASPECT - Identified Risk/Issue/Concerns (Output of FOCUS CATEGORY IMPACT process or activity) OTHER Place "X" if Yes DIVISION LEGAL Place "X" if Yes Sirius Gemstone-es Drilling Fluids: Risk Register Probability of Occurrence 1 Facility Operations Hazards identified outside SG premises Routine Consumption of fuel, power, water etc. Environment Safety General General Work Condition Vehicular Accidents Emergency Vehicular Accident Non-routine Human Factor Non-routine General use of disposable product Fatality/ Asset loss 4 Emergency Routine Safety & Health Inappropriate behavior Safety & Health Gas Leak General trash (non-hazardous waste) Risk Category SIGNIFICANT BASED ON LEGAL Probability of Occurrence Protections Available (Measure Control) 1 Acceptabl e No 4 4 Acceptabl e No i. ii. JMP ERP 4 4 Acceptabl e No i. ii. JMP ERP Low No 1 Consequences RISK Score 4 4 4 4 1 Health Environment Injury/Illness 2 4 8 Low No i. Code of conduct & ethics ii. Sexual Harassment policy i. Code of conduct & ethics ii. Sexual Harassment policy 2 4 8 Chronic disease / Illness 1 4 4 Acceptabl e Land Pollution 2 4 8 Low Yes i. ii. Waste management Plan Spill prevention and contingency plan 2 4 8 Medium Yes i. ii. Waste management Plan Spill prevention and contingency plan 4 8 4 4 2 2 2 2 1 4 4 1 4 4 1 General trash - Hazardous waste (Toner, cartridge, paint buckets, oil spill etc) General Use of Disposable Product Routine General trash - Hazardous (Light Bulbs, Toner Cartridges, etc.) Acceptabl e Environment Acceptabl e 1 Acceptabl e Land pollution Air Emission 2 High Noise Health 1 4 4 Acceptabl e Acceptabl e Acceptable Yes 1 4 4 Trainings Signage 1 3 3 i. ii. Routine inspection Trainings 1 4 8 i. Trainings X Routine Acceptabl e Acceptabl e X Environment Acceptabl e 1 X Routine RISK RESPONSE Acceptabl e Safety Conflict/Bullying and harassment of employees General use of disposable waste Working Environment 4 Natural Resource Fatality/ Asset loss Human Factor Hazards identification outside SG premises RISK Score 1 Emergency Hazards identification outside SG premises Office & Work Sites Consequences Chronic disease / Illness 2 3 6 Acceptabl e 2 4 8 Acceptabl e i. ii. Acceptabl e Electric Shock due to damaged plugs Safety Fatality / Assets Safety Emotional stress Health Chronic disease / Illness 1 4 4 Acceptabl e 1 4 4 Health Chronic disease / Illness 2 3 6 Acceptabl e 1 3 3 Ergonomics (MSD) Eye Strain (due to prolonged Health use of computer) Chronic disease / Illness 2 3 6 Acceptabl e Acceptabl e Acceptabl e Acceptabl e Centrifuge Operation Environment Normal operation Routine 4 X 12 3 i. ii. Medium iii. iv. Safety Emergency handling Serious Injury 4 5 20 i. ii. Emergency Over-pressurization leading to rupturing of pressure lines Equipment grounding Non-routine Electrocution, fire Equipment damage Non routine iii. Safety Serious injury/Fatality 4 5 20 High No High No iv. i. ii. iii. iv. DWM Drilling Waste Management Loose or damage fittings (for Safety fluid flow) High pressure injection, Hit by hose or other high-speed object Trainings 3 3 1 Soil & Water contamination leakage of hydraulic i. 4 5 20 High No v. vi. vii. viii. SOP is available. Handling & Safe Disposal as per EPA 2 requirement Work Permit and Isolation process is in place Work Instruction is provided for critical activities Pressure Relief Devices in place by design Over pressure light available Inspection program SOP is available. And Safe Work Practices are in place Acceptabl e 2 4 Acceptable Acceptable 2 2 4 Internal and external earthling Ex-proof electrical boxes SOP available Inspection program 2 2 4 PM procedure Trained supervisor Periodic check Minimum movement near equipment 1 5 5 Acceptable Further Action Target Date Risk Assessment Location/Facility: All Improper equipment placement including wires / cords Rotating parts Routine Working Environment Work at height Routine Rotating parts Non-Routine Damage hydraulic lines 0 Date 11-Sep-2021 Slip/trip/fall 2 4 8 Low i. Trainings 4 5 20 High i. ii. iii. iv. Rotating parts guarded. No Loose clothing / Proper PPE’s Installed safety devices Ensure all gauges are working and correctly indicating Trained and authorized personnel\ Regular servicing as per PM Hand and finger protection training Trained supervisor Housekeeping Entanglement or entrap in moving parts, Flying objects Safety Personnel injury/fatality injures due to the sharp edges Safety Acute Injury / Illness Injuries due to fall from height Hand and Finger injuries Leakage of hydraulic Ref # 2 4 8 Medium v. vi. i. ii. iii. Safety Injury/fatality 3 4 12 High Safety Acute injuries / Fatality 3 4 12 Medium Environment Soil & Water contamination 4 12 X Non-Routine 3 i. ii. iii. v. 4 Non-Routine Trip / Slip / Fall Safety Injury/Fatality 8 ii. Unloading from tankers Routine Tank and Bowzer overflow Environment Air Emission X Environment Chemical shifting (OBM/WBM/Gr ey/Black Water) Soil and water Pollution Environment 4 Acceptable 5 5 Acceptable 4 2 4 4 Medium 16 1 4 4 Acceptabl e 1 4 4 Acceptabl e SOP is available. connected Handling & Safe Disposal as per EPA requirement Work Permit and Isolation process is in place Work Instruction is provided for critical activities 2 2 4 Acceptabl e 1 4 4 Acceptabl e 4 2 8 Low 2 4 Medium i. leakage toxic chemicals 4 1 2 8 Non-Routine 1 ii. Trained operators/supervisor iii. Full time supervision iv. Auto shut switch Isolation High Working Environment SG/HSE/RA/Act-01 i. iv. Handling of Waste (liquids) Revision: Safety Routine Solid Waste Management SG-PR-QHSE-0016 Sirius Gemstone-es Drilling Fluids Title: Activities Risk Assessment Cables handling Routine Maintenance of equipment Doc No: High Yes Yes iii. SOP is available. Work Permit and Isolation process is in place Work Instruction is provided for critical activities 1. Mechanical Integrity Program (PMs, inspection) in place. 2. Hose Management Program is in place. 3. Trained drivers and operators 4. Calibrated dip rod 1. Risk assessment to be 2 Acceptabl e X Soil and water Pollution 4 4 16 1. Calibrated dip rod 2. Inspection program for Mechanical Integrity in Routine Over loading of tankers X Environment Loading to tankers Routine High Soil and water Pollution Spills / leakages 16 X 4 Yes place for tanks. 3. SOP is available. And Safe Work Practices are in place 4. Appropriate PPEs are used. 2 2 4 Acceptable 2 2 4 Acceptable 2 2 4 Acceptable 2 2 4 Acceptable 2 2 4 Acceptable High 4 Yes 1. SOP is available. is available. 4 Loading / unloading Routine Spills / leakages Routine Exposure of personnel to chemicals/pathogens Safety & Health Serious Injury 3 Chronic Injury / Illness 4 4 12 High No High No 1. SOP is available. is available. 2. Appropriate PPEs are used. 16 Safety & Health 1. Appropriate PPEs are used. 2. SOP is available. 3. Annual health monitoring program. 4 Handling of waste Non-Routine Improper disposal Environment Soil Pollution X 4 16 High Yes 1. Waste Management Plan is in place 2. Safe Disposal as per EPA guide lines. conducted for each critical activity As required Risk Assessment Location/Facility: All Doc No: SG-PR-QHSE-0016 Revision: 0 Date 11-Sep-2021 Sirius Gemstone-es Drilling Fluids Title: Activities Risk Assessment Liquid waste handling Soil and Water contamination Routine Spillage / Leakage Environment 3 4 12 Ref # SG/HSE/RA/Act-01 High X Yes 1. Spill SOP is available. is available. 2. Close supervision 2 2 4 Acceptable 2 2 4 Acceptable 2 2 4 Acceptable 2 2 2 2 4 Acceptable 2 4 8 Low 2 4 8 Low 2 2 4 Acceptable 2 2 4 Acceptable 2 2 4 Acceptable 3. Spill kit Solid waste handling Exposure to Chemical Handling of Chemicals Chemical waste handling Routine Acute Injury / Illness Environment Management of Storage of hazardous and Hazardous / nonhazardous waste nonhazardous Waste 4 Routine inappropriate storage / handling / disposal Routine Improper disposal Soil Pollution 4 Environment Land and water Pollution Record Keeping Routine Important records such as waste generation and disposal 4 1. Appropriate PPEs are used. Safety High No High Yes High Yes 2. SOP is available. 3. Hazard communication process is in place. 16 4 1. Dedicated area for storage 2. waste management procedure. 16 X 4 1. SOP is available 4 12 No 4 Operations Handling of Chemicals Storage of Chemicals Routine Mixing/Reaction of different chemicals Safety Fire / Explosion Accumulation of vapors / gases Safety Fire / Explosion 4 4 16 16 High No Records are maintained i. MSDS ii. Emergency Response procedure High 4 No i. MSDS ii. Emergency Response procedure 4 Management of Storage of Toxic hazardous chemicals chemicals Routine Hazard Communication Health Chronic disease / Illness 16 High 4 4 No 4 i. SOP is available ii. Caution signs iii. Labelling & HAZCOM iv. MSDS 16 1. JQP (Job Qualification Program) Environment Pollution High No 2. Work Permit training 3. PQP (Post Qualification Program) 4. OJT (On Job Training) 5. Evaluation in place after each training. 4 Operations Training & Management of Shift Qualification of Personnel personnel Lack of training Routine 16 1. JQP (Job Qualification Program) Safety Serious Injury Controlled risk High Serious Injury i. Drilling Fluids Low 2. Waste management procedure 3 Control of Records 16 X 4 Disposal of Effluent 4 Safety & Health 4 High No 2. Work Permit training 3. PQP (Post Qualification Program) 4. OJT (On Job Training) 5. Evaluation in place after each training. Compatibility analysis for chemicals and secondary containment, Risk mitigation steps for environment Compatibility analysis for chemicals and secondary containment, Risk mitigation steps for environment Q4 2016 As required Risk Assessment Location/Facility: All Sirius Gemstone-es Drilling Fluids Title: Activities Risk Assessment 4 Doc No: SG-PR-QHSE-0016 Revision: 0 Date 11-Sep-2021 Ref # SG/HSE/RA/Act-01 16 1. JQP (Job Qualification Program) Health Acute Injury / Illness 4 High No 2. Work Permit training 3. PQP (Post Qualification Program) 4. OJT (On Job Training) 5. Evaluation in place after each training. 2 2 4 Acceptable